HomeMy WebLinkAboutPermit BondNo data needs be entered on this form.
auto-populateIt will . . NTITY WORKSHEET aTr of
the fields entered in Sections I and 11. IONS Renton
Community & Economic
Planning Division 11055 South Grady Way — 6 m Floor ) Renton, WA 98057 (425) 430-7200 Development
Date:
Name:
Ali Sadr
PE Registration No:
24661
Firm Name:
Barghausen consulting engineer
Firm Address:
18215 72nd ave south Kent WA 98032
Phone No. 425-251-6222
Email Address: asdar@barghausen.com
Site Restoration/Erosion Sediment Control Subtotal
Existing Right -of -Way Improvements Subtotal
Future Public Improvements Subtotal
Stormwater & Drainage Facilities (Public& Private) Subtotal
Bond Reduction: Existing RigdaCuf-Way Improvements (quantity
Remaining)2
Bond Reduction: Stormwater & Drainage Facilities (quantity
Site Restoration
Civil Construction Permit
Maintenance Bond
Bond Reduction
Construction Permit BondAmount 3
Project Name:
CED Plan # (LUA):
CED Permit It (U):
Site Address:
Parcel #(s):
Project Phase:
(d) $ 138,535.10
(e) $
(e $
P
(a)x 108% $ 40,224.80
R
fib 3W%1+(d x Was)) $ 294.473.30
S $
(e)x 3W%+(g x 100%
T $ 334,698.10
(e+R-si
Minimum BoMAmourrt is $30,000.CO
Marriott Residence Inn Renton
U15008434
1100 Lake Washington Blvd. N. E. Renton
082305-9056-04 and 334450-006-02
FOR APPROVAL
(b) $ 103,958.80
(c) $
(d) $ 138,535.10
EST' $ 48,498.78
Rermrlmo-20%
1 Estimate Only - May involve multiple and variable components, which will be established on an individual basis by Development Engineering.
a The City of Renton allows one request only for bond reduction prior to the maintenance period. Reduction of not more than 70% of the original bond amount, provided that the remaining 30% will
cover all remaining items to be constructed.
3 Required Bond Amounts are subject to review and modification by Development Engineering.
' Note: The word BOND as used in this document means any financial guarantee acceptable to the City of Renton.