HomeMy WebLinkAboutpermti bond amount change from BQ wrksheet.pdfthis project is vested to the old bond quantity work sheet that did not include the water cost in the permit bond amount. therefore the permit bond was allowed to be established for the amount $104,010.74 which does not include the water cost.