Loading...
HomeMy WebLinkAboutStamp approved F_ Southport Office new sewer main CivilPlans U15005273 21090131.pdfBOEING PROPERTYBRISTOL PROPERTYBRISTOL PROPERTYLAKE WASHINGTONPUGET SOUND ENERGY PROPERTYTHE HOTEL AT SOUTHPORT5176*21461((+%'.#;&190&'.+8'4;.#;&190&'.+8'4;CONTRACTOR SHALL COORDINATIVE WITH OWNERAND HOTEL CONTRACTOR TO NEGOTIATE WORKLIMITS AND LOGISTICS INVOLVING THE CONSTRUCTIONPROXIMITY OF THE TWO PROJECTS5176*21461((+%'4'06109#5*+0)6105176*21461((+%'36936NREGISTEREDPROFESSIONALENGINEER OSRETEPLEONFFEJ801 SECOND AVENUE - SUITE 900P: 206/343-0460F: 206/343-5691SEATTLE, WA 9810418'4#..6'5%2.#0SEWER PIPE REPLACEMENT BMP'S:DEWATERING MAY BE REQUIRED FOR SEWER TRENCHING.ENSURE INLET PROTECTION IS INSTALLED IN SURROUNDING STRUCTURES.MULCH OPEN SOIL THAT IS TO REMAIN UNWORKED FOR MORE THAN 2 DAYS.UTILIZE STRAW WATTLES OR SILT FENCE IF NEEDED TO CONTROL SEDIMENTATION.AREA OF DISTURBANCE FORSEWER REPLACEMENT:2,976 SQUARE FEET~372 LF @ 8' WIDE TRENCH(WITHIN PREVIOUSLYDESCRIBED PROJECT LIMITS)DEVELOPMENT ENGINEERINGrnair 01/31/2019access to fire authority vehiclesand emergency vehicles shouldbe maintained at all times thruthe siteMinimum vertical separationbetween utility lines atcrossings is 12 inches. ethofoam pad should beprovided if 12 inches verticalseparation is not available.condition of approval: profile viewof the new public sewer main withinformation of other pipes at thecrossings is required to be providedwith the as- built plans. PIVABCDEFGHLegendGARAGE ENTRYFF=32.00FF=35.00FF=35.00LOADINGDOCKFF=22.00GREASE INTERCEPTOR #1GREASE INTERCEPTOR #2FF=33.50(PRIVATE)SS#1, 60" MANHOLESOUTHPORT OFFICERENTON WASHINGTONSOUTHPORT OFFICECOUGHLINLUNDEENPORTERA CONSULTING STRUCTURAL AND CIVIL ENGINEERING CORPORATION801 SECOND AVENUE - SUITE 900P: 206/343-0460F: 206/343-5691SEATTLE, WA 9810436936NSTATE OF WASHINGTONREGISTEREDPROFESSIONALENGINEER OSRETEPLEONFFEJ UTILITY PLANSEE SHEET - C402g. 8-1-1Call before youDor 1-800-424-5555UNDERGROUNDSERVICE (USA)SEE SHEET - C40336936NSTATE OF WASHINGTONREGISTEREDPROFESSIONALENGINEER OSRETEPLEONFFEJ 01/25/2019NOTE: VEHICLE ACCESS TOHOTEL TO BE MAINTAINEDDURING UTILITY INSTALLATIONMinimum vertical separationbetween utility lines atcrossings is 12 inches. ethofoam pad should beprovided if 12 inches verticalseparation is not available.condition of approval: profile viewof the new public sewer main withinformation of other pipes at thecrossings is required to be providedwith the as- built plans.WASTEWATER UTILITYdchristen 01/31/2019DEVELOPMENT ENGINEERINGrnair 01/31/2019access to fire authority vehiclesand emergency vehicles shouldbe maintained at all times thruthe site PIV1212.813141515.216171817.8JKLMNPQRSTFF=33.50GARAGEENTRYFF=22.00LegendSOUTHPORT OFFICERENTON WASHINGTONSOUTHPORT OFFICECOUGHLINLUNDEENPORTERA CONSULTING STRUCTURAL AND CIVIL ENGINEERING CORPORATION801 SECOND AVENUE - SUITE 900P: 206/343-0460F: 206/343-5691SEATTLE, WA 9810436936NSTATE OF WASHINGTONREGISTEREDPROFESSIONALENGINEER OSRETEPLEONFFEJ UTILITY PLANSEE SHEET - C402 SEE SHEET - C401g. 8-1-1Call before youDor 1-800-424-5555UNDERGROUNDSERVICE (USA)SEE SHEET - C404Sewer Trench Detail36936NSTATE OF WASHINGTONREGISTEREDPROFESSIONALENGINEER OSRETEPLEONFFEJ 01/25/20191817.8STMNNOTE: VEHICLE ACCESS TO HOTEL TO BEMAINTAINED DURING UTILITY INSTALLATION.@ 2.0%15.0 ft6.8%WASTEWATER UTILITYdchristen 01/31/2019DEVELOPMENT ENGINEERINGrnair 01/31/2019 36936 NSTATE O F WASHI N GTONR EGIST E R E DPROF E SSIONAL E N G INEEROSRE TEPLEONFFEJ 36936 NSTATE O F WASHI N GTONR EGIST E R E DPROF E SSIONAL E N G INEEROSRE TEPLEONFFEJ 01/25/2019 WASTEWATER UTILITY dchristen 01/31/2019 DEVELOPMENT ENGINEERING rnair 01/31/2019