Loading...
HomeMy WebLinkAboutCM_Construction_Mitigation_Plan_190221_v1.pdfPreliminary Construction Mitigation Plan For Madueno Short Plat Proposed Construction Dates (begin and end dates): Based on this preliminary short plat application date, we anticipate construction permits for utilities and plat infrastructure (roads, sidewalks, etc.) to be finalized in Spring of 2019 with utility and plat infrastructure construction possibly beginning in Fall of 2019. Home construction on the lots should begin during the Spring of 2020 and run through at least the Winter of 2020 and possibly longer, depending on lot sales. Hours and Days of Operation: Construction activities will be limited to the hours between 7:00am and 8:00pm, Monday through Friday and 9:00am and 8:00pm Saturday. In addition, haul hours are limited to the hours between 8:30am and 3:30pm on Saturdays, unless approved in writing in advance by the development services division. No work permitted on Sundays. Proposed Hauling/Transportation Routes: The site is accessible from the west via 106th Ave SE / SE 199th St / 108th Avenue SE (to the south) and via 106th Ave SE / SE 196th St / 108th Avenue SE (to the north). Measures to be implemented to minimize dust, traffic and transportation impact, erosion, mud, noise and other noxious characteristics: Water Truck, Temporary Erosion Control Plan, BMPs, construction proposed during City of Renton permitted work hours. Any special hours proposed for construction or hauling (i.e. weekends, late nights): No special hours for construction or hauling are anticipated or proposed at this time. Preliminary Traffic Control Plan: Site is located along 106th Ave SE (residential access) just. Anticipate “construction ahead” warning signs north / south of the project along 106th Ave SE and 108th Ave SE. Flaggers and additional signage will be provided when work is required in either right-of-way. Construction staging will be limited to on-site with parking on-site and along 106th Ave SE only as permitted. Final Traffic Control Plan will be provided at the time of Engineering approval.