Loading...
HomeMy WebLinkAboutcopperwood as built - water main tie in to existing on SE 2nd Place.pdf...:•FI•:.......\\‘....\\\\...\\-....I./7.1/I,.......-CB#7-------COPPERWOODPTNOFTHENW1/4,OFTHESE1/4OFSEC.15TWP.23N.,RGE5EAST,W.M.50100CITYOFRENTONKINGCOUNTY,STATEOFWASHINGTON:://••c:•l...:.•.._____....•;.........i::-:..r/i.*rr••..p•......••••;2’...-#2827628-itl_•-.:\.....,...cB#1o,2---..........iL\———__./ç19•—t....>_CE______I‘ICBN14—”3IiIIIIItI.III!0I-Inr290#98CB#27—.25N0—C8#26--:46..-l\4*•30\_c8#.:.7i—1ACTFSHAIEODRIVEWAYjANDuTILITIES.............4—.,‘-.—.lt—•-wII-It:.•:to’PRIVATE....-STORMEASEMENT.5I-.-i..24—8”SEWER••o’PRIVATESTORMEASEMENT43::.......—8”WATERCTE-mPENSPACENOTEStNT.OWS:1T1:•10’..,PRIVATE::.STORMEASEIENT..23......I3110’PRIVATE....STORMEASEMENT.—IjC.II1IIt.iIIIj:.III:hThACTA11:\kI\.\\\\\.....\.\\.\...\\...SLOPE-i42C8#25—-.—.CBh47:.•...-...............$SMHP-k............33.41•I8..IL.I41—.CB#SSMH#1i__L::...:\...\...\.2\...\\..“..:\•:;\39“\TopoEEX:....•........,\\mACIC....cSHAREDDIVEWA::......--\ANDUTILITIES..:\E:iQ:5UESrOBli27t/_120137City will observe the settlement till May 1, 2016 and will inform the developer regarding the repair needed. The repair will be required to be completed by May 15, 2016. The currentestimated repair includes the following at a minimum.The pavement at the settlement area should be dug up to within 6 inches of the pipe and backfilled with required compaction. Minimum full depth restoration for 6.5 feet width.The hatched area (extend will be confirmed after May 1st 2016) should be overlaid to full street width.