Loading...
HomeMy WebLinkAboutC_Compliance_letter_190122_v2.pdfRenton 14 Final Plat Compliance with Hearing Examiner Decision Conditions of Approval Hearing Examiner’s Decision dated June 29, 2016 1. All street names were provided by City of Renton and added to the construction plans. 2. All lot corners have a minimum 15-foot radius at street intersections. 3. All side sewers are extended onto the lots at a minimum of 8 feet. 4. All franchise utilities have been installed underground within a 10-foot easement located along the frontage of all lots; the final franchise plans have been submitted and approved for location by the City of Renton. 5. The TV conduits have been installed underground within the 10-foot franchise utility easement on the lots. The TV utility plans have been submitted and approved for loca tion by the City of Renton. 6. There were no mitigation measures from the DNS issued on May 2, 2016. 7. A demolition permit was obtained from the City of Renton prior to any removal of existing structures from the property. 8. Tract C has been approved for setbacks for the monopole II after the public hearing. The City of Renton Planning Department has approved the layout and setbacks of Tract C as shown on the construction drawings. 9. A draft version of the HOA agreement has been submitted to the Cit y of Renton for review and approval at the time of final plat submittal and review. 10. A detailed landscape plan was provided as part of the construction plans for approval by the City of Renton. 11. A final tree retention plan was provided as part of the construction plans for approval by the City of Renton. 12. Lot 12 has been revised since the preliminary plat to provide the necessary 35 feet of street frontage. The lot layout was provided within the construction plans for approval by the City of Renton. 13. A note shall be provided on the final plat stating the average lot areas. This is provided as part of the final plat submittal for review and approval by the City of Renton