Loading...
HomeMy WebLinkAboutIssued Irrigation water meter dropin permit W18005491.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Water Meter Drop In Permit: W18005491 Permit Informaton Permit Name: SOUTHPORT OFFICE 1" IRRIG. WATER METER DROPIN Address/Locaton:10/02/2018Application Date:0523059075Parcel Number: Permit Type:10/16/2018Issue Date:Water Permit Work Class:10/16/2019Expiration Date:Meter Drop In Description: PERMIT FOR DROP IN OF A 1" IRRIGATION WATER METER FOR SOUTHPORT OFFICE PROJECT. (FULL SERVICE INSTALL WAS DONE UNDER SEPARATE PERMIT W18004584). Contacts Name Address PhoneTypeBilling Kelly Lynn Bosa KLB Construction Inc PO Box 158 Mukilteo, WA 98275-0158 B: (425) 355-7335 C: (425) 297-9316 Contractor Business License Number: 30136Construction Contractor: KLBCOI*153B8 SOUTHPORT LLC 1083 Lake Washington Blvd N Renton, WA 98056 OwnerX General Conditons & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton codes and ordinances. Ÿ The applicant agrees that the City shall have the right to charge and collect the rates and enforce the penalties provided by ordinance, rule or regulation, and to change the rates at any time without notice to the consumer. Applicant also agrees to pay the rates now or hereafter in effect for such service and comply with all the rules and regulations as set forth in ordinances in effect, or to be adopted, regarding the use of such service and the care of plumbing fixtures.Applicant further agrees that the City does not guarantee the pressure at which water is delivered. The City shall not be held responsible for any damage by water or other cause resulting from defective plumbing or appliances on the premises supplied with water installed by the owner or occupant of said premises, and in case the supply of water shall be interrupted or fail by any reason, the City shall not be held liable for damages for such interruption or failure, nor shall such interruptions or failures for any reasonable period of time be held to constitute a breach of contract on the part of the City or in any way relieve the consumer from performing the obligation of This contract. Ÿ Call (425) 430-7400 7:00 AM to 3:30 PM to schedule an installation. Please allow up to 3 weeks from date of call.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES