Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutReport 21
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
BEFORE THE HEARING EXAMINER
FOR THE CITY OF RENTON
MISTY COVE ASSOCIATION OF
APARTMENT OWNERS,
Appellant,
V.
CITY OF RENTON, and FOOTBALL
NORTHWEST,
Respondents.
CITY OF RENTON
NO V 0 6 Z606
RECEIVED
CITY CLERK'S OFFICE
3be6i,'rred V14 d464ft1ev
NO. LUA06-073
CERTIFICATE OF SERVICE
I am a resident of King County. I am over 18 years of age and not a party to this
action. My business address is Two Union Square, 601 Union Street, Suite 4950, Seattle,
Washington, 98101-3 951.
On November 6, 2006, 1 caused to be hand delivered the following documents:
1. Notice of Appeal; Appeal of Determination of Non -Significance — Mitigated
with Mitigation Measures (Oct. 16, 2006);
2. Declaration of Steve Jansen;
3. Declaration of Eleanor Margo Kennamer; and
4. Declaration of Brian Sabey.
CERTIFICATE OF SERVICE
15577
-1- Socius Law Group, PLLC
A T T O R N E Y S
Two Union Square + 501 Union Street, Suite 4950
Seattle, Washington 98101.3951
Telephone 206.838.9100
Facsimile 206.838.9101
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
I to the parties listed below:
Hearing Examiner
City of Renton
1055 S. Grady Way
Renton, WA 98055
Roger A. Pearce
Foster Pepper PLLC
1111 3rd Avenue, Suite 3400
Seattle, WA 98101
Elizabeth Higgins
Planning/Building/Public Works Department City of Renton
1055 South Grady Way
Renton, WA 98055
And via U.S. mail to:
Lance Lopes
Seattle Seahawks
General Counsel
Qwest Field
800 Occidental Avenue S., Suite 100
Seattle, WA 98134
Lucille Noel
Misty Cove Homeowners Association
Novar Corporation
P.O. Box 77040
Seattle, WA 98177-0040
DATED this day of L�' /' r l✓ , 2006.
CERTIFICATE OF SERVICE
15577
(11 � 114, 1-c-, �—.
Alycia. oetz
2� _ Socius Law Group, PLC
A T T d R N E Y 3
Two Union Square • 601 Union Street, Suite 4950
Seattle, Washington 98101.3951
Telephono 206.838.9100
Facsimile 206.838.9101
Ray Colliver
Port Quendall Company
505 5th Avenue S ste:
Seattle, WA 98104
tel: (206) 342-2000
eml: rayc@vulcan.com
0
PARTIES OF RECORD
Seahawks Training Facility
LUA06-073, SA-H, SA-M, SM, ECF
Michael Cero
8300 Avalon Drive
#900 Mercer Island, WA 98040
tel: (206) 419-0657
eml: mscero@comcast.net
(party of record)
(owner / applicant / contact)
Thelma Sutherland
1205 N 29th Street
Renton, WA 98056
(party of record)
Jared Salstrom
5021 Ripley Lane N ste: #213
Renton, WA 98056
eml:
jared.salstrom@villanova.edu
(party of record)
Eileen Halverson
16226 Crystal Drive E
Enumclaw, WA 98022
(party of record)
Joe Burcar
Department of Ecology
Shorelands & Environmental
Assistance Program
3190 160th Avenue SE
Bellevue, WA 98008
tel: (425) 649-7145
(party of record)
Steve Jansen
5021 Ripley Lane N ste: #4
Renton, WA 98056
eml: smjansen@msn.com
(party of record)
Elya George Baches
1414 N 34th Street
Renton, WA 98056
(party of record)
Roger A. Pearce Steve Gregerson
Foster Pepper PLLC 5021 Ripley Lane N ste: #302
1111 Third Avenue ste: #3400 Renton, WA 98056
Seattle, WA 98101-3299 (party of record)
(party of record)
Elaine Wine
Vulcan
505 Fifth Avenue S. ste: #900
Seattle, WA 98104
tel: (206) 342-2397
eml: elainew@vulcan.com
(party of record)
Thomas F. Peterson
Socius Law Group PLLC
Two Union Square
601 Union Street ste: #4950
Seattle, WA 98101
tel: (206) 838-9112
eml: tpeterson@sociuslaw.com
(party of record)
Brian T. Sabey
5021 Ripley Lane N ste: #304
Renton, WA 98056
eml: bsabey@comcast.net
(party of record)
Eleanor Maargo Kennamer,
President
Misty Cove Condo Association
5021 Ripley Lane N ste: #309
Renton, WA 98056
tel: (206) 650-8855
eml: margok@msn.com
(party of record)
Aaron Belenky, President
Williamsburg Condo HOA
1800 NE 40th Street ste: #H-4
Renton, WA 98056
(party of record)
Lance Lopes
Qwest Field
800 Occidental Avenue S. ste:
# 100
Seattle, WA 98134
tel: (206) 381-7835
eml: lancel@seahawks.com
(party of record)
Barbara Paxhia Shelly Munkberg
5021 Ripley Lane N ste: # 104 SECO Development
Renton, WA 98056 1083 Lake Washington Blvd N
(party of record) ste: #50
Renton, WA 98056
(party of record)
Updated: 11/14/06 (Page 1 of 2)
PARTIES OF RECORD
Seahawks Training Facility
LUA06-073, SA-H, SA-M, SM, ECF
Larry Barsher
6940 96th Avenue SE
Mercer Island, WA 98040
(party of record)
Jeffrey Taraday
Foster Pepper
1111 Third Avenue ste: #3400
Seattle, WA 98101
(party of record)
Tom Ehrlichman
Socius Law Group
Two Union Square
601 Union Street ste: #4950
Seattle, WA 98101
(party of record)
Richard Wagner
Baylis Architects
10801 Main Street ste: #110
Bellevue, WA 98004
(party of record)
Updated: 11/14/06 (Page 2 of 2)
5
s
Seahawks Practice Facility
FOOTBALL NORTHWEST LLC jigg 81=F
RENTON,WASHINGTON
Nancy Thompson - RE: Fwd; Re: Seahawks Training Facility
Page 1
From: "Barb Paxhia" <barbpaxhia@hotmail.com>
To: <Jmedzegian@ci.renton.wa.us>
Date: 10/20/2006 8:07:17 AM
Subject: RE: Fwd-. Re: Seahawks Training Facility
/\J
,7(, (,,, _ 5` 1- J D--7 2.
J
2C
II r
jL
m (14
DESIGN DEVELOPMENT - NOT FOR CONSTRUCTIQN
Seah,9Wks Headquarters &
Training Facility
O C) FOOTBALL NORTHWEST LLC
RENTON, WASHINGTON 5
1J -
m o
E
H i �
i
1 -
V
i
1 I
1 �
- t-
x 1 t{
vv }; t`Ir
9
_ J L
1
N I
�i °' y�
z
i I m w
a
99 i h
E
-ri
A
n
f"1 i e
UJ1. _. _ _.------_. __..—_ _..___--•�_..1
fTl
+
R
k Seahawks Headquarters & i�E+
Training Facility
O -m i=00i8ALL NORTHWEST LLC �
i� � w .l � i r �------- •- R6NTON, WASWINGTON
I J;j I ir - , 4
it,
q
Ile -
jj�
14
Oil 4
p§
I A
-ii.'Ra- w�fl P I
HAW-
13
JI
_n
m
OD
BAX1 ER PARCEL
BUSH, ROED & HITCHINGS, INC.
E
—7j ;1
6.S
'
`'
'
�
F.�trS'�i6fi1'
:E73�isI�Y
pppp'SE --
....
L/.
I {
i
► i Y e iritllii fl
r i }
1 I
i-
i a=IEa{I,,,�i:`i#jt i
V
i
a I
€T73re�P k; f's; i+` iE�ttj C 31(
31 s
f
Seahawks Practice Facility
1�9 G
s RENTON, WASHINGTON
FOOTBALL NORTHWEST LLC
� k
2 RIF-.
-�ey .,PZF:A %
-C-m
P
AA- 71
s
94NP ipu �.l X'qw L� �� ',I
i r"T. MF1 E
px . E2V .g
9 1U. f
in-
R;j. !0 It Nr
52
q
�-
, - 7—
s. 7.-
%
i�
�Fj�. 9��
ee
96a
's
A :. F
�
F'O
.. ....
�
s� N'ti 6�s
'4�
% 9
4z Fi t
4�
�o�7 X
IN
'Kl
'w�
4: � -,%- -'. i I
- '-m , i i
_P
'qzF� � ", � I t !1
P
C
;.�i
- 0 , sc"k wx
X
0;'M
�45
7
5
3.4
P., yl
n.
Fit W'i ?z
-n T.; f, Ti
GAFg No, U
N., t
"I"N' 74 Ar. Y
11t14
m tx
si
Cn
NOT FOR CONSTRUCTION
Seahawks Headquarters & ;!fil
rn l
Training Facility
FOOTBALL NORTHWEST LLC
0
RENTON. WASHINGTON
J
a `ZpZpVV � Y
Z
m
r
m
m
m
r
T
pr
O
K
} °io '
H
b C W `FC
y N m ti x C;
o c Tm
Lt v Y
w n m n
F1 c
UJ y s s
Cry a n
� A
m
O
N •��
Seahawks Headquarters & :;I+
D ° Training Facility
p FOOTBALL NORTHWEST LLC
RENTON, WASHINGTON I `
}
a — `
'11 +1{ ^ Y-,� �p cos -_�• � S • � —
f
141'`�.�it SSt1 �411 •V4{ �. i� �+� F �.-
pyr T„
'I
1 '; by •'�+�• °', '; ,"� —
00
BAXTER PARCEL BUSH, ROEO & HITCHINGS INC.
!
C C I o
mmmrn' ; l rnmrnm
N N N N;
I� WWW0 i � �-N�-Pa
{ Cm
A
-------------- --------------- ------ - ----- ----- -- ------ ------ ------ ------------- ------------- . .............. ------- -------
0 0
0:0
1
t _
C) 0
rnm rn mmmm
N) N) r\-) N)
GJN a I '! wN L a
j f
�f.
NOT FOR CONSTRUCTION !
m Seahawks Headquarters 33�€
Training Facility
FOOTBALL NORTHWESTLLCEE
RENTON, WA5HENGTON 1 €
1 Y
�4m
0
�O
m
•I
r
<_
T
•
r
III- ILA-
I 1Li. J I I I
1
��....�� -•
'
r
..
•
r�
'(•)
F.
A`
>I
a.
't
5
'
a
I
& o
J
il -
1 I,
�.
=
V
I
' -
A}
... Nm
D p q Ap =
z z i of p
O [ yC F
" G
i c
z 2
c a c
o
r c noIn
d
n c
13
a
m n0
� z
C
� �
LFi
y15j
C m
i
A m
N
T`_
z
y
m
�
A
0
0
N
V
_
Seahawks Headquarters &
: ,yi
-1
Training Facility
nil ,
0
FOOTBALL NORTHWEST LLC
siv
iD� ,
I i! i
I
i
""^"""^'
•'
RENTON, WASHINGTON
i
i� Wit• L., #�
i j lil• �U. ^� '?` ,`5f}i-5 tea- :'► - --_ �"� �J�V-�'—_'_ : -
AF
a
11 ..
11, � t„5 � � , II! y ` '* ��y f I,..�� I- • RFC.. �... ` T
z tA 1 k
—n
Y '
90
�BUSH do ROES HITCHINGS INC.
BARTER VPARCELI 1
v-
Seahawks Corporate Headquarters & Training Facility
Preliminary Shoreline & Gypsy Creek Vegetation Zone (100') Calculations
EDAW, Inc.
August 29, 2006
SHORELINE ZONE COVER
Approximately 142,000 sf in 100' zone (including existing wetland and wetland buffer;
IMINIMMOM
Existing Conditions
SQ. FT.
Currently Proposed Conditions
SO. FT.
Diff.
Wetland
21,638
Wetland
21,638
0
Wetland Buffer (existing restoration planting)
6,555
Wetland Buffer (existing restoration planting)
6,555
0
Riparian Tree+ Shrub Cover
35,664
High Density Riparian Planting (native tree & shrub)
42,919
7,255
Riparian Shrub Cover Only (primarily invasive)
21,177
Low Density Riparian Planting (native shrubs & grasses)
10,534
-10,643
Grass (native and non-native)
35,364
Field Turf & Grasspave
30,984
-4,380
Landscape Planter (native plants)
0
Landscape Planter (native plants)
4,211
4,211
Building
2,129
Building
6,159
4,030
Pavement
26,148
Pavement
18,188
-7,960
Sand Filter
0
Sand Filter
7,612
7,612
TOTAL
148,675
TOTAL
148,800
Notes: 1. Overlap of tree canopy and pavement or water cause total to equal more than the approx. 142,000sf buffer area.
2. 10,074 sf of high density riparian planting is proposed at SW corner of site adjacent to wetland buffer (within 200' of shoreline).
GYPSY CREEK COVER
Approximately 24,000 sf in 100' zone (on either side of 120' long stream segment
Existing Conditions
SQ. FT.
Currently Proposed Conditions
SO. FT,
Diff.
Riparian Tree+ Shrub Cover
14,403
High Density Riparian Planting (native tree & shrub)
0
-14,403
Riparian Shrub Cover Only (primarily invasive)
2,156
Low Density Riparian Planting (native shrubs & grasses)
0
-2,156
Grass (native and non-native)
6,831
Field Turf & Grasspave
0
-6,831
Landscape Planter (native plants)
0
Landscape Planter (native plants)
6,796
6,796
Building
0
Building
963
963
Pavement/gravel
610
Pavement
16,241
15,631
TOTAL
24,000
TOTAL
24,000
C
m
01
6
Seahawks Headquarters & r `tiE
Training Facility
O ; FOOTBALL NORTHWEST LLC .n a
r: Z`
RENTON, WASHINGTON j
s I'
e m
4. TIM
_
� I
z
I % `
L a k!
t e F i
� d
I.
j
%5 T -I
-77
i q
rrl 3 F N
� p 7
ODE&QN DEVELOPMENT - NOT FOR CONSTRUCTION
Seahawks Headquarters $
D Training Facility ij� !
-1� lil FOOTBALL NORTHWEST i ii 3 9
3 r ill r i RENTON, WASHINGTON
m
(o
s
w
Seahawks Practice Facility s.TQ�a `:fl
FOOTBALL NORTHWESTLLC�
RENTON, WASHINGTON3 T iJl� �E aaa
I 1 i 1 k
71
C
m
c�
Seahawks Headquarters &
Training Facilityj�
C FOOTBALL NORTHWEST LLC
1 1 i I ---+ •- RENTON, WASHINGTON rx E
110 y
e �
�]" ro r" 4 r• 8� I i
Jp
4
{I
1 I
d: 1,
.............. J
1
T.
d
\\`
v� � IY•. � ?g �a �' Gc
t
I
+
DESIGN DEVELOPMENT,- NOT FOR CQNSTRUCTIQN
i Seahawks Headquarters & E;(�
w Training Facility
FOOTBALL NORTHWEST LLC ei
7
RENTON, WASHINGTON `
m
Seahawks Headquarters &
M 1�
Training Facifty
lowilPt '� , 1. 1- -- - " - .-. -.2-FOOTB&L NORTHWEST LLC 1 11 1 7 �nz
I
RENTON, WASHINGTON
T_
C
m
0
DESIQN D
Q
Seahawks Headquarters &
Training Facility
FOOTBALL NORTHWEST LLC
.. RENTON, WASHINGTON 11
C
m
00
n Seahawks Headquarters &(a13
yg y a Ss
' FOOTBALL NORTHWEST LLC r nnz
q RENTON, WASHINGTON �
0
iz S Z
R C, - G)
m
0
z
O 8
z
U
w
A
I
C
m
Qk
DESIQN DEVELOPMENT NOT FOR CONSTRUCTIQN
Seahawks Headquarters &
Training Facility
rp FOOTBALL NORTHWEST LLC
RENTON, WASHINGTON
e Seahawks Headquarters &—
N Training Facility
i m FOOTS&L NORTHWEST LLC
z ►a
I i ; i 1 • •••••• • '� RENTON, WASHINGTON k = Z r.w
J
e
-n T
y
o
NOT FOR CONSTRUCTION
G
n
Seahawks Headquarters &
N
Training Facility
iz
1re`i
m
FOOTBALL NORTHWEST uc
L
r1Z
i �
�
��
RENTON, WgsHINGTpN
�
�
G)
C
m
c�
Seahawks Headquarters &
N Training FacilityN
FOOTBALL NORTHWEST LLCr^
RENTON, WASHINGTON
U
2
m
c� I
NOT FOR CONSTRUCTION
n g Seahawks Headquarters &
N Training Facility 74
Fm+N,w ,. FOOTBALL NORTHWEST LLC ni
$ ! i j +. RENTON, WASHINGTON
I
r
I �3,
r
i
I y.
Y I
, / r
r
V
X,.
m li
NOT FOR CONSTRUCTION
Y Y
n Seahawks Headquarters & z� ;ilI -
m
N 6 Training Facility c `Th
FOOTBALL NORTHWEST LLC
-au,0.' Lw.'SLiRa.Nr" CR2r..r 1 d _
- RENTON, WASHINGTON �z •1�•
I
I
v
F1
L
r
_77
NOT FOR CONSTRUCTION
r
Seahawks Headquarters &
Training Facility
FOOTBALL NORTHWEST i
xnz
RENTON, WASHINGTON
s
5
C
x
m
0
NOT FOR CONS?
m
•f
d r�
iU�TJON
Seahawks HeadquartersTraining 8
FOOTBALL NORTHWEST LLC Y ? c
RENTON, WASHINGTON _nz
--I---
UA
A
0 Seahawks Headquarters & P� I !
Training Facility tt�1°'
h3 FOOTBhLLNOPiTFiWESTLLC �
r,z •ice
IA 1
RENTCAV, WASHlNGTON 11
NOT FOR CONSTRUCTION
beaMaWKS Headquarters &
Training Facility
FOOTBALL NORTHWEST LLC
RENTON, WASHINGTON
i ==
-F
G)
_ -. - - - - -- - - - _ -
- - - - - -.>-
_ _ - - -
_ _ -i3- -- -
t
- - - -
C
m
co
NOT FOR CONSTRUCTION
Seahawks Headquarters &
:;J}
m
;
Training Facliity
i mz
& ak5
FOOTBALL NORTHWEST LLC
knC
�I,
}
a .......�.. �.
RENTON, WASHINGTON
=n2 r��
{
I
�
I
�4
~
F
I
•r':�'
I
f
iau �1
13j
VD
j
I
+
8
1
I I
i
I
I
I
�
I
1
G)
C
m
cr+
3
CID
NOT FOR CONSTRUCTION
n
Seahawks Headquarters &
w
Training Facility
ez5z
Q
FOOTBALL NORTHWEST LLC
RENTON. WASHINGTON
m
I"-
9
or
Im
MO
0
7-
71
X
fl
o
0
7z
rn
0
7
P
;>
A
IM
IT
III
r.
PR
to
m
;'g
wm
m
Im
03
C LL
r, F.
-5
iz
.7
L
IM
A
X-1
:CD
z
m
t
C
IT
4
�n
o
NOT FOR CONSTRUCTION
Seahawks Headquarters &
Training Facility
N11
o
FOOTBALL NORTHWEST ILL
C
Im
RENTON, WASHINGTON
SLJBGRAD=- AT NATURAL TURF FIELDS
I I :1Nx JT
•
SUBGRADE AT NATURAL TURF FIELD COLLECTOR PiPES
SUBGRADE AT SYNTHETIC TURF FIELD.
F-AFIDSCAPE. AND BUILDING SLAB
SUBGRADE AT GRASSRAVE, INDOOR
FIELD, AND LANDSCAPE
SLJ8GRADE AT SAND FILTER
SECTION A
� I
SECTION 6
OUTLET/CUTT-ALL
z
O
C)
M
U)
z
0
0
cr-
0
LL.
I--
0
it
AGNUSSON
UEMENCIC
4)
cr .0 m 3: z
(VI LL 7 m
41)
z
Je
cc w
ac
m
FIGURE 5.21 CE402--
Qj
m
A
C7
C7
m
CD
Cn
m
2m
.a
O
z
.f
E
I
1, f
I
{,
m '
c
m i
cn Y
N
Nx
Seahawks Practice Facility
FOOTBALL NORTHWEST LLC
g RENTON, WASHINGTON �� •e
1
2
3
4
5
6
7
8
9
10
11
12
13
141'
151'
16
17
18
19
20
21
22
23
24
25
26
BEFORE THE HEARING EXAMINER
FOR THE CITY OF RENTON
MISTY COVE ASSOCIATION OF
APARTMENT OWNERS,
Appellant,
V.
CITY OF RENTON, and FOOTBALL
NORTHWEST,
Respondents.
CITY OF RENTON
NOV 062u
RECEIVED
CITY CLERK'S OFFICE
Tie lefrcl 6zer1'cr
4 , 2--.;-
NO. LUA06-073
NOTICE OF APPEAL;
APPEAL OF
DETERMINATION OF NON -
SIGNIFICANCE —
MITIGATED WITH MITIGATION
MEASURES (Oct. 16, 2006)
I. INTRODUCTION
Comes now the Misty Cove Association of Apartment Owners ("Misty Cove") and
for its appeal of the above -captioned Determination of Non -Significance Mitigated
("DNSM") pleads as follows.
This appeal is filed pursuant to the Renton Municipal Code ("RMC"), chapter 4-08-
110, the State Environmental Policy Act, RCW ch. 43.21C ("SEPA"), and under the
procedures set forth on Page 15 of the Report & Decision of the City's Environmental
Review Committee ("ERC") (Oct. 16, 2006). The City Hearing Examiner has jurisdiction to
review an appeal of the ERC's Determination of Non -Significance for this proposal. RMC
Section 4-8-070(H)(4); RMC Sec. 4-8-070(T).
MISTY COVE ASSOCIATION Soci A T Law Group,PLLC
S T O R N E Y
APPEAL OF DNSM -1- Two Union Square • 601 Union Street, Suite 4950
15563 , Seattle, Washington 98101.3951
Telephone 206.838.9100
G C . 4L 1,,( r� ! L �c%�r C'i / ` �/,�# r Facsimile 206.838.9101
De ). / CC_�C�
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
The Misty Cove Association is an unincorporated condominium association of over
50 residents, residing on Lake Washington directly adjacent and to the north of the proposed
Seahawks Headquarters and Training Facility. The Misty Cove Condominiums consist of
the condominium building, parking, grounds, and marina located at 5021 Ripley Lane North,
Renton, Washington.
The proposed Seahawks facility involves a relocation of an existing facility from
Kirkland. By moving their facility to Renton, the Seahawks Dope to quadruple the size of
their current Kirkland facility. The effect of locating this large commercial enterprise on
this vacant lakeshore site is immediate and certain change in the lives of Misty Cove
residents.
In their recent internet promotional materials for the new facility, the Seahawks
management admit the new 120-foot tall facility will be "massive," located within 50 feet of
Lake Washington.3 In the same promotional video, Renton's Mayor promises to "fast -track"
every permit application filed by the Seahawks, in support of the new facility.
While it is understandable City leadership would wish to attract an economic engine
with a "massive" commercial facility within the City limits by fast -tracking the permit and
SEPA review, the City's environmental determination must focus on impacts to the shores of
Lake Washington, a shoreline of statewide significance. When issuing the DNSM, the City's
SEPA responsible official failed to consider public comments and failed to ensure
consistency with the City's adopted Shoreline Management Master Program and other
There are 50 residential units located at Misty Cove, some of which are occupied by multiple residents.
,Information derived from the Seahawk's promotional website at:
www.seahawks.com/News/News.aspx°/a3Fid%3D 1 O218+Seahawks+Training+facility+Kirkland,+WA&hl=en
&gl=us&ct=clnk&cd=1 I
3Id., "Video Report" promoting new facility, Seabawks President Tim Ruskell.
4 RMC Sec. 4-9-070(0)(2)(c).
__ 5ocius Law Group, PLLc
MISTY COVE ASSOCIATION
A T T O R N E Y S
APPEAL OF DNSM -2- Two Union Square .601 Union Street, Suite 4950
Seattle, Washington 98101.3951
15563 Telephone 206.838.9100
Facsimile 206.838.9101
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
191
20
21
22
23
24
25
26
permit regulations. Those regulations protect the interests of Misty Cove residents and the
interests of all state residents who enjoy Lake Washington's waters and shores.
Unfortunately, neither the applicant nor City staff appeared to incorporate suggestions
or comments from neighborhood meetings or either of Misty Cove's letters to the City
providing detailed concerns. The first letter was sent in July 2006, over three months ago.
The applicant's resubmittal in September 2006 did not adequately address those concerns and
did not propose any new voluntary permit conditions to mitigate impacts described by Misty
Cove.
Upon appellate review, a central issue will be whether this massive facility may
impede, alter or impair the views of existing residents throughout the area, for a commercial
use that is neither water -dependent nor water -related. Misty Cove residents believe
additional design work is needed to mitigate the massive scale and height of the proposal in
order to make the facility consistent with applicable City shoreline regulations. Additional
study is needed to determine impacts and appropriate mitigation on a host of issues not
addressed by the DNSM conditions, not the least of which is the impact of stormwater runoff
on endangered species habitat along the shoreline. Misty Cove therefore requests the
Hearing Examiner remand the DNSM for additional study and SEPA conditions mitigating
probable significant adverse environmental impacts identified in this appeal.
I1. SUBSTANTIAL ERRORS IN FACT OR LAW
As required under the City's appeal procedures, Misty Cove offers the following list
of substantial errors in fact or law which exist in the record of the proceedings. RMC Sec. 4-
8-110(C)(3).
A. List of Errors. In addition to those reasons listed in the attached letters, the
DNSM is in error because:
MISTY COVE ASSOCIATION
APPEAL OF DNSM
15563
Socius Law Group, PLLC
A T T O R N E Y S
-3- Two Union Square . 601 Union Street, Suite 4950
Seattle, Washington 98101.3951
Telephone 206.838.9100
Facsimile 206.838.9101
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
• This proposal does not meet the City's adopted shoreline standards for the
location of commercial development along Lake Washington:
New commercial developments on Lake Washington which are neither
water -dependent, nor water -related, nor water -enjoyment, nor which
do not provide significant public access to and along the water's edge
will not be permitted upon the shoreline.
RMC Sec. 4-3-090(L)(5)(ii).
• The facility is not located in an area "where current commercial uses exist," as
required for Commercial Use within the Urban Shoreline Environment. RMC
4-3-090(J)(4); 4-3-090(L)(5).
• The 120-foot high structure is not of the same scale as other commercial
development contemplated for this commercial zone.
• The scale and design of the facility will impede or impair the views of
adjacent residents; the SEPA DNSM does not include any permit conditions
concerning design or scale capable of providing the mitigation required by the
City's shoreline regulations.
• The DNSM is silent on any mitigation conditions addressing obstructed and
impeded views, traffic gridlock, degradation of fish and wildlife habitat,
parking impacts, loss of aesthetics, increased noise, and new sources of light
and glare.
As part of this appeal, Misty Cove incorporates by reference as though fully set forth
herein, two letters submitted by Misty Cove during the public comment period, providing
specific allegations of fact and law demonstrating probable significant adverse environmental
impacts resulting from the project's noncompliance with SEPA, RCW ch. 43.21C and its
implementing regulations, WAC ch. 197-11, the Shoreline Management Act, RCW ch.
MISTY COVE ASSOCIATION Sacius Law Group, PLLe
APPEAL OF DNSM -4- Two Union SquareR • 01Union Street, Suite 4950
Seattle, Washington 98101.3951
M67 Telephone 208.838.9100
Facsimile 206.838.9101
1
2
3
4
5
6
7
8
9
10
11
12'
13
14
15
16
17
18
19
20
21
22
23
24
25
26
90.58, and applicable City regulations and policies. Additional errors are described as
follows.
B. Failure to Impose Specific SEPA Conditions Necessary for Consistency with
Shoreline Policies and Regulations.
As discussed above, the DNSM does not contain specific SEPA mitigation conditions
necessary to demonstrate consistency with the City's adopted standards and policies for
commercial uses within the shorelines. The applicant did not meet its burden of
demonstrating consistency "with the criteria which must be met before a [shoreline] permit is
granted." RMC Sec. 4-9-190(F)(4). Neither the shoreline permit nor other permits may be
granted under City code, absent a showing of consistency with the City's adopted shoreline
program and regulations. RMC Sec. 4-9-190(E). If the proposal is inconsistent with the
City's adopted SEPA policies governing the use of shorelines and mitigation of impacts, it
follows that the proposal does not adequately mitigate project impacts to the extent required
by SEPA and the City's environmental regulations.
The criteria for issuance of a shoreline permit are relevant to the Examiner's review
of the ERC's decision. The City's shoreline policies and regulations serve as the basis for
substantive conditioning of the project to ensure adequate SEPA mitigation, because they are
adopted SEPA policies. RMC Sec. 4-9-070(0)(2)(c). Under City code, specific SEPA
mitigation measures become conditions of the underlying permit approval decision, once
issued. RMC Sec. 4-9-070(L)(13). Given the interrelationship between shoreline permit
conditions and SEPA conditions, the ERC needed to determine whether the project was
consistent with the City's adopted SEPA policy for shorelines, as a pre -requisite to
completion of the City's SEPA review.
City code required that any mitigation conditions addressing the requirements of the
City's shoreline regulations be specific, in order to qualify as SEPA mitigation measures.
PLLC
MISTY COVE ASSOCIATION Soci T Law Group, 8
APPEAL OF DNSM -5- Two Union Square 601 Union Street, Suite 4950
Seattle, Washington 98101.3951
15563 Telephone 206.838.9100
Facsimile 206.838.9101
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
RMC Sec. 4-9-070(L)(9). In the absence of specific mitigation measures addressing
compliance with shoreline regulations, the DNSM must be overturned and remanded for
further study.
C. Failure to Impose -Specific SEPA Conditions Necessary for Consistency with
Other Land Use Permit Regulations.
It does not appear that the Optional DNS issued by the City covered more than a
shoreline substantial development permit application. On September 6, 2006, the applicant
added permit applications for a Master Site Plan Approval and Site Plan Approval. The ERC
Report & Decision dated October 16, 2006, appears to have expanded the Optional DNS
notice to now include more than the shoreline permit, specifying "SA-M" and "SA-H"
designations. It is not clear from the text of the decision or staff recommendation exactly
what permit applications are covered by the DNS.
D. The Record Lacks Evidence the Public Comments Were Considered for This
DNS, as Required by SEPA.
It is little surprise the DNSM failed to include specific mitigation conditions
addressing timely -submitted neighborhood comments and concerns. In the City's haste to
fast -track the permitting process, detailed comments from Misty Cove and other members of
the public were not considered.
The City's SEPA record does not contain any evidence that the staff or ERC
considered Misty Cove's comments, timely filed prior to issuance of the DNSM. As the
City's SEPA Responsible Official, the ERC had a duty to consider Misty Cove's written
comments and those of other members of the public, prior to issuance of the DNS. WAC
197-11-355(4).5
s This is the citation for a DNS issued under the Optional DNS process. It is unclear from the Report &
Decision issued by the ERC on October 16, 2006 whether the ERC utilized the Optional DNS process. If it did
not, the State SEPA Rules require consideration of public comments for a period of 14 days following issuance
of the DNS. During that period, WAC 197-11-340(2)(f) requires the responsible official to "reconsider the
DNS based on timely comments."
LLC
MISTY COVE ASSOCIATION Soci A T Law Group, S T O R N E Y
APPEAL OF DNSM -6- Two Union Square • 601 Union Street, Suite 4950
Seattle, Washington 98101.3951
sim Telephone 206.838.9100
Facsimile 206.838,9101
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Misty Cove submitted a comment letter to the City in July 2006, and again in early
October 2006, both prior to issuance of the DNSM. Neither letter was even mentioned in the
staff report to the ERC or in the ERC's written decision and letter issuing the DNSM. It
seems clear the complete lack of design mitigation conditions in the DNSM is in error in
light of the comments the City received from the public concerning inconsistencies with the
City's adopted SEPA policies, which include the Shoreline Management Master Program and
its regulations.
E. The ERC Failed to Examine Underlying Permit Applications and Proposed
Conditions and Failed to Require Sufficient Environmental Information.
The exhibits offered to the ERC for its review are described in the staff
recommendation dated October 16, 2006. None of these exhibits include the specific permit
application materials covered by the DNS. Because the DNS relies upon mitigation
measures applied to other permits through existing codes, it was logically necessary for the
ERC to review specific measures proposed for the underlying permits, which apparently
were not presented.
By way of illustrative example, Paragraph 5 of the DNSM states that Mitigation
Measures for the DNS are described in "the Shoreline Substantial Development Permit
Application component of this Land Use Action." The record of the ERC decision shows
that the ERC did not appear to consider the shoreline permit application and did not review
any specific mitigation measures proposed as conditions for that application. Thus, the
DNSM is flawed by citing to the shoreline permit mitigation measures when they are not
listed in the DNS and are not otherwise disclosed in the application materials or record of
staff review. Under City code, the mitigation conditions for the application had to be listed in
the Notice of Application, so that the public had an opportunity to comment. This was not
done.
MISTY COVE ASSOCIATION Socius Law Group, A T T D R N E Y S
APPEAL OF DNSM -7- Two Union Square • 601 Union Street, Suite 4950
Seattle, Washington 98101.3951
15563 Telephone 206.838.9100
Facsimile 206.838.9101
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Similarly, the staff recommendation, dated October 16, 2006, discusses ideas for
mitigation of building design, without proposing any specific mitigation conditions for
underlying permits related to design, mass or scale. Clearly, the DNSM list of mitigation
measures on Page 3 of the ERC Report & Decision does not address these issues or identify
conditions proposed for any underlying permit.
The staff recommendation curiously identifies not a single mitigation measure related
to impacts to shoreline water quality or fish habitat. Under the heading "Water" (Page 5,
Para. 3), the staff recommendation notes a proposal to improve the functions and values of
the riparian zone, but does not cite to any specific proposed permit condition and does not
propose any DNS mitigation condition. In fact, the recommendation in its entirety refrains
from mentioning the presence of endangered salmonid species, their documented use of the
shoreline during migrations, or any proposed mitigation to preserve and enhance this
valuable state and federal resource. See discussion at Page 11, Para. 10, Staff
Recommendation ("No mitigation is required.").
The staff report to the ERC does acknowledge there will be five new stormwater
drainage system outfalls to Lake Washington at the ordinary high-water mark. Because the
staff report failed to describe any ESA habitat assessment, the ERC did not carefully consider
probable significant adverse environmental impacts of stormwater runoff on that habitat.
In the absence of materials from the applicant or staff, the ERC had a duty to direct
staff or the applicant to produce missing information concerning not only proposed
conditions for underlying permit applications but also basic environmental data necessary to
assess impacts and a record of public comments. Insufficient data was provided to the ERC
concerning:
• the presence of fish;
• the presence of endangered species;
MSacius Law Graup, pLLc
MISTY COVE ASSOCIATION mm�
A T T O R N E Y$
APPEAL OF DNSM -8- Two union Square • 601 union Street, Suite 4950
issa� Seattle, Washington 98101.3951
Telephone 206.839.9100
Facsimile 206.838.9101
1
2
3
4'
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
the current quality of nearshore habitat for aquatic species and birds;
• the impacts of five new stormwater discharge facilities on habitat and
water quality;
• the impacts of construction sediments on nearshore habitat and fish
migrations;
• proposed mitigation to address specific impacts to the shoreline
ecosystem; and
• public concerns about changes to the shoreline.
Misty Cove requests the Hearing Examiner remand the DNSM to develop missing
information, review proposed voluntary conditions for underlying permits, and for further
consideration of appropriate mitigation conditions to be incorporated into the DNS, following
a review of public comments.
F. Errors Incokporated by Reference.
Descriptions of errors of law or fact are contained in other sections of this appeal and
are hereby incorporated by reference in their entirety as though fully set forth in this section.
I1I. STANDING
As required for SEPA appeals and under RMC Sec. 4-8-110(E), Misty Cove
incorporates the above and alleges the following facts demonstrating that its interests are
among those that are required to be considered, the decision prejudices those interests, the
prejudice will result in injury in fact, and a decision in favor of Misty Cove would
substantially eliminate or redress the prejudice.
The interests of Misty Cove residents are within the zone of interests the City must
consider, as specified in City code and SEPA. The City's shoreline regulations expressly
require consideration of view and aesthetic impacts on adjacent residents. RMC Sec. 4-3-
090(K)(3); RMC Sec. 4-3-090(L)(5)(c). Similarly, the SEPA Checklist required for the
project included discussion of impacts to traffic, stormwater, fish and wildlife habitat,
parking, aesthetics, noise, light and glare, all environmental factors to be considered by the
MISTY COVE ASSOCIATION Socius Law Group, pLLc
A T T p R N E Y 5
APPEAL OF DNSM -9- Two Union Square • 601 union Street, Suite 4950
Seattle, Washington 98101.3951
15563 Telephone 206.839.9100
Facsimile 206.838.9101
1
2
3
41
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
City during its SEPA review. Issues of height, noise, design, parking and traffic mitigation
are all issues considered as part of the City's review for the underlying Master Site Plan
approval. The City's critical areas and shoreline regulations also require protection of the
natural resource along the shoreline.
The interests Misty Cove members seek to address in this appeal are within the zone
of interests the City was required to consider under its code, the Shoreline Management Act,
and SEPA. Thus, the City was required to consider the comments and interests of Misty
Cove residents related to views, traffic, stormwater, fish and wildlife habitat, parking,
aesthetics, noise, light and glare.
The injury in fact and manner in which the Association and its members are
prejudiced by the DNSM are set forth in detail in the Declaration of Eleanor Margo
Kennamer, attached hereto as Exhibit A, the Declaration of Steve Jansen, attached hereto as
Exhibit B, and the Declaration of Brian Salley, attached hereto as Exhibit C.
With 50 residential units on four floors and a marina, Misty Cove residents have real
property interests in their use and enjoyment of the Misty Cove property and adjacent Lake
Washington, including views. Under the Declaration of Condominium for Misty Cove
recorded on February 11, 1980, all of the owners of units at Misty Cove are members of the
Association. The Association represents the interests of its members in this appeal.
Declaration of Eleanor Margo Kennamer. See, Save a Valuable Environment v, Bothell, 89
Wn. 2d 862, 865-68, 576 P.2d 401 (1978).
Many, if not all, of the individual members of the Association are likely to be harmed
by significant adverse environmental impacts of the proposed Seahawks Practice Facility that
are immediate, concrete and specific, related to views, traffic, stormwater, fish and wildlife
habitat, parking, recreation, aesthetics, public safety, noise, light and glare. See, e.g.,
MISTY COVE ASSOCIATION Socius Law Group, PLLC
A T T a R N E Y 5
APPEAL OF DNSM -10- Two Union Square • 601 Union Street, Suite 4950
Seattle, Washington 98101.3951
15563 Telephone 206.838.9100
Facsimile 206.838.9101
1
2'
3
4
5
6
7
S
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
2s
26
Declaration of Steve Jansen. As such, the Association is prejudiced by the City's decision to
issue a DNSM that fails to adequately mitigate those impacts.
The residents of Misty Cove have chosen to live there because they use and enjoy
Lake Washington and the shoreline adjacent to it. All of the units of Misty Cove have
balconies and patios. The lake and the shorelands can be viewed from almost every unit.
Misty Cove residents frequently walk on the shorelands, view the water and shorelands, fish,
boat, engage in watersports, watch wildlife, and generally enjoy all of the sights and
activities available on Lake Washington and the adjacent shorelands. Declaration of Eleanor
Margo Kennamer, � 4.
Because of the proposed massive height and scale of the structure, the lack of
conditions requiring design modifications and a lack of visual mitigation measures in the
DNSM, views of the water and shorelands will be impaired from nearly half of the units of
Misty Cove and from numerous other vantage points throughout their property. Declaration
of Steve Jansen, 13. The proposed indoor practice facility will cast a huge shadow over the
Misty Cove property, particularly in the months from late fall to early spring when the sun
crosses the southern sky. The proposed facility will not only block views of the water, it will
block views of the sun, sky, vegetation, and wildlife associated with the Lake Washington
shorelands. In the case of residents on the ground floor, at least one resident believes the
120-foot high facility will prevent his unit from being exposed to the sun for the better part of
most winter days. Declaration of Steve Jansen, T 4.
Misty Cove Association members also have an interest in use and enjoyment of the
Lake Washington's water quality, as reflected in the health of the aquatic ecosystem. The
proposed grading, construction, retaining wall, and new stormwater outfalls within the
shoreline and in some case below the ordinary high water mark are likely to have significant
adverse impacts on shoreline habitat for endangered species of fish, other fish, birds and
MISTY COVE ASSOCIATION Soci A T Law Group, pLLc
T T O R M E Y 5
APPEAL OF DNSM -11- Two Union square • 601 Union Street, Suite 4950
15553 Seattle, Washington 98101.3951
Telephone 206.838.9100
Facsimile 206.838.9101
1
2
3
41
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
mammals using the nearshore habitat. Association members have observed bald eagles and
osprey on the Port Quendall property to the south (Seahawks site) and regularly engage in
bird -watching. Declaration of .Steve Jansen, ¶ 5; Declaration of Eleanor Margo Kennamer,
¶ 10; Declaration of Brian Sabey, ¶ 4. Association members who live on the north side of
the property enjoy walking along the waterfront and sitting beside the Misty Cove pool,
which is located on the southwest portion of the property to engage in birdwatching.
Declaration of Eleanor Margo Kennamer, ¶ 10.
Misty Cove members also fish and utilize boats parked in one of the 24 boat slips
available to them in the Misty Cove Marina. Association members frequently boat on Lake
Washington in the vicinity of the Port Quendall Property. Declaration of Eleanor Margo
Kennamer, ¶ 11; Declaration of Steve Jansen, ¶ 6; Declaration of Brian Sabey, ¶ 6. Probable
significant adverse environmental impacts from stormwater runoff include but are not limited
to damage to fish, poor visibility in the Lake waters, and sedimentation of nearshore gravels,
all of which directly harm Misty Cove members enjoying the shoreline and waters of Lake
Washington. The DNSM fails to include mitigation measures necessary to prevent these
probable significant adverse environmental impacts.
The Association and its members are also harmed by the DNSM decision because it
does not contain mitigation measures designed to reduce the noise and harmful effects of the
proposed service, delivery, and trash functions on the northwest corner of the building
nearest the shore and Misty Cove. The noise of truck traffic and clanging dumpsters, as well
as odors, debris, and vermin will cause harm and annoyance to Misty Cove and the members
of the Association. Declaration of Steve Jansen, ¶ 8.
Because Misty Cove is located near the end of a dead end road, Association members
believe it more than likely the Football Northwest proposal will result in a substantial
increase in traffic and parking problems. Currently, the only traffic in the area leads to Misty
MISTY COVE ASSOCIATION Sacius Law Group, PLLC
A 7 7 0 R N E Y S
APPEAL OF DNSM -12- Two union Square • 601 Union Street, Suite 4950
Seattle, Washington 98101.3951
15563 Telephone 206.838.9100
Facsimile 206,838,9101
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Cove and the adjoining Condominium. The DNSM failed to include mitigation measures
capable of reducing what is projected to be an enormous amount of new traffic to the area,
associated with summer training camp, when thousands of people a day are expected to visit
the Seahawks property. Without DNS mitigation measures, Misty Cove Association
members believe their parking lot and dock will be utilized as a shortcut to gain access to the
Seahawks facility. Declaration of Eleanor Margo Kennamer, ¶ 14; Declaration of Steve
.Jansen, ¶ 9.
Parking problems are expected to increase as a result of the proposal. Misty Cove has
only 98 parking stalls for 50 units. Losing street parking in the area during Seahawks events
will increase the demand for parking within the Misty Cove property and potentially create
security problems as hundreds of visitors use the area during training camp. The DNSM did
not include mitigation measures capable of addressing increased parking demand off -site and
security measures for crowd control. Declaration of Steve .Jansen, ¶ 9; Declaration of Brian
Sahey, T 9.
The proposal evidently would not include the construction of lamp posts and field
lighting for night-time practice. Misty Cove would be directly harmed by such lighting,
because glare would likely be seen from the Misty Cove property at night, thus substantially
reducing the visibility of night-time skies through "light pollution." Misty Cove believes the
SEPA DNSM should have included permit conditions permanently prohibiting night-time
lighting of outdoor play fields. No mitigation conditions are currently proposed in the
DNSM.
IV. RELIEF SOUGHT
Misty Cove seeks an order remanding or revising the above -captioned DNSM.
Remanding the DNSM to the ERC for additional study or revising the DNSM to include
necessary mitigation conditions would substantially eliminate or redress each of the above-
LLC
MISTY COVE ASSOCIATION — _ 5ociA T T Law Group, S T O R N E Y
APPEAL OF DNSM -13- Two Union Square - 601 Union Street, Suite 4950
Seattle, Washington 98101.3951
t ssea Telephone 206.838.9100
Facsimile 206.838.9101
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
described injuries to the interests of Misty Cove members, related to views, traffic,
stormwater, fish and wildlife habitat, parking, recreation, aesthetics, public safety, noise,
light and glare.
Petitioner Misty Cove requests that the remand order require adoption of specific
mitigation conditions related to views, traffic, stormwater, fish and wildlife habitat, parking,
recreation, aesthetics, public safety, noise,li ht and glare`, was described in this appeal.
DATED this day of �J�'UyY►� 12006.
MISTY COVE ASSOCIATION
APPEAL OF DNSM
15363
SOCIUS LAW GROUP, PLLC
By I v
Tbbmas F. Peterson, WSBA 416587
Attorneys for Misty Cove Association of
Apartment Owners
TOM EHRLICHMAN, ATTORNEY AT LAW
By
Torn) Ehrlichrnan, WSBA#20952
Attorneys for Misty Cove Association of
Apartment Owners
Socius Law Group, PLLC
A T T O R N E Y S
-14- Two Union Square • 601 Union Street, Suite 4950
Seattle, Washington 98101.3951
Telephone 206.838.9100
Facsimile 206.838.9101
1
2
3
4
5
6
7
8
9
10
11
12
13,
14
15
16
17
18
19
20
21
22
23
24
25
26
BEFORE THE HEARING EXAMINER
FOR THE CITY OF RENTON
MISTY COVE ASSOCIATION OF
APARTMENT OWNERS,
Appellant,
V.
CITY OF RENTON and FOOTBALL
NORTHWEST,
Respondents.
NO. LUA06-073
DECLARATION OF STEVE JANSEN
I, Steve Jansen, am competent to testify to the matters set forth herein and make this
declaration of my own personal knowledge and belief.
1. I own and reside in a unit of Misty Cove Condominium ("Misty Cove") and
am a member of the Misty Cove Association of Apartment Owners ("Association").
2. 1 own unit number 4, which is located on the southwest corner of the Misty
Cove building. From my unit, I have views to the west of Lake Washington and to the
southwest of the shoreline located on the Port Quendall property where the proposed
Seahawks Headquarters and Practice Facility is planned. Not only do I live in my unit, but I
have my home office there too. Consequently, I am in the unit and on or about the Misty
Cove property during all hours of the day throughout the week.
LLC
DECLARATION OF STEVE JANSEN _I_ Socit�s Law Group, A T T O R N E Y 5
15549 Two Union Square • 601 Union Street, Suite 4950
Seattle, Washington 98101.3951
j� Telephone 206.838,9100
Facsimile 206.838.9101
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
3. The 120 foot high indoor practice facility proposed for the Seahawks site will
seriously impair views of the water and shorelands from nearly half of the units of Misty
Cove and from numerous other vantage points throughout the property. All of the residents
and guests of Misty Cove will be affected by the project in some way. The practice facility
will block my view of the shoreland to the south of the Misty Cove property and the
territorial view beyond.
4. The proposed indoor practice facility will cast a huge shadow over the Misty
Cove property, particularly in the months from late fall to early spring when the sun crosses
the southern sky. The proposed facility will not only block views of the water, it will block
views of the sun, sky, vegetation, and wildlife associated with the Lake Washington
shorelands. The shadowing will particularly impact me because my unit is located on the
ground floor. I doubt whether I will be able to see the sun for the better part of most winter
days. Furthermore, the 120 foot high indoor practice facility will loom over the public areas
of Misty Cove creating a canyon -like effect. Driving in and out of Misty Cove will be like
driving down a dark alley.
5. 1 enjoy watching the wildlife from my unit and around the Misty Cove
Property. 1 have observed blue heron, otter, beaver, turtles, migrating geese, nesting osprey,
bald eagle, raccoon, and deer in the vicinity of Misty Cove and the on the Port Quendall
property to the south.
6. 1 also enjoy boating and fishing, I own a boat slip at Misty Cove, although I
do not currently have a boat moored there.
DECLARATION OF STEVE JANSEN
15549
-2 Socius Law Group, PLLC
A T T 4 R N E Y 5
Two Union Square . 601 Union Street, Suite 4950
Seattle, Washington 98101.3951
Telephone 206.838.9100
Facsimile 206.838.9101
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
7. The proposed grading, construction, retaining wall, and new stormwater
outfalls within the shoreline and in some cases below the ordinary high water mark are likely
to have significant adverse impacts on shore habitat for endangered and other fish and other
birds and mammals using the near shore habitat. There is virtually no mitigation conditions
required in the City's Environmental Review Committee Report and DNS that address
wildlife habitat.
8. At present, Misty Cove is an extremely quiet and peaceful location. The
Seahawks construction project and the operating practice facility will greatly disturb the quiet
in the area. There are no mitigation measures in the DNS designed to reduce the noise and
dirt during construction to an acceptable level. Furthermore, the project proposes to locate
the service, delivery, and trash functions on the northwest corner of the building nearest the
shore and Misty Cove. The noise of truck traffic and clanging dumpsters, as well as odors,
debris, and vermin will cause particular harm and annoyance to me because my unit is
located on the ground floor directly north of the proposed service area. The DNS contains no
mitigation measures designed to eliminate these problems.
9. Misty Cove is located near the end of a dead end road. The only traffic in the
area leads to Misty Cove and the adjoining Condominium. The Seahawks practice facility
will bring an enormous amount of new traffic to the area creating additional noise, pollution,
and security problems in the area. Misty Cove has only 98 parking stalls for 50 units.
Losing street parking in the area will seriously harm Misty Cove residents. In addition, the
pressure on parking from Seahawks visitors will make matters even worse. During the
weeks of training camp, thousands of people will visit the property each day. Those people
DECLARATION OF STEVE JANSEN _3_ Socius Law Group, A T T O R N E Y 8
15549 Two Union Square . 601 Union Street, Suite 4950
Seattle, Washington 98101,3951
Telephone 206.838.9100
Facsimile 206,838.9101
1
2
3
4
5
t.1
7
8
9
10
11
12
13
14
1$
16
17
18
19
20
21
22
23
24
25-
26
will attempt to park in Misty Cove's parking lot and drop off on Misty Cove's dock in order
to cross the property to Ot) access to the Seahawks facility. These Seahawks visitors will
walk through the Misty Cove property directly past my windows and through the parking lot
to the Ripley Lane. 1 have already experienced this problem at events Ue when the Blue
Angels perform. 1 expect that it will be even worse when the Seahawks are around. The
DNS contains no mitigation measures designed to eliminate the traffic, noise, pollution, and
security issues caused by the facility year round and especially during training camp.
1 declare under penalty of perjury under the laws of the state of Washington that the
foregoing is true and correct.
Steve Yanseu
Executed this day of 2 , 2006,
at WaAington.
DF.CT..ARA,T1ON OF STEVE JANSEN
15549[1J
.4. Socius Law Groue, PLLC
A T T 0 H N k y S
Two Union Square • 601 Union stFeeti Suite 4950
Seattle, vuasninglon 98101,3951
Telephone 206.838.9100
FamirnMe 206.838.9101
1
2
3
4
5
6
7
8
9
10
11
12'
13
14
15
16
17
18
19
20
21
22
23
24
25
26
BEFORE THE HEARING EXAMINER
FOR THE CITY OF RENTON
MISTY COVE ASSOCIATION OF
APARTMENT OWNERS,
Appellant,
V.
CITY OF RENTON and FOOTBALL
NORTHWEST,
Respondents.
NO. LUA06-073
DECLARATION OF ELEANOR
MARGO KENNAMER
1, Eleanor Margo Kennamer, am competent to testify to the matters set forth herein
and make this declaration of my own personal knowledge and belief.
l . I am the President of Misty Cove Association of Apartment Owners ("the
Association"). The Association is an unincorporated condominium association formed
under RCW ch. 64.32.
2. Misty Cove Condominium ("Misty Cove") is a condominium consisting of a
building, parking, grounds, and marina located at 5021 Ripley Lane North, Renton,
Washington. Misty Cove is located on Lake Washington directly adjacent and to the north of
the proposed Seahawks Headquarters and Training Facility.
DECLARATION OF ELEANOR Socius Law Group, A T T D R N E Y S
MARGO KENNAMER -1- Two Union Square • 601 Union Street, Suite 4950
Seattle, Washington 98101.3951
15486 Telephone 206M8.9100
EXH I B 1T Facsimile 206.838.9101
1
2
3
4
5
6
7
8.
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
3. Misty Cove contains 50 residential units on four floors. 25 units are located
on the north side of the building and 25 are located on the south side of the building. Under
the Declaration of Condominium for Misty Cove recorded on February 11, 1980, the owners
of units at Misty Cove are the members of the Association.
4. Many, if not all, of the individual members of the Association are directly and
perceptibly harmed by the proposed Seahawks Practice Facility.
5. The residents of Misty Cove have chosen to live there because they use and
enjoy Lake Washington and the shoreline adjacent to it. Misty Cove residents frequently
walk on the shorelands, view the water and shorelands, fish, boat, engage in watersports,
watch wildlife, and generally enjoy all of the sights and activities available on Lake
Washington and the adjacent shorelands.
6. All of the units of Misty Cove have balconies or patios. The lake and the
shorelands can be viewed from almost every unit.
7. The 120 foot high indoor practice facility proposed for the Seahawks site will
seriously impair views of the water and shorelands from nearly half of the units of Misty
Cove and from numerous other vantage points throughout the property. All of the residents
and guests of Misty Cove will be affected by the project in some way and some more than
others.
8. The proposed indoor practice facility will cast a huge shadow over the Misty
Cove property, particularly in the months from late fall to early spring when the sun crosses
the southern sky. The proposed facility will not only block views of the water, it will block
DECLARATION OF ELEANOR Socius Law Group, PLLC
MARGO KENNAMER A T o R N E Y S
-2- Two Union Square • 601 Union Street, Suite 4950
15486 Seattle, Washington 98101.3951
Telephone 206.838.9100
Facsimile 206.838.9101
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
views of the sun, sky, vegetation, and wildlife associated with the Lake Washington
shorelands.
9. The proposed grading, construction, retaining wall, and new stormwater
outfalls within the shoreline and in some case below the ordinary high water mark are likely
to have significant adverse impacts on shore habitat for endangered and other fish and other
birds and mammals using the near shore habitat.
10. I keep a pair of binoculars at hand because I enjoy watching the wildlife that
live and frequent the properties in the vicinity of Misty Cove, including the property to the
south. Although my unit is on the north side of the building, I frequently sit on a landing on
the south side of the building to view the birds and mammals and also do so when I visit my
neighbors. I also enjoy walking along the waterfront and sitting beside the Misty Cove pool,
which is located on the southwest portion of the property. I have personally observed bald
eagles and osprey on the property located to the south of Misty Cove. I have also frequently
observed six dear on that property.
11. There are 24 boat slips in the Misty Cove Marina. Many of the Association
members own boats. We own two boats and frequently boat on lake Washington in the
vicinity of the Port Quendall property.
12. The proposed grading, construction, and installation of stormwater outfalls
within the shoreline and below the ordinary high water mark if not carefully designed and
mitigated will seriously impact fish and wildlife habitat, including those of endangered
species. There is virtually no mitigation conditions required in the City's Environmental
Review Committee Report and DNS that address wildlife habitat.
DECLARATION OF ELEANOR Socius Law Group, PLLC
MARGO KENNAMER -3- Two Union Squarer- 601 Union Street, Suite 4950
15436 Seattle, Washington 98101.3951
Telephone 206.838.9100
Facsimile 206.838.9101
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
261
13. At present, Misty Cove is an extremely quiet and peaceful location. The
Seahawks construction project and the operating practice facility will greatly disturb the quiet
in the area. There are no mitigation measures in the DNS designed to reduce the noise and
dirt during construction to an acceptable level. Furthermore, the project proposes to locate
the service, delivery, and trash functions on the northwest corner of the building nearest the
shore and Misty Cove. The noise of truck traffic and clanging dumpsters, as well as odors,
debris, and vermin will cause harm and annoyance to Misty Cove and the members of the
Association. The DNS contains no mitigation measures designed to eliminate these
problems.
14. Misty Cove is located near the end of a dead end road, The only traffic in the
area leads to Misty Cove and the adjoining Condominium. The Seahawks practice facility
will bring an enormous amount of new traffic to the area creating additional noise, pollution,
and security problems in the area. During the weeks of training camp, thousands of people a
day will visit the property. Those people will attempt to park in Misty Cove's parking lot
and drop off on Misty Cove's dock in order to cross the property to gain access to the
Seahawks facility. The DNS contains no mitigation measures designed to eliminate the
traffic, noise, pollution, and security issues caused by the facility year round and especially
during training camp.
DECLARATION OF ELEANOR
MARGO KENNAMER
15486
Socius Law Group, PLLC
A T T O R N E Y S
-4- Two Union Square • 601 Union Street, Suite 4950
Seattle, Washington 98101.3951
Telephone 206-838.9100
Facsimile 206.838.9101
FrnM:PHW Realty 4259436840 11106/2006 14:42 #9B0 P.001/001
NOV. 6. 2006 1: 31 PM SOC IUS LAIN CROUP NO.25H P. 6
1
2
3
4
5
6
7
8
9
1�
11
12
13
14
15
16s
17
l8
19
20
21
22
23
24
25
26
I decleree under penalty of perjury under the laws of due stab of Washingft thAt the
forepi lig is truc and omct.
Eleanor Mama
E ;� �tcd.�= daycif 006,
at7WasWngt i
MOeRMA D1i ELP.A,NORQAMSR
15OM
Socius f aW Grow pair
A T r a R N L Y S
-5- Tm* UF#Dn ftwe4 601 UrdOq Sl I, SuKe 49M
SMME, Wg9 08101.3951
Telepltons 908Am.4100
(�Ciitn6a 2 2836.91n1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
BEFORE THE HEARING EXAMINER
FOR THE CITY OF RENTON
MISTY COVE ASSOCIATION OF
APARTMENT OWNERS,
Appellant,
V.
CITY OF RENTON and FOOTBALL
NORTHWEST,
Respondents.
NO. LUA06-073
DECLARATION OF BRIAN SABEY
I, Brian Sabey, am competent to testify to the matters set forth herein and make this
declaration of my own personal knowledge and belief.
1. My wife and I own and reside in a unit of Misty Cove Condominium ("Misty
Cove") and are members of the Misty Cove Association of Apartment Owners
("Association")
2. We own unit number 304, which is located on the top floor of the southwest
corner of the Misty Cove building. From my unit, I have views to the west of Lake
Washington and to the southwest of the shoreline located on the Port Quendall property
where the proposed Seahawks Headquarters and Practice Facility are planned. Not only do I
DECLARATION OF BRIAN SABEY _1_ Stacius LawGraup, PLLC
A T T Q R N E Y S
55fA �-y 7wo Union Square • 601 Union Street, Suite 4950
f/V/ Seattle, Washington 99101.3951
Telephone E H I BIT Facsimile 2 6.83891010
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
live in my unit, but I have my home office there too. Consequently, I am in the unit and on
or about the Misty Cove property during all hours of the day throughout the week.
3. As proposed, the Seahawks indoor practice facility will block my view of
everything to the east and south. I currently enjoy a wonderful territorial view of Renton and
Bryn Mawr that will be lost if the practice facility is built as planned. Instead of looking out
at the hill, trees, and sky, I will see a massive ten -story wall.
4. 1 enjoy watching the wildlife from my unit and around the Misty Cove
Property. I have observed blue heron, and bald eagles nesting and feeding on the Port
Quendall property and in the adjacent waters of Lake Washington.
5. Besides enjoying the view and observing wildlife from my unit, I also
frequently stand, walk, and run along the road adjacent to the Port Quendall Property, along
the Misty Cove shoreline, and on our dock and pool area. The views of the shoreline will be
blocked from all of those vantage points by the proposed indoor practice facility.
6. 1 also enjoy boating and fishing. I own a boat, which I keep in the Misty Cove
Marina. From our boat, my wife and I view the marine life in the waters adjacent to the Port
Quendall property.
7. The proposed grading, construction, retaining wall, and new stormwater
outfalls within the shoreline and in some cases below the ordinary high water mark are likely
to have significant adverse impacts on shore habitat for endangered and other fish and other
birds and mammals using the near shore habitat. There are virtually no mitigation conditions
required in the City's Environmental Review Committee Report and DNS that address
wildlife habitat.
DECLARATION OF BRIAN SABEY
15564
Socius Law Group, PLLC
-2- A T T O R N E M S
Two Union Square • 601 Union Street, Suite 4950
Seattle, Washington 98101.3951
Telephone 206,838.9100
Facsimile 206.838.9101
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
8. At present, Misty Cove is an extremely quiet and peaceful location. The
Seahawks construction project and the operating practice facility will greatly disturb the quiet
in the area. There are no mitigation measures in the DNS designed to reduce the noise and
dirt during construction to an acceptable level. Furthermore, the project proposes to locate
the service, delivery, and trash functions on the northwest corner of the building nearest the
shore and Misty Cove. The noise of truck traffic and clanging dumpsters, as well as odors,
debris, and vermin will cause particular harm and annoyance to me because my unit is
located on the third floor directly north of the proposed service area. The DNS contains no
mitigation measures designed to eliminate these problems.
9. Misty Cove is located near the end of a dead end road. The only traffic in the
area leads to Misty Cove and the adjoining Condominium. The Seahawks practice facility
will bring an enormous amount of new traffic to the area creating additional noise, pollution,
and security problems in the area. Misty Cove has only 98 parking stalls for 50 units.
Losing street parking in the area will seriously harm Misty Cove residents. In addition, the
pressure on parking from Seahawks visitors will make matters even worse. During the
weeks of training camp, thousands of people will visit the property each day. Those people
will attempt to park in Misty Cove's parking lot and drop off on Misty Cove's dock in order
to gain access to the Seahawks facility. The DNS contains no mitigation measures designed
to eliminate the traffic, noise, pollution, and security issues caused by the facility year round
and especially during training camp.
DECLARATION OF BRIAN SABEY
15564
_3_ Socius Law GrQU , PLLC
A T T O R N E Y S
Two Union Square • 601 Union Street, Suite 4950
Seattle, Washington 98101.3951
Telephone 206.838.9100
Facsimile 206.838.9101
1
2
3
4
5
6
1
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
1 declare under penalty of perjury wader the laws of the state of Washington that the
foregoing is true and Correct.
Brian 5abey
Executed s 6 day of �006,
at , Washington.
DECLARATION OF BRIAN SA,BEY
155"
_ Socius Law Group, PI1_c
A T T O R N E Y S
Two Union SgUM • 601 union Street, 5uite 4950
Seattle, Waahington 98101.8951
Telephone 206.838.9100
Faerimife 2W.838.9101
20G,838,9100 MAIN PKoNE
206,038,9101 w FA%
Two Unioh Square
S O L I U S L A" G R O U !I PLLC Seattle,I WA 98101 4950
Thomas F. Peterson
206.838,9112
tpeterson@sociuslaw.com
July 10, 2006
VIA LEGAL MESSENGER
Elizabeth Higgins
Planning/Building/Pubhe Works Department
City of Renton
1055 South Grady Way
Renton, WA 98055
Re: Seahawks Training Facility, LUA06-073
Dear Ms. Higgins.
This law firm represents the Misty Cove Association of Apartment Owners. As you know,
Misty Cove Condominium is located on the property immediately adjacent to the north of the
proposed Seahawks Training Facility. We provide this letter by way of our comments to the
Seattle Seahawks' ("Applicant's") request for environmental (SEPA) review and for a Shoreline
Substantial Development Permit.
Timing of SEPA Review. As an initial matter, we note that the City appears to be conducting
an environmental review for a shoreline substantial development permit only, without first
requiring environmental review for the entire project, which is known to the applicant and the
City at this time. Conducting environmental review of shoreline uses only is incomplete without
first requiring the applicant to submit all known information about the ultimate buildout of the
project, i.e., traffic analysis and building footprints shown on a site plan. Piecemeal review is
prohibited under the State Environmental Policy Act, RCW ch. 43.21C (SEPA), as discussed in
numerous court cases.
The City's Notice of Application and Proposed Determination of Non-Signif cance-Miti gated
(DNS-M) ("Notice") issued on June 23, 2006 ("Notice") identifies a very limited scope of
review for a project involving multiple permits. The "Pen-nits/Review Requested" is limited to
"Environmental (SEPA) Review, Shoreline Substantial Development Permit." Because the
Notice states that the applicant is only seeking a Shoreline Substantial Development Permit at
this time, it seems clear the SEPA, review applies only to that permit. To our knowledge, no
other permit applications have been filed. Thus, the SEPA review could not cover those unfiled
land use applications and is being conducted piecemeal on only one select perinit application, the
13552 EXHI I svciirsln:n,cour
Elizabeth Higgins
July 10, 2006
Page 2
shoreline substantial development permit. Alternatively, if the SEPA review is intended to cover
the entire project, the SEPA applicant should be required to provide full details of the entire
project, including but not limited to a traffic analysis, prior to your issuance of a mitigated SEPA
determination. Absent a full disclosure and analysis of all project impacts prior to issuance of
the SEPA determination, the SEPA determination fails to assess possible needed mitigation
addressing those undisclosed impacts. SEPA's policy against piecemeal review is specifically
designed to avoid such a result.
The Notice does not identify commencement of a review period for the Master Use Permit
Application and furthermore, no Binding Site Plan has been submitted. Accordingly, the City
will have to commence a new SEPA review process when those applications and plans are
submitted. Such piecemeal review conflicts with SEPA and SMA policies. Merlde v. Port of
Brownsville, 8 Wn. App. 844, 509 P.2d 390 (1973). We request that the SEPA review be
postponed until the application and plans are complete so that the City and the neighbors can see
the whole project and the full suite of impacts and proposed mitigation before the SEPA review
process begins.
The Practice Facility Location. The Preliminary Site Plan calls for construction of a 120-foot
high warehouse structure for use as a practice facility on the North end of the Baxter Property.
The location of the practice facility should be moved for a number of reasons.
1. View Blockage. All of the apartments on the south side of the Misty Cove condominium
currently enjoy unobstructed views of Lake Washington to the south and west. The proposed
practice facility will block most of these views. Such view blockage directly conflicts with the
City's Shoreline Master Program. The General Use Regulations for All Shoreline Uses in the
Shoreline Master Program provide as follows:
The potential impact of any of the following on adjacent, nearby, and possibly
distant land and shoreline users shall be considered in the design plans and efforts
made to avoid or minimize detrimental aspects.
View Obstruction: Buildings, smokestacks, machinery, fences, piers,
poles, wires, signs, lights, and other structures.
RMC 4-3-090(IC)(3). The Specific Use Regulations for Commercial Developments further
define the Applicant's obligations with respect to potential view obstruction.
The applicant for a shoreline development pen -nit for a new commercial
development must indicate in his application the effect which the proposed
commercial development will have upon the scenic view prevailing in the given
area. Specifically, the applicant must state in his permit application what steps
have been taken in the design of the proposed commercial development to reduce
to a minimum interference with the scenic view enjoyed by any significant
number of people in the area.
13552
Elizabeth Higgins
July 10, 2006
Page 3
RMC 4-3-090(L)(5)(c). The Application incorrectly characterizes the impact of the
development on the views of Misty Cove owners. The Project Narrative states that
"[v]iews to the lake from adjacent uses located to the north and south will not be
adversely affected." Land Use & Shoreline Permit Application (the "Application"), § 2,
p. 4. The Environmental Checklist contains similar mischaracterizations. Application
§ 3, p. 16. This misstatement by the applicant alone is grounds for the City to delay
issuance of a SEPA determination, pending submittal of complete and accurate
information on the entire project. It is also a basis for denying the shoreline substantial
development permit for failure to comply with the policies and regulations cited above.
Not surprisingly, the Application does not state what steps the Applicant has taken to
"reduce to a minimum" the interference that the practice facility will have on Misty Cove
owners' views. In fact, the practice facility is located in the spot that will most interfere
with Misty Cove views. The negative view impact would be minimized if the practice
facility was located on the south side of the project, where there are no adjacent
residences, or situated further from the shoreline. This appears to be feasible given the
proposed layout of the site.
The practice facility is also quite tall. Although a 120-foot high structure is not barred
outright in a COR zone, where the building is abutting a lot designated as residential,
maximum building height is to be determined through site development plan review.
RMC 4-2-120B. Generally, the limit is 20 feet higher than the maximum height allowed
in the abutting residential zone. Id. This would not be an issue if the practice facility
were located on the south end of the property, which area does not abut a residential
zone. if the facility is not relocated, we contend it is in violation of RMC 4-2-120B.
2. Shoreline Orientation. The proposed practice facility is located too close to the shoreline.
The General Use Regulations provide as follows:
Facility Arrangement Shoreline Orientation: Where feasible, shoreline
developments shall locate the water -dependant, water -related and water -
enjoyment portions of their developments along the shoreline and place all other
facilities Inland.
RMC 4-3-090(K)(5). The General Use Regulations further require preservation of unique and
fragile Areas:
Unique and Fragile Areas: Unique features and wildlife habitats should be
preserved and incorporated into the site. Fragile areas shall be protected from
development and encroachment.
RMC 4-3-090(K)(7). The Preliminary Site Plan locates the practice facility only 50 feet
from the shoreline. This not only orients this massive structure, which is not water
dependant or water -enjoyment related, too close to the shoreline. It also may impinge on
the unique and fragile areas of the waterfront. As currently designed, it appears the
proposed shoreline permit would need a variance or conditional use approval from the
13552
Elizabeth Higgins
July 10, 2006
Page 4
Department of Ecology. If such a request has been made, please provide us with a copy
of that correspondence, so that we may comment to DOE. We reserve our right to
comment further on these issues, as more information is disclosed by the applicant and
we have an opportunity to review any critical areas studies submitted in support of the
total project,
Traffic Im acts. One of the problems with piecemeal SEPA review is the difficulty of
commenting on and reviewing significant issues before the required plans and studies are
submitted. There will likely be significant traffic impacts on the neighborhood but the
actual impact is unknown because the Applicant has not yet submitted its traffic impact
analysis. We reserve comment on the traffic impact until the traffic impact analysis has
been provided.
The Applicant states that the facility will accommodate annual training camp on site and
that parking for training camp vehicles will be located offsite. Misty Cove requests that a
requirement for offsite parking be made a condition of permit approval.
Community Disturbances/Refuse/Service Areas. The preliminary site plan does not
identify the location of areas for refuse bins, service entry, storage yards, and outdoor
service areas. The Misty Cove owners are concerned that those areas will be located in
the parking area adjacent to Misty Cove Condominium and that they will cause excessive
noise, odors, night lighting, pollution, and be unsightly in appearance. The Shoreline
General Use Regulations cited above, restrict community disturbances such as noise,
odors and night lighting, and require screening of visually unpleasant areas. RMC 4-3-
090(K)(3)(ii)&(iv). Furthermore, RMC 4-4-090(C) contains general requirements
relating to refuse storage areas. In addition, the Shoreline General Use Regulations
proscribe activities near the shoreline that may cause pollution or ecological disruption.
RMC 4-3-090(K)(2). Misty Cove requests that proper identification, location, and
screening of these areas be provided in the site plan. Misty Cove further reserves
comment ou these issues until the site plan is available for review.
Dock Use. The Baxter site currently contains the remnants of a dock. We understand
that the Applicant intends to restore and use the dock. Misty Cove is concerned that
prolonged parking of ships and large yachts at the dock will obstruct views. Misty Cove
requests that permanent or long term mooring of boats, particularly large ones, be
restricted as a condition of the pen -nit. Misty Cove owners are also concerned that
visitors to the Seahawks facility will use the Misty Cove marina for mooring. We request
that the conditions for the shoreline permit include limitations on the amount of time
larger vessels may be moored at the facility and prohibit mooring at the Misty Cove
marina.
Security and Parkin& Because Ripley Lane is a dead-end street, Misty Cove owners
are concerned that people going to the new facility will often end up in the Misty Cove
parking lot, which is not adequate to accommodate existing Misty Cove tenants. The
owners are also concerned that the increased traffic will lead to more car break-ins and
13552
Elizabeth Higgins
July 10, 2006
Page 5
other safety threats to Misty Cove Owners. Appropriate signage and security measures
should be made a condition of permit approval to avoid these likely impacts on adjacent
residents,
Lighting and Noise, The Environmental Checklist states that there will be no permanent
lighting of the practice fields and no glare anticipated that would adversely impact
adjacent land uses. This should be made a permanent condition of permit approval. The
Checklist also states that there will minimal noise impact on adjacent properties both
during construction and after completion. Plans to control noise should be a condition of
permit approval, based on the applicant's promise.
The Misty Cove Owners request that the City and the Applicant consider these comments
and make the appropriate changes for the better of the surrounding neighborhood. If you
have any questions about these comments or if we can provide any additional
information, do not hesitate to contact me.
Very truly yours,
7�-L 21-�
Thomas F. Peterson
cc: Department of Ecology (via U.S. Mail)
Torn Ehrlichman, Attorney at Law (via U.S. Mail)
Ray Colliver, Port Quendall Company (via U.S. Mail)
Misty Cove Association of Apartment Owners
13552
2o6,836,0100 MAINPHONE
206.838.9101 MAIN rAX
S O` r E +v..iF' S 1!.,., dAC: V[ 1 G R O U 4i PLLC
ayri
October 10, 2006
VIA LEGAL MESSENGER
Elizabeth Higgins
Planning/Building/Public Works Department
City of Renton
1055 South Grady Way
Renton, WA 98055
Re: Seahawks Training Facility, LUA06-073
Dear Ms. Higgins:
clrraFR��ro
RECEIVED
OCT 18 2YO6
81J'JD)1V(331Y1S10M
TWO Union Square
801 Union Sl, Suite 4950
Sea111e, WA 98101
Thomas F. Peterson
206,838.9112
teterson@sod uslaw.com
On behalf of our client, the Misty Cove Association of Apartment Owners, we are writing to
provide supplemental comments regarding impacts of the proposed Seahawks Training Facility
on our clients' homes. This letter is intended to supplement rather than replace our earlier letter,
sent to you on July 10, 2006. That earlier letter is hereby incorporated by reference.
I. INTRODUCTION
Our clients live at the Misty Cove Condominium, located on the property immediately adjacent
to the north of the proposed Seahawks Training Facility. As such, they will be directly affected
by the changes taking place at the Seahawks Training Facility and along the shoreline of Lake
Washington, if the various applications are approved as currently designed.
We appreciate the assistance of City staff in our review of materials. Please consider this letter
an initial comment letter (supplemental), based on our initial reviews of the files. We may have
missed something or new information may be developed during the review and hearing process,
thus giving rise to additional analysis in the future. If there are any pieces of infon-nation we cite
below as missing that are actually in the City file, we would appreciate your letting us know so
that we can correct our data list.
Our aim during this review process will be to present an accurate analysis of facts in the record
and to provide additional data that appears to be missing. In that effort, we appreciate the
applicant's willingness to respond in writing to our requests for information or clarifications.
Unfortunately, the applicant recently denied our clients even limited access to the property for
EXHIBIT- C.,
soriIts leTo. cnr)r
Elizabeth Higgins
'October 10, 2006
Page 2
the purposes of looking at the site with our fisheries and wetlands biologists. We trust the City
and the applicant will continue to work with us as we seek an honest evaluation of the facts,
recognizing the citizens' role in upholding the policies and requirements of the Shoreline
Management Act, RCW ch. 98.58, as well as their rights under the State Environmental Policy
Act, RCW ch. 43.21 C ("SEPA"),
II. SCOPE OF THESE COMMENTS AND REQUEST TO PARTICIPATE
This letter is intended to present our clients' concerns and initial comments applicable to each of
the following, individually and collectively:
• Notice of Application (revised application September 22, 2006)
• Revised Notice of Application and Proposed Determination of non -Significance -
Mitigated (DNS-M) (Sept. 26, 2006)
• Applications for Approval of.
o Master Plan
o Site Plan
o Shoreline Substantial Development Permit
o Construction Permit -and Building Permit
We understand City staff will make recommendations to the Hearing Examiner and provide a
presentation at the public hearing tentatively scheduled for November 21, 2006. We request that
this letter and our previous letter be provided to the Hearing Examiner as part of the permit file.
We also request advance written notice of any public meetings concerning this proposal and
would appreciate your assistance to ensure we remain a party of record. Your continued
assistance is much appreciated.
III. THE APPLICATION DOES NOT PROVIDE PROPOSED DESIGN
MITIGATION REQUIRED BY BOTH THE SHORELINE CODE AND SEPA
CONCERNING ADVERSE IMPACTS TO VIEWS
The City's shoreline policies and regulations are particularly important to our analysis. These
policies contain directives on the types of uses that are permitted, and require analysis and
mitigation of aesthetic impacts. Although quoted in our prior letter, these specific requirements
are worth repeating here. The General Use Regulations for All Shoreline Uses in the Shoreline
Master Program provide as follows:
The potential impact of any of the following on adjacent, nearby, and possibly
distant land and shoreline users shall be considered in the design plans and efforts
made to avoid or miniinize detrimental aspects.
15079
-Elizabeth Higgins
October 10, 2006
Page 3
View Obstruction: Buildings, smokestacks, machinery, fences, piers,
poles, wires, signs, lights, and other structures.
RMC 4-3-090(K)(3). The Specific Use Regulations for Commercial Developments further
define the Applicant's obligations with respect to potential view obstruction.
The applicant for a shoreline development permit for a new commercial
development must indicate in his application the effect which the proposed
commercial development will have upon the scenic view prevailing in the given
area. Specifically, the applicant must state in his permit application what steps
have been taken in the design of the proposed commercial development to reduce
to a minimum interference with the scenic view enjoyed by any significant
number of people in the area.
RMC 4-3-090(L)(5)(c).
As discussed herein, the application does not provide information or mitigation capable of
demonstrating compliance with applicable shoreline regulations concerning views. In our
opinion, the City is therefore compelled to declare the application incomplete for purposes of
shoreline permit review. If and when the application is submitted with a credible view analysis
as required by code, the City should require preparation of an environmental impact statement
This project, as proposed, is not allowed under the Shoreline Management Act. The current
proposal will bring over 343,000 square feet of new buildings to a vacant lot directly adjacent to
the Misty Cove Condominiums.' The buildings are expected to reach as high as 120 feet. This
19.6-acre site includes over 1,800 linear feet of undeveloped shoreline on Lake Washington.
The state -regulated shoreline is 200 feet wide, from the ordinary high water mark ("OHWM").
RCW 90.58A30 ft Washington's review criteria for all development mandates that a permit
shall not be issued for any new building or structure of more than thirty-five feet above average
grade level on shorelines that will obstruct the view of a substantial number of residences on
areas adjoining shorelines. WAC 173-27-140. In addition to imposing a 50-foot setback from
the OHWM, City regulations also require an assessment of how a project within the [200-foot]
shoreline will impact the scenic view prevailing the given area. RMC 4-3-090(L)(5)(c); RMC 4-
3-090(L)(5)(d).
The view analysis provided by the applicant does not do justice to the siguiftcant impacts this
massive building within the shoreline will have on current residents. Nor does the study make
any attempt to evaluate the views from the water for boaters, or from Mercer Island. The
applicant's view study does not identify the 200-foot shoreline in its photographs and has what
1 Information about the specifics of the proposal is obtained exclusively from the applicant's Project Overview and
Environmental Checklist, both revised Sept. 6, 2006.
t5079
.Elizabeth Higgins
' October 10, 2006
Page 4
may be questionable digital scaling when making comparisons between pre- and post -
construction views.
The applicant's response to the shoreline permit requirements for a view analysis was to submit
"two pages" of analysis. The entire second page is blank except for the following;
3.00 ON GOING ANALYSIS
Analysis will be on going as the design proceeds.
Addendum 1, Yisualiz anon Assessment (Section 11) (Crawford Architects Sept. 27, 2006). That
is a circular statement. City regulations do not allow the permit to proceed unless all materials
required by code are submitted as part of the application. An incomplete or cursory submittal
does not satisfy the intent of the shoreline regulations for a full analysis of view impacts and
design measures to mitigate those impacts.
The applicant's one page of text offers a before -and -after view comparison for only three visual
points. For one of the views taken from a Misty Cove balcony, the photographs displayed in
Figures 5 and 6 do not line up and thus involve some form of digital scale adjustments that call
into doubt whether a true comparison is being made between the before -and -after views.2
Equally important, the 200-foot shoreline of statewide significance is not identified anywhere on
the photographs to give the viewer a sense of how views of the state shoreline area would
change.
The photographs are also misleading because they are taken from vantage points beyond the
railings of the effected units (as is apparent from the photos themselves). They do not show the
view impact on residents from typical viewing positions such as seated on the balconies or inside
the units. From these vantage points the building will block much of the views of the 200-foot
shoreline. The photos and text also solely concern views of the water and ignore the residents'
views of the rest of the shoreline, the landscape, and sky and the impact of the building on light
and sunshine (particularly in late fall through early spring when the sun traverses the southern
sky.) Even the applicant's photos show that the massive building will block these views and
light.
City shoreline policies and regulations require an assessment not only of the views to be affected
by the project --which clearly has not been completed here --but also a listing of the applicant's
design measures to reduce to a minimum interference with the scenic view enjoyed by a
significant number of people in the area. RMC 4-3-090(K)(3), (L)(5)(c). The applicant claims
that "the building has been sited to take advantage of the most stable soils and to minimize deep
foundations." Environmental Checklist. (Rev. Sept. 6 2006) at 17. However, the Geotechnical
Report indicates that deep borings were done only in the area of the proposed building, The
'' Once can simply compare the measurement between the skyline on a point and the diagonal rootline on a point, for
cach picture, to see the inaccuracy of the comparison between the two pictures; they do not match. The digital
photographic work completed for this assessment appears to have been of very poor quality.
15D74
Elizabeth Higgins
October 10, 2006
Page 5
applicant has not adequately explored the subsurface of other portions of the property to
determine suitability of alternative locations that will not impair views from neighboring
properties.
The applicant's view study does not provide the information required by the City's shoreline
code. Thus, the City should determine the application to be incomplete. The City has the
authority to do so, since the resubmitted application was provided to the City on September 22,
2006 and the City has 28 days under state law to make a completeness determination. RCW
36.70B.070. On that basis the master application, which includes the shoreline application,
should be deemed incomplete until required materials are provided to the City for public review.
Given that these same comments were provided previously in response to the initial SEPA
notice, and the fact the applicant was provided the opportunity to submit proposed mitigation
based on an analysis of the issues, withdrawal of the proposed Mitigated Determination of
Nonsignificance. is appropriate. The City should issue a Determination of Significance, for the
purpose of requiring the complete view analysis required by code. The benefit of the EIS
process would be to carefully identify design mitigation potential, and any alternative sites
within the City or the vicinity. RMC 4-3-090(L)(5)(c).
IV. THE CITY SHOULD NOT EVEN REACH AN ANALYSIS OF SHORELINE OR
VIEW IMPACTS BECAUSE THE COMMERCIAL USE IS NOT AUTHORIZED
WITHIN A "SHORELINE OF STATEWIDE SIGNIFICANCE"
Lake Washington is adjacent to the site and is classified a "shoreline of statewide significance."
RMC 4-3-090(E), (F). The proposed Seahawk building and facility are not consistent with the
list of priority uses within the 200-foot shoreline:
1. Recognize and protect the statewide interest over local interest for
shorelines of statewide significance.
2. Preserve the natural character of the shorelines.
3. Result in long-term over short-term benefits.
4. Protect the resources and ecology of the shorelines.
5. Increase public access to publicly owned areas of the shorelines.
6. Increase recreational opportunities for the public in the shoreline.
RMC 4-3-090(D) 3 The proposal is not consistent with these mandates because the extensive
construction and lot coverage would decimate rather than preserve the "natural character" of the
3 Preference is giWen to the uses in descending order of priority.
55070
Elizabeth Higgins
October 10, 2006
Page 6
shoreline. Jd. Similarly, the public interest in long term visual aesthetics along Lake
Washington outweighs the relatively short term needs of the local football franchise — short term
when compared to a long term historical timeframe.
Perhaps more importantly, the Specific Use Regulations of the City's shoreline code prohibit the
kind of use proposed for this facility and thus the application must be denied, following issuance
of a Determination of Significance. New commercial development on Lake Washington is not
permitted unless it is either water dependent, water related or involves water enjoyment. RMC
4-3-090(L)(5)(a). The Seahawks Training Facility, however popular, cannot be permitted in
violation of this exclusive list of permitted commercial uses within a shoreline of statewide
significance. It simply is not water dependent, water related or involved in water enjoyment.
Furthermore, the project does not provide "significant public access to and along the water's
edge." The application does not contend otherwise.
The applicant can be expected to argue that none of its buildings or fields are planned within the
City's setback area (50 feet from the OHWM). That is not the test under the use regulations for
the City's shoreline program. Instead, the setback only comes into play if the use itself is
authorized within the 200-foot zone, which it is not as explained above.
V. IMPACTS FROM NEW RETAINING WALLS WITHIN A "SHORELINE OF
STATEWIDE SIGNIFICANCE" REQUIRE MITIGATION FOR ENDANGERED
SPECIES HABITAT
As previously mentioned, Lake Washington has been designated a "shoreline of statewide
significance" under state law. RCW 90.58.020. Despite the presence of endangered species
habitat along the shores of Lake Washington, the application proposes grading and permanent
retaining wall construction not only within the 200-foot shoreline zone, but also (as disclosed in
the application) inside the City's standard 50-foot setback area for approved shoreline urban
development.4 This is proposed in at least three separate locations within the 50-foot setback.
At this time, the plans for the grading and construction of retaining walls are not described, based
on our review of the application materials. Similarly, proposed mitigation is not well -articulated
to address the impacts of grading and permanent structures on Chinook salmon and bull trout
shoreline habitat, and bald eagle habitat.5 We do know that the applicant's wetlands report rates
this as a high quality "lake -fringe" wetland that is subject to freshwater tidal influences .6 Thus,
use of the site and its impact on juvenile endangered species should be analyzed, impacts
assessed, and mitigation proposed..
4 Baxier Development Project— Phase 150 Fool Setback, Site Plan, A001 (May 3, 2006),
5 Chinook salmon, mull trout, and bald eagles are protected under the Endangered Species Act ("ESA").
Shoreline and Wetland Survey, North and Soulh. Baxter Parcels (The RE` BC Group, Inc. Aug. 30, 2006), Wetland
Rating Form, Page 3 (May 26, 2006).
15079
,Elizabeth Higgins
October 10, 2006
Page 7
The project appears to include a proposed grading and retaining wall project to be constructed at
elevation 21 feet (NAVD88), which is within one and one half feet in elevation from the highest
ordinary high water mark acknowledged by the applicant (19.5 feet NAVD 88 datum).' Despite
these proposed but as -yet -undefined shoreline stabilization walls, the entire discussion of impacts
and mitigation concerning ESA species habitat along the lake are so sparse as to be non-existent
as follows:
2.4 Wildlife Habitat
No federally Endangered, Threatened or Sensitive animal or plant species were observed
on the subject property during the site visit.8
An earlier section summarizing the report's "Shoreline Survey" does not even mention ESA
species in the lake or their habitat along the shoreline. See Section 1, at Page 2. Nothing in the
report discusses habitat let alone mitigation from the proposed grading and retaining wall
construction within the 50-foot setback or within the 200-foot shoreline zone. in addition to
addressing those issues, the report should have interpreted the applicant's prior study in May
1997,9 which identified May Creek as a nearby "shoreline of the state" supporting runs of Coho,
Chinook and sockeye salmon as well as resident fish species (citing Williams et al., 1975).
Mitigation may be required for the linkage between May Creek residents and use of the nearby
shoreline of Lake Washington at the project site, i.e., at various times of their life cycle. Thus,
we conclude the application is deficient because it fails to adequately address the project's
impacts on ESA species.
Ironically, the applicant's Environmental Checklist, updated September 6, 2006, does disclose
the existence of Chinook salmon, bull trout, bald eagle on or near the site. However, no habitat
is described and no mitigation is offered. instead, the following is offered:
Is the site part of a migration route? If so, explain
Adult Chinook Salmon in Lake Washington migrate past the site on their way to
the Cedar River each summer. Juvenile Chinook pass the site on their way back
to Puget Sound, and may spend some time rearing on the site vicinity. Sockeye
juveniles rear in Lake Washington and may utilize the shoreline and offshore
habitat along the project for rearing.
Proposed measures to preserve or enhance wildlife, if any:
None.
Environmental Checklist (Rev. Sept, 6, 2006) at 12.
Conceptual Grading Plan, CIO (May 3, 2006); RETEC Group Shoreline and Wetland Survey at 2 (Aug. 30,
2006),
8 RETEC Group Shoreline and Wetland Survey (Aug. 30, 2006) aL 2.
9 Wetland Determination Report on the JAG Development Pr vpero) David Evans and Associates, Inc. (May 1997)
at 8.
15019
Elizabeth Higgins
October 10, 2006
Page 8
A Determination of Significance for the project should be issued instead of the proposed
Mitigated Determination of Nonsignificance, in part to ensure careful study of shoreline ESA
habitat and determine whether mitigation measures would ever moderate the adverse impacts
fi•om the proposed, permanent disturbance of the 50-foot setback area and the 200-foot shoreline
and associated wetlands. By requiring an EIS on this issue, the City would.also ensure that an
objective assessment of site alternatives is conducted by the applicant.
Misty Cove residents enjoy the shoreline of Lake Washington on a daily basis. They enjoy
existing shoreline views and the natural habitat for plants and animals along the vegetated
shoreline, including endangered species. There is a direct linkage between the probable
significant adverse environmental impacts of the project and residents' continued use and
enjoyment of their property and the adjacent lake. Thus, they have standing to appeal the City's
SEPA determination, in the event it is necessary.
Please consider these comments in addition to the comments set forth in our letter of July
10. If you have any questions about these comments or if we can provide any additional
information, do not hesitate to contact me.
Very truly yours
Thomas F. Peterson
cc: Department of Ecology (via U.S. Mail)
Misty Cove Homeowners Association (via U.S. Mail)
Torn Ehrlichman, Attorney at Law (via U.S. Mail)
Lance Lopes, Attorney for Applicant (via U.S. Mail)
k5079
Y CITY OF RENTON
City Clerk Division
+ + 1055 South Grady Way
Renton, WA 98055
rNVIT 425-430-6510
❑ Cash
(heck No. 4i j '-
Description:
L. L
Funds Received From:
Receipt NO 0683
Date ItA,&' 0 6
❑ Copy Fee ❑ Notary Service
L;-Appeal Fee ❑
Name �0(' j L% <
Address
City/Zip f uo t&! f 5�e `/ -,0
e,� ate , ' I:i 1 r
V
Amount $ -)
� /, ( / -/zi b
City fff SigiQLre
DEPARTMENT OF CON. INITY cilyof - ..
AND ECONOMIC DEVELOPMENT
MINOR MODIFICATION
OF AN SITE PLAN
APPROVAL 0 DENIAL
PROJECT NAME:
PROJECT NUMBER:
PROJECT MANAGER:
APPLICANT:
ZONING DESIGNATION:
PROJECT LOCATION:
SUMMARY OF REQUEST:
EVALUATION FORM & DECISION
Seahawks' Training Facility Site Plan Modification
LUA06-073
Angelea Wickstrom, Planning Specialist
Carports of Washington, Inc.
P.O. Box 2389
Buckley, WA. 98321
Commercial Office/Residential (COR)
5015 Ripley Lane N.
Virginia Mason Athletic Center is asking Carports of Washington, Inc. to build a permanent
structure to cover their field equipment. This project is located at 5015 Ripley Lane N, and part
of the project number LUA06-073. The zoning designation for the property is Commercial
Office/Residential (COR).
The original proposal for LUA06-073 in 2006 was the development of the Seahawks'
Headquarters and Training Facility. The original proposal consisted of a single building
consisting of 135,534 square feet of office space on two levels, 89,423 square feet of indoor
practice facility, and four outdoor practice fields. Since the initial proposal, a 5,550 square foot
one-story maintenance shed has also been developed on the property.
Virginia Mason Athletic Center is asking Carports of Washington, Inc. to build a new carport
to cover their field equipment. The proposed structure would be located in the Southeast
corner of the property and would intrude on the current front yard setback. Currently, the
minimum front yard setback for COR zones is determined through site development plan
review. The original proposed setback, approved as part of site plan review for the project, was
20 feet (Exhibit 1). Carports of Washington, Inc. is requesting a setback modification from 20
feet to 5 feet to accommodate this permanent field equipment carport.
The existing building footprint on the property is 150,647 square feet. The proposed field
equipment carport is 1,050 square feet. The proposed structure is only a 0.69 percent increase
in area of the existing building footprint, which is significantly less than the 10 percent
maximum allowed for a minor modification. The property is approximately 19.6 acres. The new
City of Renton Department of Com y and Economic Development Administrative i . .;ication Request Report & Decision
5EANAWKS' TRAINING FACILITY SITE PLAN MODIFICATION LUAO&073, MOD
Report of May 1, 2014 Page 2 of 3
carport, plus existing structures, will make up 17.8 percent of the 19.6 acre site, which is less
than the 65 percent lot coverage maximum for COR zoning. The proposal does not have a
significantly greater impact on the environment or other facilities.
According to Renton's Municipal Code Section 4-4-070, ten feet of on -site landscaping is
required along all public street frontages, with the exception of areas for required walkways
and driveways and those zones with building setbacks less than ten feet. In those cases, ten
feet of landscaping shall be required where buildings are not located. Planning Staff
recommends approval of this project on the condition that the applicant provides a landscape
plan with building permit application that shows a 5-foot landscape strip between the carport
and property line. The landscape plan shall be reviewed and approved by the Current Planning
Project Manager prior to building permit issuance.
Analysis of Request
The following table contains an analysis of the criteria outlined in RMC 4-9-2001:
Criteria
Criteria Met
The adjustment does not involve more than a ten percent (10%)
increase in area or scale of the development in the approved site
X
plan; or
The adjustment does not have a significantly greater impact on the
X
environment and facilities than the approved plan; or
The adjustment does not change the boundaries of the originally
X
approved plan.
DECISION
The proposal satisfies 3 of the 3 criteria listed in RMC 4-9-2001. Therefore, the Seahawks'
Training Facility Site Plan Modification, Project Number LUA06-073, MOD (as shown in Exhibit
1), is approved and subject to the following condition of approval:
1. The applicant shall provide a landscape plan with building permit application that
provides a 5-foot landscape strip between the carport and property line. The landscape
plan shall be reviewed and approved by the Current Planning Project Manager prior to
building permit issuance.
City of Renton Department of Com , ty and Economic Development Administrative ification Request Report & Decision
SEAHA WKS' TRAINING FACILITY SITE PLAN MODIFICATION LUA06-073, MOD
Report of May 1, 2014 Page 3 of 3
C.E. "Chip" Vincent, CED Administrator
Date
The decision to approve the modifications) will become final if not appealed in writing together
with the required fee to: Hearing Examiner, City of Renton, 1055 South Grady Way, Renton,
WA 98057 on or before 5:00 pm, on May 15, 2014. Additional information regarding the
appeal process may be obtained from the Renton City Clerk's office, Renton City Hall — 71h Floor,
(425) 430-6510.
If you have any further questions regarding this decision, feel free to contact the project
manager, Angelea Wickstrom, at 425.430.7312 or awickstrom@rentonwa.gov.
EMSTING POWER
POLE LOCATION --
SOUTH PROPERTY
FENCE LINE —
PEE EASEMENT
LINE (TED) T
EXISTING POWER
POLE LOCATION -
9�
ELECT C'QPSE T U -
LIFT \
. STATION
ATTILA
I �
\ I UR
I�
f
I!
NEW I- STORY
MAINTENANCE
SHED
COVERED CAR WASH PAD
ERISTING POWER
x POLE LOCATION
MAINT, PARKING
3 STALLS
H SECURITY GATE
& FENCE
e
GRASS
w
' I �,J_41-j T F
ti
!1RTI-IFRN GANTA FF Rif -HT nF-WAY
LAKE WASHINGTON
30' o
owl
m
X
w
EXISTING BUILDING
STRUCTURE TO BE
REMCVED
LXTLNT OF
—PUBLIC ACCESS
EXISTIN 5' ACCESS WALK
-
_ -
DOCK SECURITY FENCE
20' SERVICE ROAD
-
PROPOSED RAILWAY CROSSING
NOTE..
PARKING COUNT
r�l�
STREAM CIASS
GENERAL SURFACE PARKING 9 S STALLS
Y 5
GYPSY SUB NBASIN DRAINAGE LAKE WASHIGTON - CLASS'- CLASS 2 (RE: FIGURE 8.3)
SECURE TEAM PARKING B2 STALLS
`
•
TOTAL 252 STALLS
fir
_ _- -- -- —� -�
---�
eoirx
f M4TIGAr_ TaON S!T€ PLAN - ALTERNATIVE
BROAS n�iiN0VEN=
A�
k
C4
N
m
x
H
I
1 '
. PLAYING FIELDS
PARKING -
9 STALLS
1
1
FIELD CURB m O
- sr
! QNm
m rnU .
�Lu
z
0 1 UNDER CANOPY
PERIMETER
OF BERM
E*STING POWER' �^
POLE LOCATION H F.F.INT.ELEV.
. 28'4 r+
1 � .F. ELEV. 2B'-0•
SECURITY GATE FIRE HYDRANT AREA: 5,550 SF
&FENCE A BOLLARDS RIVER ROTC v I
+a PLANTERS H
CHEM r
STOR. a
PSE
ACCESS
ROAD
` ° ♦ 1 G SS CLIPS s
f , SAND FILTER
�N SAND fil
/ • CANOPY rn
GRAPHIC SCALE
• f GRAVEL PATH I+�I
KEY i.
SITE BOUNDARY " e+ " r , r �, + , 46
FENCE ITBI WITH LANDSCAPE PACKAGE}
RAILROAD RIGHT OF WAY -----"-`-----'---
AREA OF PAVEMENT "' / f + ► =—� ■ '
s" i t: /,. -2 1 V
_—_—_—_---_—_—_— _—_—_—_-----_—_ ..—.-,�=� "�-��='r- �-�'�-�1 Li1��r��i�`4 ovia FOR GOWSTRUC7
_ — _ _ 021i8lIIB
DEPARTMENT OF COP 1NITY
AND ECONOMIC DEVELOPMENT ' , ?
MINOR MODIFICATION
OF AN SITE PLAN
❑ APPROVAL F ] DENIAL
PROJECT NAME:
PROJECT NUMBER:
PROJECT MANAGER:
APPLICANT:
ZONING DESIGNATION:
PROJECT LOCATION:
SUMMARY OF REQUEST:
EVALUATION FORM & DECISION
Seahawks' Training Facility Site Plan Modification
LUA06-073
Angelea Wickstrom, Planning Specialist
Carports of Washington, Inc.
P.O. Box 2389
Buckley, WA. 98321
Commercial Office/Residential (COR)
5015 Ripley Lane N.
Virginia Mason Athletic Center is asking Carports of Washington, Inc. to build a permanent
structure to cover their field equipment. This project is located at 5015 Ripley Lane N, and part
of the project number LUA06-073. The zoning designation for the property is Commercial
Office/Residential (COR).
The original proposal for LUA06-073 in 2006 was the development of the Seahawks'
Headquarters and Training Facility. The original proposal consisted of a single building
consisting of 135,534 square feet of office space on two levels, 89,423 square feet of indoor
practice facility, and four outdoor practice fields. Since the initial proposal, a 5,550 square foot
one story maintenance shed has also been developed on the property.
Virginia Mason Athletic Center is asking Carports of Washington, Inc. to build a new carport
to cover their field equipment. The proposed structure would be located in the Southeast
corner of the property and would intrude on the current front setback. Currently, the minimum
front yard setback for COR zones is determined through site development plan review. The
original proposed setback, approved as part of site plan review for the project, was 20 feet.
Carports of Washington, Inc. is requesting a setback modification from 20 feet to 5 feet to
accommodate this permanent field equipment carport.
The existing building footprint on the property is 150, 647 square feet. The proposed field
equipment carport is 1,050 square feet. The proposed structure is only a 0.69 percent increase
in area of the existing building footprint, which is significantly less than the 10 percent
maximum allowed for a minor modification. The property is approximately 19.6 acres. The new
' �-
RECEIPT EGU0022668 City °F"o-
Transaction Date: April 28, 2014
BILLING CONTACT
IMPORT IMPORT
IMPORT CASHIER CONTACT
REFERENCE NUMBER FEE NAME TRANSACTION PAYMENT AMOUNT PAID
TYPE METHOD
LUA06-073
PLAN - Modification
Fee Payment
heck #8545
$100.00
Technology Fee
Fee Payment
heck #8545
$3.00
SUB TOTAL
$103.00
TOTAL $103.00
Printed On: 41=2014 Prepared By: Angelea Wickstram Page 1 of 1
RECEIPT EGO0022668 City Of
r i
Transaction Date: April 28, 2014
BILLING CONTACT
IMPORT IMPORT
IMPORT CASHIER CONTACT
REFERENCE NUMBER FEE NAME TRANSACTION PAYMENT AMOUNT PAID
TYPE METHOD
LUA06-073
PLAN - Modification
Fee Payment
heck #8545
$100.00
Technology Fee
Fee Payment
heck #8545
$3.00
SUB TOTAL
$103,00
TOTAL $103.00
Printed On: 412812014 Prepared By. Angelea Wickstrom Page 1 of 1
RECEIPT EG00022668 City of .,
{
Transaction Date: April 28, 2014
BILLING CONTACT
IMPORT IMPORT
IMPORT CASHIER CONTACT
REFERENCE NUMBER FEE NAME
LUA06-073 PLAN - Modification
Technology Fee
TRANSACTION PAYMENT AMOUNT PAID
TYPE METHOD
Fee Payment =heck #8545 $100.00
Fee Payment heck #8545 $3.00
SUB TOTAL $103.00
TOTAL $103.00
Printed On: V2812014 Prepared By: Angelea W ickstrom Page 1 of 1
PLAN REVIEW COMMENT-UA06-073} 4 City of
PLAN ADDRESS: 5015 RIPLEY N LN APPLICATION DATE: 06/0912006
RENTON, WA 98056
DESCRIPTION: The Seattle Seahawks Headquarters and Training Facility is proposed to be located on a 19.68 acre (857,477 sf) site known as the
"North Baxter Property," a former timber processing facility located on the shore of Lake Washington in Northeast Renton,
In addition to approximately 1,887 lineal feet of Lake Washington shoreline, a jurisdictional wetland is located on the site. The wetland and
a portion of the shoreline have been restored as part of site cleanup activities. Site cleanup from previous industrial activities is on -going
and would continue simultaneously with the initial stages of site development.
The project proponent has submitted a land use master application requesting Master Plan Review, Site Plan Review, and a Shoreline
Substantial Development Permit. The Shoreline Permit is required due to the project's proximity to Lake Washington. The requested
actions require environmental review by the City of Renton in accordance with the State Environmental Policy Act (SEPA).
5/8107 - Appeal received from Lawrence Barsher
5/29/07 - Scheduled to be heard by the Hearing Examiner
6/11 /07 - Hearing Examiner modified the Director's decision and added an additoinal condition. Appeal period ends 6/25/07.
6/15/07 -Appeal of Hearing Examiner decision received from the Applicant (Football NW, LLC)
7/5107- Planning & Development Committee reviewed appeal.
7/9107 - Council approved Planning & Development Decision to strike conclusions 5, 6, & 7 of the Hearing Examiner's Decision and be
replaced with the following conclusions and the Decision be "modified" to grant the minor modiification without condition.
Conclusion 5: "However, since the change in elevation would be indistinguishable from appellant's property, and otherwise meets all the
requisite criteria of RMC 4-9-2001, there is no basis to condition the minor modification."
Conclusion 6: "Because the ERC did not condition the project when itt was greater in elevation than the current elevation with the minor
modification and the Examiner did not condition the orginal site plan approval, there appears to be no authority to impose conditions on this
minor modification."
See ofclink for Hearing Examiner's Decision
4128/14 - Site Plan Modification - Carports of Washington, Inc. is requesting a setback modification from 20 feet to 5 feet to accommodate
a permanent field equipment carport.
May 01, 2014 Page 1 of 1
I'ira•t class mailUAIIrEosrarES FORM 3547 fee due 50 ¢ Postage and Fees Paid
g POSTAL SERVICE uses
Restricted Data Permit No. GIO
t CITY OF RENTON
.' Office of the City Clerk
1055 South Grady Way - Rrnton WA 99057
KE, NNAMER
OLD: 5021 RIPLEYLNNAPT 309
RENTON WA 98056-1578
NEW: 13006162ND AYE SSE
RENTON WA 980594608
07!23107 111:06 72043400629W da proc3f1070720 eff.20060925
I
Eteonor A KVIUlatner, President
J f
Misty Cove Condo Association
5021 Ripley lane N., #3C9
Benton, WA 98056
i;f�j,
�Rkr'�rj
rf
ctt;f�
FWO
AOUIjt;SS SttjV,Ut Ht=QUGS FEO
E--idait saG56[Ll..t..I.SI.... Id..I1 „O.I1.1.3
TO THE POSTMASTER OF
1055 S GRADY WAY
RENTON WA 98057-9998
'�1 �kIlkIIIII1111 �II I�I III �I I11I1I III1�11�[1'iI I�I III Ikl lllll�
,.0
Denis Law, Mayor
June 3, 2008
CITY OF RENTON
.1UN o 3 Z008
RECEIVE©
CITY CLERK'S OFFICE
L.0 A-C)l,I-r'`I
CITY OF RENTON
apartment of Community and
Economic Development
Alex Pietsch, Administrator
CITY CI EP
SUBJECT: ADDRESS CORRECTION AT THE NEW SEAHAWKS TRAINING
FACILITY
TO WHOM IT MAY CONCERN:
Please note the following address change initiated by City of Renton Council action. This
building is under construction right now and will be opening under this new address in
the next month or so. The only portion of Ripley Lane Forth that is changing name is
that -part of the street frontage along this property, no otheraddresses on Ripley Lane N
are affected at this point:
OLD
5015 Ripley Lane N
NEW
12 Seahawks Way
incerely,
Jan Conklin
Energy Plans Examiner
Development Services Division
Telephone: 425-430-7276
#l:utilltr
Parcel #
2924059001
1055 South Grady Way - Renton, Washington 98057
This paper contairis 5('% recycled material; 30% pusi'consumer
RENTON
Ax,Ran or THT CURVE
RECEIVED
n�NTrvo)
PLANNING/BUILDING/
PUBLIC WORKS DEPARTMENTFEB 20Q8
Renton CI Coun M E M O R A N D U M
DATE: February 28, 2008 1T OF RJ!N-rao
TO: Marcie Palmer, Council President MAR. 0 3 200a
Members of the Renton City Council RCt=1VE{)
'`ff7Y VIA: Denis Law, Mayor CLERK'S OFFICE
FROM: Gregg Zimmerm4zministrator
STAFF CONTACT: Neil Watts, Development Services Director
SUBJECT: Ripley Lane Project Costs
iSSUF,-
What are the costs and revenues associated with the Ripley Lane project?
RECOMMENDATION:
The City is currently working on two projects in Ripley Lane, adjacent to the Seahawks
development site. The Surface Water Utility section will be completing storm drainage
improvements across Ripley Lane this summer, and a City design team will also be
completing landscaping improvements on the west side of Ripley Lane this summer. At
this time, the landscaping project will include minor street improvement elements only.
We recommend proceeding with these two projects as currently planned and budgeted
this year. Full street improvements, such as curb, gutter, and sidewalks are not proposed
or funded at this time. We recommend that development of more formal street
improvements not be funded at this time, and instead be included in future discussions of
the City of Renton's Transportation Capital Improvement Projects (CIP) list.
BACKGROUND SUMMARY:
Following the announcement of the Seahawks' plans to develop its corporate offices and
training facilities in Renton at the Ripley Lane location, the City budgeted $500,000 for
improvements along Ripley Lane. These improvements are intended to improve the
appearance of the west side of the street between the existing roadway and the railroad
tracks adjacent to the Seahawks site. A conceptual landscaping plan has been developed
for this street frontage area. The landscape plan is for low maintenance landscaping,
includes retaining many of the existing trees, adding new trees and new groundcover
landscaping improvements. The area near the new entryway to the Seahawks site would
hadivision_sldevelop.serladminlripley lane - memo to council.doc
Ripley Lane Project Costs
Page 2 of 3
February 28, 2008
be irrigated, and include more prominent plantings. The total length of the street frontage
to be improved is roughly 1400 feet.
There is roughly 70 feet between the existing paved roadway and the railroad tracks; 20
feet of this is City right-of-way next to the paved road, and the remaining 50 feet is
railroad (BNSF) right-of-way. Any improvements within the BNSF right-of-way will
require a permit from the railroad, which is currently under discussion. We anticipate at
this time that the landscaping improvements along the west side of Ripley Lane will
extend 30 to 35 feet back from the edge of the paved street. The shoulders for the
pavement in Ripley Lane are planned to be improved with gravel as part of this
beautification project, and "No Parking" signs will be installed along both sides of the
street. The dirt turnaround currently used by school buses will be improved as well,
either with gravel or asphalt paving.
This project is being managed by a City design team, including members from
Community Services, Surface Water Utility, Transportation Division, Economic
Development, and Development Services. The work will be completed in phases, using
contractors and consultants on our existing small works rosters. Trees have already been
marked for removal, and work is expected to begin on tree and vegetation removal in the
next couple of weeks.
Rough cost estimates for the projects are as follows:
Project Phase
Estimated
Cost
Tree removal
$20,000
Vegetation removal
20,000
Landscaping design
20,000
Landscape installation
300,000
Irrigation system
10,000
Gravel shoulders
40,000
Turnaround paving
25,000
Asphalt improvements for pedestrian
access to north from turnaround
25,000
TOTAL PROJECT COSTS
$460,000
The current project budget is an estimate. If the landscaping costs vary from this
estimate, we can adjust the depth of the landscape strip to keep within the budget. If we
are successful at completing the landscaping and minimal street improvements at this
cost, we will have some limited funding available to use toward purchase of gateway
signage to complete the 2007 Ripley Lane improvement project.
H:1Division.s%Develop.serlAdmin\Ripley Lane - memo to Council.doc
Riptey Lane Project Costs
Page 3 of3
February 28, 2008
In addition to the Ripley Lane enhancement project, Surface Water Utility is completing
design work for storm drainage improvements across Ripley Lane at this same location.
This project will connect into the completed new storm line across the Seahawks site, and
is designed to end the flooding problems, which occur frequently on this section of
Ripley Lane. Details of this project and associated funding are described in the attached
memo from Surface Water Utility.
attachment
cc: Jay Covington, Chief Administrative Officer
Terry Higashiyarna, Community Services Administrator
Peter Hahn, Deputy PBPW Administrator — Transportation
Suzanne Dale Estey, Economic Development Director
Ron Straka, Surface Water Utility Supervisor
Terry Flatley, Parks Maintenance Manager
Jim Seitz, Transportation Planning Supervisor
H:1Division.s\Dcvclop.ser\Admin\Ripley Lane - memo to Council.doc
`SY O PLANNING/BUILDING/
PUBLIC WORKS DEPARTMENT
I�?,4.w01 M E M O R A N D U M
DATE: February 28, 2008
TO: Gregg Zimmerman inistrator
FROM: Ron Straka, Surface Water Utility Supervisor
SUBJECT: Surface Water Utility Projects Related to the Seahawks'
Headquarters and Training Facility
The following is a summary of the Surface Water Utility storm system improvements
associated with the Football Northwest, LLC Seattle Seahawks' Headquarters and
Training Facility project:
PROJECT DESCRIPTIONS AND COST ESTIMATES:
The storm system (72" and 60" pipe) currently constructed on the Seahawks' site by
Football Northwest, LLC was oversized to accommodate the 100-year storm runoff
condition for the upstream tributary basin future land use conditions and accounting for
future I-405 improvements by WSDOT.
The City will reimburse Football Northwest, LLC for both the City's share (3.9%) and
WSDOT's share (21.4%) of the total cost for the storm system improvements that they
made, based upon the percent increase in runoff between the existing land use condition
and future conditions. The total percentage of 25.3% was determined through a basin
hydrologic analysis. The actual total cost incurred by Football Northwest, LLC was
$561,862. The City will reimburse Football Northwest, LLC S 142,151, by reducing the
amount of Water Utility System Development Charge that Football Northwest LLC has
to pay for the Seahawk Headquarters and Training facility. The Surface Water Utility
will have to reimburse the Water Utility for the waived Water Utility System
Development Charge.
An agreement between the City and Football Northwest, LLC is being prepared for
Council review and approval for the reimbursement of the costs associated with
oversizing the storm system. The agreement will also allow the City and WSDOT to
construct additional upstream storm system improvements on the Seahawks' site, and to
the east of the site across Ripley Lane N, that will connect to the storm system
constructed by Football Northwest, LLC.
The City and WSDOT are currently designing additional storm system improvements
that will connect to the storm system improvements constructed on the Seahawks' site by
Football Northwest, LLC. The project includes a 12-foot by 48-foot vault structure to
connect to the Seahawks' stone system and then four 36-inch storm pipes in a 42-inch
Seahawks Site Storm System , irovement Summary
February 28, 200S
Page 2 of 3
casing under the BNSF railroad and between the six foot on center pile supports for the
King County Wastewater 84-inch Sanitary Sewer Eastside Interceptor. The four 36"
storm pipes will be extended to the east side of Ripley Lane N and involve channel
improvements up to the I-405 roadway where existing 48-inch and 24-inch storm systems
discharges runoff from 1-405 and the upstream basin (see attached map).
The preliminary cost estimate for the City/'WSDOT stone system improvements across
Ripley Lane N, which will connect into the Football Northwest, LLC constructed storm
system on the Seahawks' site, will be revised as part of the final design prior to
advertising forbids. The preliminary total cost estimate is $1,355,244, which includes
$183,316 for design and an estimated $1,171,908 for construction.
The City and WSDOT will have a separate agreement to share these costs based upon the
percentage of total runoff from the WSDOT I-405 right-of-way and the remaining
upstream tributary area within the basin. The Surface Water Utility's share of this cost is
71.3% and WSDOT share is 28.7%. However, WSDOT's share will be increased to
reimburse the Surface Water Utility for WSDOT share of the oversizing cost for the
storm system improvements constructed on the Seahawks' site by Football Northwest,
LLC.
The following tables summarizes the actual costs for the Seahawks' improvements and
the estimated costs associated with the additional upstream storm system improvements
across Ripley Lane N to be funded by the City and WSDOT, along with each cost share.
On Seahawks' Site (60-inch & 72-inch downstream storm system):
Actual Seahawks' Cost to Design/Construct: $ 561,862.08
Cost Share % Design/Construction
Seahawks' 0.747 $ 419,710.97
WSDOT
Renton
Total:
0.214 $ 120,238.49
0.039 $ 21,912.62
$ 561,862.08
CITY & WSDOT Ripley Lane N. Storm System Improvements (Estimated Costs)
Preliminary Cost Estimate: $ 183,316,00 $ 1,171,908.13
Cost Share % Design Est. Construction Design/Construction
WSDOT 0.287 $ 52,611.69 $ 336,337.63 $ 388,949.33
Renton 0.713 $ 130,704.31 $ 835,570.50 $ 966,274.80
Total: $ 183,316-00 $ 1,171,909.13 $ 1,355,224,13
The following summarizes each parties share of the total project cots:
WSDOT portion of Seahawks' 60-inch storm system: $ 120,238.49
WSDOT portion of Ripley Lane N Design: $ 52,611.69
WSDOT portion of Ripley Lane N Storm System Estimated Construction: $ 336,337.63
Total WSDOT Cost Share: $ 509,187.81
Total City of Renton Cost Share: $ 988,187.43
Total Seahawks Cost Share: $ 419,710.97
Total CityMSDOTISeahawk Project Cost. $ 1,917,086.21
H:1Division. s,,Develop. ser�Admirn',,Temporary Docs"Seahawks Memo - 5traka.docl16tp
Seahawks Site Stone System . rovement Summary
February 28, 2008
Page 3 of 3
WSDOT's share of the additional upstream storm system improvement construction cost
will include the WSDOT share of the Seahawks' storm system cost that the City will pay
for WSDOT. WSDOT will pay approximately 43% of the estimated construction cost of
the Ripley Lane N Storm Systern Improvements. The percentage may change if the costs
used in the calculation change once we complete project design.
Total Percentage WSDOT is to contribute to Ripley Lane N Construction:
= (WSDOT Contributing Funds Total) / (Estimated Construction)
= ($509,187.81) / (1,171,908.13) x 100=43.449%
(Rounded by WSDOT to be 43%)
BUDGET:
The total Surface Water Utility budget for the City's share of the storm system
improvements is $1,046,683. This includes $146,683 of funding remaining in a HUD
Brownfield Grant awarded for the Port QuendaIl Brownsfield Redevelopment, which was
approved for the projects use in 2007. The approved 2008 Surface Water Utility Capital
Improvement Program budget includes an additional $900,000 for the design, pennitting
and construction of the project. The City's share of the estimated total project cost is
$988,187, which is only $58,496 below the total project budget. Once the project design
is completed a new cost estimate will be developed to determine if additional funding
will be necessary to cover the City's share of the cost.
SCHEDULE:
The storm system improvement constructed by Football Northwest, LLC on the
Seahawks' Headquarters and Training Facility site have been completed. The
City/WSDOT Ripley Lane N storm system improvements that will connect into the
Seahawks' storm system are planned for construction to start on or before June 1, 2008,
and be completed by November 2008. The cost share agreements with Football
Northwest, LLC and WSDOT will be submitted for Council review and approval in
March 2008. The construction bid advertisement and construction contract award is
planned for April 2008.
Please contact me, if you have any questions or need additional information.
Attachment
cc: Lys Hornsby, Utility Systems Director
Neil watts, Development Services Director
H:1Division.s!Dcvclop.ser',.Admin`,Tcmporary Docs\Seahawks Memo - Straka.doc',,RStp
s
IN
City of Renton
Pam of, Gypsy .sin Scam 'ste' ittravementc
Mm t "Im" - Plans and Specs
IN
City of Renton
Pam of, Gypsy .sin Scam 'ste' ittravementc
Mm t "Im" - Plans and Specs
STATE OF WASHINCTON, COUNTY OF KING r
AFFIDAVIT OF PUBLICATION
PUBLIC NOTICE
3odv L_ Rarton. being first duly sworn on oath that she is the Leu-al Advertising
Representative of the
Renton Reporter
a bi-weekly newspaper, which ncwspaper is a le -al newspaper of gencral
circulation and is now and has been for more than six months prior- to the date
of publication hereinafter referred to, published in the English language
continuously as a bi-weekly newspaper in King County, Washington. The
Renton Reporter has been approved as a Legal Nci spaper b3- order of the
Superior Court of the State of WashiMIton liar bill" L'utrn V.
The notice in the exact form annexed was published in regular issues of the
Menton Reporter (and not in supplement form) which was regularly
distributed to its subscribers during the below stated period. The annexed
notice, a:
Public Notice
was published on May 19, 2007.
The full aanouni of the fee charVcd for said foregoing publication is the sum
of S94.00.
arton
al Advertising Representative, Renton Reporter
Subscribed and sworn to me this 2 1 " day of May, 2007
-ILL,
B D Cantelon
Notary Public for the State of Washington, Residing in Kent,
P. O. Number:
Q
s
Waslfrlt =tup'
fie•
NOTMF OF APPEAT, ITFARlNG
RE,NT0N.WAS }ilNGTON
'1 Public iv? l be lwc d by t.ho
Renton Hoa3 inv Examirrc;r in 01C
Council CJianik!rs on the seventh
floor of Renton City Hatt, 1055 South
Grady bray, Renton, Washington, on
Atay 29. 2007 qt 9:00 A.Al to consider
Ihr fnll1y.vin<r tx Jilin;
5<: b.rFt Ic, l ;i lr:r ;3ric r; trod
'i'rainiiig1�a ilavAppcal
LUA06-073, SA-H.. SA-M. Sii, ECF
.Location: 5015 Lake lkabhirrgton
Blvd N.
Descriptium An appeal of an
administrative determinatiun and
apprcnal of a ruinor mvxliticatior, has
heen filert with tllo city of Wilton
(alert;, 'fhc-,ppeai i�z(Ztlzo. approval
of an increast- in the ovorall bmIrfing
height. From Ill feet. a= approved
through the- Situ Plan Review
graces to a 1Wi 11t cal' M frr[.
All interested persons are invited to be
present at the Public Hearing to
r pree their opinior:�; Qcrc iinr7;
should ho dirc�ctcd to th(� Hearing
Examiner at 42.543041-515.
Pubhshed in the Renton Reporter
Muy 19, 2007. #8834<34
G o CITY OF R-'NTON
Office c.x the City Clerk
1055 South Grady Way - Renton WA 98057
6C
AL 1
ro , 1fa 9t
0
MP ARTIER
CITY OF I
Steve Janson & Eileen Halvorsen JUL. 2 ;
5021 Ripley Lane N., Ste- 302 RECE!
Renton, WA 98056 CITYClERK
RETURN TO SENDMV
ATTMMFsTMD — NOT 1{ri1Ctir, N
UNABL-C TO F"0W0AFV0
MC; 90057'0232zz
M; 11ri>�{rrj:��rr:r r�i�r; ��r��trr3r rrt�rrr�:�t�rj:r�r rrr
Kathy Keolke€, Mayor.
July 13, 2007
CITY `]F RENTON
City Clerk
Bonnie I. Walton
Roger A. Pearce
Foster Pepper PLLC
1111 —.3rd Ave., 43400
Seattle, WA 98101
Re: football Northwest LLC Appeal of Hearing Examiner's decision dated 6/11/2007,
regarding the Seahawks Headquarters and Training Facility Site Plan application, 5015_
Ripley Lane N. (File No. LUA-06-073, SA-H, SA-M, SM, ECF)
Dear Appellant:
At the regular Council meeting of July 9, 2007, the Renton City Council took action on the
referenced appeal by adopting the recommendation of the Planning and. Development
Committee. Enclo,sed is copy of the Planning and:Development Committee report as adopted.
Unless an appeal of the decision of the City Council is filed with King County Superior Court as
indicated in. Renton Municipal Code, the decision of the City Council is final,
If I can provide further information, please feel free to contact me.
Sincerely,
Bonnie I.. Walton
City Clerk
Enclosure
cc: Mayor Kathy Keolker
Council President Toni Nelson
Larry Warren, City Attorney
Jennifer Henning, Principal Planner
Parties of Record
1055 South Grady Way -Renton, Washington 98057 - (425) 430-6510 / FAX (425) 430-6516 R E lr 1 0 lr
AHEAD OF THE CUR'V'F.
This paperoontafns50%recycledrtiateria�.3o'/opostoonsumer
Larry & Esther Barsher Roger Pearce Elaine Wine
6940 96th Ave. SE Foster Pepper Football Northwest, LLC
Mercer Island, WA 98040 1111 Third Ave., Ste. 3400 505 Fifth Ave. S., Ste. 900
Seattle, WA 98101 Seattle, WA 98104
Port Quendall Company
505 Fifth Ave. S., Ste. 900
Seattle, WA 98104
Carl Hadley
Cedar Rock Consultants
19609 224th Ave.
Woodinville, WA 98077
Michael Cero
8300 Avalon Drive
Mercer Island, WA 98040
Jared Salstrom
5021 Ripley Lane N., Ste. 213
Renton, WA 98056
Steve Gregerson
5021 Ripley Lane N., Ste 302
Renton, WA 98056
Torn Ehrlichman
Socius Law Group
601 Union St., Ste. 4950
Seattle, WA 98101
Dwight & Christine Schaeffer
6958 96th Ave. SE
Mercer Island, WA 98040
Jeffrey Taraday
Foster Pepper
1111 Third Ave., 34th Floor
Seattle, WA 98101
Lance Lopes
VP Seahawks
800 Occidental Ave. S.
Seattle, WA 98034
Carl Lindstrom
6910 96th Ave. SE
Mercer Island, WA
Thelma Sutherland
1205 N 29th St.
Renton, WA 98056
Thomas Peterson
Socius Law Group, PLLC
601 Union St., Ste. 4950
Seattle, WA 98101
Joe Burcar
3190 160th Ave. SE
98040 Bellevue, WA 98008
Steve Janson & Eileen Halvorsen
5021 Ripley Lane N., Ste. 302
Renton, WA 98056
Eleanor M. Kennamer, President
Misty Cove Condo Association
5021 Ripley Lane N., #309
Renton, WA 98056
Barbara Paxhia
5021 Ripley Lane N., Ste. 104
Renton, WA 98101
Brian T. Sabey
5021 Ripley Lane N., Ste, 304
Renton, WA 98056
Elya G. Baches
1414 N. 34th St.
Renton, WA 98056
Aaron Belenky, President
Williamsburg Condo Association
1800 NE 40th St., Ste. H-4
Renton, WA 98056
Dan & Jody Samson
6952 96th Ave. SE
Mercer Island, WA 98040
Shelly Munkberg Richard Wagner
SECO Development Baylis Architects
1083 Lk. Wasbington Blvd N. Ste. 50 10801 Main St., Ste, 110
Renton, WA 98056 Bellevue, WA 98004
Les & Denise Klaff Howard & Sue Robboy
6915 96th Ave. SE 6944 96th Ave. SE
Mercer Island, WA 98040 Mercer Island, WA 98040
Steve & Deanna Marshall Hal & Gerry Fardal Dr. and Mrs. Robert Dietz
6934 96th Ave. SE 6920 96th Ave. SE 7906 E. Mercer Way
Mercer Island, WA 98040 Mercer Island, WA 98040 Mercer Island, WA 98040
.ialy 9, 2007 Renton City Council Minutes Page 239
•
APPEALS
Planning & Development
Committee
Appeal: Seahawks
Headquarters & Training
Facility, Football Northwest,
SA-06-073
Mr. Pietsch indicated that the annexation boundary was brought forward by
property owners representing 10 percent of the assessed value of the area, and
the City did not design the boundary. He noted that historically, Renton has
grown incrementally by annexation as property owners have been interested in
joining the City. Regarding Liberty High School, Mr_ Pietsch explained that a
Superior Court decision found that school district property could not be
included in the petition method of annexation and therefore schools are required
to annex to cities on their own. He noted that development in the area will
allow the extension of the City sewer line to Liberty High School, and
regardless of whether the school annexes, the sewer line extension could occur
within the next couple of years.
There being no further public comment, it was MOVED BY CORMAN,
SECONDED BY NELSON, COUNCIL CLOSE THE PUBLIC MEETING.
CARRIED.
Councilman Corman objected to having property owners pay the proportional
share of the City's existing outstanding bonded indebtedness, pointing out that
Benson Hill Communities Annexation -area residents are not being asked to
assume the City's bonded indebtedness.
MOVED BY CLAWSON, SECONDED BY PALMER, COUNCIL ACCEPT
THE 10% NOTICE OF INTENT PETITION FOR THE LIBERTY
ANNEXATION AND AUTHORIZE THE CIRCULATION OF A 60%
DIRECT PETITION TO ANNEX SPECIFYING THAT SIGNERS SUPPORT
FUTURE ZONING CONSISTENT WITH THE CITY'S COMPREHENSIVE
PLAN LAND USE DESIGNATION FOR THE AREA.*
Mr_ Pietsch brought to the Council's attention the correspondence received from
Highland Estates residents in support of adding the subdivision to the Liberty
Annexation boundary. He pointed out that the 8.7-acre subdivision is located
immediately west of the annexation area and contains 58 houses.
MOVED BY CLAWSON, SECONDED BY PERSSON, COUNCIL AMEND
THE MOTION TO ADD THE HIGHLAND ESTATES SUBDIVISION TO
THE ANNEXATION AREA. CARRIED.
*MAIN MOTION AS AMENDED CARRIED
Planning and Development Committee Vice Chair Clawson presented a report
regarding the appeal of the Seahawks' Headquarters and Training Facility site
plan (SA-06-073). The appeal deals with a minor modification of the permitted
height of the Seahawks' training facility. The height is less than that permitted
in the zone. The height reviewed and approved by the environmental review
committee (ERC) was 120 feet, less than the height after the minor modification
of 115 feet. Minor modifications are controlled by City Code Section 4-9-200I.
The Hearing Examiner found that all of the elements of that City Code section
have been met.
The Hearing Examiner originally approved the site plan with an elevation of
11 I feet for the training facility. On appeal, the Hearing Examiner conditioned
the minor modification on the planting of between 12 and 24 trees of a
reasonable specimen size at maturity_ The Committee recommended that the
City Council affirm the decision of the Hearing Examiner with respect to the
granting of the minor modification, but insofar as the additional conditions
imposed by the Hearing Examiner, the Committee recommended that the City
July 9, 2007 Renton City Council Minutes Page 240
Council find that the Hearing Examiner made errors of fact and law by
conditioning the minor modification on the planting of trees.
To that end, the Committee recommended that the Hearing Examiner's decision
be affirmed as to the minor modification but modified by adding three findings
of fact as follows:
11. Increasing the building's height to a full 115 feet would only create a 3
percent increase. At It 3 feet, the likely end result, the overall site massing
would only increase by 1.5 percent. The change in elevation would be
unnoticeable from the appellant's home, which is three-quarters of a mile
away on Mercer Island.
12. Requiring the applicants to plant evergreen trees along the lakeshore fagade
of the building would be nearly impossible in that there are emergency fire
access lanes along that area. Furthermore, there are structural and utility -
based issues which would need to be completely overhauled and re-
assessed in order to comply with this condition.
13. The Seahawks moved the facility back from the shoreline to preserve the
view from the Misty Cove condominiums. The planting of trees shoreward
of the facility would do much greater harm to the adjacent view of the
Misty Cove residents than it would benefit Mercer Island residents.
The Committee further recommended that conclusions 5, 6, and 7 be stricken
and replaced with the following conclusions, and the decision be modified to
grant the minor modification without condition.
5. However, since the change in elevation would be indistinguishable from
appellants' property, and otherwise meets all the requisite criteria of City
Code Section 4-9-2001, there is no basis to condition the minor
modification.
6. Because the ERC did not condition the project when it was greater in
elevation than the current elevation with the minor modification and the
Hearing Examiner did not condition the original site plan approval, there
appears to be no authority to impose conditions on this minor modification.
MOVED BY CLAWSON, SECONDED BY PALMER, COUNCIL CONCUR
IN THE COMMITTEE REPORT. CARRIED.
Appeal: The Landing, Harvest Planning and Development Committee Vice Chair Clawson presented a report
Partners, SA-06-071 regarding the appeal by Harvest Partners regarding The Landing site plan (SA-
06-071). The Committee met on 7/5/2007 to consider the appeal brought by the
applicant, Harvest Partners of the decision of the Hearing Examiner dated
5/22/2007. This matter stems from an appeal by Brad Nicholson and Alliance
for South End (appellants) of the site plan approval for The Landing. The
Hearing Examiner heard the appeal and rendered a decision on 5/22/2007. The
Hearing Examiner's decision affirmed the Development Services Director's
approval of the site plan for The Landing project in most respects but reversed
the Director's approval of certain specific elements in the The Landing site plan.
The City of Renton filed a request for clarification. On 6/5/2007, appellants and
Harvest Partners filed separate requests to reconsider with the Hearing
Examiner,
On 6/6/2007, consistent with a settlement between appellants and Harvest
Partners, appellants, through their attorney, withdrew appellant's request for
reconsideration and they notified the Hearing Examiner that they did not oppose
APPROVED By
CITYCOUNCIL
PLANNING AND DEVELOPMENT COMMITTEE Data Z- 9- ,?ad7
COMMITTEE REPORT
July 9, 2007
Seahawks' Headquarters and Training Facility Site Plan Appeal
LUA —06-073, SA-H, SA-M, SM, ECF
(Referred July 2, 2007)
This appeal deals with a minor modification of the permitted height of the Seahawks'
Training Facility. The height is less than that permitted in the zone. The height reviewed
and .approved by the environmental review committee (ERQ was 120 feet, less than the
height after the minor modification of 11.5 feet. Minor modifications are controlled by
City Code Section 4-9-2001. The Hearing Examiner found that all of the elements of that
Code section had been met.
The Hearing Examiner originally approved the site plan with an elevation of 111 feet for
the training facility. On appeal, the Examiner conditioned the minor modification on the
planting of between 12 and 24 trees of a reasonable specimen size at maturity. The
Committee recommends that the City Council affirm the decision of the Hearing
Examiner with respect to the granting of the Minor Modification, but insofar as the
additional conditions imposed by the Hearing Examiner, the Committee recommends that
the City Council find that the Examiner made errors of fact and law by conditioning the
minor modification on the planting of trees.
To that end, the Committee recommends that the Examiner's decision be affirmed as to
the Minot Modification but modified by adding three findings of fact.
11. Increasing the building's height to a full 115 feet would only create a three (3%)
percent increase. At 113 feet, the likely end result, the overall site massing would
only increase by one and a half (1 % %) percent. The change in elevation would
be unnoticeable from the appellant's home, which is'/4's of a mile away on
Mercer Island.
12. Requiring the Applicants to plant evergreen trees along the lakeshore facade of
the building would be nearly impossible in that there are emergency fire access
lanes along that area. Furthermore, there are structural and utility -based issues
which would need to be completely overhauled and re -assessed in order to
comply with this condition.
13. The Seahawks moved the facility back from the shoreline to preserve the view
from the Misty Cove condominiums. The planting of trees shoreward of the
facility would do much greater harm to the adjacent view of the Misty Cove
residents than it would benefit Mercer Island residents.
The Committee further recommends that conclusions 5, 6 and 7 be stricken and replaced
with the following conclusions and the Decision be modified to grant the minor
modification without condition.
5. However, since the change in elevation would beindistinguishable from
appellants' property, and otherwise meets all the requisite criteria of RMC 4-9-
200I, there is no basis to condition the minor modification.
6. Because the ERC did not condition the project when it was greater in elevation
than the current elevation with the minor modification and the Examiner did not
condition the original site plan approval, there appears to be no authority to
impose conditions on this minor modification.
Terri Briere, Chair
Clawson, Vice Chair
Marcie Palmer, Member
C: Neil Watts
JenniferHenning
Fr[d �(4wrma,-
t-QYi.ry arYtn
Alec PiGksc,
(yre9g Zimmerman
Seahawks' HQ & Training Facility Site Plan Appeal
Page 2
July 2, 2007 Renton City Council Minutes Page 231
Added
CORRESPONDENCE
Citizen Comment: Various -
Seahawks Headquarters &
Training Facility Appeal,
Football Northwest, SA-06-
073
�r
MOVED BY PERSSON, SECONDED BY LAW, COUNCIL REFER
CONSENT AGENDA ITEM 51. TO THE FINANCE COMMITTEE.
CARRIED.
City Clerk reported receipt of five letters, as allowed by City Code, regarding
the appeal of the Hearing Examiner's decision concerning the Seahawks
Headquarters and Training Facility site plan application from the following
parties of record: Hal and Gerry Fardal, 6920 96th Ave. SE, Mercer Island,
98040; Dwight R. Schaeffer, 6958 96th Ave. SE, Mercer Island, 98040, Larry
and Esther Barsher, 6940 96th Ave. SE, Mercer Island, 98040; Howard and Sue
Robboy, 6944 96th Ave. SE, Mercer Island, 98040; and L. Paul Ohainle, Socius
Law Group, PLLC, Attorneys for Misty Cove Association of Apartment
Owners, 601 Union St., Suite 4950, Seattle, 98101.
MOVED BY BRIERE, SECONDED BY CLAWSON, COUNCIL REFER THE
CORRESPONDENCE TO THE PLANNING AND DEVELOPMENT
COMMITTEE, CARRIED.
UNFINISHED BUSINESS
Council President Nelson presented a Committee of the Whole report regarding
Committee of the Whole
the Benson Hill Communities Annexation_ The Committee recommended
Annexation: Benson Hill
concurrence in the staff recommendation to approve a resolution amending the
Communities, S 200th St &
boundaries of the Benson Hill Communities Annexation in keeping with
128th Ave SE
boundaries recommended by the Boundary Review Board, and amending the
ballot title in the request to King County to hold a special municipal election on
the Benson Hill Communities Annexation on the 11/6/2007 election ballot. The
Committee further recommended that the resolution regarding this matter be
presented for reading and adoption. MOVED BY NELSON, SECONDED BY
BRIERE, COUNCIL CONCUR IN THE COMMITTEE REPORT. CARRIED.
(See below for resolution.)
RESOLUTIONS AND
The following resolution was presented for reading and adoption:
ORDINANCES
Resolution #3891
A resolution was read authorizing the Mayor and City Clerk to take those
Annexation: Benson Hill
actions necessary to place Proposition I before the voters, including the
Communities, S 200th St &
preparation of information for the voter's pamphlet for the election to be held on
128th Ave SE
11/6/2007 regarding the annexation of approximately 2,438 acres of contiguous
unincorporated territory within Renton's Fair -wood Potential Annexation Area,
also known as the Benson. Hill Communities Annexation. MOVED BY LAW,
SECONDED BY CLAWSON, COUNCIL ADOPT THE RESOLUTION AS
READ. CARRIED.
The following ordinances were presented for second and final reading and
adoption:
Ordinance #5296 An ordinance was read amending the 2007 Budget by transferring $150,000
Utility: SW 34th St Culvert from the Lake Ave. S./Rainier Ave. S. Storm System Replacement Project
Replacement Project Fund expenditure account to the SW 34th St. Culvert Replacement Project
Transfer, Budget Amend expenditure account. MOVED BY CLAWSON, SECONDED BY BRIERE,
COUNCIL ADOPT THE ORDINANCE AS READ. ROLL CALL: ALL
AYES. CARRIED.
Ordinance #5297 An ordinance was read amending Sections 4-5-040, 4-5-050, 4-5-055, 4-5-090,
Development Services: 4-5-100, and 4-5-110 and adding Section 4-5-051 of Chapter 5, Building and
Standard Codes Adoption Fire Prevention Standards, of Title IV (Development Regulations) of City Code
by adopting the 2006 International Building, Residential, Mechanical, The
Washington State Energy Code, and Fuel Gas Codes; the 2005 National
CITY of RENTON
rt
JUL 2 2o07 CAO
7'ot-0?DD7 RECEIVED
CITY CLERIC'S OFFICE
HAL & GERRY FARDAL
6920 - 96th Ave. S.E.
Mercer Island, WA 98040-5406
July 2, 2007
City Clerk, City of Renton
1055 S. Grady Way
Renton, WA 98057
Attn: Bonnie 1. Walton
Re: Barsher Appeal of Seahawks Building Request ( I L F- L uA -06 - U -7 3,11
Dear Clerk: ,
We are writing this letter in support of Larry and Esther Barsher's
request that the June 11, 2007 decision of Hearing Examiner Fred J.
Kaufman be upheld by the Renton City Council.
Our home is located two lots up the slope from the east waterfront of
Mercer Island, in the 6900 S.E. block. The sweeping and unobstructed view
from our east side windows and deck is almost directly east to the new
Seahawks' facility.
The scale of the planned Seahawks' buildings greatly exceeds that of
any other within our view of the landscape on the east side of the East
Channel of Lake Washington. We are confident that there are many, many
residences on the east waterfront/slope of Mercer Island that will be
similarly impacted by the new structures.
We are also confident that the Seahawks' owners want to be good
neighbors, not only to any immediate neighbors (relatively few in number),
but also to the substantially greater number of neighbors whose homes
directly face the new buildings. And we are certain that the City of Renton
likewise desires to take into account the effect of its developments on the
residents of Mercer Island.
The conclusion of the Hearing Examiner that from 12 to 14 evergreen
trees be planted along the lakeside fagade of the Indoor Practice Field to
soften, at least to some extent, the visual impact of this huge structure is
certainly reasonable, and should be upheld by the Renton City Council.
Very truly yours,
Hal &. Gerry Fardal
hfardal@yahoo.com
yahoo.com
July I, 2007
City Clerk
Attention: Bonnie Walton
City of Renton
1055 Grady Way
Renton, WA 98057
C1TY OF RENTOM
JUL 0 2 Z007
CdI FtECEIYE'D
LER7U5 OFFICE
Re: Seahawks Practice Facility. Barsher Appeal of Seahawks Building Height' f e-""LU6—OG �Q]
Dr. Ms. Walton:
I am writing in support of Examiner Fred Kaufman's recommendation that supports
Larry Barsher's appeal. The proposed Sea Hawks' facility is an enormous structure that
dwarfs all other structures visible from the eastern side of Mercer Island, affecting the
views of thousands of Mercer Island residents. I find the recommendation to be an
inexpensive and reasonable approach to mitigate the impact. It's a mitigating provision
that should have been part of the original design approval.
I estimate the "minor" height increase represents a volume of eight of my houses. if it's
that minor, the inside clearance could be reduced by the same amount without any
significant impact to the Sea Hawks, or the foundation could be lowered. The Sea Hawks
have not shown any significant hardship for complying, and therefore, their appeal should
be denied. 1 suspect it would be cheaper for them to comply than it is for them to appeal.
Sincerely,
GCl/t
Dwight r.
6958 96`h
Ave SE
Mercer Island, WAS 98040
Larry and Esther Barsher
6940 96th Ave. 5. E.
Mercer 151an4, Washington 98040
2O6-232-9280.... lesb4v0i COtTlC,1St.net
City Clerk
City of Renton
1055 South Grady Way
Renton, WA 98057
CITY OF RENTON
r�
JUL 0 2 2007
CITY CLERK'SCOFFICE
July 2, 2007
Re: Appeal of Hearing; Examiner's decision dated 6/11/2007, File ## LUA-06-073
This letter is in support of Barsher's approved Seahawks Headquarters & Practice Facility
appeal.
At the May 29, 2007 hearing my wife requested a copy of the Seahawks Headquarters &c
Practice Facility site and landscape plans from Elisabeth Higgins, Development Services
City of Renton. These drawing; were never provided_ After 1. received notice of the
appeal of the hearing examiner's decision on the Barsher appeal I called Elisabeth and
requested the plans be mailed to me. After waiting; many days l called Elizabeth again on
.tune 28, 2007 and she apologized for not sending; the drawings and said it will now be
sent. .l checked my mail box today (July 2, 2007) and the promised submittal was not
there. if I get the drawings before the July 5th appeal meeting; I will review and consider
using them, with added commentary, as an attachment to this letter.
As a Licensed Professional Civil Engineer 1. have done numerous site plan layouts during
my nearly 50 years of practice. The above referenced plans will show me if there are
adequate landscape areas next to the west side of the indoor football field building, and the
administrative office building; that surrounds it, to accommodate the approved addition of
trees. If there is not enough areas then additional landscape areas could be created by
relocating; a few of the adjacent building parking stalls to another place on the site.
The legacy of having the luxury of between 12 and 24 parking; stalls close to the building
(where large trees can be planted) surely does not equate to the negative impact legacy the
large mass building will have on hundreds of Mercer Islanders now and for generations to
come.
If"between 12 and 24 trees" are placed close to the indoor football field building; as well
as the 55-foot high administrative office building, which wraps around the west side of the
football building, those trees should not effect the Misty Cove lake views. Mr. Pearce's
suggestion that trees be planted 55 feet in the air is making; light of the hearing; examiner's
tree approval decision. The intent of the hearing; examiners decision was to soften the
impact and by placing trees very near the west side of both buildings that intent will be met
because the football building will also be screened by trees planted adjacent to the office
building.
Mr. Pearce states "the existing site plan already has significant landscaping along the
shoreline, which will screen views from the water". He misses the point. The purpose of
adding "between 12 and 24 trees" is to nvtigate and soften the massive building's size and
greatly reduce the environmental impact on those viewing the building from across the
lake on Mercer :Island, not from the water.
Mr. Pearce also states " Nothing in the code gives the Examiner authority to impose
additional conditions". I plead that common good sense gives the Examiner authority to
impose additional, conditions when it comes to serving the good of the greater community,
especially when such conditions are so minimal and inexpensive, Regardless of Mr.
Pearce's commendable knowledge of the law and strict interpretation of city code &
ordinances isn't the overriding purpose of city government to protect the welfare of its
community and, in the big picture, the welfare of the greater community?
One has to wonder how many trees could have been bought and installed with the money
that has already been spent by this appeal of the hearing examiner's decision, will be spent
conducting the July .5th review and finally be spent at the subsequent full Council meeting.
Is this not ultimate folly? Surely on a 19.68 acre site one can arrange the layout to allow
planting "between 12 and 24 trees" to soften the building's visual impact.
Please consider this letter as a pertinent document when conducting the Council's
Planning and .Development Committee appeal review on July 5, 2007,
Sincerely,
L d Esther Barsher
ps. Misty Cove's submittal to the City Council states that Barsher did not serve Misty
Cove with a notice of their appeal. I was never told by the Development Services
Department or the City Clerk that serving Misty Cove was my responsibility. I always
thought service to parties of record (or interested parties) was the job of the City Clerk.
,/7�
ClTY OE RENTt7N
JUL 0 2 2007 OWE
Howard & Sue Robboy RECERED
ciTY rXERK$ OFFICE
6944 96tb Ave SE
Mercer Island, TEA 98040
Date: July 1, 2007
To; City of Renton & Seattle Seahawks
From.- Howard .Robboy
Re; Seahawks Appeal of our Request to :Plant Trees �t= r��4t- L_ U A. -7 3�
Dear Seahawks,
Unlike many of the people in the Northwest, we supported your desire to build Quest
Field. We pay additional property taxes every month for your stadium. It's a strange
relationship_ I: make a payment, but. I'm not an investor and don't share in the profits.
When we learned of your decision to build a practice field in Renton, we were excited that
you'd play a role in cleaning up the waterfront.
Your structure is shaped like a box. It's ugly. How about being a good neighbor and
putting trees up and keeping the shoreline pretty and green? The cost is quite minimal and
appears to have a level of support by the city.
We're not asking for a multi -million dollar change or to delay your project. We're just
asking you to do for us what we do for you - support each other.
Very truly yours,
41 &1/*/—
ward Sue :Robboy
JUNK. 29. 2C07 3:HUM SUwIU� LAW HUP Nu. jidy r, I
Socius Law GrM, PLLC
A T T O R N E Y S 4+1,�
Two Union Square • 601 Union Street, Suite 4950�y
Seattle, Washington 98101.3951 9
Telephone 206.838.9100 o Facsimile 206.838.9101
www.sociLislaw.cam
7. 2 a 00 7
Facsimile Transmittal ,Sheet
City Clerk
TO:
Attn: Bonnie Walton
City of Renton
FAX NUMBER;
(425) 430-6516
FROM:
L. Paul Ohainle
Sealaawks l'zactice Facil
Barsher Appeal of Seahawks Building Height
RE:
LUA-06-073, SA-H, SA-M, SM, ECF
("Barsher Appeal")
NUMBER OF PAGES:
4 (including transmittal sheet)
DATE/TIME:
6/29/07 2:27 PM
IF ALL PAGES ARE NOT PROPERLY RECEIVED, PLEASE CONTACT: Erin Knobler
ORIGINAL TO FOLLOW: X WILL WILL NOT
COMMENTS:
Enclosed please find Misty Cove's Submittal in Support of .Football Northwest
LLC's Appeal of the Office of the Hearing, Examiner's ,hone 11, 2007 Report and
Decision..
�If you have any questions or need anything further, please do not hesitate to call.
CONFIDEN77ALITY NOTE: The doctanenis ooeomp❑vying this facsimile transmission contain hijormation belonging to Socius Law
Ciro+tp, FLGC which is confidential and/or lega11yprivdeged, The information is intsndsd only for the use of the individual or "illy named above.
If you are not the intended recipient, you are hereby norjfed that any disclosure copying, distribution or the raking of any action in reliance on
the conrents of this telecopied information is siricdy prohibiter!. If you have received this facsimile !n error, please inarnedi❑rely notify us by
telephone to arrafnge for rentrn of the original documents to us.
As this facsimile mayfimk, you are advised ro make a copy for your files to ensure a permanent mcord.
ff you do not receive all poses indicated above or if you experience aproblew with this ironsminal, please call our ofce immediately.
xW
!UN. 29, 2007 3.00PM SOCIUS LAW GROUP
NO.3289 P. 2
V
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
BEFORE THE CITY COUNCIL OF THE CITY OF RENTON
In re Appeal of Hearing Examiner's June 1I,
2007 Decision Regarding the Seahawks'
Headquarters and Training Facility Site Plan
Application
Pile No. LUA06-073
SA-H, SA-M, SM, ECF
SUBMITTAL IN SUPPORT OF
FOOTBALL NORTHWEST LLC'S
APPEAL OF THE OFFICE OF THE
HEARING EXAMINER'S JUNE 11,
2007 REPORT AND DECISION
L INTRODUCTION
Misty Cove Association of Apartment Owners ("Misty Cove") joins Football
Northwest LLC's ("FNW") request that the City Council modify the .tune 11, 2007 decision
of the City of Renton Hearing Examiner in File Nos. LUA-06-073, SA. -II, SA-M, SM, ECF
("the Barsher Decision"). Misty Cove requests that the City Council set aside the conditions
imposed by the Barsher Decision that conflict with the Master Plan and Site Plan, dated
December 7, 2006 ("December Decision"), and the Settlement Agreement between Football
Northwest LLC and Misty Cove ("Settlement Agreement"). Specifically, Misty Cove
requests that the City Council remove any conditions that impair Misty Cove's view corridor,
SUBMITTAL IN SUPPORT OF FOOTBALL
NORTHWEST LLC'S APPEAL
20473
Sodus Law Group, P1_tC
A T T O R N E Y S
Two Unior Square • 601 union Street Suite 4950
-1 S=Ve. Washington 98101.3951
Tc1cphonc 206.898,M0
Facsimiie 206.638.9101
I
AN. 19.2'UJ 3. VV S CIS LAW 6NUF
NU. J269 F, j
1
2
4
5
6
7
8
9
10
11
12
13
I4
15
16
17
18
19
20
21
22
23
24
25
26
such as the condition requiring 12-24 evergreen trees to be planted along the lakeshore
fagade of the Indoor practice Field.
H. FACTUAL BACKGROUND
On December 7, 2006, Hearing Examiner Fred Kaufmarx entered Findings,
Conclusions, and Recommendations and a Decision that honored, in part, a Settlement
Agreement between FNW and Misty Cove that would partially preserve the views of Lake
Washington currently enjoyed by owners of Misty Cove. The Barsher Decision requires 12-
24 evergreen trees to be planted along the lakeshore fagade of the Indoor Practice Field_ This
decision directly conflicts with the December Decision. It appears likely that the location of
the 12-24 evergreen trees along the fagade will negatively impact Misty Cove's view, a
central issue to both the Settlement Agreement and the December Decision. Section 12 of
the December Decision provides as follows'
The proposed shoreline area planting plan shall include lower -level plantings
in the north section of the project shoreline area, in order to minimize impacts
of views of the water fxom the adjacent Misty Cove Condominium property.
For these reasons, Misty Cove joins FNW's appeal of the Barsher Decision.
Misty Cove is one of the parties of record in this matter. Misty Cove will be directly
affected by the Examiner's decision and has standing to join FNW's appeal. l~NW filed a
timely appeal of the June 11, 2007 Barsher Decision. Misty Cove is permitted to file a letter
in support of FNW's appeal on or before July 2, 2007.
Misty Cove incorporates by reference FNW's Assignments of Error, Finding of Fact
10 and Conclusions of Law 5, 6, and 7.
Socius Law Group, PLLC
SUBMITTAL IN SUPPORT OF FOOTBALL A T T a R N E Y $
NORTHWEST LLC'S APPEAL. Two Unlon Squaw • 601 Union Srroat, SuiteA95o
_2- 5eame, Washington 99101.3951
Telephone 206.33a.9100
2047; Facsimile 2X.$3a.9101
,SUN. EJ. 1UU! 3:01FM KCHS LAW GROUP
NO, 3289 P. 4
1
2
3
4
5'
6
7
8
9
10
I1
12
13
14'
15
16
17
19
19
20'
21
22
231
24
251
26
The newly imposed condition to plant between 12 and 24 trees along the lakeshore
facade of the Indoor Practice Field may seriously impact Misty Cove's lake views. The same
views were a critical aspect of the Settlement Agreement with FNW and were protected in
the City of Renton's December Decision. Now, Misty Cove's lake views may be lost so that
a Mercer Island resident's view across the lake will be more natural.
in addition, from a review of our records, it does not appear that the Barshers served
Misty Cove with a notice of their appeal or that Misty Cove received a copy of the Barsher
appeal, despite the fact that Misty Cove is a party of record. Upon proper notice of the issues
raised by the Barsher appeal, Misty Cove would have submitted comments in opposition to
it.
IV. CONCLUSION
For the reasons set forth in FNW's Appeal and in this submittal in support, Misty
Cove requests that the City Counsel strike the additional conditions set forth in the Barsher
Decision and preserve Misty Cove's lake views,
DATED this 290' day of Arne, 2007.
SUBMITTAL rN SUPPORT OF FOOTBALL
NORTHWEST LLC'S APPEAL
30413
SOCIUS LAW GROUP, PLLc
By 2 to
Thomas F, Peterson, WSBA #16587
L. Paul Ohainle, WSBA 433755
Attorneys for Misty Cove Association of
Apartment Owners
Socius Law Group, PLLC
A T T 0 RH E Y S �.
Two Unlon Square: • 601 union Street, Suite 4950
Seattle, Washington 981013951
Talophene 206.SU1100
Facsimile 206.838.9101
1
2
3
4
5
6
7
S
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
:f�1 J'Y YF RE f oN
i- ")) ?i)01 C
kECtIVED �l
r,ITY C;[,FRK'S F!CF
BEFORE THE CITY COUNCIL OF THE CITY OF RENTON
In re Appeal of City of Renton Hearing
Examiner Decision re Minor Adjustment to
Approved Site Plan
File No. LUA06-073
SA-H, SA-M, SM, ECF
PRE -APPEAL HEARING BRIEF OF
FOOTBALL NORTHWEST LLC
I. INTRODUCTION
Project applicant and property owner Football Northwest LLC ("FNW") requests the City
Council to modify the June 11, 2007 appeal decision from the City of Renton Hearing Examiner
to eliminate the condition added to the Community Development decision.
The permit at issue is a Minor Adjustment to the approved site plan for the Seattle
Seahawks Corporate Headquarters and Training Facility. City Staff has jurisdiction to approve
minor adjustments, and the Examiner only has appeal authority. On appeal, the Examiner was
required to give substantial deference to the Community Development's decision.
The only change to the approved Site Plan was to allow the Indoor Practice Facility (the
"IPF") portion of the Seahawks headquarters to be slightly higher than described in the City's
original site plan approval. The minor adjustment allowed a change from I I I feet in height to
115 feet — but the actual change will less than a two (2) foot height increase. The Minor
Adjustment clearly meets all the minor adjustment criteria in Renton Zoning Code §4-9-200(I).
PRE -HEARING BRIEF FoSTF.R PEPPER PLLC
OF FOOTBALL NORTHWEST - 1 ORIGINAL 1111 THIRD AVENUE, SUITE 3400
SEATTLE, WA5HINGTON 98101-3299
C� j} PHONE (206) 447-4400 FAX (206j 447-9700
50623954.1 j/T,
-II ,� y � x►.Cf4��
1
2
3
4
5
6
7
8
9
14
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
The Department of Development Services approved the Minor Adjustment because all criteria
were met. The Examiner also concluded that all criteria for the issuance of the Minor
Adjustment were satisfied.
Rather than give deference to Development Services' decision (as the Examiner was
required to do once he found that the Development Services decision was not unlawful and was
based on substantial evidence), the Examiner made his own original, discretionary decision to
add a condition on the Corporate Headquarters project. The condition reads as follows:
The applicant shall be required to plant evergreen trees along the lakeshore fagade of the
Indoor Practice Field [sic]. The plantings should reflect a more natural arrangement and
not necessarily be the same species or evenly spaced along the fagade. Nor at maturity
should the all trees [sic] necessarily reach the height of the facility. This office will defer
to the Development Services Division to determine the spacing and species.
This condition should be rejected by the City Council for four independent reasons:
One: The condition ignores the only expert testimony before the Examiner and is not
supported by substantial evidence in the record. FNW stipulated that the height increase would
only be two feet, and the only expert evidence before the Examiner was that this minor height
change would not be noticeable.
Two: The condition does not even address the impact of raising the IPF two feet in
height. The uncontroverted expert evidence showed that the minor height increase would not be
noticeable — especially from the Barsher's residence, which is three quarters of a mile away on
Mercer Island. The Examiner's condition, however, addresses the overall massing of the
structure — not the additional two feet in height. In addition, complying with the condition would
negatively impact the views of FNW's next door neighbors, the owners and residents of the
Misty Cove Condominiums, which was totally ignored by the Examiner.
Three: The condition is illegal because it is unnecessarily burdensome and infeasible.
As shown by the approved site plan, which was ignored by the Examiner, placing trees along the
lakeshore fagade of the IPF would require FNW to plant trees on top of the Seahawks
administrative office building (which would require extensive re -engineering) and would require
PRE -HEARING BRIEF FOSTER PEPPER PLLC
OF FOOTBALL NORTHWEST - 2 1111 THIRD AVENUE, SUITE 3400
SEATfLE, WASHINGTON 98101.3299
PHONE (206) 4474400 FAx (206) 447-9700
5023954,1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
FNW to place trees right in the middle of the Site Plan -approved player entry, loading dock, and
disabled parking area for the administrative office building. Under controlling Washington law,
this type of unreasonable and arbitrary condition is illegal and should be rejected by the Council.
Four: The Examiner failed to give any deference to the Department of Community
Development decision and acted outside his jurisdiction. In this case, the Examiner was not the
original decisionmaker but was only hearing an appeal of a decision from the Department of
Community Development approving the Minor Amendment. Once the Examiner determined
that the Department of Community Development decision was lawful — was based on the correct
legal criteria and supported by substantial evidence — the Examiner was required to uphold that
Staff decision. Instead, the Examiner went beyond his legal jurisdiction and added an additional
condition, which is a violation of Washington law.
For all those reasons, FNW respectfully requests the Council to modify the Examiner's
decision to eliminate the Examiner condition. This will not eliminate landscaping that softens
the views of the facility from the water and from more distant areas, such as the Barsher's
residence on Mercer Island. As shown in the City's record, there are dense landscaping areas
along the shoreline (a fact that was also ignored by the Examiner) that both screen the facility
and provide full mitigation for any impacts to aquatic habitat.
1I. FACTUAL BACKGROUND
The evidence at the administrative record shows:
The Seattle Seahawks Corporate Headquarters and Practice Facility is located on a
19.6-acre site between Lake Washington and I-405. The site was formerly part of a wood -
treating operation. As part of the development of the Seahawks site, FNW has remediated soils
and capped the site as approved by the Washington Department of Ecology. Development on the
site will include football practice fields on the south part of the site, public access along the north
edge of the site, an administrative office building for the Seattle Seahawks professional football
franchise, and an indoor practice facility or IPF. The chief requirement of the IPF is a 95-foot
PRE -HEARING BRIEF ]FOSTER PEPPER PLLC
OF FOOTBALL NORTHWEST - 3 1111THIRD AVENUE, SUrrE3400
SEATTLE, WASHINGTON 98101-3299
PHONE (2061447-4400 FAX (206)447-9700
50823954.1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24.
25
26
interior clearance so that professional football practices can be conducted. The administrative
office building wraps around the IPF on two sides — the south side and the west side (facing Lake
Washington). A current site plan from the administrative record is attached as Exhibit A.
The City's environmental review for the Seahawks Corporate Headquarters Site Plan
analyzed an IPF structure of up to 120 feet in height. The City determined that a building of that
height would have no significant environmental impacts — including no view impacts either to
immediate neighbors or to more distant views of the site.
After the City's environmental review, FNW moved the office building and IPF
structures approximately 62 feet further back from the shoreline, in order to minimize the impact
to the neighboring condominium owners to the north of the site — the Misty Cove
Condominiums. Landscaping along the north edge of the project shoreline was also kept
purposely low in order to preserve water views from Misty Cove.
Design development for the IPF structure showed that the interior 95-foot clear height
could likely be accomplished with an overall building height of approximately 1 I 1 feet in height.
Those design development drawings were presented to the City at the Site Plan hearing in
November 2006. Accordingly, the City's Site Plan approval described the IPF as being
"approximately 11 I feet tall."
After the December 6, 2006, Site Plan approval, in response to City building code
requirements, FNW was required to thicken the truss structure of the IPF roof. To keep a 95-foot
clearance, the new truss structure requires a building height of under 113 feet. To be cautious,
FNW requested a minor adjustment to allow up to 115 feet in height. Since then, final building
permit drawings have been submitted to the City, and FNW stipulated at the Minor Adjustment
appeal that the IPF will be slightly less than 113 feet in height.
This minor height variation to the IPF is the only change to the approved Site Plan. No
additional lot coverage is proposed, and no expansion of the site plan boundary is proposed.
Notably, the dense landscaping areas along the shoreline will also not be changed. See Exhibit A
PRE -HEARING BRIEF FQSTGR PEPPER PLLC
OF FOOTBALL NORTHWEST - 4 1111 THIRD AVENUE, SUITE 3400
SEATTLE, WASHINGTON 98101-3299
PHONE 1206) 447-4400 FAX (206) 447-9700
50823954.1
1
21
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
(Site Plan) and Exhibit B (landscaping plan from the City's administrative record). The
landscaping plan, which was approved by Ecology to ensure there would be no impacts to habitat
and shoreline values, shows several densely planted areas which will screen the Seahawks
facility from the water.
The massing of the site structures would increase only three percent (3%) if the full 115
feet in height were utilized for the IPF. At a final IPF height of approximately 113 feet, the
overall site massing would only increase by only one and one-half percent (1'/2 %).
The uncontroverted expert testimony at the hearing from project manager and
professional architect Elaine Wine showed that the small increase in height of the IPF would not
be noticeable, whether from near views or from distant views, such as from the residence of
project appellants the Barshers, who live over 3/ of a mile away on Mercer Island.
I A.
III. DISCUSSION OF LEGAL ISSUES
The Examiner's Condition Is Not Based On Substantial Evidence.
Under Washington law, land use conditions must be supported by substantial evidence in
the record. Benchmark Land Co. v. City of Battleground, 146 Wn.2d 685, 694, 49 P.3d 860
(2002). Substantial evidence is evidence sufficient to persuade a fair-minded person. Id.
Here, the Examiner completely ignored the uncontroverted expert testimony that the
minor height increase to the IPF would not be noticeable. The evidence also showed that the IPF
(even at 120 feet in height) would not have view impacts. Instead of following that evidence of
the Minor Adjustment itself, the Examiner considered the massing of the entire 1PF facility, and
determined that plantings closer to the facade would soften the look of the overall building. This
conclusion was taken without even considering the landscaping plan for the facility, which
locates significant and dense landscape areas along the shoreline, and without considering the
impact on views of the water from the Misty Cove Condominiums. (Appellants Barshers have a
view of I-405 and commercial development — not a view of the water). The Examiner's
PRE -HEARING BRIEF
OF FOOTBALL NORTHWEST - 5
FOSTER PEPPER PLL.0
I III THIRD AVENUE, SUITE 3400
SEATTLE, WASHINGTON 98101-3299
PHONE (206) 447-4400 FAX (206) 447-9700
50823954.1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
condition is not supported by substantial evidence, and is directly contradicted by the only expert
evidence in the record. Accordingly, the Examiner's condition should be eliminated.
I B. The Examiner's Condition Does Not Address the Impact of the Minor Adjustment.
Under Washington law, any land use condition must cure a direct impact caused by the
permitted activity and must do so proportionally. Isla Verde International Holdings, Inc. v. City
of Camas, 146 Wn.2d 740,49 P.3d 867 (2002).
Here, the only decision before the Examiner was Staff's approval of the Minor
Adjustment. The view impacts of the 111-foot high IPF and of the administrative office building
were not at issue. The only impact at issue was the impact of the Minor Adjustment — a less than
two (2) foot height increase to the IPF. The Examiner's condition, however, addresses the
massing of the entire IPF, not just the two -foot additional increment (Conclusion 6 — addressing
"the building's facade"). And the Examiner's condition does not even pretend to address the
two -foot height increase because the trees required by the Examiner are not required to reach the
height of the facility. Finally, the Examiner's decision does not address the impact of the actual
Minor Adjustment, because the evidence showed there would not be any impact to address — i.e.,
there would be no noticeable difference between a 111-foot tall IPF and a less than 113-foot tall
IPF. Attached at Exhibit C to this brief are simulations showing a photosimulation of the 111-
foot tall IPF with a red line showing how little difference there would be at a 115-foot height.
The actual building will only be 113 feet in height, so the impacts are half of what is shown on
those exhibits from the administrative record.
Importantly, the Examiner's condition will actually create view impacts to the
neighboring Misty Cove Condominiums. Misty Cove is just to the north of the Seahawks office
building and IPF. Because the Seahawks buildings have been moved back from the shoreline, in
order to minimize impacts on Misty Cove views of the water, many of the Misty Cove residents
have a territorial view along the lakeshore facade of the Seahawks buildings. That view will be
impacted by the Examiner's condition, which the Examiner failed to take into consideration.
PRE -HEARING BRIEF FOSTER PEPPER PLLC
OF FOOTBALL NORTHWEST - 6 3111 THIRD AVENUE, SUITE 3400
SEATTLE, WASHINGTON 98101-3299
PHONE (206) 447-4400 FAX (206) 447-9700
50823954.1
1 11 C. The Examiner's Condition Is Unreasonable and Arbitrary.
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Under Washington law, land use conditions are unreasonable and illegal if they are
unnecessarily burdensome. Standard Mining & Dev. Corp. v. City of Auburn, 82 Wn.2d 321,
1 331, 510 P.2d 647, (1973); Anderson v. City of Issaquah, 70 Wn. App. 64, 80, 851 P.2d 744
(1993). Conditions are illegal and arbitrary if they are unreasonable actions taken without regard
of the facts and circumstances. Terhar v. Washington State Department ofLieensing, 54 Wn.
App. 28, 34, 771 P.2d 1180 (1989),
Here, the Examiner has required evergreen trees "along the lakeshore fagade of the
Indoor Practice Field [sic]." This condition is plainly unreasonable and arbitrary because the
Examiner failed to consider the required structures in the approved Site Plan that are located
along that facade, and which would have to be replaced. Those structures make the Examiner's
condition practically impossible to implement, and would violate the City's own Site Plan
approval.
For most of the IPF lakeshore faqade, the Seahawks administrative office building (a
three to five story structure) adjoins the IPF. Any trees along the IPF facade would have
to be on the roof of the administrative office building (3 to 5 stories in the air). In
addition to looking ridiculous, this would require a complete re -engineering of the office
building.
• The remaining, section of the IPF lakeshore fagade contains numerous structures required
by the City's Site Plan that would have to be relocated in order to accommodate trees
along that fagade — including the player entry, the loading dock for both buildings, the
dumpster and recycling area, a short covered walk to the player entry, and disabled
parking stalls. Again, the Examiner completely ignored the relevant facts and
circumstances when he required trees to be located in this area.
Even if the Examiner "meant" to require trees along the administrative office building
facade, the Examiner completely ignored the emergency access fire lane that is adjacent
PRE -HEARING BRIEF FOSTER PEPPER PLLC
OF FOOTBALL NORTHWEST - 7 1111 THIRD AVENUE, SurrE 34DD
S£ATTLB, WASHINGTON 98101-3299
PHONE (206) 4474400 FAX (206) 447-9704
50623454.1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
to that fagade. Trees could not be located along the administrative office building fagade
without blocking that fire lane. Not only is the fire lane a critical life -safety component
of the project, but the fire lane location along the fagade of the office building is a
requirement of the Site Plan.
The Examiner's condition is unreasonable and arbitrary, because it ignores the facts and
circumstances of the Site Plan and directly conflicts with other structures approved and required
by the Site Plan. Accordingly, the Council should modify the Examiner's decision to eliminate
I that condition.
I1W
The Examiner's Condition Is Outside His Authority.
An appellate decisionmaker is required to uphold the decision from below if the decision
is not unlawful and is based on substantial evidence. Maranatha Mining, Inc. v. Pierce County,
59 Wn. App. 795, 801, 801 P.2d 985 (1990). Here, the Examiner was not the original
decisionmaker on the Minor Adjustment to the Site Plan. Rather, that original decision is made
by the Department of Community Development.
The City's own Code is consistent with the Maranatha decision. The Examiner is
required to give substantial weight to any discretionary decision of Community Development
Renton Zoning Code 4-8.110E(7)(a). After giving substantial weight, the Examiner has only
three choices: he may affirm the decision, remand for further proceedings, or reverse the
decision. Renton Zoning Code 4-8.110E(7)(b). There is nothing in the Renton Municipal Code
allowing the Examiner to decide that the Community Development decision was lawful and
based on substantial evidence, but then to go on an make his own separate discretionary decision.
Yet that exactly what the Examiner did in this case.
Once the Examiner determined that the Department of Community Development decision
was lawful — was based on the correct legal criteria, was supported by substantial evidence, and
was otherwise lawful — the Examiner was required to uphold that Staff decision. The Examiner
did not find that the Community Development decision was unlawful or contrary to law in any
PRE -HEARING BRIEF FOSTER PEPPER PLLC
OF FOOTBALL NORTHWEST - 8 1111 THIRD AVENUE, SUITE 3400
SEATTLE, WASHINGTON 96701-3299
PHONE (206) 447-4400 FAX(206)447-9700
50823954.1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
respect. Likewise, the Examiner did not conclude that the Community Development decision
was not supported by substantial evidence. In fact the Examiner concluded that the Community
I Development decision had examined all the criteria for minor adjustment, and that all criteria
were met. Instead of upholding the Community Development decision, however, as he was
required to do, the Examiner went on to make his own discretionary decision — as if he were the
original decisionmaker. This type of decisionmaking by an appellate body is plainly unlawful
and was beyond the Examiner's jurisdiction.
Even worse, after going beyond his jurisdiction and failing to give any deference to the
Community Development's approval of the Minor Adjustment, the Examiner crafted an
unreasonable and arbitrary condition that ignores the facts, is not supported by the record, fails to
address the actual permit before the City, and will actually increase view impacts to the Misty
Cove Condominiums.
IV. CONCLUSION
For all the reasons above, FNW respectfully requests the City Council to modify the
Examiner's decision by striking the additional condition added in the Examiner's June 11, 2007,
decision on appeal of Development Services Minor Adjustment approval.
DATED this 2nd day of July 2007.
PRE -HEARING BRIEF
OF FOOTBALL NORTHWEST - 9
FOSTER PEPPER PLLC
Roger A. arce, WSBA No. 21113
Attorneys for Football Northwest LLC
FOSTER PEPPER PLLC
1111 TmRD AVENUE, SurrE 3400
SEATPLE, WASHINGTON 98101-3299
PHONE (206) 447-4400 FAX (206) 447-9700
50921954.1
EXHIBIT A
� � 9 � � ■ ] | ��
� i a ----
. � �
1 . .
As
\� \7
»»<-
Seaha« Practice Facility
`
---,
FOOTBALL NORTHWEST LLC
-
RE«m._mNGm,
|
! )
EXHIBIT B
f
z
m N0I9NIHSVM'NO1NM1
O'!l 1S8MH1�JON '11V810OA
r� w
VUCj�~�Lj
0
G
p��
0
s m gvh, I if
Q
C�a ii W Ho
LL
fij!zHt 2 g
gS�1�GGZZ o
0
r
U
2
2
Y
9
!®■
- - -- --- - --- --- -----
� l L� 133HS 33S — 3NI�HDIVM
x►1
I
0
'I'I " O'lx� "k)`
mmum
1
a
p
' NOIJNIHSVM `NOlN33 CV
O111S3MHlI:lON 11b9100" N
z
O
p
U
LU
CO
z
H
z
a
_r
a
r
Cn
z
W
G
2
S
x
I. u
i gg
f
Will
n
11
LL
8
a
N
Lb
H
,5 1p 11 k� 115 la 7IS 16 17
'—
NOTES. +
1. EXWV C LARGE (6- 4 DR PIEATER). WTNE (C0TTOIAL00('- VOIA, SHORELNE 2mc AI- I p
P ALDEN- ALRU, ",LOW- SO). SO)RELAK TREES (POrEOHML IIIGH DENWT RPMMN PIANTNG (Wm { ...
LOUTIOHS —Am S+. )m AS NECESSAAF FOR opn6m SHOKLW 20K A2-
- OAS HIGH DENSm WARM PLANTIMG (WY) I
_ LAKE WASHINGTON 2. Law DERM FhPARAN PLA4n c AREAS VVLL BE wwcm FO S:O(ut ZONE 81- I �2
ENSURE VOY5 ARE MAINTAINED TIROUGH 4" PRUNRC AND ITEMF1719 LOW OCWFY RIPARIAN PIANW W)
SEEDLING RELkOVAL $HORLLNE ZONE B2- I _J rc iNw.na.
S. IIO+ATDRTEG PLAN FOR WARM ZONE TO IX PROAM IN THE ® LOW O;N"WARM PLANIWG (DIM kha,mar
STREAM A WE REPOOAT. - pUFFALLANP-RAP I W M
4. SmoREl1E ZONE PLANT DLNSTICS FO BE SUCH TwU FULL Q
coy(Rmc IS ACHEVFO N APPROK 10 tFAEES. ® W i0w STAKE RMmNG - SEE T/L201 I Ld
FOR
S. CONTRACTOR SHLWIRTNA ALLOW FOR THE ADWIDN OF THE SMCJFED ® LffiTINC +EEAND BUFFER RESIORAIM I
LAKE MA$TONGTaNF st1NMER HK:n Os OF SDL AUENDLOn AND CDNUTIWRS N SOL PLANTING TD REIUM
WATER LINE - ELEV 19' PREP ALATM NO FpASH SAAO FLTER CRASS - SCEQ Yi PER IADLL SPECS I l.J
G. PLANT OD RE F IXWINfES, T AREA CALCLIAHOF6 RDI[A1C0 ON ILLJ
ROE PLANS ARE THE TRAC R+E CONEOICE OILY. THE IpN-`LIB GRASS -SEED IPII PER ]ABLE V)
CURIRy.-OOR FINALU C'SPOON
BE RERS,BLE FOR f1Nll PUNT [OIAHS, ® I
AREA OLLCIRALFUNS TO WALL ENRRE AREAS OF TOPS W&04 I I
AND PLANT CO',ERAGC Y EDAW
_ 7. ALL CUNSERUCIIDN LUTE14k Sw011 51 ExOAM FROM tOPS L I Ly
- L RAW TREES LARGER RUR 3 rq1 CAIPLR OR S'EOWN Z 115 WESTeW AVE
CLUMPS PR10R TO YISTALLAFIM OF RWATI N IA MINES *0 I 1 OAATE 300
L� ) LAIERALS. sEATTLE. TWA
. - 3. ALL FW LOCATIONS SHALL BE FkQL RENEWED HU AQAISEED I U YliD4
I— TEL We 022-tat
BY itt qE AT RE TUC 9F ommi m. I !` PAX NI6 343-AEDG
10. AA RESENICS THE WIT TO XVUST TIE UXATK)N OE PLANT
L _ w WTERIAL OURIK NSTAUATKM AS APPROPRNTE TO THE PROJECT_
CT - I r. L
AM FO A90U DIRECT BLOCT" OF PHENOUSLY WSTALLM -
1RRWATIOM SPRAT W-QS- A"PSTYFNES IN LOCATOR N REV _
AREAS SHNI BE FlELD-$POTTED Bt AWffCT. I
I 11. REFER TO SLEET L20+ FOR T"4CAL PIAIITND DESAA,S. I `
REMM YWASNE SPECIE WSW POIR (I)
. I ' SOOREU E ZONE
K I - a 7/LI01 MING W1 {1)'16
a o 0 a O 1`•` • TEAPLATE ROT I --_ E�
E1EC. LIFT STATION O O O 0 D O O O [»,IIxG ,`,`, �`. FASTING AIR:, {ly ATEJI; SEF 1202 I }.,�.. (V 0
000000000000 PDSA(t) ( LL, a z
00000000000000 a 0 00000000000000000 Iu)
00 000000000000000000 o}-
w a
000 000 000000own a0000 ;`�`. `+ ♦ ` ♦ ♦ + • { l V T S
{ 000 0000 o" 00000 (50000000 ` . + ` ++\�• `+ + + `+ � � co
00000 0.000000000009- ++ ++`+++ +`++ ♦ ♦``�• Lp
00000 000000000009
00000 0000000000 %,w J
000000 000000000
0000000 000000000 _ 4 F-
00000000 000000000 ------ -- .-�
OOOOa0400000004000000 REPLACEMENT*�- -- --- W
0000000000000000000 WMAND BUFFER • ;�.�
r r 00000000000o0oo00 997GSFTO
X7�-c��
I0000000000000"A"`E� 0000000 coo00000
00000000000 � i I �` �
i IIW-AEPIACEWW wow N ETOSiNG I ; .
r '. I YOSF - REHM 10 122D g- RETBO TO I I S
E PLANT SPEOES PLANT 5PEaIES
I _
1�
E
I ,
- PLANFJNC BEDS: RANT LAYOUT - • - .�
' - - NATURAL CAw PRACta FIELDS
<K DiIIAi
19
I — ,
I NOTE: PLANT LAYOUT & PLANT SCHEDULE FOR PLANTING BEDS
F ADJACENT TO BUILDINGS AND PARKING TO BE DETERMINED.��
A ---_— — — — — — — ..._.....---_——_........----_—__-- — — — — — — — — — — — — — — _----_------ —— __ Si1T]t;F1N'!E
ATCHLINE - SEE SHEET L112 PLAHINGPLAN
SWL M 1p.T 4 4A b /!D L a •�
EXHIBIT C
Seahawks Headquarters & j
Training Facility I
FOOTBALL NORTHWEST LLC
RENTON, WASHINGTON
ƒ
El
2
j
-
§
� '
\
\
V.
2.
,�
-
\ �
Seahawks Headquarters & |
Training Ri!
FOOTBALL NORTHWEST LLC
2 I mmm._eImmw
in
#1 vIt
,I
RENTON CITY COUNCIL
Regular Meeting
July 2, 2007 Council Chambers
Monday, 7 p.m. MINUTES Renton City Hall
CALL TO ORDER
Mayor Kathy Keolker called the meeting of the Renton City Council to order
and led the Pledge of Allegiance to the flag.
ROLL CALL OF
TONI NELSON, Council President; DAN CLAWSON; DENIS LAW; TERRI
COUNCILMEMBERS
BRIERE; MARCIE PALMER; DON PERSSON; RANDY CORMAN.
CITY STAFF IN
KATHY KEOLKER, Mayor; JAY COVINGTON, Chief Administrative
ATTENDANCE
Officer; ZANETTA FONTES, Assistant City Attorney; BONNIE WALTON,
City Clerk; SUZANNE DALE ESTEY, Economic Development Director;
LESLIE BETLACH, Parks Director; MARTY WINE, Assistant CAO; CHIEF
I. DAVID DANIELS and DEPUTY CHIEF CHUCK DUFFY, Fire Department;
COMMANDER DAVID LEIBMAN, Police Department.
ADMINISTRATIVE
Chief Administrative Officer Covington reviewed a written administrative
REPORT
report summarizing the City's recent progress towards goals and work programs
adopted as part of its business plan for 2007 and beyond. Items noted included-
* Celebrate the nation's independence at Revo225's Fabulous Fourth of July at
Gene Coulon Memorial Beach Park.
* Picnic Pizzazz, a Kid's Entertainment Series at Kiwanis Park, kicks off July
12 with Castro the Magician.
CONSENT AGENDA
Items on the consent agenda are adopted by one motion which follows the
listing. At the request of Councilmember Persson, item 51. was removed for
separate consideration.
Council Meeting Minutes of
Approval of Council meeting minutes of 6/25/2007. Council concur_
6/25/2007
Appointment: Planning
Mayor Keolker reappointed Robert Bonner, Jr_, 1507 Jones Ave. NE, Renton,
Commission
98056, to the Planning Commission for a three-year term expiring 6/30/2010.
Council concur.
Appointment: Library Board
Mayor Keolker appointed Tyler Morse, 2625B Jones Ave. NE, Renton, 98056,
to the Library Board (youth representative) for a two-year term expiring
7/i/2009. Refer to Community Services Committee.
Appeal: The Landing, Harvest
City Clerk reported appeal of Hearing Examiner's decision regarding The
Partners, SA-06-071
Landing site plan application (SA-06-071); appeal filed on 6/5/2007 by Harvest,
Partners, 8214 Westchester Dr., 4650, Dallas, TX, 75225, represented by Hillis
Clark Martin & Peterson, accompanied by required fee. Refer to Planning and i
Development Committee.
Appeal: Seahawks
City Clerk reported appeal of Hearing Examiner's decision regarding the
Headquarters & Training
Seahawks Headquarters and Training Facility site plan application (SA-06-073)
Facility, Football Northwest,
by Football Northwest LLC, 505 5th Ave. S., #900, Seattle, 98104, represented
SA-06-071--
by Roger A. Pearce of Foster Pepper PLLC, accompanied by required fee.
Refer to Plannin and Development Committee.
CI )F RENTON COUNCIL AGENDE .L
AI -
Submitting Data:
For Agenda of: 7/2/2007
Dept/Div/Board.. AJLS/City Clerk
Agenda Status
Staff Contact...... Bonnie 1. Walton
Consent .............. X
Public Hearing..
Subject:
Appeal of Hearing Examiner's decision dated 6/11 /2007
Correspondence..
regarding the Seahawks Headquarters and Training
Ordinance .............
Facility Site Plan application. (Tile No. LUA-06-073,
Resolution............
Old Business........
SA-H, SA-M, SM, ECF)
New Business.......
Exhibits:
A. City Clerk's letter (6/21/2007)
Study Sessions......
B. Appeal - Football Northwest, LLC (6/ 15/2007)
Information.........
C. Hearing Examiner's Report & Decision
(6/11/2007)
Recommended Action: Approvals:
Refer to Planning and Development Committee. Legal Dept.........
Finance Dept......
Other ...............
Fiscal Impact: N/A
Expenditure Required... Transfer/Amendment.......
Amount Budgeted....... Revenue Generated.........
Total Project Budget City Share Total Project..
Appeal of the Hearing Examiner's decision on the Seahawks Headquarters and Training
Facility Site Plan application was filed on 6/15/2007 by Northwest Football, LLC, represented
by Roger A. Pearce, Foster Pepper, PLLC accompanied by the required $75 fee.
STAFF RECOMMENDATION:
Council to take action on the Seahawks Headquarters and Training Facility Site Plan application
appeal.
cc: Jennifer Henning
Larry Warren
Rentonnetlagnbill/ bh
�S``'r� IO�� CITY `3F RENTON
+ „u # City Clerk
Kathy Kcolker, Mayor 71
Bonnie I. Waltonly
June. 21, 2007
APPEAL FILED BY: Football Northwest, LL,C, represented by Roger A. Pearce, Foster Pepper
PLLC
RE: Appeal of Hearing Examiner's decision dated 6/11/2007 regarding the S.eahawks
Headquarters and Training Facility Site Plan application, 5015 Ripley Ln N. (File No.
LUA-06-073, SA-H, SA-M, SM, ECF)
To Panties of Record:
Pursuant to Title 1V, Chapter 8, Renton City Code. of Ordinances, written appeal of the hearing
examiner's decision on the Barsher appeal of Seahawks Building Height has been filed with the
City Clerk.
In accordance with Renton Municipal Code Section 4-8-110F; the City Clerk shall notify all
parties of record of the receipt of the appeal. Other parties of record may submit letters Iimited
to .support of their positions within ten (10) days of the date of mailing of the notification of the
filing of the appeal. The deadline for submission of additional letters is 5:00 pm, July 2, 2007.
NOTICE IS HEREBY GIVEN that the written. appeal and other pertinent docurients will be
reviewed by the Council's Planning and Development Committee at 2:00 p.m. on Thursday, July
5, 2007, in the Council Chambers, 7th Floor of Renton City Hall, 1055 South Grady Way,
Renton, WA, 98057. The.recommendation of the Committee will be presented for consideration
by the full Council at a subsequent Council n-weting.
Attached are a copy of the appeal and a copy of the.Renton Municipal Code regarding appeals of
Hearing Examiner decisions or recommendations. Please note that the City Council will be
considering the merits of the appeal based upon the written'record previously established.
Unless a showing can be made that additional evidence could not reasonably have been available
at the prior hearing held by the Hearing Examiner, no further evidence or testini�ony on this
matter Will be accepted by the City Cotirigl.
For additional informationor assistance, please feel free to call me at 425-430-6502.
Sincerely
Bonnie 1. Walton
City Clerk
Attachments
cc: Council Liaison
1055 South Grady Way - Renton, Washington 98057 - (425) 430-651 U / FAX (425) 430-6516
l his paper contains 50%recycled rnatenal, 30%post consumer
RENTON
AHEAD OF T-I-[r-CURVE
City of Renton Municipal C ' • Title N Chapter 8, Section 110 — Appe-'-
4-8-1 IDC4
The notice of appeal shall be accompanied by a fee in accordance with RMC 4-1-170, the fee schedule of
the City. (Ord. 3658, 9-13-82)
4-8-110F: Appeals to City Council Procedures
1. Time for Appeal: Unless a specific section or State law providing for review of decision of the
Examiner requires review thereof by the Superior Court or any other body, any interested party
aggrieved by the Examiner's written decision or recommendation may submit a notice of appeal to the
City Council, upon a form furnished by the City Clerk, within fourteen (14) calendar days from the
date of the Examiner's written report.
2. Notice to Parties of Record: Within five (5) days of receipt of the notice of appeal, the City
Clerk shall notify all parties of record of the receipt of the appeal.
3. Opportunity to Provide Comments: Other parties of record may submit letters in support of
their positions within ten (10) days of the dates of mailing of the notification of the filing of
the notice of appeal.
4. Transmittal of Record to Council: Thereupon the Clerk shall forward to the members of the
City Council all of the pertinent documents, including the written decision or
recommendation, findings and conclusions contained in the Examiner's report, the notice of
appeal, and additional letters submitted by the parties. (Ord. 3658, 9-13-1982)
5. Council Review Procedures: No public hearing shall be held by the City Council. No new or
additional evidence or testimony shall be accepted by the City Council unless a showing is made by
the party offering the evidence that the evidence could not reasonably have been available at the time
of the hearing before the Examiner. if the Council determines that additional evidence is required,
the Council shall remand the matter to the Examiner for reconsideration and receipt of additional
evidence. The cost of transcription of the hearing record shall be borne by the applicant. In the
absence of an entry upon the record of an order by the City Council authorizing new or additional
evidence or testimony, and a remand to the Hearing Examiner for receipt of such evidence or
testimony, it shall be presumed that no new or additional evidence or testimony has been accepted by
the City Council, and that the record before the City Council is identical to the hearing record before
the Hearing Examiner. (Ord. 4389, 1-25-1993)
6. Council Evaluation Criteria: The consideration by the City Council shall be based solely
upon the record, the Hearing Examiner's report, the notice of appeal and additional
submissions by parties.
7. Findings and Conclusions Required: If, upon appeal of a decision of the Hearing Examiner
on an application submitted pursuant to RMC 4-1-05017 1, and after examination of the
record, the Council determines that a substantial error in fact or law exists in the record, it
may remand the proceeding to Examiner for reconsideration, or modify, or reverse the
decision of the Examiner accordingly.
8. Council Action: If, upon appeal from a recommendation of the Hearing Examiner upon an
application submitted pursuant to RMC 4-1-050172 and F3, and after examination of the record, the
Council determines that a substantial error in fact or law exists in the record, or that a
recommendation of the Hearing Examiner should be disregarded or modified, the City Council may
remand the proceeding to the Examiner for reconsideration, or enter its own decision upon the
application.
9. Decision Documentation: In any event, the decision of the City Council shall be in writing and shall
specify any modified or amended findings and conclusions other than those set forth in the report of
the Hearing Examiner. Each material finding shall be supported by substantial evidence in the record.
The burden of proof shall rest with the appellant. (Ord 3658, 9-13-1982)
10. Council Action Final: The action of the Council approving, modifying or rejecting a decision
of the Examiner shall be final and conclusive, unless appealed within the time frames
established under subsection G5 of this Section. (Ord. 4660, 3-17-1997)
CITY OF RENTON
' PEAL TO RENTON CITY COUNC.
OF HEARING EXAMINER'S DECISION/RECOMN&NDATION `��� � I iU l
- r RECEIVED '29Xra
CITY LERoF10E
APPLICATION NAME APP qL OF 1 I1,1c, �XRMr.,�8 �C'c�1S-io-1 FILE NO.LOR at �
The undersigned interested party hereby files its Notice of Appeal from the decision or recommendation o?the
Land tfse Hearing Examiner, dated _ ,SU�IL __, 24�.
1. IDENTIFICATION OF PARTY
APPELLANT:
Name: Foo-r-6rqLj— _LLG
Address: Pr-r-- 4: P-127. C-9LL-1Vi L -
505 - 5-CLq da . S . *92 SZ Orr-c-c wA 91310�
Phone Number. T- _
Email:
REPR,ESENTATNE (IF ANY),
Name: JLOG,51L A . PF-A2cY- Fas—,,Gvt PEPPER
CL C1
Address:111(-32,b
.Sa rr-z.E W4 _ i OI
Phone Number: 6) :-:-
Email:
?. SPECII~ICAT;!ON OF ERRORS (Attach additional sheets, if necessary)
Set forth below are the specific errors or law or fact upon which this appeal is based:
Findineof Fact: (Please designate number as denoted in the Examiner's Report)
No, 10 Error: S��4 R7-T-,9C4--C- S
Correction:
Conclusions:
No.5Error: EL R'^G SEE
COUCC, t l a ll :
Other:
No. Error:
Correction.
1 SUMMARY QF ACTION REQUESTED The City Council is requested to grant the fallowing relief:
{Attach explanation, if desired)
Reverse the decision or recornmend€ttion and grant the following relief:
Modify the decision or recommendation as follows:
Remand to the Examiner for further consideration as follows•
Other:
Appellanidtopresentative Signature TypelPrinted Name 1113 Tate
NOTE: Pleasc refer to Title IV, Chapter 8, of the Rcnton Municipal Code, and Section 4-8-110F, for specific appeal procedures,
GG 24LwfY 4j",re-t CL�'
1
2
3
4
5
6
7
8
9
10
li
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
BEFORE THE CITY COUNCIL OF THE CITY OF RENTON
In re Appeal of City of Renton Hearing
Examiner Decision re Minor Adjustment to
Approved Site Plan
File No. LUA06-073
SA-H, SA-M, SM, ECF
NOTICE OF APPEAL OF FOOTBALL
NORTHWEST LLC
I. INTRODUCTION
Football Northwest LLC ("FNW") requests the City Council to modify the June 11, 2007
decision of the City of Renton Hearing Examiner in File Nos. LUA-06-073, SA-H, SA-M, SM,
ECF. This supplements the City's Notice Of Appeal form.
The appeal before the Examiner involved a minor adjustment to the approved site plan
for the Seattle Seahawks Corporate Headquarters and Training Facility. The only change to the
approved site plan was to allow the Indoor Practice Facility (the "IPF") to be several feet higher
than described in the City's original site plan approval. Because this minor change to the
approved site plan clearly met the minor adjustment criteria in Renton Zoning Code §4-9-200(I),
the City's Department of Development Services issued the minor adjustment. On appeal, the
Examiner was required to give substantial weight to that administrative decision from the
Department of Development Services. In the Examiner's decision, the Examiner concluded that
all criteria for the issuance of the minor adjustment were satisfied.
NOTICE OF APPEAL - I
FOSTER PEPPER PLLC
1111 THIRD AVENUE, SurrE 340D
SEAME, WA5HINu'rON 98101-3299
PHONE (206) 447-4400 FAx (206) 447-9700
5D816'42.2
June 11, 2007
A
OFFICE OF THE HEARING EXAMINER
CITY OF RENTON
REPORT AND DECISION
APPELLANT: Larry & Esther Barsher
6940 96"' Ave SE
Mercer Island, WA 98040
Barsher Appeal of Seahawks Building Height
LUA-06-073, SA-H, SA-M, SM, ECF
PUBLIC; HEARING: After reviewing the Appellants written requests for a hearing
and examining available information on file, the Examiner
conducted a public hearing on the subject as follows:
MINUTES
The following minutes are a summary of the May 29, 2007 hearing.
The legal record is recorded on CD.
The hearing opened on Tuesday, May 29, 2007, at 8:59 a.m. in the Council Chambers on the seventh floor of the
Renton City Hall. Parties wishing to testify were affirmed by the Examiner.
The following exhibits were entered into the record:
Exhibit No. 1: Fellow file containing the original
a peal letter and site information.
Exhibit No. 2: Topographic Map of Mercer Island
Exhibit No. 3: Photograph of Seahawk's site from
Barsher property
Exhibit No. 4: Photograph of Boeing site at south end
of Lake Washington
Exhibit No. 5: Photograph of east Boeing site
Exhibit No. 6: Site Plan File LUA 06-073
Exhibit No. 7: Environmental Checklist
Exhibit No. $: October 19, 2006 letter from the City
of Renton regarding the Seahawks Headquarters and
Training Facility, acceptance from Environmental
Review Committee
Exhibit No. 9: Original Elevations (2 sheets)
submitted with the Site Plan application
Exhibit No. 10: Hearing Examiner Decision dated
December 8, 2006
Exhibit No. 11: VA102 — view study from Misty
Cove (2 sheets)
Parties Present:
Larry Barsher, 6940 96`4 Ave SE, Mercer Island, WA 98040
1(
2
3
4
5
6i
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
I'
structure as already permitted and the structure as amended (approximately two feet higher),
Because the Examiner's condition is not related to an impact of the minor adjustment, it is
plainly unlawful under controlling Washington law.
Sixth, the Examiner's condition is unreasonable. The existing site plan already has
significant landscaping along the shoreline, which will screen views from the water and provide
habitat amenities for the shoreline environment. The existing site plan proposed lower level
plantings in the northwest comer of the site in order to mitigate any view impacts that new
construction would have on the immediate project neighbors. The Examiner's condition would
require additional trees along the Lakeshore facade of the IPF, This condition ignores the fact
that the 55-foot high administrative office building is shoreward from majority of the IPF.
According, the majority of the IPF facade does not even begin until 55-feet in the air. A
condition purporting to require trees 55 feet in the air --- on the roof of another structure — is
unreasonable.
IV. CONCLUSION
For all the reasons above and for the reasons to be shown at the closed record hearing
before the City Council, FNW respectfully requests the City Council to modify the Examiner's
decision by striking the additional condition added by the Examiner in his June 11, 2007,
decision on appeal of Development Services minor adjustment decision.
DATED this 15"' day of June 2007.
NOTICE OF APPEAL - 6
FOSTER PEPPER PLLC
1-w� a,, af4V16
Roger A, earce, WSBA No, 21113
Attorneys for Football Northwest LLC
FOSTER PEPPER PLLC
]111 THIRD AVENUE, SurrE3400
SEATTLE, WA5HINGTON 98101-3299
PxoNF (206) 4474400 FAX (246) 447.9700
5ob 16742 2
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Rather than uphold Development Services' decision, as the Examiner was required to do
once he found that the criteria for an approval of a minor adjustment were met, the Examiner
placed an additional condition on the Corporate Headquarters project. This additional condition
violated the review criteria in the Renton Zoning Code, failed to give substantial weight to the
decision of City staff, was unsupported by the evidence on appeal, was unrelated to any impact
From the minor adjustment, and imposed an unreasonable condition on the project. In particular,
the Examiner required 12 to 24 evergreen trees "along the iakeshore fagade of the Indoor
Practice Field [sic]." Even if the Examiner had authority to impose conditions on the project
after finding that all minor adjustment criteria had been met, this condition is not supported by
any evidence in the record, which showed that the IPF would not look noticeably different from
the 1 11-foot tall building already approved. Moreover, the condition purports to require trees
along the 1PF's "lakeshore facade" but the great majority of that lakeshore fagade of the
Scahawks Corporate Headquarters does not even begin until an elevation of 55 feet in the air. It
is certainly unreasonable to plant evergreen trees 55 feet in the air on the roof of another
structure.
Because the Examiner's decision is not supported by the record or by the City's Code,
fails to give any deference to the City staff decision, and imposes an unreasonable condition, the
Council should modify the Examiner's decision to eliminate the "additional condition" required
by the Examiner,
II. FACTUAL BACKGROUND
The evidence at the hearing and in the record of the hearing shows the following:
The City's environmental review for the Seahawks Corporate Headquarters master plan
analyzed an IPF structure of up to 120 feet in height above slab, with a 95-foot clear interior
space over the indoor practice field. The 95-foot clear interior space is required for the facility to
operate in the manner designed for professional football practices. Based on its analysis of that
proposal, the City issued a Determination of Nonsignificance ("DNS").
NOTICE OF APPEAL - 2
FOSTLR PEPPER PLLC
1111 THIRD AVENUE, Surn 3400
SEATTLE, WASHINGTON 99101-3299
1`110NE (200447-4400 FAX (206) 447-9700
50816?42.2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
After the issuance of the DNS, the project applicant moved the IPF structure (and other
project buildings) approximately 62 feet further back from the shoreline, in order to minimize the
impact to the neighboring condominium owners to the north of the site. Design development for
the IPF structure showed that the interior 95-foot clear height could likely be accomplished with
an overall building height of approximately I I I feet in height. Those design development
drawings were the basis of the drawings and renderings presented to the City at the hearing on
the original site plan for the Seahawks Corporate Headquarters and Training Facility.
Accordingly, the City's site plan approval described the IPF as being "up to I I I feet" and
"approximately I I I feet tall."
After to the December 6, 2006, site plan approval, FNW worked with the City on the
final structural design of the IPF. In response to City building code requirements, FNW was
required to make changes to the truss structure of the IPF roof In order to maintain the 95-foot
clear interior space for the IPF, the new truss structure requires a building height of
approximately 113 feet. To be cautious, FNW requested a minor adjustment to allow up to 115
feet in height, even though only approximately 113 feet in height is anticipated and currently
submitted to the City for permits.
This minor height variation to the IPF is the only change to the approved site plan. No
additional lot coverage is proposed, no expansion of the site plan boundary is proposed, and no
expansion of any other planned building on the site is proposed. Transportation and parking
impacts would be unchanged. Use of public services and utilities would be unchanged. The
only impact will be to allow a small increase in the scale of the IPF building.
The massing of the IPF itself will increase less than four percent (4%) if the full 115 feet
in height were utilized. At the anticipated final IPF height of approximately 113 feet, there
would be only a two percent (2%) increase to the scale of the IPF. With respect to the scale of
all development approved by the site plan, the total building volume would increase only three
percent (3%) if the full 115 feet in height were utilized for the IPF. At the anticipated final IPF
NOTICE OF APPEAL - 3
FOSTER PEPPER PLLC
1111 THIRD AVENUE, Sum 3400
SEATTLE, WA$MINGTON 98101-3299
PHONE (206) 447-4400 FAX 1206) 447-9700
50816742.2
II ,
0
1
2
3
4
5
6
7
S
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
11 The Examiner did not find that any of those standards of review were violated, and the Examiner
did not give any deference to the City staff decision as required by law.
2. Conclusions of Law 5, 6 and 7.
In Conclusions 5, 6 and 7, the Examiner makes multiple errors of law including the
I following -
First, the Examiner fails to grant deference to the decision of Development Services to
issue the minor adjustment.
Second, the Examiner imposes an additional condition to the minor adjustment even after
concluding that all required criteria for issuance of the minor adjustment were met.
Third, the Examiner misinterprets the wording of the minor adjustment Code section
("Minor modifications may be permitted by administrative determination") to aggrandize
conditioning authority unto himself. That section of the Code merely distinguishes minor
adjustments from major adjustments. If the criteria for a minor adjustment are met, then
Development Services makes the decision on the site plan change. If the minor adjustment
criteria are not met, then a major adjustment application and public hearing are required.
Nothing in that Code section gives the Examiner authority to impose additional conditions.
Fourth, the conditions imposed by the Examiner are not even related to the change to the
project proposed by the minor adjustment. The only change to the IPF is a slight height increase
(from approximately 1 I 1 feet to approximately 113 feet in height at the crest of the IPF roof).
The condition imposed by the Examiner, however, does nothing to address this tiny increase in
height, but only addresses the overall bulk of the building, which was already approved in the
original site plan approval.
Fifth, the Examiner's condition is not supported by any evidence in the record. Both the
expert testimony and the photosimulation exhibits show that the additional height of the IPF
would not even be a noticeable change to the project. While the IPF is admittedly a significant
structure, the only issue when issuing the minor adjustment is the difference between the
NOTICE OF APPEAL - 5
FOSTER PEPPER PLLC
1111 THIRD AVENUE, SUITE 3400
SEATTLE, WASHINGTON 98101-3299
PHONE (206) 447-4400 FAX (206) 447-9700
50916742.2
E
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
height of approximately 113 feet, the overall site massing would only increase by one and one-
half percent (1 %2 %).
III. APPEAL CRITERIA
A. Standing.
FNW is the pen -nit applicant, one of the parties to the appeal hearing before the
Examiner, the owner of the property affected by the Examiner's appeal decision, and the ultimate
user of the Seahawks Corporate Headquarters. FNW will be directly affected by the Examiner's
decision and has standing to bring this appeal.
B. Time to File.
The Examiner's decision on the appeal of Development Services minor adjustment
approval was issued June 11, 2007. This appeal is filed within the required time limit in Renton
Zoning Code 4-8-11 OF.
C. Notice of Appeal and Filing Fee.
The notice of appeal form from the Renton City Clerk accompanies this Notice. A check
for the filing fee specified in Renton Zoning Code 4-1-170 is enclosed.
B. Assignments of Error.
1. Finding of Fact 10.
In Finding of Fact 10, the Examiner purports to explain his authority on appeal. The
Examiner claims to have "all the powers of the office from whom the appeal is taken." This
finding ignores controlling City ordinances, which require the Examiner to give substantial
weight to any discretionary decision of City staff and require the Examiner to review the City
staff decision under the appropriate standard of review and modify that decision only if it is
made on unlawful procedure, is clearly erroneous, or is arbitrary and capricious. Renton Zoning
Code 4-8-110E7(a and b). Nothing in the record shows that staff followed any erroneous
procedure, committed any clear error of law, and made any arbitrary and capricious decision.
NOTICE OF APPEAL - 4
FOSTER PEPPER PLLC
1111 THIRD AVENUE, Sum 3400
SEATTLE, WASHINGTON 98101-3299
PnoNE (206) 447-4400 FAX (206) 447-9700
5081fi742,2
5
Barsher Appeal of Seahawks B ng Height
LUA-06-037, SA-11, SA-M, SM, FCF
.Tune 11, 2007
Page 2
Larry Warren, City Attorney, City of Renton
Roger Pearce, Foster Pepper, 1111 Third Ave, Ste. 3400, Seattle, WA 98101
Larry Barsher stated that he is a State of Washington Licensed Professional Civil Frigineer and that he has lived
on Mercer Island since 1980 and enjoyed the views and vistas for 27 years. He and his wife are alarmed by the
fact that the City would allow this large building to get even larger and not include in this modification some
landscaping to soften and mitigate the appearance of this structure.
He produced a topographic map of Mercer Island and surrounding areas. He pointed out where his home lies
and where the new Seahawk facility will be located. The distance from their home to the Seahawk building is
approximately 3,700 feet or'/4 of a mile. He took more photographs of the Boeing plant, the width of that
building is 840-feet and the height is approximately the same as the Seahawks is proposed to be. It shows
approximately how much space the Seahawk building will actually take and the views that will be covered.
There is a crane in the first photograph, it is 120-feet long, the Seahawk building is planned to be 115-feet tall.
The new building will take up almost half of the hillside. A third photograph of the Boeing site shows an
apartment building that is approximately 60-feet tall.
They would not object to an approval of this increase in height provided it included the addition of some large
evergreen trees that would reach approximately the roof elevation at maturity and planted judiciously close to
the building. The trees would greatly reduce the facility's impact on those viewing the building from a distance,
This small modification would �7catly benefit the people of Mercer Island and generations to come.
It seems reasonable that some large trees could be planted there. He is not asking for a total camouflage of the
entire building_ There should be some attention given to this matter.
Esther Barsher, 6940 961h Ave SE, Mercer Island, WA 98040 stated that large specimens could be used.
Planting smaller trees further from the building will not have the same softening effect as if you planted larger
trees now.
Larry Warred, City Attorney stated that there is an underlying presumption that the Barsbers have a right to a
view, however, there is no such right that is recognized. Secondly their entire argument is based upon
environmental impact of this particular project, this is not a SEPA Appeal, in fact the original proposal reviewed
by the Environmental Review Committee has the height of the building between 95-feet at the center of the field
and 120-feet altogether, which is under the elevation that is now being approved by the minor modification. The
actual building height will be approximately 113-feet rather than 115-feet.
This issue must focus on Code or 9-200.1 on minor modifications. A four -foot increase and 120-feet is not 10%.
'Fake into fact that 360-feet was the width and the increase in the facade area, it is much smaller in percentage
basis so it is much less than 10%. The second factor, adding a significantly greater impact on the environment,
this does not have a significantly greater impact on the environment. This project was already reviewed by the
Environmental Review Committee, and their decision was not appealed. The third item of the criteria changes
the boundaries of the original approved plan, that does not occur- at all.
1•-'Ir. Warren referred the Examiner to the Staff Report to the ERC, page 2 of 16, third paragraph from the
bottom, third line from the bottom of that paragraph.
Barsher Appeal of Seahawks B -ng Height
LUA-06-037, SA-H, SA-M, Sh., LCF
June 11, 2007
Page 3
Roger Pearce, Foster Pepper, 1111 Third Ave, Ste. 3400, Seattle, WA 98101 submitted a short hearing brief to
the Examiner. The only issues before the Examiner are ones that require minor adjustments. The only change
to the approved site plan is that the indoor practice facility is required to have a 95-foot height so that they can
plan professional football inside_ It required being 7-feet higher than it was described in the Examiner's
original site plat approval. In the original application, the building was described as 120-feet high, and that was
what the DNS was based on and the City found there was no environmental impact from a building of that
height. Since that time, the building actually came down significantly in height. The Seahawks have no
incentive to overbuild, all they need is a building that looks good and that has 95-feet clear height in the center
of the field. At that time that the structure would be adequate and that the building could be I 1 I -feet and at that
time they also moved the entire building back 62-feet to help out the view from the Misty Cove Apartments.
They have had some unexpected seismic issues that must be dealt with so the roof structure had to be beefed up
a little bit, they asked for I I5-feet just to make sure they don't have to come back again in addition to this
proceeding today, they now believe that the height of the building will actually be in the range of 112-113-feet
when they get to the final building approval. The main issue today is the incremental change in the height of the
building, which is two to four feet.
There is not a significantly greater impact at 115-feet from I I 1-feet, in fact, from the Misty Core building the
increase in building mass is not going to be noticeable.
They request that the Examiner uphold the City's Decision,
Elaine Wine, Football NW, 505 Fifth Avenue S., Ste. 900, Seattle, WA 98104 stated that she is a licensed
architect in the State of Washington and the project manager for Football NW design and construction of this
facility.
The Indoor Practice Facility (IPF) clear height has been specified to be 95-feet at the mid -point of the practice
held. That is the optimal height where the kickers can actually punt the ball and not interfere with any of the
roof structure. She was involved with all the land use permitting that occurred back in the fall of 2006.
The Environmental Checklist lists the approximate overall height of the building at 120-feet from the lowest
elevation. In Exhibit 8, page 12 of 16 it describes the height of the IPF building to range in height from 55-Feet
to 120-feet.
The facility was originally designed using a single member structural steel roof rafter that would have
minimized the height of the IPF, which was the goal at that time. They were required to add a substantial
amount of bracing in the walls and roof, which required roof trusses. Those trusses are deeper than a single
member rafter and that caused the height of the facility to increase approximately 1 S-inches.
On Exhibit 10, page 8, paragraph 19 states that the office building would be located closest to the lake to take
advantage of lake views, it would be "L" shaped and wrap around the southwest corner of the larger indoor
practice field. The IPF situated on the north and east sides of the building would be up to 111-feet. And on the
next page, paragraph 22 states that the office building would be 55-feet while the practice facility will be
approximately 111-feet tall.
VA102 was a view study showing what the impact of the adjusted height would be if it reached a maximum of
i 15-feet. A second study showed the view from the lake shows the added impact with the additional four feet of
height added to the building. At this time the expectation is that the building height would be 113-feet.
Barsher Appeal of Seahawks B ng Height
LUA,p6-037, SA-H, SA-M, SM, ECF
Tune 11, 2007
Page 4
There have been no site plan boundary changes, the footprint of the building has not been increased. The added
volume to the WF is approximately 4% and with the overall site the added impact was about 3% total volume._
At 113-feet, which it is believed the building will actually be, the increase is about 2% to the overall volume to
the WF and 1.5% increase to the entire project.
At a distance of/4 of a mile the proposed increase would not be noticeable.
The Examiner called for further testimony regarding this project. There was no one else wishing to speak, and
no further comments from staff. The hearing closed at 10.00 am.
FINDINGS, CONCLUSIONS & RECOMMENDATION
Ilaving reviewed the record in this matter, the Examiner now makes and enters the following:
FINDINGS:
The appellants, Larry and Esther Barsher, hereinafter appellants, filed an appeal of an administrative
decision approving an increase in the height of a building allowed under a previously approved Site
Plan. The underlying proposal is for the development of the Seattle Seahawks headquarters and
Practice Facility. The height adjustment addresses the height of the Indoor Practice Facility.
The appeal was filed in a timely manner May 8, 2007.
The appellants were parties to the original Site Plan public hearing. They were concerned about the
height of the original facility at that time.
The original Site Plan decision was issued on December 7, 2006. In that decision Finding 19 noted that
the height of the Indoor Practice Facility would be up to 1 I 1 feet. -
"The height of the indoor practice field ... would be up to I I I feet."
(Page 8, Seahawks' Headquarters and Training Facility, LUA-06-073).
Similarly at Page 9:
"The office building will be 55 feet tall while the practice facility will
be approximately I I I feet tall."
At Page 13 of the same report in Conclusion 8, the report states:
"The building complex has been designed to terrace upward from the
lake with the office building scaled to approximately 55 feet and the
more easterly element, the indoor practice fields, at I I I feet."
The ERC, the body responsible for the original environmental determination, noted in its staff report:
"The height of the 80,000 gross square foot indoor practice field, situation
on the north and east sides of the building, would be between 95 feet at the
center of the field and 120 feet."
Barsher Appeal of Seahawks B .ng Height
LUA-06-037, SA-H, SA-M, SNv , r✓CF
June 11, 2007
Page 5
SA
A representative of the applicant submitted a written request for an adjustment to the height of the
building on April 9, 2007. The request stated:
"1. Maximum Building Height - 115'0" feet in lieu of 110'6" feet as
noted on figure 10.6 (Sheet A401) of the Land Use, Shoreline & Master
Plan Permit Application - Volume 1.
The requested adjustment is based on the refinements to the final structural
design and accommodates a clear inside height dimension of 95 feet as noted
in our application. The referenced height is measured to the highest point of
the roof deck from the finished floor slab."
The Director, Development Services Division, issued a decision on the requested "Minor Adjustment to
the Site Plan" on April 25, 2007. The Director approved the request. The Director noted:
"_ the proposed modified height of 115 feet would result in an additional 4 feet
of building height and approximately 350,064 square feet of area.
The proposed increase in area would not result in more than a 10 percent increase
in area or scale of the development.
Although the increased height could impact views from nearby properties, the
modification would not have a substantial impact on the environment or facilities.
The requested modification would not changc the boundaries of the originally
approved site plan."
The Director's decision itself states:
'Based on the analysis and recommendation of staff, I have determined the proposed
revision is within the parameters defined by the Renton Municipal Code.
Therefore, the proposed modification of the site plan is deemed to be 'minor' and
therefore, is approved ..."
The appellants in their letter did indicate that they could accept the proposed height increase if the
facade that faced their home and Mercer Island were screened with evergreen trees to soften the
appearance of the facade. The appellants provided exhibits that provide a frame of reference for the
final structure from their viewpoint (their home). These purport to show the mass of the building, how
it will affect their view of the shoreline and background hillside. They use the relatively similar facade
width and height of the Boeing complex to provide a concrete example of the scale of the proposed
complex from their distance and vantage point. There was concern by the applicant that landscaping
might affect the view from the condominiums.
The provisions allowing "minor adjustments" to a site plan are contained in Section 4-9-200I.
"MINOR ADJUSTMENTS TO AN APPROVED SITE DEVELOPMENT PLAN:
Minor modifications may be permitted by administrative determination. To be
considered a minor modification, the amendment must not:
, 1
Barsher Appeal of Seahawks B, lg Height
LUA#)6-037, SA-H, SA-M, SM, ECF
,June 11, 2007
Page 6
1. Involve more than a ten percent (10%) increase in area or scale of the development
in the approved site development plan; or
2, Have a significantly greater impact on the environment and facilities than the
approved plan; or
3. Change the boundaries of the originally approved plan. (Ord. 4802, 10-25-1999;
Amd. Ord. 4954, 2-11-2002; Ord, 5028, 11-24-2003)"
10_ Section 4-8-1 10_E. provides the authority of the Examiner on appeal:
"APPEALS TO EXAMINER OF ADMINISTRATIVE DECISIONS AND
ENVIRONMENTAL DETERMINATIONS: (Amd. Ord. 4827, 1-24-2000)
1. Applicability and Authority:
c. Authority: To that end; the Examiner shall have all of the powers
of the office from whom the appeal is taken insofar- as the decision
on the particular issue is concerned."
CONCLUSIONS:
The appellant has the burden of demonstrating that the decision of the City Official was either in error,
or was otherwise contrary to law or constitutional provisions, or was arbitrary and capricious (Section 4-
8-1 10(E)(7)(b). The appellants have demonstrated that the action of the City should be modified.
Arbitrary and capricious action has been defined as willful and unreasoning action in disregard of the
facts and circumstances. A decision, when exercised honestly and upon due consideration of the facts
and circumstances, is not arbitrary or capricious (Northern Pacific Transport Co_ v Washington Utilities
and Transportation Commission, 69 Wn. 2d 472, 478 (1966).
An action is likewise clearly erroneous when, although there is evidence to support it, the reviewing
body, on the entire evidence, is left with the definite and firm conviction that a mistake has been
committed. (Ancheta v Daly, 77 Wn. 2d 255, 259 (1969). An appellant body should not necessarily
substitute its judgment for the underlying agency with expertise in a matter unless appropriate.
4. In this case the original Site Plan was reviewed and approved by the Hearing Examiner. That was the
original reviewing body or "the underlying agency with expertise." The Director was then asked to
approve a minor adjustment to that Hearing Examiner approved Site Plan. The Director's decision as to
whether the adjustment was minor is correct and the appellants have not demonstrated that part of the
decision should be reversed. The increase proposed by the applicant does not exceed ten percent in area
or scale. The increase does not appear to have a greater impact on the environment and facilities than
the approved plan and it does not change the boundaries, at least, the footprint of the originally
approved plan although it does change the boundaries if one uses vertical extent as a delimiter in
boundaries.
But the plans have been changed. The appellants produced evidence showing the scale of the building
in reasonable juxtaposition to its locale and a frame of reference showing the similarly scaled Boeing
complex. While the building might have nice design elements, it is still large. The applicant has
Barsher Appeal of Seahawks B .ng Height
LUA-06-037, SA-H, SA-M, SM, FCF
June 11, 2007
Page 7
demonstrated a willingness to provide a "green screen" to soften the view from the northerly
condominium and a softened appearance from Lake Washington of this now even taller building is
reasonable. Code states:
"Minor modifications Way be permitted by administrative determination."
Code does not require that minor modifications be approved. Minor modifications MAY be permitted
by administrative determination. The term "may" denotes discretionary authority. That does not mean
it must be approved. So while the Director is correct about this being a minor modification, that does
not mean it should necessarily be granted or that it should not be subject to a reasonable condition or
conditions.
6. The appellants have demonstrated the building's facade will increase in height and while it may not be a
monumental change, the addition of landscaping cannot help but soften that view. Significant impact is
not necessarily required to condition a project so that it blends better with its environment and provides
a reasonable "streetscape" or in this case "waterscape." The originally proposed shoreward landscaping
will not help soften the facade as well as plantings closer to the facade. While these plantings could
affect the view from the adjacent condominium complex, trees could also naturally spring up along the
boundaries of the site and alter that view and there would be no requirement to remove them_
7. Therefore, to the extent that the Director did not consider requiring landscaping to soften the impact of
the facade change, the Director's decision is modified. The applicant shall be required to plant
evergreen trees along the lakeshore facade of the Indoor Practice Field. The plantings should reflect a
more natural arrangement and not necessarily be the same species or evenly spaced along the facade.
Nor at maturity should the all trees necessarily reach the height of the facility. This office will defer to
the Development Services Division to determine the spacing and species but the applicant shall plant
between 12 and 24 trees of a reasonable specimen size at maturity.
DECISION:
The decision of the Director is modified and an additional condition shall be required as follows:
The applicant shall be required to plant evergreen trees along the lakeshore facade of the Indoor Practice
Field. The plantings should reflect a more natural arrangement and not necessarily be the same species
or evenly spaced along the facade. Nor at maturity should the all trees necessarily reach the height of the
facility_ This office will defer to the Development Services Division to determine the spacing and
species but the applicant shall plant between 12 and 24 trees of a reasonable specimen size at maturity.
ORDERED THIS I It' day of June 2007.
FRED J_ KA
AN
HEARING EXAMINER
harsher'Appeal of Seahawks h .ng Height
LUA-06-037, SA-11, SA-M, Sly-, —CF
June f1, 2007
"rage 8
TRANSMITTED THIS I 1" day of June 2007 to the parties of record:
Larry Warren
City Attorney
City of Renton
Roger Pearce
Foster Pepper
11 I 1 Third Ave, Ste. 3400
Seattle, OVA 98101
Lance Lopes
VP Seahav,,ks
800 Occidental Ave S
Seattle, WA 98034
Eileen Halverson
5021 Ripley Lane N., #302
Renton, WA 98056
Thelma Sutherland
1205 N 29"' Street
Renton, WA 98056
Steve Jansen
5021 Ripley Lane N., #302
Renton, WA 98056
Elizabeth Higgins
Development Services
City of Renton
Elaine Wine
Football N-W
505 Fifth Avenue S., Ste. 900
Seattle, WA 98104
Thomas Peterson
SOCiLls Law Group PLLC
601 Union Street, Ste 4950
Seattle, WA 98101
Joe Burcar
3190 160"' Arne SE
Bellevue, ''VA 98008
Brian T. Sabev
5021 Ripley Lane N., #304
Renton, WA 98056
Elya G. Baclies
I414 N 34'h Street
Renton, WA 98056
Eleanor N4. Kennanler, ]'resident Aaron Belenky, President
Misty Cove Condo Assoc. Williamsburg Condo HOA
5021 Ripley Lane N.
#309 1800 NT 40"' Street Ste. II-4
Renton, WA 98056 Renton, WA 98056
Barbara Paxhia
5021 Ripley Lane N., #104
Renton, WA 98056
Dan & Jody Samson
6952 96"' Ave SE
Mercer Island, WA 98040
Shelly Munkberg Richard Wagner
S} CO Development Baylis Ai,chitects
1083 Lk. Washington Blvd N, Ste. 50 10801 Main Street, Ste. 110
Renton, WA 98056 Bellevue, WA 98004
Les & Denise Klaff
6915 96'h Ave SE
Mercer Island, OVA 98040
Carl Lindstrom
6910 96"' Ave SE
Mercer Island, WA 98040
Larry & Esther harsher
6940 96`h Ave SE
Mercer Island, WA 98040
Port Quendall Company
505 Fifth Avenue S., Ste. 900
Seattle, WA 98104
Carl Hadley
Cedar Rock Consultants
19609 244"' Avenue
Woodinville, OVA 98077
Michael Cero
8300 Avalon Drive
Mercer Island, WA 98040
Jared Salstrom
5021 Ripley Lane N., #213
Renton, WA 98056
Steve Gregersoo
5021 Ripley Lane N., #302
Renton, WA 98056
Tone .Ehrlicliman
Socius Law Group
601 Union Street, Ste. 4950
Seattle, WA 98101
Dwight & Christine Schaeffer
6958 96t" Ave SE
Mercer Island, WA 98040
Jeffrey Taraday
Foster Pepper
1111 Third Ave, 346' Floor
Seattle, WA 98101
Howard & Sue Robboy
6944 96t" Ave SE
Mercer Island, OVA 98040
Steve & Deanna Marshall Hal & Gerry Fardal Dr. and Mrs. Robert Dietz
6915 96th Ave SE 6915 96 h Ave SE 7906 E Mercer Way
Mercer Island, WA 98040 Mercer Island, WA 98040 Mercer Island, WA 98040
Barsher Appeal of Seahawks I ing Height
LUA-06-037, SA-H, SA-M, S 'CF
June 11, 2007
Page 9
TRANSMITTED TI-11S 11 "' day of June 2007 to the following:
Mayor Kathy Keolker
Jay Covington, Chief Administrative Officer
Julia Medzegian, Council Liaison
Gregg Zimmerman, PBPW Administrator
Alex Pietsch, Economic Development
Jennifer Henning, Development Services
Stacy Tucker, Development Services
King County Journal
Larry Dude, Fire Marshal
Larry Meckling, Building Official
Planning Commission
Transportation Division
Utilities Division
Neil Watts, Development Services
Janet Conklin, Development Services
Pursuant to Title IV, Chapter 8, Section 100Gof the City's Code, request for reconsideration must he filed in
writing on or before 5:00 P.m., June 25, 2007. Any aggrieved person feeling that the decision of the
Examiner is ambiguous or based on erroneous procedure, errors of law or fact, error- in judgment, or the
discovery of new evidence which could not be reasonably available at the prior hearing may make a written
request for a review by the Examiner within fourteen (14) days from the date of the Examiner's decision. This
request shall set forth the specific ambiguities or errors discovered by such appellant, and the Examiner may,
after review of the record, take further action as he deems proper.
An appeal to the City Council is governed by Title IV, Chapter 8, Section 110, which requires that such appeal
be filed with the City Clerk, accompanying a filing fee of $75.00 and meeting other specified requirements.
Copies of this ordinance are available for inspection or purchase in the Finance Department, first floor of City
Hall. An appeal must be filed in writing on or before 5:00 p.m., June 25, 2007,
If the Examiner's Recommendation or Decision contains the requirement for Restrictive Covenants, the
executed Covenants will be re uired pXior to approval by Cit Council or final rocessin of the file. You
may contact this office for information on formatting covenants.
The Appearance of Fairness Doctrine provides that no ex parte (private one-on-one) communications may occur
concerning pending land use decisions_ This means that parties to a land use decision may not communicate in
private with any decision -maker concerning the proposal. Decision -makers in the land use process include both
the Hearing Examiner and members of the City Council.
All communications concerning the proposal must be made in public. This public communication permits all
interested parties to know the contents of the communication and would allow them to openly rebut the
evidence. Any violation of this doctrine would result in the invalidation of the request by the Court.
The Doctrine applies not only to the initial public hearing but to all Requests for Reconsideration as well as
Appeals to the City Council.
1Ti es
/J r`
3`3 ` 17 'xi
South Point- i
i 1�ennydale Ty
I t� Coleman froinf '� r .'�- I �� T •
-—�
?PAK tr
CRAWR0A0
9 April 2007
Mr. Neil R. Watts
Director: Development Services Division
City of Renton
Renton City Hall - 6th Floor
1055 South Grady Way
Renton, WA 98055
Regarding: SEATTLE SEAHAWKS HEADQUARTERS & PRACTICE FACILITY
Renton, WA
Project No. KC 005-03 i File No.IPF1
Subject: MINOR ADJUSTMENT TO SITE PLAN REQUEST
Dear Neil:
We have been informed by Bayley Construction that the engineer of record for the Indoor
Practice Facility (IPF), Mr. H. David Jeter PE SE of HCI Steel Building System Inc. has
requested a minor adjustment to the approved Site Plan consisting of:
1. Maximum Building Height— 115'-0" feet in lieu of 110'-6" feet as noted on Figure 10,6
(Sheet A401) of the Land Use, Shoreline & Master Plan Permit Application — Volume 1.
The requested adjustment is based on refinements to the final structural design and
accommodates a clear inside height dimension of 95 feet as noted in our application. The
referenced height is measured to the highest point of the roof deck from the finished floor slab.
Crawford Architects and the applicants -- Port Quendall Company and Football Northwest LLC
concur with this request. Please contact me at this office if you have any questions or require
further information.
Sincerely,
CRAWFORD ARCHITECTS LLC
,
David M. Murphy
Partner
Page 1
9 April 2007
Crawford Architects
1901 Main Street — Suite 200
Kansas City, MO 64108
816 421 2640 telephone
816 421 2650 facsimile
david. murphy@a crawford-usa.com
Enclosure: None
Copies: Jim Levin — Bayley Construction (for distribution)
Lance Lopes — Seattle Seahawks
Ray Colliver -
Vulcan
Tom Chiado —
Vulcan
Elaine Wine --
Vulcan
Roger Pearce
— Foster Pepper
Brian Dickson
— MKA Structural
Filer
Page 2
9 April 2007
Crawford Architects
1901 Main Street — Suite 200
Kansas City, MO 64108
816 421 2640 telephone
816 421 2650 facsimile
david. murphy@crawford-usa.corn
t
M Y
M Y
1
4 � .
- _
SS iri `yyy`
i t
I
m
z
m
m
0
m
rn
rn
Cl)
I
I
r
-
r
l
S'
Z
w
r
3
2
I
a
uj
W
U)
a
W
r r
r
r r r
c �
a
f -
�.
�s
ran
Z
4 -
i
�
tt
F
c
t
Z
"
0LU
❑
Z
LL]
a
C
UJ
z
W
z
2
� U
LLJ
J
W
M
❑
LLJ
aCC
W
North and South Baxter `e Development Plan
New Seattle Seahawks Headquarters & Training Facility
r Renton, WA
DEVELOPMENT SERVICES DIVISION
ENVIRONMENTAL CHECKLIST
City of Renton Development Services Division
1055 South Grady Way, Renton, WA 98055
Phone: 425-430-7200 Fax, 425-430-7231
A. BACKGROUND
1. Name of proposed project, if applicable:
North and South Baxter Site Development Plan
2. Name of applicant:
Port Quendall Company and Football Northwest LLC
3. Address and phone number of applicant and contact person:
Mr. Ray Colliver
Senior Director
505 Fifth Avenue South
1 Suite 900
Seattle, WA 98104
206 342 2000 telephone
206 342 3554 facsimile
rayc6Dvulcan.com email
4. Date checklist prepared:
24 May 2006
Revised 6 September 2006
4. Agency requesting checklist:
City of Renton, Washington
6. Proposed timing or schedule (including phasing, if applicable):
a. Design and Documentation March 2006 to May 2007
b. Final Remediation and Cap on Overall Site* November 2006 until May 2007
c. Final Remediation and Cap under building footprint* December 2006 until June 2007
d. Building Construction above the Cap January 2007 until July 2008
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 1
North and South Baxter to Development Plan
New Seattle Seahawks Headquarters & Training Facility
Renton, WA
1 "Pursuant to Department of Ecology Approval as lead agency (Items b and c).
The project is required to open in June of 2008.
7. Do you have any plans for future additions, expansion, or further activity related to or
connected with this proposal? If yes, explain.
No plans for future additions, expansion or further activity are anticipated with the proposal.
8. List any environmental information you know about that has been prepared, or will be
prepared, directly related to this proposal.
The following information has been prepared:
Past Studies
In the past, several investigations of potential contamination at the Baxter Property have
been performed, generating a large volume of chemical data and visual observations of
soil quality. Comprehensive summaries of project area historical information, regulatory
records and environmental data were provided in the Draft Remedial Investigation Report
(Woodward Clyde, 1990). Those data were incorporated with data collected by
ThermoRetec during the previous due diligence process and during 1998 and 2000 to
develop an interpretation of site conditions currently present. These data were presented
in the South Property Feasibility Study ([FS]; ThermoRetec, 2000) and the North
Property Feasibility Study and Cleanup Action Plan (IFS/CAP]; ThermoRetec, 2000).
SEPA was completed in 2000 for the site representing compliance with the State
Environmental Policy Act ("SEPA") environmental review requirements for the proposed
remedial actions to be performed as stated in the Consent Decree. Ecology has been
established as the agency lead pursuant to SEPA for all cleanup actions under the
consent decree. Remedial actions occurred in 2002 and 2004 at the South Baxter
property. Baxter Cove Wetland Monitoring Reports have been prepared in 2005 and
2006.
In 1989, the City of Renton began work on development of a Comprehensive Plan
affecting the Property and surrounding properties. Between 1990 and 1993, extensive
public hearings and meetings were held, and notification was provided to impacted
property owners and the general public concerning Comprehensive Plan land use
alternatives and proposed Renton Zoning Code amendments.
In addition, in 1996 and 1997, an Environmental Impact Statement ("EIS") scoping
process was conducted in association with proposed development of the Facility. This
EIS scoping process involved significant public participation, including mailings, formal
comment, and public meetings. The proposed development was never pursued.
In preparing this submittal, the following reports were referenced:
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 2
North and South Baxte ite Development Plan
New Seattle Seahawks Headquarters & Training'Facility
Renton, WA
l
OTHER REFERENCES — Past Studies
City of Renton Gypsy Sub Basin Analysis Technical Memorandum No. 2 April 1995
City of Renton, Gypsy_ Sub Basin Drainage Improvements_ Design Memorandum September
1997
City of Renton Zoning Map, updated 10 January 2006
Washin ton Department of Transportation, 1-405 Renton to Bellevue Pro6ect Environmental
Assessment, March 2006
Washington State Department of Ecology, Consent Decree #00-2-11778-7KNT and #00-2-
11779-5KNT.
9. Do you know whether applications are pending for governmental approvals of other
proposals directly affecting the property covered by your proposal? If yes, explain.
Remediation and mitigation has been substantially completed on the South Baxter property as
documented in the Completion Report (2005) and approved by the Department of Ecology by
the April 10, 2006 Partial Certificate of Completion. Capping of residual soil impacts to
prevent direct contact to humans, institutional controls to insure cap integrity and future
groundwater monitoring remain to be completed pursuant to the Consent Decrees and
Cleanup Action Plans which were previously subject to a SEPA review and a Mitigated
Determination of Significance issued by the Department of Ecology in 2000.
10. List any governmental approvals or permits that will be needed for your proposal, if
known.
a. City of Renton Master Plan approval
b. City of Renton Shoreline Substantial Development Permit
c. City of Renton Critical Areas Review
d. City of Renton SEPA Review
Remaining cleanup (capping and institutional controls) will be performed under Consent
Decrees between the Department of Ecology and Port Quendall Company as part of
initial work on the properties. As a result, certain state and local permits are preempted
pursuant to the Model Toxics Control Act, although substantive requirements of those
statutes and regulations will be satisfied by the cleanup approval.
11. Give brief, complete description of your proposal, including the proposed uses and the
size of the project and site.
Proposed Uses
Proposed uses include administrative offices for professional football franchise and accessory
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 3
North and South Baxter ite Development Plan
New Seattle Seahawks Headquarters & Training facility
M Renton, WA
training and practice facilities. Potential tenant space may include accessory retail and office
uses.
Size of the Site
The Project site is approximately 19.6 acres (853,776 square feet) in size.
Facility Features
• A permanent indoor practice field structure
• Approximately 215,000 gross square feet of enclosed space will be constructed including
the indoor practice field
Approximately 50,000 gross square feet of training facilities will be provided.
• Approximately 15,000 gross square feet of player meeting space will be provided.
• Approximately 48,000 gross square feet of administrative offices will be provided.
• Approximately 15,000 gross square feet of technical and support areas will be provided.
• Approximately 6,000 gross square feet of freestanding maintenance/ storage building.
Training Camp
The new facility will accommodate annual training camp on site. Training camp parking
demand in excess of normal operations will be accommodated off -site. The Transportation
Impact Analysis from TRANSPO Group, Inc., discusses parking and transportation issues in
f greater detail. Please refer to Section 12.
On Site Parking
275 to 315 Cars (final count to be verified)
Setbacks & Wetlands
A fifty foot setback from Lake Washington for structures will be provided consistent with
Renton development regulations and the Renton Shoreline Master Program. Existing
wetlands that are constructed on South Baxter with 50 foot buffer pursuant to Consent
Decree, CAP and mitigation analysis in 2000 will be maintained.
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 4
North and South Baxtei 'te Development Plan
New Seattle Seahawks Headquarters & Training, Facility
Renton, WA
' 12. Location of the proposal. Give sufficient information for a person to understand the
precise location of your proposed project, including a street address, if any, and
section, township, and range if known. If a proposal would occur over a range of area,
provide the range or boundaries of the site(s). Provide a legal description, site plan,
vicinity map, and topographic map, if reasonably available. While you should submit
any plans required by the agency, you are not required to duplicate maps or detailed
plans submitted with any permit applications related to this checklist.
Location
As indicated by the attached site plans, the Baxter properties are located at 5015 Lake
Washington Boulevard North, in the northeastern portion of Renton, Washington. They
are located in the Southwest '/a of Section 29, Township 24 North, Range 5 East, King
County. The Baxter site occupies approximately 19.6 acres adjacent to Lake
Washington, three miles south of the junction of Interstate Highways 405 and 90, and
has approximately 1,887 feet of shoreline. The legal descriptions of the North and South
properties are provided below.
Access
Interstate 405 provides regional access to the site. Other vehicular access is also provided by
Lincoln Avenue from the east, Ripley Avenue from the north and Lake Washington Avenue SE
from the northeast via 441h Street interchange.
] Legal Description
BAXTER SOUTH PROPERTY
That portion of the "South Parcel," as shown on Survey recorded under King County
Recording No. 20000209900005, Records of King County, Washington, lying Southerly
of the following described line: Beginning at the most Northerly corner of said "North
Parcel"; Thence S 45 26'31" W along the Northwesterly line thereof a distance of 912.56
feet to the True Point of Beginning of the herein described line; Thence S 58 1314" E a
distance of 918.82 feet to a point on the Southeasterly line of said "North Parcel," distant
thereon 267.64 feet Northerly of the angle point in said Southeasterly line and the
terminus of the said fine.
BAXTER NORTH PROPERTY
That portion of the "North Parcel", as shown on Survey recorded under King County
Recording No. 20000209900005, Records of King County, Washington, lying Northerly of
the following described line: Beginning at the most Northerly corner of said "North
Parcel"; Thence S 45 26'31 " W along the Northwesterly line thereof a distance of 912.56
feet to the True Point of Beginning of the herein described line; Thence S 58 13'14" E a
distance of 918.82 feet to a point on the Southeasterly line of said "North Parcel", distant
thereon 267.64 feet Northerly of the angle point in said Southeasterly line and the
terminus of the said line.
Please refer to Section 1 for detailed Title Report.
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 5
J
North and South Baxter to Development Plan
New Seattle Seahawks Headquarters & Training Facility
Renton, WA
Location and Vicinity Map
Please refer to the attached location and vicinity map for additional detail.
Topographic Map
Please refer to the attached topographic map in Section 8 (Figure 8.1 and Figure 8.2) for
additional detail regarding existing conditions.
S. ENVIRONMENTAL ELEMENTS
EARTH
a. General description of the site (circle one); flat, rolling, hilly, steep slopes,
mountainous, or other,
The site is located on the shore of Lake Washington and is generally flat.
b. What is the steepest slope on the site (approximate percent slope?)
The slope of the site is generally 1 % to 2% with a maximum slope of approximately 5%.
c. What general types of soils are found on the site (for example, clay, sand, gravel,
peat, muck)? If you know the classification of agricultural soils, specify them and
note any prime farmland.
The Baxter Property (both North and South) is located on the eastern shore of Lake
Washington on the former delta of May Creek, which is an under fit stream remaining
within the glacial Kennydale Channel. The subsurface geology of the site is a
combination of fluvial deltaic, lacustrine near shore and constructed fill deposits
overlying Pleistocene glacial sediments and Eocene volcanic and sedimentary
bedrock. The shallow geology at the project area has been heavily influenced by
recent human activity, beginning with construction of the Lake Washington Ship
Canal in 1916. This lowered the level of Lake Washington approximately 8 feet, and
exposed a significant area of the May and Gypsy Creek Sub Basin Deltas which had
formerly been submerged.
Subsequent filling of low-lying areas was performed in 1955 to extend the shoreline
and raise the grade for construction of industrial facilities at the Baxter North and
South Properties. The source of the fill material is not well documented. The
combination of naturally complex deltaic deposits with numerous dredging and
backfilling episodes has resulted in a highly heterogeneous subsurface mixture of
clay, silt, peat, sand, gravel and cobbles, as well as discarded debris and abandoned
subsurface structures from former site activities.
Geology and subsurface conditions for the project area were determined based on
the geologic field reconnaissance, current and previous borings and published
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 6
North and South Baxter to Development Plan
New Seattle Seahawks Headquarters & Training Facility
Renton, WA
z
t geologic data. Based on field explorations, the depth to bedrock is varied with
depths from 17.5 feet to depths greater than 50 feet.
In general, the subsurface soils under the building footprint and fields consist of either
fill material, soft estuarine deposits, loose alluvial soils and underlying very dense
bedrock, or stiff to very stiff silt and clay and medium dense sand overlying bedrock.
The fill is generally 2 to 3 feet thick, while the soft estuarine and loose alluvial soils
extend to depths ranging from 17 to 38 feet below the existing ground surface under
most of the building footprint. The alluvial and estuarine deposits contain layers of
loose sand that are susceptible to liquefaction, as well as layers of highly
compressible peat. The bedrock consists of highly weathered Andesite and is a
competent bearing material for building foundations.
The professional geotechnical report submitted in conjunction with this Environmental
Checklist provides additional detail, including detail regarding constructability
concerns for larger structures on the south portion of the site. Please refer to Volume
2, Appendix 2 of this application for additional information.
d. Are there surface indications or history of unstable soils in the immediate vicinity?
If so, describe.
Recent subsurface exploration in 2006 included 6 borings and 29 backhoe test
excavations.
Liquefaction and settlement were identified as potential concerns. The upper 50 to
60 feet of soil within the May Creek delta are loose and potentially susceptible to
liquefaction during a strong earthquake. In addition, consolidation of near -surface
peats and clays from placement of the environmental cap fill upon this material may
result in minor surface settlement.
Please refer to Volume 2, Appendix 2 of this application for additional information.
e. Describe the purpose, type, and approximate quantities of any filling or grading
proposed. indicate source of fill.
Filling and grading will proceed pursuant to the Consent Decrees and Cleanup Action
Plans, and subject to review and approval by the Department of Ecology. Some cleanup
work and associated grading have been performed and documented in the Completion
Report (2005) and approved by the Department of Ecology by the April 10, 2006 Partial
Certificate of Completion.
f. Could erosion occur as a result of clearing, construction, or use? If so, generally
describe.
Final capping of site will be conducted to complete remediation and cleanup activities
in accordance with the Consent Decree. As a result erosion could occur but is not
likely due to the shallow grade of the site.
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 7
North and South Baxter _ ite Development Plan
New Seattle Seahawks Headquarters & Training Facility
Renton, WA
Please refer to Sections 5 and 6 for additional detail regarding TESC Plan.
g. About what percent of the site will be covered with impervious surfaces after
project construction (for example, asphalt or buildings)?
Approximately 40% of the site will be covered by impervious materials including buildings,
plazas, surface parking and driveways.
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if
any:
Erosion will be controlled by maintaining a shallow grade to the site. Storm water will
be managed consistent with best management practices to prevent any adverse
effects from erosion.
2. AIR
a. What types of emissions to the air would result from the proposal (i.e., dust,
automobile, odors, industrial wood smoke) during construction and when the
project is completed? If any, generally describe and give approximate quantities if
known.
Dust may be generated during construction activities. On -site construction
„} equipment and hauling vehicles will generate emissions from internal combustion
engines.
b. Are there any off -site sources of emission or odor that may affect your proposal? If
so, generally describe.
No, there are no off -site sources of emission or odor that will affect the new facility.
c. Proposed measures to reduce or control emissions or other impacts to air, if any:
Dust will be suppressed by spraying water, as necessary, during construction. Stockpiles
will be covered to the extent practicable to further minimize dust during construction.
3. WATER
a. Surface Water:
1) Is there any surface water body on or in the immediate vicinity of the site
(including year-round and seasonal streams, saltwater, lakes, ponds,
wetlands)? If yes, describe type and provide names. If appropriate, state
what stream or river it flows into.
The project area includes approximately 1,887 feet of Lake Washington
shoreline. 250 feet of shoreline is adjacent to the Baxter Cove inlet and wetland
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 8
North and South Baxter 'te Development Plan
New Seattle Seahawks Headquarters & Training Facility
Renton, WA
which is not being altered. The current shoreline characteristics range from
gently sloping vegetated shorelines to vertical exposed dirt banks, with a minor
portion of bulkhead. As part of cleanup activities, a 0.46-acre wetland and a 50-
foot vegetated buffer was restored along the South Baxter shoreline. In
addition, the Gypsy Sub Basin drainage is located on the North Property; this
system conveys storm water from 1-405 and the interchange to Lake
Washington. A minor portion of this drainage is exposed while most is piped.
The ordinary High Water (OHW) is approximately 18.8 feet (NAVD88) or 15.2
feet (NGVD29).
2) Will the project require any work over, in, or adjacent to (within 200 feet) the
described waters? If yes, please describe and attach available plans.
Yes. The following work efforts are anticipated:
a. Soil cover placement will occur within 200 feet of the shoreline on the North and
South Properties consistent with the Department of Ecology Consent Decree
requirements.
b. Construction of Headquarters Facility
c. Construction of natural grass Practice Fields
d. Shoreline improvements within 50 foot setback per statute including riparian plant
zone.
e_ Construction of retaining walls and driveways_
f. Capping the site pursuant to Ecology regulations will require covering the short
stretch of Gypsy Sub Basin that is not piped. Mitigation for any lost functions will
be provided pursuant to Ecology capping approval.
3) Estimate the amount of fill and dredge material that would be placed in or
removed from surface water or wetlands and indicate the area of the site that
would be affected. Indicate the source of fill material.
No fill or dredge will be placed in or removed from surface water or wetlands.
4) Will the proposal require surface water withdrawals or diversions? Give general
description, purpose, and approximate quantities if known.
No.
5) Does the proposal lie within a 100-year flood plain? If so, note location on the
site plan.
No
6) Does the proposal involve any discharges of waste materials to surface waters?
If so, describe the type of waste and anticipated volume of discharge.
There will be no discharge of waste material into surface waters.
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 9
North and South Baxter to Development Plan
New Seattle Seahawks Headquarters & Training Facility
Renton, WA
b. Ground Water:
1) Will groundwater be withdrawn, or will water be discharged to groundwater?
Give general description, purpose, and approximate quantities if known.
No
2) Describe waste material that will be discharged into the ground from
septic tanks or other sources, if any (for example: Domestic sewage;
industrial, containing the following chemicals...; agricultural; etc.).
Describe the general size of the system, the number of such
systems, the number of houses to be served (if applicable), or the
number of animals or humans the system(s) are expected to serve.
There will be no discharge of waste material into the ground from septic
tanks or other sources.
c. Water Runoff (including storm water):
1) Describe the source of runoff (including storm water) and method of collection
and disposal, if any (include quantities, if known). Where will this water flow?
Will this water flow into other waters, if so, describe?
Storm water is the only source of runoff at the site. Stormwater will be
collected and managed in accordance with applicable regulations and
best management practices. Some storm water will infiltrate or evaporate
but most will drain to Lake Washington after proper treatment.
2) Could waste material enter ground or surface waters? If so, generally describe.
No.
d. Proposed measures to reduce or control surface, ground, and runoff water impacts,
if any:
Storm water runoff from impervious surfaces subject to vehicular use will be treated
prior to release. Best construction management practices will be in -place to prevent
erosion and sedimentation impacts to surface water. Previous cleanup has improved
ground water quality at the site. Final storm water controls will be designed to
applicable Ecology and/or City of Renton storm water management requirements.
4. PLANTS.
a. Check or circle types of vegetation found on the site:
t ) X deciduous tree: alder, maple, aspen, other
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 10
North and South Baxter to Development Plan
New Seattle Seahawks Headquarters & Training •Facility
Renton, Wfl
'
a. Including: Red alder saplings, sapling and seedling sized black
cottonwood, red -osier dogwood, sitka willow, Pacific Madrone, Pacific
willow
2)
_X evergreen tree: fir, cedar, pine other
a. Including in restored wetland and buffer area: Douglas fir, Sitka spruce,
western red cedar
3)
X shrubs
a. Himalayan blackberry, Scotch broom, willow
b. Restored wetland and buffer area: willows, snowberry, nootka rose, black
twinberry, salmon berry, vine maple
4)
X grass
a. Non-native grasses and soft rush , bentgrass, red fescue, rye grass, white
clover
5)
pasture
6)
crop or grain
7)
X wet soil plants: cattail., buttercup, Ibu (rush, skunk cabbage, other: soff ru_ h
yellowflag iris, reed canary grass, small fruited bulrush, slough sedge
8)
water plants: water lily, eel grass, milfoil, other
9)
other types of vegetation
Please refer to the Stream and Lake Study in Section 7 for additional habitat data.
b. What kind and amount of vegetation will be removed or altered?
A great deal of pre-existing vegetation was removed during cleanup activities as
prescribed in the 2000 SEPA. The North and South Properties are largely devoid of
vegetation — approximately 10% of the property contains trees/brush. Almost all
vegetation on the South Property will be removed to facilitate final cleanup and capping
activities; however, no native vegetation in the restored wetland will be removed. Most
vegetation, including grasses, invasive shrubs (Himalayan blackberry and Scotch broom),
and trees (sapling red alder, willow, and cottonwood) on the North Property will be
removed prior to placement of the soil cover.
c. List threatened or endangered species known to be on or near the site.
To the best of our knowledge, there are no threatened or endangered plant species known
to be on or near the site.
d. Proposed landscaping, use of native plants, or other measures to Preserve or
enhance vegetation on the site, if any:
Previous mitigation for wetland removal included creation of 0.46-acres of enhanced,
forested wetland. Previous planting in this wetland and the any new planting in the
associated 50-foot buffer will be maintained with native vegetation as described in the
Mitigation Analysis Memorandum.
If removed due to construction, existing vegetation along the shoreline, whether invasive
or native species, will be replaced per the City of Renton Critical Areas Ordinance and
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 11
North and South Baxter to Development Plan
flew Seattle Seahawks Headquarters & Training Facility
Renton, WA
associated Shoreline Master Program. Mature native trees immediately adjacent to the
shoreline (outside of the limit of grading) will be preserved where possible_ All invasive
shrubs along the shoreline will be removed and replaced with native shrub species as
indicated in the current drawings. The proposed vegetation for this area will consist of
native riparian species found in the King County Native Plant Guide and the King County,
Washington — Surface Water Design Manual. Existing concrete and pavement debris that
currently exists along the water's edge will be removed and replaced with large woody
debris such as root wads and large trunk sections, Preserving mature trees, removing
invasive species, planting native species, removing shoreline debris, and providing large
woody debris are all actions that will provide enhanced functional habitat compared to pre -
development conditions along the shoreline.
5. ANIMALS
a. Circle or underline any birds and animals which have been observed on or near the
site or are known to be on or near the site:
1) Birds: hawk, heron, eagle, songbirds, other
a. Red -winged blackbird, snipe, mallards, Canada geese, osprey
2) Mammals: deer, bear, elk, beaver, other
3) Fish: bass, salmon, trout, herring, shellfish, other
a. Lake Washington contains Chinook, Coho, and sockeye salmon, steelhead,
cutthroat trout, bull trout, kokanee salmon, speckled dace, three -spine
stickleback, northern scfuawfish, yellow perch, black crappie, largemouth
bass, smallmouth bass, mountain whitefish, large scale sucker, longfin smelt,
prickly sculpin -- See Mitigation Analysis Memorandum (AES, 2000).
b. Crayfish, freshwater shrimp, freshwater clams — See Mitigation Analysis
Memorandum (AES, 2000).
c. ALSO: Turtles (painted and slider)
Please refer to the Stream and Lake Study in Section 7 for additional habitat data.
b. List any threatened or endangered species known to be on or near the site.
Chinook salmon, bull trout, bald eagle
C. is the site part of a migration route? If so, explain
Adult Chinook Salmon in Lake Washington migrate past the site on their way to the
Cedar River each summer. Juvenile Chinook pass the site on their way back to
Puget Sound, and may spend some time rearing in the site vicinity. Sockeye
juveniles rear in Lake Washington and may utilize the shoreline and offshore habitat
along the project for rearing.
d. Proposed measures to preserve or enhance wildlife, if any:
None
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 12
North and South Baxter to Development Plan
New Seattle Seahawks Headquarters & Training'Facility
Renton, VITA
6. ENERGY AND NATURAL RESOURCES
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to
meet the completed project's energy needs? Describe whether it will be used for
heating, manufacturing, etc.
Electricity will likely be used for cooling. Natural gas will be used for cooking and
potentially heating. During final capping and construction, the only energy to be used
is diesel to operate construction equipment. No manufacturing will be conducted on
site.
No. The project will not affect potential use of solar energy by adjacent properties_
c. What kinds of energy conservation features are included in the plans of this
proposal? List other proposed measures to reduce or control energy impacts, if
any:
7. ENVIRONMENTAL HEALTH
a. Are there any environmental health hazards, including exposure to toxic chemicals,
risk of fire and explosion, spill, or hazardous waste that could occur as a result of
this proposal? If so, describe.
The South Baxter remediation will restore a contaminated, abandoned
industrial/manufacturing site to allow project redevelopment. Adherence to
institutional controls will minimize the potential for releases during development
construction and thereafter. Where warranted, a site -specific health and safety plan
will be prepared and used to limit worker exposure to hazards on site.
1 j Describe special emergency services that might be required.
The site -specific health and safety plan will include emergency contacts and procedures.
2) Proposed measures to reduce or control environmental health hazards, if any:
Adherence to institutional controls will minimize the potential for releases during
development construction and thereafter. Where warranted, a site -specific health
and safety plan will be prepared and used to limit worker exposure to hazards on
site.
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 13
North and South Baxte ite Development Plan
New Seattle Seahawks Headquarters & Training Facility
Renton, WA
t
' b. Noise
1) What types of noise exist in the area which may affect your project (for example:
traffic, equipment, operation, other)?
There are no noises in the area that occur on a regular basis that will adversely
impact the project. interstate 405 is located near the site, although traffic noise is
not expected to adversely affect the project. There is periodic railroad traffic on
the adjacent rail line.
2) What types and levels of noise would be created by or associated with the
project on a short-term or a long-term basis (for example: traffic, construction,
operation, other)?
During construction, there will be noise from construction equipment that will have
minimal impact to adjacent uses. Impact -type noises will be limited and will occur
during restricted hours to minimize any potential adverse impacts to adjacent uses -
Indicate what hours noise would come from the site.
These noises will occur during daylight hours and will vary seasonally. Once the
building is enclosed, these noises will be contained within the enclosed building.
Construction is anticipated to take approximately 18 months with approximately 6
months of exterior noise possible. Hours of construction operation will likely be 7:00
AM-5:00 PM, 5 days a week.
Based on project needs, weekend work may be required to keep the project on
schedule to meet occupancy dates. If this measure is necessary, adjoining property
owners will be notified in advance.
3) Proposed measures to reduce or control noise impacts, if any:
Any adverse noise impacts will be minimal and will likely be lower in frequency to
the adjacent Interstate 405 and adjacent railroad. Exterior construction will be
limited to daylight hours as permitted by the City of Renton. Contact with
adjacent neighbors who may be adversely impacted will be made and information
provided when loud noises, if any, will occur. The applicant is evaluating a
request for restrictions on horn operation by the railroad at adjacent crossings.
8. LAND AND SHORELINE USE
a. What is the current use of the site and adjacent properties?
Current Use of the North Baxter Site: Vacant
Current Use of the South Baxter Site: Vacant
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 14
North and South Baxte ite Development Plan
New Seattle Seahawks Headquarters & Training Facility
Renton, VITA
' At the Baxter Property, wood treating operations ceased in 1981. Adjacent properties
include:
• Quendall Terminals, a former refining facility that is currently used
for log sorting and storage, is located to the south;
• Barbee Mills, a former lumber mill, is located south of Quendall
Terminals;
■ Pan Abode, a cedar homes manufacturing facility, is located to the
southeast;
• Lake Washington Boulevard and 1-405 are located to the east;
• Lake Washington is located to the west;
• Condominiums and residences are located to the north.
b. Has the site been used for agriculture? If so, describe.
No, the site has not been used for agriculture in the recent past.
c. Describe any structures on the site.
Asphalt pad, a small one-story office building, and a small dock and boathouse are
located on the North Property.
d. Will any structures be demolished? If so, what?
l The small one-story office building will be demolished.
e. What is the current zoning classification of the site?
Commercial/Office/Residential (COR-2)
f. What is the current comprehensive plan designation of the site?
Commercial/Office/Residential
g. If applicable, what is the current shoreline master program designation of the site?
Urban
h. Has any part of the site been classified as an "environmentally sensitive" area? If
so, specify.
No
i. Approximately how many people would reside or work in the completed project?
Daily on -site personnel - approximately 200 people on a typical work day.
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 15
North and South Baxter to Development Plan
New Seattle Seahawks Headquarters & Training Facility
Renton, WA
I. Approximately how many people would the completed project displace?
None
k. Proposed measures to avoid or reduce displacement impacts, if any:
Not Applicable
I. Proposed measures to ensure that the proposal is compatible with existing and
projected land uses and plans, if any:
Adjacent Use to the North: Landscape buffers and potential fencing will be provided to
buffer the project from adjacent residential uses
Adjacent Use to the South: Landscape buffers and fencing will be provided to provide
necessary visual separation between the project and adjacent
9. HOUSING logging operation and storage and remediation activity.
a. Approximately how many units would be provided, if any? Indicate whether high,
middle, or low-income housing.
No housing will be provided.
b. Approximately how many units, if any, would be eliminated? Indicate whether high,
middle, or low-income housing.
i
No housing will be eliminated.
C. Proposed measures to reduce or control housing impacts, if any:
Not Applicable.
10. AESTHETICS
a. What is the tallest height of any proposed structure(s), not including antennas; what
is the principal exterior building material(s) proposed.
The bulk of the building is approximately 52 to 55 feet in height. The indoor practice
facility is approximately 120 feet in height from its lowest elevation.
b. What views in the immediate vicinity would be altered or obstructed?
Views from the lake will be altered because the site is currently vacant. Views to the lake
from adjacent uses located to the north and south should not be adversely affected_
Views to the lake from structures located to the east, across Interstate 405 may be altered
above existing tree lines. in this instance, approximately 30 to 40 feet of view above
existing trees could be obstructed by the highest building masses. Visual simulations
showing the view impact on nearby residential properties are being provided to the City of
Renton in conjunction with the submittal of this Environmental Checklist.
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 16
North and South Baxter 'te Development Plan
New Seattle Seahawks Headquarters & Training Facility
Renton, KA
The design of the facility has maintained view corridors to Lake Washington from adjacent
properties. The bulk of the building on site has been sited furthest from the shoreline to
mitigate visual impacts to the condos located to the north. The majority of the site has no
structures above grade, thus preserving views to the lake. As detailed design proceeds,
these view corridors will be developed further.
c. Proposed measures to reduce or control aesthetic impacts, if any:
Traditional architectural devices to reduce the apparent scale and mass of the project are
being explored including:
1. horizontal expression lines at changes of materials and fenestration
2. roof treatments
3_ fenestration and glazing systems
4. Setbacks of building mass from the shoreline
5. Maintaining view corridors to Lake Washington.
At the lakefront, the office components are placed in front of high mass elements
associated with indoor practice facility in order to minimize view impacts from neighboring
properties. This approach occurs at the south fagade as well. To the north, landscaping
will be incorporated at the building perimeter as well as the property line to buffer the
facility from the adjacent residential uses. The majority of the site will have little or no
structure above grade, which will effectively preserve a view corridor to Lake Washington
over the majority of the site.
The building has been set back from the north property line, and the higher element of the
building has been located on the furthest landward part of the building, in order to mitigate
view impacts from the residential use to the north. Significant view impacts are not
anticipated from that site. The building has been sited to take advantage of the most
stable soils and to minimize deep foundations.
The south portion of the site is the area containing the soils of most environmental
concern, and the applicant does not wish to disturb the Ecology -approved cap with
foundation elements on that portion of the site. And functionally, the south portion of the
site is further from the site entries and other structures, so it is more suitable for the
training field elements of the proposed facility.
11. LIGHT AND GLARE
a. What type of light or glare will the proposal produce? What time of day would it
mainly occur?
No permanent field lighting will be provided. Thus, no glare or light is anticipated that will
adversely impact adjacent land uses, or land uses located in adjacent municipalities to the
east or west with views of the properties from upland locations or across portions of Lake
Washington.
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 17
North and South Baxtei ite Development Plan
New Seattle Seahawks Headquarters & Training Facility
Renton, WA
b. Could light or glare from the finished project be a safety hazard or interfere with
views?
No. It is not anticipated that any light or glare will pose a safety hazard.
c. What existing off -site sources of light or glare may affect your proposal?
There are no off -site sources of light or glare that we are currently aware of that will impact
the project.
d. Proposed measures to reduce or control light and glare impacts, if any:
Not Applicable
12. RECREATION
a. What designated and informal recreational opportunities are in the immediate
vicinity?
Public access to the shoreline will be provided as indicated by the Conceptual Site Plan.
Access is proposed along the north property line with connections to the lakefront. The
proposed access will include seating areas, a landscaped walkway and access to the Jake
for active and passive recreational use.
Due to the security requirements associated with the daily operation of the Practice
Facility, public access to the overall site is limited to the designated public access areas.
b. Would the proposed project displace any existing recreational uses? If so, describe.
None
c. Proposed measures to reduce or control impacts on recreation, including recreation
opportunities to be provided by the project or applicant, if any:
Not Applicable
13. HISTORIC AND CULTURAL PRESERVATION
a. Are there any places or objects listed on, or proposed for, national state, or local
preservation registers known to be on or next to the site? If so, generally describe.
No
b. Generally describe any landmarks or evidence of historic, archaeological, scientific,
or cultural importance known to be on or next to the site.
A Cultural Resource Assessment (Larson, 1997) was performed for the Baxter Properties
Environmental Checklist
24 May 2006
Devised 6 September 2006
Page 18
North and South Baxte ite Development flan
New Seattle Seahawks Headquarters & Training Facility
Renton, VYA
l
and properties south of Baxter in 1997. This assessment did not identify any cultural
resources eligible for listing on the National Register of Historic Places were identified in
the area. Literature review suggested that a Duwamish site may have been present at the
historic mouth of May Creek, assumed to have been located on a nearby property south of
the Baxter Properties. A copy of the Larson report is being submitted with this
Environmental Checklist.
c. Proposed measures to reduce or control impacts, if any:
Monitoring for archeological materials will be included in development activities
involving excavation in portions of the site designated "High Probability Areas" in the
Cultural Resource Assessment (Larson, 1997). Monitoring could include having a
professional archeologist on site to monitor any subsurface excavation to insure that
no intact archeological materials or features are adversely affected by such activities.
14. TRANSPORTATION
a. Identify public streets and highways serving the site, and describe proposed access
to the existing street system. Show on site plans, if any.
Greater detail on all transportation and parking issues can be found in the
Transportation Impact Analysis (TRANSPO 2006) in Section 12. A more general
discussion is provided below.
Interstate 405 provides regional access to the site. The site is served by Lake
Washington Boulevard, the primary access to which is via exit 7 (NE 441h Street) from
1-405. Other vehicular access is also provided by Lincoln Avenue from the east,
Ripley Avenue from the north and Lake Washington Avenue SE from the northeast
via 441h Street interchange.
Two existing on grade crossings provide access to the site as shown on the attached site
plans. Preliminary discussions between the Seahawks and the BNSF Railroad have
commenced regarding a third (new) crossing, located halfway between existing crossings.
b. Is site currently served by public transit? If not, what is the approximate distance to
the nearest transit stop?
The site is not served by public transit. The nearest transit stops are located at Park
Ave N/N 33`d and 116`h/76tn
c. How many parking spaces would the completed project have? How many would the
project eliminate?
New Parking: 275 to 315 cars
Displaced Parking: No parking will be displaced or eliminated
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 19
North and South Baxter ite Development Plan
New Seattle Seahawks Headquarters & Training Facility
Renton, WA
l
d. Will the proposal require any new roads or streets, or improvements to existing
roads or streets, not including driveways? If so, generally describe {indicate
whether public or private?
Improvements will likely be required at the following areas:
1. Ripley Avenue
2. Existing at grade crossings @ BNSF Railroad right of way
3. Potential new at grade crossing @ BNSF Railroad right of way as indicated above
e. Will the project use (or occur in the immediate vicinity of) water, rail, or air
transportation? If so, generally describe.
The Seahawks will continue to use commercial and charter air transportation at their
current levels.
Please refer to Section 12 for additional information.
g. Proposed measures to reduce or control transportation impacts, it any:
Please refer to Section 12 for proposed measures.
15. PUBLIC SERVICES
a. Would the project result in an increased need for public services (for example: fire
protection, police protection, health care, schools, other)? If so, generally describe.
No.
b. Proposed measures to reduce or control direct impacts on public services, if any.
Not applicable
16. UTILITIES
a. Circle or underline utilities currently available at the site: electricity, natural gas,
water, refuse service telephone, sanitary sewer, septic system, other.
Describe the utilities that are proposed for the project, the utility providing the
service, and the general construction activities on the site or in the immediate
vicinity which might be needed.
The following utilities will be provided by municipal systems
1. Water
2. Sanitary Sewer
Other utilities will be required including.
1. Electricity — Puget Sound Energy
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 20
North and South Baxter 'te Development Plan
New Seattle Seahawks Headquarters & Training.Facifity
Renton, WA
2. Natural Gas --- Puget Sound Energy
3. Fiber - Qwest
4. DSL or T1 Telecommunication Lines - Qwest
These utilities are available immediately adjacent to the site. Please refer to Section 5 for
preliminary utility plans.
C. SIGNATURE
1, the undersigned, state that to the best of my knowledge the above
information is true and complete. it is understood that the lead agency may
withdraw any declaration of non -significance that it might issue in reliance
upon this checklist should there be any willful misrepresentation or willful
lack of full disclosure on my part.
Proponent:
Name Printed: Ray Colliver
Date:
D. SUPPLEMENTAL SHEETS FOR NONPROJECT ACTIONS
Not Used
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 21
1'
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
I8
19
20
21
22
23
24
25
26
�l
vCk
BEFORE THE HEARING EXAMINER FOR THE CITY OF RENTON
LARRY BARSHER and ESTHER BARSHER,
Appellants, File No, LUA06-073
V.
CITY OF RENTON, and FOOTBALL
NORTHWEST,
Respondents.
SA-H, SA-M, SM, ECF
NOTICE OF APPEARANCE ON
BEHALF OF FOOTBALL NORTHWEST
LLC
TO: Fred Kaufinan, City of Renton Hearing Examiner; and
AND TO: Larry Barsher and Esther Barsher, Appellants
PLEASE TAKE NOTICE that Roger A Pearce, and Foster Pepper PLLC, enter
their appearance as counsel for Respondent Football Northwest LLC, by and through the I
undersigned attorney, and request that semce of all papers and pleadings in this lawsuit, except
original process, be made upon the undersigned attorney at the address stated below.
DATED this 9i1t day of May, 2007.
FOSTER PEPPER PLLC
12v,,G
Roger Aoearce, WSBA No. 21.1.13
Attorney for Respondent Football Northwest LLC
NOTICE OF APPEARANCE ON BEHALF FOSTER PPPPF.R PLLC
OF FOOTBALL NORTHWEST - 1 1111TE[1ROAVENUE,SuiTE3400
SEAME, WASHINGTON 98101-3299
P110 NE (246) 447-4400 Fnx (246) 447.9700
5OS13270 1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
DECLARATION OF SERVICE
Helen M. Stubbert declares:
I am a legal assistant to Roger A. Pearce, and competent to be a witness in the above -
entitled proceeding. On May 9, 2007, 1 caused to be delivered in the manner indicated below
true and correct copies of a Notice of Appearance and this Certificate of Service to the following:
Fred J. Kaufman Larry and Esther Barsher
Hearing Examiner 6940 96"' Ave. S-E.
City of Renton Mercer Island WA 98040
1055 South Grady Way Via U.S Mail
Renton, Washington 98055
Via U.S. Mail
1 declare under penalty of perjury under the laws of the State of Washington that the
foregoing is true and correct.
DATED this 9'h day of May, 2007, at Seattle, Washington.
Helen M. Stubbert
NOTICE OF APPEARANCE ON BEHALF
OF FOOTBALL NORTHWEST - 2
Fos'rER PEPPER PLLC
1111 THIRD A4 FNuF., SUITS 3400
SEATTI.E, WASHINGTON 98101-3299
PHONE(206)447-4400 FAX(206)447-9700
50313270 1
Seahawks' Headquarters and Training Facility
I=ile No.: LUA-06-073, SA-H, SA-M, SM, EC1:
December 7, 2006
Page 16
Fan parking during training camp will be accommodated at a parking lot or parking facility off the
project site, with fans then being bused to the site.
The project dumpsterlrecycling area will use containers with lids, and the container storage area will be
screened from the Misty Cove property. The garbage and recycling pickups will occur during normal
business hours on weekdays -- not at nights or very early morning hours. All non -recyclable materials
placed in the containers will be in sealed plastic bags.
FNW shall replace the existing property line fence between the Misty Cove property and the project site
with a new fence of at least equal quality_
10. No athletic field lighting is being proposed under the permit. The Seahawks agree not to seek any
permit to do so for a period of 15 years from the date of this Agreement. All project exterior lighting
will be designed so that the lighting is directed away from the Misty Cove residences.
11. FNW will provide signage that clearly indicates the main entrance to the project site, so that visitors to
the site can easily find the entrance. A3iy signage will have to comply with City and State regulations.
12. The proposed shoreline area planting plan shall include lower -level plantings in the north section of the
project shoreline area, in order to minimize impacts of views of the water from the adjacent Misty Cove
Condominium property.
13. The mitigation and design measures in the Lake and Stream Study and the Turf Integrated Pest
Management Plan submit#ed to the City as part of the project application shall be conditioned to permit
approval,
ORDERED THIS 7"' day of December 2006.
— _T�J_
FRED J. KAU(4AN
HEARING EXAMINER
TRANSMITTED THIS 7"' day of December 2006 to the parties of record:
Elizabeth Higgins
1055 S Grady Way
Renton, WA 98055
Lance Lopes
VP Seahawks
800 Occidental Avenue S
Seattle, WA 98034
Kayren Kittrick
1)cvelopmcnt Services
Renton, WA 98055
David Murphy
Crawford Architects
1801 McGee St., Ste. 200
Kansas City, MO 64108
Roger Pearce
Foster Pepper
I I I t Third Avenue, 34'h Floot
Seattle, WA 98101
Larry & Esther Barsher
6940 96"' Avenue SE
Mercer Island, WA 98040
Eileen Halverson .toe Burcar Carl Hadley
5021 Ripley Lane N, 4302 3190 160"' Avenue SE Cedar Rock Consultants
Renton, WA 98056 Bellevue, WA 98008 19609 244" Avenue
Scahawks' Headquarters and Training Facility
File No.: LUA-46-073, SA-1-1, SA-M, SM, ECF
December 7, 2006
Page 15
is. The proposal is basically self-contained. The site's limitations include the poor and/or contaminated
soils on the south half leaving commercial and office development a reasonable accomplishment. In
addition, the COR zoned property to the south provides a residential component. 11 meets the
comprehensive plan's goal of redeveloping the subject site with high quality uses.
19. The plan provides both public and private open space. There is the walking path along the shoreline and
there are the open practice fields for team workouts_ The applicant proposes to enhance the shoreline by
restoring natural plants and protecting the existing wetland.
20. Shoreline view corridors will be provided both by the shoreline trail as well as the open views across the
playing fields. Views of the lake will be available from the office building and other open areas on the
subject site.
21. The proposal will provide a focal point as an icon of a professional football team as well as when it is
open to the public for practice sessions in the summer. The building is well designed and should be
attractive even at its larger scale.
22. The access for the site is focused along Ripley Lane and/or Lake Washington Boulevard_ it should
reasonably serve the site tar both vehicles and pedestrians.
DECISION.
The proposed Master Site flan and Site Plan are approved subject to the following conditions:
1. The applicant shall submit a color and materials board demonstrating exterior materials and finishes to
the Development Services project manager for approval prior to obtaining building permits.
2. The applicant shall submit a detailed landscape plan for the riparian zone along the shoreline of Lake
Washington and install landscaping of a type and in a manner so as to enhance wildlife riparian habitat.
Such submittal shall be prior to obtaining building permits and installation of landscaping shall be
completed prior to building occupancy.
3. The applicant shall submit a detailed project landscape plan, meeting the requirements of RMC 4-5-
120D 12, to the Development Services project manager for approval prior to obtaining building permits.
4. The applicant shall submit a detailed landscape plan and maintenance program for the public right-of-
way landscaping along Ripley Lane abutting the Burlington Northern Santa 1'e Railroad right-of-way.
The plan shall be submitted to the Development Services project manager for approval prior to
obtaining building permits and installation shall be prior to building occupancy.
5. The applicant shall submit a plan demonstrating locations of outdoor light fixtures, their function, light
levels, and illumination coverage to the Development Services project manager for approval prior to
obtaining building permits.
G- Football Northwest shall develop the project with the office building and the indoor Practice Facility
located as shown in the Mitigation Site Plat -Alternative. FNW shall develop a green screen wall,
planted with ivy or other appropriate landscaping materials, along the bottom thirty (30) feet of the
northeasterly elevation of the indoor practice facility. In addition, FNW will develop the north elevation
of the indoor practice facility substantially in accordance with the principles stated in the Settlement
Agreement.
Seahawks' Headquarters and Training Facility
File No._ LUA-06-073, SA-H, SA-M, SM, ECF
December 7, 2006
Page I4
accommodated by shuttle vehicles from remote parking; areas to help limit the amount of traffic to the
site. A cartopicd walkway connects parking to the main entrance. Interior walkways will accommodate
pedestrians moving between facilities on the property.
1?. The large open spaces on the south as well as the setback between the residential complex to the north
and the current proposal allows entry of light and air to both (lie side and neighboring properlies. The
east aspect is already fairly open given the parallel roadways and railroad. The relocation of flit
building .will reduce some shadow impacts although, again, any development of the subjec€ site by
legally permissible development would have an impact. The impacts have been reduced but not
eliminated.
13. Construction will generate the most noise and this should be limited in duration. As noted above, there
will be additional hubbub when the site is occupied and a bit more during the open practices during the
summer season.
141 The site will be served by City water and sewer service. The Baxter Lift Station will need to be utilized
and appropriately updated. Stormwater will be directed to the lake. The development will comply
with the Department of Ecology and King County regulations. The creek's alignment will be altered
and its outfall enhanced but it will remain culverted for a majority of its run through the subject site.
The applicant will be paying mitigation fives imposed by the ERC to offset some impacts of the
development on the City's facilities.
15. The redevelopment of the subject site will enhance the site and prevent deterioration or additional blight
on the subject site
16. In addition to the above criteria the COR Zones provide additional criteria for reviewing a proposal.
Those criteria include:
a. The plan is consistent with a Planned Action Ordinance, if applicable;
b. The plan creates a compact, urban development that includes a
compatible mix of uses that meets the Comprehensive Plan vision and
policy statements for the Commercial/Office/Residential or Urban
Center North Comprehensive Plan designations;
C. The plan provides an overall urban design concept that is internally
consistent, and provides duality development;
d. The plan incorporates public and private open spaces to provide
adequate areas for passive and active recreation by the occupants/users
of the site, and/or to protect existing natural systems;
C. The plan provides view corridors to the shoreline area and Mt, Rainier
where applicable;
f. Public access is provided to water and/or shoreline areas;
g- The plan provides distinctive focal points such as public area plazas,
prominent architectural features, or other items;
h. Public and/or private streets are arranged in a layout that provides
reasonable access to property and supports the land use envisioned; and
i- The plan accommodates and promotes transit, pedestrian, and other
alternative modes of transportation.
17. There is no Planned Action Ordinance involving the subject site.
Seahawks' Headquarters and Training Facility
File No.: LUA-OG-Q73, SA-I1, SA-M, SM, ECF
December 7, 2006
Page 13
and wetlands and views out over the lake. These will be well exploited by the orientation of the
building.
The building irneets the bulk standards for (lie COR 2 zone in terms of height and lot area coverage.
Staff reported that it complies with the urban definition requirements of the City's current Shoreline
regulations. Compliance with building and fire code requirements will be determined when appropriate
pernnits are submitted for actual development.
7. The building complex has been moved away from the lake an additional 62 feet to offset to some extent
its impacts on the adjacent residential complex. It has also redesigned its north facade treatment to
reduce its visual impact on its near neighbors, There is no question that any permissible development of
this site that adds buildings above grade will have an impact. That cannot be prevented save for keeping
privately owned property as open space. That is not currently an option and the proposed plan appears
to have achieved sonic; reasonable compromise. After all, approximately half of the site, the entire south
portion of the property will be open space - it .mill be practice fields. The applicaii( is seeking to create
its own, new crossing of the railroad to reduce traffic impacts on its northerly residential neighbors who
all share Ripley Lane. The applicant proposes replanting areas of the lakeshore with naive plants and
some larger specimens, Those efforts will serve to provide some screening without closing off the site's
own visual access to the lake view.
The building complex has been designed to terrace upward from the lake with the office building scaled
to approximately 55 feet and the more easterly element, the indoor practice fields, at 11 1 feet. Open
space is a featured clement on the entire south half of the parcel. Landscaping will be used to soften
facades and enhance the perimeter of the site near the railway and the road system. The building has a
formal entry and focal point. It also has the public shoreline walkway- The exterior treatment combines
a variety of high -quality materials and finishes, colors and textures. Both horizontal and vertical
banding and articulation will also be used in the facades to add visual interest and break the bulk into
faceted planes. Recognizing past industrial pollution and current sensitivities, the applicant will be
using Integrated Pest Management (IPM) tecluniques on all ornamental landscaped areas and natural turf
practice fields.
The redevelopment of this will increase property values although there is no avoiding the fact that
construction and occupancy on what has been a vacant site for quite a while will have an impact on the
immediate community. The construction impacts should be relatively short-lived. The impacts of reuse
and occupancy were anticipated when this site was comprehensively planned and the zoning was put in
place. It was expected that this site and its neighbors to the south would be developed with a variety of
more intensive uses bringing with those more intensive uses additional traffic, people, urban scale
development and the general tumult of a vibrant urban lake shore.
10. The settlement agreement provides assurances that for an extended period of time there would be no
night activities or lighting to accommodate night activities. Normal considerations will Emit exterior
lighting and parking lots and building entrances would be equipped with cut-off features to avoid light
spillage onto adjacent properties, Again, though, interior lights will change the character or visual
canvas that a vacant site provided from the lake's vantage point or even for those looking down on the
site from the east.
11. The site's somewhat isolated location limits the complexity of access and circulation although the site
does share Ripley Dane with others north of the site. The applicant is seeking an additional access
which, would help improve access for both visitors to the site and to adjacent properties. The internal
circulation appears reasonable. Additional visitor access during open events on the campus will be
Seahawks' Headquarters and Training Facility
File No.: LUA-06-073, SA-H, SA-M, SM, ECI'
December 7, 2006
Page 12
i. Availability of public services and facilities to accommodate
the proposed use; and
j. Prevention of neighborhood deterioration and blight.
The criteria for a Master Plan and Site Plan review overlap or coincide in a number of particulars.
Frankly, the Master Plan criteria are intended for a large multi -dimensional project with a variety of
components, probably spread over a larger area. The Master plan would be more appropriately applied
to a large, multi -phase or multi -building project where the aim is to achieve a cohesive, blended,
harmonious whole. The Master Plan review would be to make sure to knit a uniform project that looks
as if all of the elements and a variety of buildings had a basic design theme or one which made sure that
all of the elements worked together as far as access, circulation and similar features spread over a larger
proposal. A Master Plan review does not necessarily identify with the current proposal where one
purpose is identified by the applicant - a complex in which to manage and train a professional football
team. In the current proposal there really is only the one building, served by one, linear access road and
the associated outdoor sports fields. The site pretty much stands alone. If and when development
occurs south of the proposed complex on additional CDR 2 property that will be under separate
ownership and development criteria.
4. A fair number of City goals and objectives all point to redeveloping this very under-utilized property
The City has always envisioned more interesting, one could say, grand plans for this former industrial
area along the Lakeshore. It has been years since a major industrial use that was water -related could
utilize lakeshore property and not potentially inflict environmental damage on the shoreline or the lake
and its water quality, Of course, some questions could be raised about the limited scope of this proposal
in terms of creating new as opposed to relocated employment and of basically leaving fallow, the spaces
dedicated to practice fields that might have been developed with additional office buildings or research
park. Might a mixed -use complex been more appropriate rather than one focused solely on the
Seahawks football team? Possibly, but than again, a portion of this property still requires remedial
capping of environmentally questionable soils probably mediating against development of housing.
Similarly, disturbance of some portion of the underlying soils would not be advisable for building
:foundation work whereas outdoor practice fields present a good match since there would be limited
disturbance of the soils_ The proposed plan will bring executive and administrative offices to this site.
The site will be a focus for public visitation - practice and pre-scason games. The proposed complex is
also quite well -designed and has metamor-phed into a better plan_ The building has been moved further
from the lake to reduce its visual impacts on both neighbors and those using the lake itself or viewing it
across the lake. The four playing fields also keep about half of the site visually unencumbered. The
complex will also be screened by landscaping along its facades and the site's perimeter. The building
couplet has been scaled and terraced and utilizes visual elements to reduce its bulk and increase its
visual interest. Clearly, any permissible use of the site, other than open space or parkland would create
impacis on neighbors, boaters and Mercer Island residents. The plan also accommodates public use of a
shoreline that has been closed to the public for decades.
The comprehensive plan suggests the redevelopment of former industrial sites wi(h large-scale projects
while remediating the impacts of the former industrial pollution. The proposed Seattle Seahawks
administrative offices and practice facilities appear to fulfill these objectives with a high profile (enant
in a highly styled complex. The complex as noted offers a mix of structural components, the office
building and the indoor practice facility, and open space and landscaping, the four open-air practice
fields and the general landscaping found around the grounds. The shoreline location suggests public
access and that will be provided by the approximately 250 feet of trail along the lake shore as well as the
connecting trail to the public rights -of -way east of the subject site. The offices will provide an urban
focus and a center for employment. The site, of course, provides built-in amcnities. It has the lakeshore
Seahawks' Headquarters and Training Facility
File No.: 1_UA-06-973, SA-1-1, SA-M, SM, ECF
December 7, 2006
Page I I
The intent of the tiered site development plan review process is to provide an
opportunity to review projects at broad levels for the Master Plan and with
increased specificity as development plans becomes refined to the level of Site
Plan. Intent statements below shall guide review of the plans at a specificity
appropriate to the level of review.
1. To promote the orderliness of community growth, protect and
enhance property values and minimize discordant and undesirable
impacts of development both on- and off -site;
2_ To promote high quality design meeting criteria set forth in the City's
Urban Center Design Overlay, where applicable;
3_ To pa-otect and enhance the desirable aspects of the natural landscape
and environmental features of the City;
4. To ensure convenience and safety of vehicular and pedestrian
movement within the site and in relation to adjacent areas, and ensure
that road and pedestrian circulation systems implement land use
objectives for the zone in which the project occurs;
5. To promote coordination of public or quasi -public elements, such as
walkways, driveways, paths, and landscaping within segments of larger
developments and between individual developments;
G_ To protect neighboring owners and uses by assuring that reasonable
provisions have been made for such matters as sound and sight buffers,
light and air, and those other aspects of site plans which may have
substantial effects on neighboring land uses;
7. To minimize conflicts that might otherwise be created by a mix of
uses within allowed zones;
8. To provide for quality, multiple family or clustered Dousing while
minimizing the impacts of high density, heavy traffie generation, and
intense demands on City utilities and recreational facilities;
9. To provide a mechanism to more effectively meet the purposes and
intent of the State Environmental Policy Act;
10. To supplement other land use regulations by addressing site plan
elements not adequately covered elsewhere in the City Code and to
avoid violation of the purpose and intent of those codes.
More specific guidance is provided in the following criteria:
General Review Criteria for Both Master Plans and Site Plan Review:
a_ Conformance with the Comprehensive Plan, its elements,
goals, objectives, and policies. In determining compliance with
the Comprehensive Plan, conformance to the objectives and
policies of the specific land use designation shall be given
consideration over city-wide objectives and policies;
b. Conformance with existing land use regulations;
C. Mitigation of impacts to surrounding properties and uses;
d. Mitigation of impacts of the proposed site plan to the site;
e_ Conservation of area -wide property values;
f. Safety and efficiency of vehicle and pedestrian circulation;
g. Provision of adequate light and air;
h. Mitigation of noise, odors and other harmful or unhealthy
conditions;
Seahawks' Headquarters and Training Facility
File No.: LUA-06-073, SA-H, SA-M, SM, ECP'
December 7, 2006
Page 10
29. As noted, there will be access to approximately 250 feet of Lake Washington shoreline. Access to the
shoreline path would be via an east -west paved walkway located parallel to the north property boundary.
A landscaped seating area and viewpoint would be provided. This path will typically be available to the
public on the same schedule as City parks.
30. The development will increase traffic approximately 555 average vehicle trips per day. Traffic during
open public sessions, mainly in August would be generally confined to normal traffic as well as some
form of shuttle service to limit the amount of traffic and avoid taxing the local roads and the parking
facility.
31. The applicant proposes using an "integral pest management plan" to limit the use of chemicals on the
site.
CONCLUSIONS-.
The following general criteria are applicable to the subjcct site, which is zoned COR:
Section 2 4-9-200 SITE. DEVELOPMENT PLAN REVIEW:
A PURPOSE AND INTENT:
The purpose of site development plan review shall be to assure that proposed
development is compatible with the plans, policies and regulations of the City
of Renton as outlined in the City's Comprehensive 11tan and the City's Business
Plan Goals. Site development plan review may be used to analyze plans at
varying levels of detail to ensure continuity of project concept and consistent
implementation. Elements subject to this Section include, but are not limited to,
site layout, building orientation and design, pedestrian and vehicular
environment, signage, landscaping, natural features of the site, screening and
buffering, parking and loading facilities, and illumination. Site development
plan review is divided into two types. Master Plan and Site Plan.
1. Master Plan: The purpose of the Master Plan process is to guide
phased planning of development projects with multiple buildings on a
single large site. The Master Plan is required to demonstrate how the
major elements of a development are proposed on the site at sufficient
detail to demonstrate the overall project concept_ In addition, the
Master Plan must illustrate how the major project elements, combined,
create an urban environment that implements City goals. An additional
purpose is to allow consideration and mitigation of potential impacts
that could result from large-scale site and facility development, and to
allow coordination with City capital improvement planning. Master
Plan review should occur at an early stage in the development of a
project, when the scale, intensity and layout of a project arc known.
2. Site Plan Review: The purpose of the Site Plan process is the
detailed arrangement of project elements so as to be compatible with
The physical characteristics of a site and with the surrounding area. An
additional purpose of Site Plan is to ensure quality development
consistent with City goals and policies. For those developments that do
not require Master Plan first, Site Plan Review should occur at an early
stage in the development of a project, when the scale, intensity and
layout of a project are known.
Scahawks' Headquarters and "braining Facility
File No.: LUA-06-073, SA-H, SA-M, SM, ECF
Dcccmber 7, 2006
Page 9
thirds to reduce the apparent height and vertical modulations and articulations will also be used to
reduce the apparent bulk of the building_ Additionally, the administrative office portion of the building
will be about half as tall as the indoor practice portion, providing a terraced or stepped aspect. There
will be a formal entry along the Ripley Lane facade and a canopy will connect parking with the formal
entrance. Other entries are provided along various aspects of the building complex.
21 _ The appeal settlement resulted in the building being moved toward the east approximately 62 feet and
away from the shoreline. "11c taller indoor practice building is now located outside of the 200-foot
shoreline management area. The move will reveal more of the shoreline and sky for the residents of
Misty Cove. It will also move the mass of the building away from the shoreline.
22. The COR 2 zone permits lot coverage of 65 percent and a building height of 10-stories or 125 feet. The
office building has a footprint of approximately 55,674 square feet, the indoor practice complex has a
footprint of approximately 89,423 square feet and there is the 6,000 square foot maintenance shed for a
total of 151,097 square feet or 17.7 percent of the 19.6 acre site. The office building; will be 55 feet tall
while the practice facility will be approximately 1 11 feet tall. Staff reports that the office building
which falls within the 200-foot shoreline management zone complies with the Urban Shoreline
desigmation of Renton's Shoreline Master Program. Although it is not a water -dependent use, the
complex will provide access to the portions of the shoreline that have been off-limits to the public in the
past. The one-story, 6,000 square foot maintenance and equipment storage building would be located in
the southeast corner of the site.
23. 7-herc would be thrcc or four outdoor practice fields. Some of the fields can be rotated to account for
wear patterns. The three natural grass practice fields would be located on the portion of the property.
The one artificial turf practice field would be parallel and adjacent to the cast property line. The four
practice fields would cover 8.3 acres.
24. The site would contain secured area to protect the practice fields, the players and to provide security and
privacy during practices.
25. There is a variety of vegetation on the subject site including weeds, weed trees and some I imited natural
vegetation along the take shore. The site will be landscaped with a variety of native trees and shrubs.
Some of the larger trees would be preserved. As indicated a "green wall" would be located along the
north facade as part of landscaping and screening.
26. Parties from Mercer Island with a view across the lake to this facility were concerned about views and
screening as well as night lighting_
27. Primary access to the site would be glom Lake Washington Boulevard and Ripley Lane. Any access or
accesses will have to cross the Burlington Northern Santa Fe Railroad right-of-way. Currently, the
primary access would be at the northeast corner of the subject site near the Misty Cove complex. A
secondary access is available at the southeast corner of the property to Lake Washington Boulevard.
Negotiations are underway with the railroad for a crossing about midway along the east property line.
This would become the primary access if agreement can be reached,
28. On -site roads would be private and there would be parking for 252 vehicles. Parking would include 91
stalls for general surface parking and 161 secure (fenced) surface parking stalls for team members. Due
to both limited access and on -site parking, the annual izaining camp, held for three weeks in August,
would require off -site parking with a scheduled shuttle bus service in order to accommodate visitors.
Seahawks' headquarters and Training Facility
File No.: LUA-06-073, SA-1-1, SA-M, SM, ECF
December 7, 2006
Page 8
13. The site is essentially flat. Gypsy Creek runs through the site in an open ditch for approximately 125
feet before entering a 490-foot culvert. The culvert empties above the surface of the lake in an
unnatural drop_ Plans are to restore the shoreline in this area, create a cove and create a more natural
entry into the culvert.
14. A Category 3 wetland has been restored. It would remain in a protected area at the southwest portion of
the properly, adjacent to Lake Washington. It probably would not be open to the public.
15. The subject site is under a cleanup agreement with the State. Remediation involves removing
contaminated soils and capping depending on the proposed use and contaminants involved. The
contamination was the result of the former use of the property for wood -processing activities_ Site
grading for the project would be coordinated with continuing remediation_ Calculations indicate the
capping of the site and grading would require approximately 29,600 cubic yards of cut and 52,900 cubic
yards of fill material. Some cut material would be removed from the site and the remainder reused.
Any fill material will be tested or require a "source statement" to assure clean materials. As noted, the
adjacent site to the south is under Superfund cleanup governance.
16, Two existing structures remain on the site. A single -story, 1,300 square foot wood -frame office
building on the north portion of the site that would be removed. An existing boathouse and dock are
located at the northwest shoreline. Currently, there are no plans for these facilities.
17. The underlying geology of soils dictated where the building would be located. Soils generally dictated
that the large building would need piles for structural support and the soils on the south half of the site
were not appropriate without additional remediation. In addition, the proposed practice playing fields
require more and appropriately shaped space, which the wider south half provided.
18. The proposed complex consists of the Seahawks administrative offices and accessory training and
practice facilities and a smaller maintenance building_ The two major components are the attached
office and indoor practice facility located on the north portion of the subject site and four practice fields
including three with natural turf and one with artificial turf on the south portion of the property. The
maintenance shed will be located at the southeast corner of the property.
19. Offices, meeting and classrooms, kitchen and dining area, lockers and exercise areas, football
equipment storage areas, and an indoor practice field would be within a 224,957 square foot building on
the North Baxter property. The office or Headquarters portion of the building would be up to 55 feet in
height and contain two stories and a mezzanine level that would be open to the indoor practice field.
The office building would be located closest to the lake to take advantage of the lake views. It would be
L-shaped and wrap around the southwest corner of the larger indoor practice field. The height of the
indoor practice field, situated on the north and east sides of the building, would be up to 111 feet,
Originally, the roof was designed to swing upward along its edges to screen rooftop mechanical
equipment. That equipment has since been moved into the building proper. The practice building has
been designed to have an inside height clearance of approximately 95 feet to accommodate realistic
passing and kicking moves.
20. The building would be a steel frame building. It would be faced with synthetic stone, masonry, and
storefront systems on the lower level. Clear -glazed windows and cementiuous or metal wall panels
would be used on upper portions and vary depending on location. The color palette would be earth
tones with light beiges, buff, light gray and browns and greens would be used for exterior treatments.
The settlement agreement requires a green -screen or lattice wall with vegetation growing on it on the
north facade, the facade facing Misty Cove. There will be horizontal banding breaking the building into
Scahawks' Headquarters and Training Facility
File No.: LUA-06-073, SA-11, SA-M, SM, EC1;
December 7, 2006
Page 7
FINDINGS CONCLUSIONS & RE, COMMENDATION
Having reviewed the record in this matter, the 1 xaminer now makes and enters the following:
FINDINGS.
I. The applicant, Football Northwest, for the Seattle Seahawks' Headquarters and Training Facility, filed a
request for a Master Plan and Site Plan review,
2. The yellow file containing the staff report, the State Environmental Policy Act (SEPA) documentation
and other pertinent materials was entered into the record as Exhibit ##1.
3_ The Environmental Review Committee (ERC), the City's responsible official issued a Determination of
Non -Significance - Mitigated (DNS-M). An appeal of this determination was filed by adjacent property
owners. The appeal was scaled with an agreement to include certain additional conditions on the
development of the subject site if those conditions were found appropriate after public hearing and
review.
4. The subject proposal was reviewed by all departments with an interest in the matter.
5. The subject site is located at 5015 Lake Washington Boulevard N and is also addressed as 5015, 4801
and 4635 Ripley Lane. The site is just north or west of the NE 44th Street (Exit 7) I-405 interchange.
The site is located on the shoreline of Lake Washington. The Burlington -Northern railroad tracks run
between the site and Ripley Lane,
6. The site actually nuns at a diagonal from the southwest toward the northeast along the lakeshore but is
commonly thought of as running south to north. Therefore for illustrative purposes and descriptions this
common reference will be used and so the take will be considered the western edge of the site and
Ripley Lane the eastern edge of the site - readers will be able to orient facilities and buildings to their
location on the site from the lake and roadway locations.
7. Misty Cove residential complex is located immediately north of the site. As noted above, the
homeowners in Misty Cove had filed an appeal of the SEPA decision but they, along with a separate
resident of that complex settled the appeal prior to the hearing after reaching an agrcernent with the
applicant.
8. Immediately south of the subject site is the fort Quendall site. That site is a "Superfund Site" that is
highly contaminated and subject to separate cleanup regulations.
9. The map element of the Comprehensive flan designates the area ]In which the subject site is located as
suitable for the development of commercial, office and residential uses, but does not mandate such
development without consideration of other policies of the Plan.
10. The subject site is currently zoned COR-2 (Commercial, Office, Residential).
it. The subject site was annexed to the City with the adoption of Ordinance 1823 enacted in April i960.
12_ The size of parcel is approximately 19.6 acres or 853,776 square feet.
Seahawks' Headquarters and Training Facility
File No.: LUA-06-073, SA-H, SA-M, SM, LCF
December 7, 2006
Page G
City of Rcnlon Shoreline Master Program does not regulate buildings below 75-feet that are within the 200-foot
buffer.
Mr. Bursar stated that he is testifying on behalf of the State. And finally, the parking area along the north of the
facility, is there any buffer averaging happening in that area as well? He further was concerned as to the use of
fertilizers and pesticides and what kind of plan would be in place to ensure that water quality of the lake would
be protected.
Ms_ Higgins stated that this project does not require a Conditional Use Permit. The Shoreline permit is being
processed separately. The )!RC report states that the applicant is proposing an integrated pest management
program with extremely limited use of chemicals on the fields and landscape areas.
Carl Hadlily, Cedar Rock Consultants, 19609 244''' Avenue, Woodinville, WA 98077 stated that he is a
professional fisheries biologist with 18 years of experience in the Seattle area. He was part o£ the team that
wrote the lake and stream study, which was a requirement of the Renton Municipal Code. That study was
required because there is a direct impact to a water body, the Gypsy sub -basin drainage and secondly, the site
contains a shoreline of the state. The study takes a look at existing functions and values and compares that to
future conditions based on mitigation and other things that are proposed for the site. 11 must be shown that there
are equivalent or better values for the fish habitat and wildlife habitat on the site. The Gypsy sub -basin has been
declared a fish bearing water, it drains 320 acres of the slope to the east with runoff from paved surfaces via
roadside ditches, culverts, and parking lots with a bad history of flooding. There is a 500-foot long, 2-foot wide
culvert, with a 125-foot open reach at the bottom of a 15-foot deep manmade ditch_ The 125-foot open reach
will be filled with capping, there can be no exposed water. The culvert will run between the playing fields and
the side of the building. A new outfall will be built for the pipe with a 25-foot channel on the lake as mitigation
for tilling that existing open section of channel_ The Department of Fish and Wildlife has initially approved the
proposed plan.
An Integrated Pest Management plan has been established for the site and will include a set ofrules regarding
the use of pesticide and fertilizer. Air, sunlight and drainage for the fields are an important part of pest control.
A small amount of chemicals will be used for fungus only_
Mr. Pearce stated that there is no proposed parking for the public access to the lake, the public most likely will
use it more when the Burlington Northern tracks become a trail.
There is a landscape plan in the application materials that points out species that will be planted including some
larger species such as Douglas Fir and Western Red Cedar.
Regarding Mr. Burcar's comments, this is a permitted use so long as significant public access is provided to and
along the shoreline. No variance is required for height under the City Shoreline Master Program.
There is a 50-foot setback for commercial buildings from the shoreline, not for paved surfaces or playing fields
or grading.
Kayren Kittrick, Development Services stated that they are working with the applicant regarding Ripley Lane
and the Gypsy Creek flooding onto Ripley Lane. If a security gate is being provided for Misty Cove, is there a
turnaround being provided for those people that like to wander in and will then need access to get out. That will
all be covered during the design phase.
The Examiner called for further testimony regarding this project. There was no one else wishing to speak, and
no further comments from staff. The hearing closed at 11:34 am.
Seahawks' Headquarters and Training Facility
Tile No.: LUA-06-073, SA-14, SA-M, SM, LC1=
December 7, 2006
Page 5
The indoor facility is standard for the industry, which allows special teams to practice their punting and kicking.
Public access will be from the north side of the property down to the lake and still keep the practice fields
private, The plan is for a cyclone fence with a green screen on the fence. Between the Misty Cove and
Seahawks a quality wood fence has been planned.
David Murphy, Crawford Architects, 1801 McOce St_, Ste. 200, Kansas City, MO 64 t 08 gave a power point
presentation of the project with site layout, vegetation and design details. The design materials allow them the
ability to create a corporate image that is appropriate for (lie City of Denton and the Seattle Seahawks. The
facility will be designed specifically to the Pacific Northwest. They are currently in design development stages,
the south side of the office will be facing Else practice fields and would be constructed with a series of
cementiuous materials. The practice facility would consist of cementiuous panels or metal panels that would
make up the composition of the facade. On the east elevations there would be cementiuous panels, wood, and
translucent materials that would allow daylight to come into the indoor practice facility. The north side, facing
Misty Cove would be designed with horizontal lines with shadows to break down the scale of the building. The
green screen at the base would be 30-feet of lattice with green plantings to cover and allow for privacy. The
west elevation of the building is proposed to be two stories and the south three stories. However, the west may
go to 3 stories, it has not been fully determined as yet. The dumpsters and loading dock areas will be screened
from the public.
To study the view impacts on the project from the Misty Cove property, the owners of units 302 and 312
allowed access to their property and they were able to photograph views from those sites. The lower levels on
the south side have blocked views to the shoreline and to (lie site. Several photos were shown with various
views to the south_ Their goal was to maintain and enhance as many view corridors as possible.
A 5-minute break was taken.
Larzy Barsher, 6940 96`r' Avenue SE, Mercer Island, WA 98040 stated that he lives directly west of the facility
across Lake Washington and from the front of his house he can see the training facility. From a close up
perspective, it looks very attractive however, from a mile away it still is going to appear as a big box. When the
final landscape plan is prepared he would like to suggest that some consideration would be given to soften the
view as much as possible by the addition of perhaps some trees that could reach heights of 100-feet at maturity.
1n addition, perhaps a green wall could be installed on the roof of the office building in the center to add some
contrast and softening. 1-Ie did appreciate the fact that the lights would not be on in the evening.
Eileen Halverson, 5021 Ripley Lane N, #302, Renton, WA would like to know where the parking would be
located for the public access.
Esther Barsher, 6940 96"' Avenue SE, Mercer Island, WA 98040 stated that she was concerned about the
lighting for the parking area, would it be lit all night'?
Joe Burcar, 3190 160"' Avenue SE, Bellevue, WA 98008 stated that he is a shoreline specialist with the
Washington State Department of Ecology. Considering the City Shoreline Master Program, would the use of
this facility be considered a Conditional Use within the Master Program or is it in fact a permitted use and how
would that translate into the final shoreline permitting, would it be a substantial shoreline permit or a conditional
use permit?
Ms. Hig�,ins stated that there would be some buffer averaging. The wetland buffer is 50-feet and extends into the
field area, however there is some buffer mitigation outside the field area that has been approved. The indoor
practice facility which is 95-feet to the center clear height on the interior is outside of the 200 foot line, The
Seahawks' Headquarters and Training Facility
File No.: LUA-06-073, SA-H, SA-M, SM, ECF
December 7, 2006
Page 4
The redevelopment of COR sites is intended to provide economic development and retnediation of formerly
impacted industrial sites. This site certainly provides that criteria. The Seahawks' building has been designed
to be an architecturally significant state of the art facility for a professional football team. The community
design element is met through the design of the project. The north facade of the indoor practice facility will be
softened by use of a "green -screen wall". The project meets the development standards by being lower than the
maximum building height, by covering only 17%U of the property with buildings and by moving the project the
applicant has attempted to mitigate the impacts of this building on the neighboring property.
Visual assessment studies were done as well as shadow studies in order to study impacts to the Misty Cove
condominiums. The outside practice fields .will not be lit and not used at night so there will be no lighting that
would interfere with the Misty Cove condominiums,
There are no regulations on the types of fencing provided in this area, they will be replacing the fence along the
border of Misty Cove Apartment Condominiums. The general parking consists of 91 stalls would be along the
east side of the building, the secured team parking would be along the north and northwest comer of the
building. The field is open to the public for three weeks in August and it is presumed that thousands of people
will attend training. There will be a plan to shuttle people from off -site parking areas.
Roger Pearce, roster Pepper, I I 1 I Third Avenue, 34d' Floor, Seattle 98101 stated that he is the Attorney for
Seahawks and that there were several people that would be speaking today. There are no specific height limits
in the urban environment, the Shoreline Master Program does allow new commercial uses if public access to and
along the water is provided. A significant public access has been provided and it will be open just like a City
park. It will only be open during the day, there will be on -site security.
Lance_L2pes, VP Seahawks, 800 Occidental Avenue S., Seattle, WA 98034 stated that lie also serves as the
general manager for this project. He identified goals in acquiring this location, the Kirkland facility was too
small and had become obsolcte in terms of what teams need to handle their requirements. The site in eastern
Washington has served them well for many years, in recent times there has been a drop-off in attendance at the
training camp, the fans from western Washington have not been able to get over there.
The number of users for this property varies, there are approximately 130 full-time employees and a varying
number between 30 and 90 players depending on the time of year.
The site is laid out with the Fields to the south, with three fields they can rotate during the training camp, the
fourth field may or may not be built, That location will provide an area where fans will be able to view the
practices of the team. The office building was built with the views in mind, both lake and practice fields.
The nineteen acres is really the minimal amount and just about all of it has been used for this facility. The
month of August is the best time to think about training camp, it typically is a 25-day period and can vary from
year to year. That is the time of year that the players are trying out for the team, the public is very interested in
that process. The number of fans coming out for training camp could be in the range of 1,500 and 2,000 per
day. A Saturday or Sunday could rise to perhaps 2,500. Practice is in the morning; and the afternoon each day.
They have asked the City about developing a bus turnaround on Ripley Lane, ~which can be shared with the
current school bus stop, they propose to make it a nicer bus stop. That would allow the shuttle busses to drop
people off right at the front gate. Burlington Northern Railway has indicated they would allow an casement
over the center entrance area. Offsite parking has not yet been determined. There are some locations that they
are looking at currently.
Scahawks' Headquarters and Training Facility
File No.: LUA-06-073, SA-H, SA-M, SM, ECF
December 7, 2006
Page 3
The Examiner stated there were two appeals, .which had been filed by the Misty Cove Association of
Apartments Owners and Steve Jensen, who filed on his ovvn behalf as a separate individual. Letters have been
received stating that the parties had reached a settlement in those two appeals_
Zanetta Fontes stated that that was correct. She had been notified and she would let the parties go over the
conditions to which they have agreed. It was noted that Mr. Jensen was not in the hearing room.
Roecr Pearce, Foster Pepper stated that they had reached a formal settlement agreement with Misty Cove
Association of Apartment Owners who are represented by Mr. Peterson_ The settlement letter did include 7
permit conditions that should be placed on the project. With respect to Mr. Jensen's appeal, lie indicated the he
was withdrawing and would fax a formal withdrawal to the Hearing Examiner's Office. lie did ask that Mr.
Jensen's appeal be dismissed if a letter were not forthcoming from Mr. Jensen.
Tom Peterson stated that lie represents Misty Cove, they have filed a dismissal of their appeal along a,.rith a letter
identifying permit conditions, which are identical to the ones that Mr. Pearce submitted.
The Examiner stated that Mr. Jensen's appeal is dismissed. The settlement is acceptabteand the appeal is
dismissed for both Misty Cove and Mr. Jensen.
The Land Use Hearing began at 9:I 1 am with a presentation ofthe staff rcport by Elizabeth Higgins, Senior
Planner, Development Services. The applicant is requesting both Master Plan and Site Plan review of currently
vacant 19.6-acre property in the Kennydale area of northeast Renton. The project consists of one building at
approximately 135,534 square feet, outdoor and indoor practice fields and an accessory building that would be
used for maintenance. The project is located in the area known as Port Quendall in northeast Denton, just west
of I-405_ To the south is the Quendall terminals property, south of that the Barbee Mill property, the entire area
is zoned Commercial -Office -Residential (CUR)_ North of the project site is the Misty Cove Condominium and
north of that the Ripley Lane neighborhood. To the east of the property is the Pan Abode property and the
interchange to 1-40.
The site was considered to be in the distant country early on, and was used for wood processing alter it was
logged off. It has remained vacant since wood processing ended in 1981. It has been used for storage since
then. The site has been subject to clean up by consent decree with the Department of Ecology. A cap will be
required to be placed over soil that still has residual contamination.
Currently, the site is largely vacant, there is one building that will be removed.
The indoor practice facility would be the farthest away from the lake and the office building would be a 2-story
with a mezzanine level between the two stories and closest to the lake. This is part of the settlement between
Misty Cove owners and the Seahawks, the fields were shifted around but remain on the south side of the
property. The public access to the lake was extended to approximately 250 feet along the lake. The public
access will be handled as a county park, open only during the daylight hours. The Shoreline Management Act
allows uses that are water related, this is not water related, however the access to the lake for the public allows
this property to meet the requirements.
Access to the property currently is at the northeast corner and the southeast corner of the property. There are
ongoing negotiations with the Burlington Northern Santa Fe Railroad to have an additional private crossing at
about the midpoint of the property. This would be the primary entrance for the site.
This project went to the Environmental Review Committee, the decision was appealed and has been settled.
There were seven mitigation measures.
Seahawks' Headquarters and ''raining Facility
File No.: LUA-06-073, SA-H, SA-M, SM, ECF
December 7, 2000
Page 2
The following exhibits were entered into the record:
Exhibit No. 1: Yellow file containing the original
application, proof of posting, proof of publication and
other documentation pertinent to this request.
Exhibit No- 2: Vicinity Map
Exhibit No. 3: Historic Aerial Photo of North and
South Baxter Properties
Exhibit No. 4: Zoning Map
Exhibit No. 5: Mitigation Site Plan - Alternative
Plan
Exhibit No, G: Plan Diagrams
Exhibit No. 7: North and South Building Elevations
Exhibit No. 8: South View Transverse Section
Exhibit W 9: Base Site Plan
Exhibit No. 10:
Building Location Qptions
Exhibit No. t I: Green Screen Wail A
Exhibit No. 12:
Green Screen Wall 13
Exhibit No._13:. Existing View from Misty Cove Unit
302
Exhibit No. 14:
Base Site Plan
View from Misty Cove Unit 302,
Exhibit No. 15: View from Misty Cove Unit 302,
Mitigated Site Plan
Exhibit No lb:
Comparison
View from Misty Cove Unit 302,
Exhibit No. 17: Existing View from Misty Cove Unit
312
Exhibit No. 18:
Base Site Plan
View from Misty Cove Unit 312,
Exhibit No. 19: View from Misty Cove Unit 312,
Mitigated Site Plan
Exhibit No. 20:
Comparison
View from Misty Cove Unit 312,
Exhibit No. 21. Daily Shadow Studies — Base Plan
Exhibit No. 22:
Alternative Plan
Daily shadow Studies — Mitigated
Exhibit No. 23. Seasonal Shadow Studies — Existing
Conditions
Exhibit No. 24:
Plan
Seasonal Shadow Swdics — Base
Exhibit No. 25: Seasonal Shadow Studies — Mitigated
Alternative Plan
Exhibit No, 26:
List of 25 Exhibits from Staff Report
Exhibit _No. _27_ _: Foster Pepper Appeal Settlement
Letter
Exhibit No. 28.
Petersen Appeal Settlement Letter
Exhibit No. 29; A eat File b Reference
Exhibit No. 30:
Shoreline
Exhibit No. 31. Geotech Summary.Exhibit
No. 32;
Power Point Presentation
Exhibit No. 33: Draft Engineering Design Plan
December 7, 2006
OFFICE OF THE HEARING EXAMINER
CITY of RENTON RECEIVED
Minutes DEC 8 2006
APPLICANT: football Northwest FOSTER PEPPER PLLC
505 Fifth Avenue S., Ste. 900
Seattle, WA 98104
OWNER: Port Quendall Company
505 Fifth Avenue S., Ste. 900
Seattle, WA 98104
CONTACT: Ray Col liver
505 Fifth Avenue S-, Ste. 900
Seattle, WA 98104
Seattle Seahawks' 1-Ieadquarters and Training I-acility
File No.: LUA 06-073, SA-H, SA-M, SM, ECF
LOCATION: 5015 Lake Washington Boulevard N (also addressed as 5015,
4801, and 4635 Ripley Lane)
SUMMARY OF REQUEST: Appheant requested Master Plan and Site Plan Review for the
development of the Seattle Seahawks' Headquarters and
`]'raining Facility. The project would be a single building
consisting of 135,534 sf of office space on two levels and
89,423 sf indoor practice facility. There would be up to four
outdoor practice Gelds. The zoning designation is
Commercial-Office-Rcsidential.
SUMMARY OF ACTION: Development Services Recommendation: Approve with
conditions
DEVELOPMENT SERVICES REPORT-. The Development Services Report was received by the
Examiner on November 14, 2006.
PUBLICHEARING: After reviewing; the Development Services Report, examining
available information on file with the application, field
checking the property and surrounding area.. the Examiner
conducted a public hearing on the subject as follows:
MINUTES
They folloWng minutes are a summary of the November 21, 2006 hearing.
The legal rerand is vecoi-del oit CA.
The hearing opened on Tuesday, November 21, 2006, at 9:01 a-m. is the Council Chambers on the seventh floor
of the Renton City Hall- Parties wishing to testify were affiniied by the Examiner.
Seahawks' Headquarters and rI ing Facility
File No.: LUA-06-073, SA-H, SA-M, SM, ECF
December 7, 2006
Page 16
7. Fan parking during training camp will be accommodated at a parking lot or parking facility off the
project site, with fans then being bused to the site.
8. The project dumpster/recycling area will use containers with lids, and the container storage area will be
screened from the Misty Cove property. The garbage and recycling pickups will occur during normal
business hours on weekdays — not at nights or very early morning hours. All non -recyclable materials
placed in the containers will be in sealed plastic bags.
9. FNW shall replace the existing property line fence between the Misty Cove property and the project site
with a new fence of at least equal duality.
10. No athletic field lighting is being proposed under the permit. The Seahawks agree not to seek any
permit to do so for a period of 15 years from the date of this Agreement. All project exterior lighting
will be designed so that the lighting is directed away from the Misty Cove residences.
11. FNW will provide signage that clearly indicates the main entrance to the project site, so that visitors to
the site can easily find the entrance. Any signage will have to comply with City and State regulations.
12. The proposed shoreline area planting plan shall include lower -level plantings in the north section of the
project shoreline area, in order to minimize impacts of views of the water from the adjacent Misty Cove
Condominium property.
13. The mitigation and design measures in the Lake and Stream Study and the Turf Integrated Pest
Management Plan submitted to the City as part of the project application shall be conditioned to permit
approval.
ORDERED THIS 7'h day of December 2006.
FRED J. KAUFMAN
HEARING EXAMINER
TRANSMITTED THIS 7"' day of December 2006 to the parties of record:
Elizabeth Higgins
1055 S Grady Way
Renton, WA 98055
Lance Lopes
VP Seahawks
800 Occidental Avenue S
Seattle, WA 98034
Eileen Halverson
5021 Ripley Lane N, #302
Renton, WA 98056
Kayren Kittrick
Development Services
Renton, WA 98055
David Murphy
Crawford Architects
1801 McGee St., Ste, 200
Kansas City, MO 64108
Joe Burear
3190 160'' Avenue SE
Bellevue, WA 98008
Roger Pearce
Foster Pepper
1111 Third Avenue, 34`h Floor
Seattle, WA 98101
Larry & Esther Barsher
6940 96"' Avenue SE
Mercer Island, WA 98040
Carl Hadley
Cedar Rock Consultants
19609 244`h Avenue
Seahawks' 1leadquartcrs and "braining Facility
File No.: LUA-06-073, SA-H, SA-M, SIA, l Cl'
December 7, 2006
Page 17
Football Northwest
505 Fifth Avcnue S., Ste. 900
Seattle, WA 98104
Michael Cero
8300 Avalon Drive
Mercer Island, WA 98040
Brian T. Sabey
5021 Ripley Lane N, Ste. 304
Renton, WA 98056
Port Quendail Company
505 Fifth Avenue S_, Ste. 900
Seattle, WA 98104
Thomas Peterson
Socius Law Group PLLC
Two Union Square
601 Union Street, Ste. 4950
Seattle, WA 98101
Woodinville, WA 98077
Ray Col liver
S05 Fifth Avenue S., Ste. 900
Seattle, WA 98104
Thelma Sutherland
1205 N 29"' Street
Renton, WA 98056
.Tared Salstrom
5021 Ripley Lane N, Ste. 213
Renton, WA 98056
Stcve Janseri Eleanor Maargo Kennamer, President Elya George Baches
5021 Ripley Lane N, Ste. 4 Misty Cove Condo Association 1414 N 34"' Street
Renton, WA 98056 5021 Ripley Lane N, Ste. 309 Renton, WA 98056
Renton, WA 98056
Aaron Belenky, President
Williamsburg Condo HOA
1800 NE 40"' Street, Ste. 14-4
Renton, WA 98056
Barbara Paxhia
5021 Ripley Lane N, Ste. 104
Renton, WA 98056
Richard Wagncr
Baylis Architects
10801 Main Street, Ste. l 10
Bellevue, WA 99004
Steve Gregerson
5021 Ripley Lane N, Ste. 302
Renton, WA 98056
Shelly Munkberg
SEGO Development
1083 Lake Washington Blvd N_, Ste. 50
Denton, WA 98056
Jeffrey Taraday
Fostcr Pepper
11 1 t Third Avenue, Ste. 3400
Seattle, WA 98101
TRANSM11-FED THIS 7"` day of December 2006 to the following:
Mayor Kathy Keolker
.Tay Covington, Chief Administrative Officer
Julia Med?egian, Council Liaison
Gregg Zimmerman, PBPW Administrator
Alex Pietsch, Economic Development
Jennifer Henning, Development Services
Stacy Tucker, Development Services
K ing County Journal
Elaine Wine
Vulcan
505 Fifth Avenue S, Ste. 900
Seattle, WA 98104
Tom Ehrlichman
Socius Law Group
Two Union Square
601 Union Street, Ste. 4950
Seattle, WA 98101
Stan Engler, Fire
Larry Meckling, Building Official
Planning Commission
Transportation Division
Utilities Division
Neil Watts, Development Services
Janet Conklin, Development Services
Pursuant to Title IV, Chapter 8, Section 100Gof the City's Code,_r_ectuest for reconsideration must be filed in
writing on or before 5:00 p.m., December 21, 2006, Any aggrieved person feeling that the decision of the
Examiner is ambiguous or based on erroneous procedure, errors of law or fact, error in judgment, or the
discovery of new evidence which could not be reasonably available at the prior hearing may make a written
request for a review by the Examiner within fourteen (14) clays from the date of the Examiner's decision. This
request shall set forth the specific ambiguities or errors discovered by such appellant, and the Examiner may,
after review of the record, take further action as he deems proper.
Scahawks' Headquarters and Training Facility
Pile No.: LUA-06-073, SA-11, SA-M, SM, FCF
December 7, 2006
Page 18
An appeal to the City Council is governed by Title IV, Chapter 8, Section 110, which requires that such appeal
be filed with the City Clerk, accompanying a filing fee of S75.00 and meeting other specified requirements.
Copies of this ordinance are available for inspection or purchase in the Finance Department, first floor of City
Halt. An appeal must be filed in writing on or before 5:00 p.m., December 21, 2006.
If the Examiner's Recommendation or Decision contains the requirement for Restrictive Covenants, the
executed Covenants_Fvill be required prior to approval by City, Council or final processing of the file. You
may contact this office for inforniation on formatting covenants.
The Appearance of Fairness Doctrine provides that no ex parse (private one-on-one) conununications may occur
concerning pending land use decisions. 'Phis means that parties to a land use decision may not communicate in
private with any decision -maker concerning the proposal. Decision -makers in the land use process include both
the Hearing Examiner and members of the City Council.
All communications concerning the proposal must be made in public. This public communication permits all
interested parties to know the contents of the communication and would allow them to openly rebut the
evidence. Any violation of this doctrine would result in the invalidation of the request by the Court.
The Doctrine applies not only to the initial public hearing but to all Requests for Reconsideration as well as
Appeals to the City Council.
Project Location: 5015 Lake Washington Boulevard N (also addressed as 5015, 4801,
4635 Ripley Lane)
_a
0
0 114 112 1
E)1IB I ; Scale In Mlles
2
NOTE
Re -produced wfih pennlsslon grantod by THOMAS BROS. MAPS.
Tfris map Is copyrighted by THOMAS BROS. MAPS®. If is
unlawful to copy or reproduce all or any part themf, whether for
personal use or resale, without permission. All rights reserved.
9bbhawks Headquarters and Practloe Facility
Renton, Washington
VICINITY MAP
September2006 21-1-205254)03
SFiA.hINON & WlLSON, INC.
owkdr w end 6M'xn w �ttmrts
CQR
r
ZONING MAP
tl
II
f
LAKE WASHING i QN
PSE
UFT
Y
ISTIvC BVILDIIC
STRl1CTURE ?4 BE
EXTENT OF REuOYE0
livitil
PUQL]C ACCESS ExISTIN A• ACCESS WALK
ExmPOLE EHC POWEAllbNi SOCK
SECURfrr FENCE
POLE tMhT6N �\ 0' 20" SERVICE RCnb
SOOTH PROPERTY t
FENCE URE \ `i E f _ - - _ - ` Cc
FsC GSEWEM
uNE trap) I
POLE �LaCAP ouR
I 1.J U 4
C
IS h C
NEW f- STORY -x
wuuf£kANCE KI
COVERED CAP WASH PAD J �� cu
Q1
TL 2
EXISTING POWER _ _—
POL( LOCATTON CuRB l F �,
Lw NT. PAWN - -IT 7y-
10 STALLS ' Y I!�.'7x'�,� I
MtjCURfTY GATE I I ter I
SURFACE PAHKIHC - FlLTE 1 1 i k I IILLI I r SrCVRrTY CATE ----4RT
-------------
' I Y PROFCSE6 MLWAY CROSSINC - E�
EXHIBIT a
QSAlf f:t ASS CENEI7F.L SURFACE PARKING JAI STALLS 9z
LAKE WA.SHMCTON - CLASS I SECVRE TEAM PARKING I13 5-ALLS
CYPSr Sus EASIN ORWAC£ - CUSS 2 (RE: FICURE 6.3) T l 7
TOTAL 754-----------------------
s L L7 U
',s
... .:�:f.�..'�
w
I
I
�41W
1Ai.
-mp
City of Renton P131PW bepartmeni Preffmfnary Report to the Hearing Examiner
SEA TFLES AHAWKS'HEAUQUARTERSANO TRAINING FACUTY LUA-06-073, SA-H, SA-M, SA ECF
PIJ13LIC HEARING DATE., November 21, 200 Page 7 of 20
appeal period commenced on October 23, 2006 and ended on November 6. 2006. Two appeals of the
threshold determination were filed. It is anticipated that these appeals would be heard on November
21, 2006, prior to the public hearing on the Master and Site Plan Reviews_
3. ERG MITIGATION MEASURES
Based on an analysis of probable impacts from the proposed project, the following mitigation measures
were issued for the Determination of Non -Significance — Mitigated:
1. The applicant shaft comply with the recommendations included in the geotechnical report,
"Supplemental Preliminary Geotechnical Report Seahawks Headquarters and Practice Facility
Renton, Washington," by Shannon & Wilson, Inc., dated September 13, 2006, including
recommendations for excavation, backfill materials, structural concrete blocking, and soil
remediatioa for the water mains.
2. This project shall be subject to the 2005 King County Surface Water Design Manual for water
quality.
3. The applicant shall be required to provide a Temporary Erosion and Sedimentation Control
Plan (TESCP) designed pursuant to the Department of Ecology's Erosion and Sediment
Control Requirements, outlined in Volume II of the 2001 Stormwater Management Manual and
provide staff with a Construction Mitigation Plan prior to issuance of construction permits.
4. The applicant shall work with the City to alleviate upstream flooding that may impact access to
the site. Additional details of pipe sizing and/or street improvements would be addressed
through site plan review_
5. A traffic mitigation fee of $75 per additional daily trip shall be assessed based on the submitted
calculation of 555 ADT. The fee of $41,625.00 shall be assessed at building permit issue.
6. Afire mitigation fee of $0.52 per square foot of building space shall be assessed at building
permit issue.
7- In the event that archaeological deposits are found during construction, work shall stop and the
contractor(s) shall contact the State Archaeologist at the State of Washington Office of
Archaeology and Historic Preservation, phone (360) 586-3065, the Muckleshoot Cultural
Resources Program, phone (253) 939-3311, and Duwamish Tribal Services (206) 431-1582_
4. STAFF REVIEW COMMENTS
Representatives from various city departments have reviewed the application materials to identify and
address site plan issues from the proposed development. These comments are contained in the
official fife, and the essence of the comments has been incorporated into the appropriate sections of
this report and the Departmental Recommendation at the end of the report.
5. SITE DEVELOPMENT PLAN REVIEW
The purpose of site development plan review is to assure that proposed development is compatible
with the plans, policies, and regulations of the City of Renton as outlined in the City's Comprehensive
Plan and the City's Business Plan Goals. Site development plan review is divided into two types:
Master Plan and Site Plan.
HEX staff 0 0"73.dw
Yi t FOSTER PEPPER,,.,,
November 17, 2006
VIA MH SSE NGER
Mr. Fred J. Kau#inan
Hearing Lxaminer
City of Renton
1055 South Grady Way
Renton, Washington 98055
Re: Seattle Seahawks Headquarters facility
City of Renton Application No. LUA06-073
Dear Mr, Kaufman:
Direct Phone (206) 4-17-4676
Direo Facsimile (206)719-1997
L-Mail f'�arReifoslL•r.cc>m
G �J a +111
1 !�
h E iTy OF RIG UAt
�i11Vi
As pail of its settlement with the Misty Cove Association of Apartment Owners, permit applicant
Football Northwest LLC ("FNW") agrees to the following hermit conditions with respect to its
Master Plan and Shoreline Perriiit Applications for the Scahawks Corporate Headquarters and
Training Facility under the above -referenced project number (the "Project") and respectfully
requests they be made conditions of permit approval.
Buildin Location/Indoor Practice Facilitv North Elevation Design- FNW shall develop the
Project with the office building and the Indoor Practice Facility ("IPF") located as shown in the
Mitigation Site Plan -Alternative, which is attached as Exhibit A to this letter. FNW shall
develop a green screen wall, planted with ivy or other appropriate landscaping materials, along
the bottom thirty (30) feet of the northeasterly elevation of the IPF (the IPF elevation to the south
of the Misty Cove Condominium), In addition, FNW will develop the north elevation of the IPF
substantially in accordance with the principles stated in Exhibit B to this letter.
Trainin Caine Of#=Site I an Parke . Fan parking during training camp will be accommodated
at a barking lot or parking facility off the Project site, with fans then being bused to the Project
site.
Project Durnpster/Recyling Area. The Project dumpster/recycling area will use containers with
lids, and the container storage area will be screened from the Misty Cove property. The garbage
and recycling pickups will occur during; normal business hours on weekdays -- not at nights or
very early morning hours. All non -recyclable materials placed in the containers will be in sealed
plastic bags.
MistyCove/FNW Property Line Fence. FNW shall replace the existing property line fence
between the Misty Cove property and the Project site with a new fence of at least equal quality.
507.18L13.2
Mr. Fred J. Kaufman
November 17, 2006
Page 2
Project Outdoor Li&htirit7. No athletic field lighting is being proposed under the permit. The
Seahawks agree not to seek any permit to do so for a period of 15 years from the date of this
Agreement. All project exterior lighting will be designed so that the lighting is directed away
from the Misty Cove residences.
Si na e_ FNW will provide signage that clearly indicates the main entrance to the Project site,
so that visitors to the site can easily find the entrance. Any signage will have to comply with
City and state regulations.
Slioreline_PlantinLys. The proposed shoreline area planting plan shall include lower -level
plantings in the north section of the Project shoreline area, in order to minimize impacts of views
ofthe water from the adjacent Misty Cove Condominium property.
Shoreline lnipacts. The mitigation and design measures in the Lake and Stream Study and the
Turf Integrated Pest Management Plan submitted to the City as part of the Project application
shall be conditions to permit approval.
Thank you for your consideration of this request.
Very truly yours,
FOSTER PEPPER PLLC
Roger A. Pearce
Attorneys for applicant Football Northwest LLC
cc: Ms. Elizabeth Higgins, City of Renton
Tom Peterson, Esq,
Mr, Lance Lopes
Ms_ Elaine Wine
7 k � V L v m • � c z n' yy
1 1: C7% gg YT 7 C
y �z� � cox .r•, �' l o�} -0
_ x
rn
IN
eu
irl i
{ e�i r f
J � ti
J �>�}
I
1E ICY'gf rr+/r l
k
I -
1zRCD
J ! �1 j I � �r — J"ffiiITTTTiiTT� J
I E = rTrir
r i
l '
50% DESIGN DEVELOPMENT -
NOT FOR CONSTRUCTION
Seahawks Headquarters &
WA 65
Training Facility
EA 9 i� [ SciSLa�e �vnw++pon oasvn,nNw.
— PeNon,
Indoor Practice Facility (IPF) — North Elevation
The design features the use of traditional architectural devices to reduce the apparent
scale and mass of the project including: horizontal expression lines, special roof
treatments plus fenestration and glazing systems. At the north elevation of the IPF,
three exterior wall systems are being developed:
9 . Base -- The first 30 feet of the fapade will consist of cementious wall panels
and/or nonreflective metal siding to a height of approximately 30 feet.
Additional shade and shadow will be created by a "green -screen" that is
comprised of a metal lattice grid with vegetation.
2_ Middle - The middle portions of the elevation will consist of cementious wall
panels and/or nonreflective metal siding to a height of approximately 80 feet
with no "green screen."
3. Top W The "top" portions of the elevation will include a high percentage (up to
70% to 85% of translucent panels) and sculpted roof_ The sculpted component
of the roof would add visual interest and reduce the apparent scale of the
fagade by casting varying shadow on the 1PF facade,
Each layer of the fagade will be defined by horizontal expression lines as mentioned
above. In addition, the composition of the materials being proposed for the facade will
have a texture which will further reduce the apparent mass of the structure.
A range of color palettes are being studied for the facade including:
i. Metal Panels/Siding — Nickel to light gray
2. Cementious Panels — Buff/Sandstone to light gray/nickel
3. Translucent Panels — white to "off-white'7light gray
4. "green -screen" — stainless/metal wire mesh with vegetation growing on the
screen_
Final color palettes will be based on actual materials selected. An example of potential
final colors, massing and roof design is included on the following page.
1-'XHIBIT
EXHIBIT
-2-
�
� X CIT' OF RENTON �
+ +
L'Y%� Kathy iCeollcer, Mayor
Planning/Building/PublieWorks Department
Gregg Zimmerman P.C., Administrator
October 19, 2006
RECEIVED
Ray Colliver
OCT
Port Q.uendall Company
505 5th Avenue S ste: #900
FOSTER PEppER
Seattle, WA 98104
p LLC
SUBJECT: Seahawks Headquarters and Training Facility
LUA06-073, SA-M, SA-H, SM, ECF
Dear Mr. Colliver:
This letter is written on behalf of the Environmental Review Committee (ERC) to advise you that they
have completed their review of the subject project and have issued a threshold Determination -of Non -
Significance -Mitigated with Mitigation Measures. Piease-refer to the enclosed ERC Report and Decision,
Part 2, S.ec-tion B .for a list of the Mitigation Measures.
Appeals of the environmental, determination must be filed in writing on or before 5:00. PM ° on-
Novemb-er :6, 2006. Appealsmust be filed in writing together with the required $75.00 application`fee
with- Hearing Examiner, City. of Renton, 1055 South Grady Way, Renton, WA 98055_ Appeals to the
Examiner. are governed by City of Renton Municipal "Cnd6`Section 4-8-110.B. Additional information
regarding the appeal process may be obtained from the Renton City Clerk's Office, (425) 430-6510.
A Public Hearing will be held by the Renton Hearing Examiner in the Council Chambers on the seventh
floor of City Hall, 1055 South Grady Way, Renton; Washington., on November 21, 2006 at 9:00 AM to
consider the Master Site Plan and Site. Plan. The applicant or representative(s) of the applicant is
required to be present at the public hearing. A copy .of the stuff report will be .mailed to you one week
before the hearing. If the Environmental Determination isappealed, the appeal will be heard as.part of
this public hearing.
The preceding information will assist you in planning fpr,im.plementation of your pr6ject and enable you to
exercise your appeal. rights more fully, if you, choose 'to do so. If you have any questions or desire
clarification of the above,. please call me at (425) 430-7382.
For the Environmental Review Committee,
All
Elizabeth.Higgins
Senior Plann. er
cc: Parties of Record
Enclosure
1055 South Grady Way - Renton; Washington 98055
RENTON
AHEAD OF THE CURVE
J
I
REPORT
e _ A Renton �
Department of Planning / Building / Public Worms
&
DECISION
ENVIRONMENTAL REVIEW COMMITTEE REPORT
ERC MEETING DATE:
October 16, 2006
Project Name:
Seahawks Headquarters and Training Facility
Owner:
Port Quendall Company
Applicant:
Football Northwest
Contact:
Mr. Ray Colliver
505 Fifth Avenue S, Suite 900
Seattle, WA 98104
File Number:
LUA06-073, ECF, SA-M, SA-H, SM
Project Manager:
Elizabeth Higgins, Senior Planner
Project Description:
The project proponent is requesting SEPA environmental review for development of the
Seahawks Headquarters and Training Facility. The proposed project would consist of
a three-story office building and indoor practice facility in a single structure and four
outdoor practice fields for the sport of professional football. An ancillary building for
football -related equipment storage is also planned.
Continued next page
Project Location:
5015 Lake Washington Boulevard N (also addressed as 5015, 4801, 4635 Ripley Lane)
Exist. Bldg. Area SF:
NIA Proposed New Bldg. Area (footprint): 129,595 sf
Proposed New Bldg. Area (gross): 215,000 sf
Site Area:
19.68 acres (853,776 sf) Total Building Area GSF: 215,000 sf
RECOMMENDATION:
Staff recommends that the Environmental Review Committee issue a Determination of
Non -Significance — Mitigated (DNS-M).
Project Location Map Seahawks ERC Report 03
City of Renton P/B/PW Departmer, Erg omentaf Review Committee Staff Report
SEAHAWKS HEADQUARTERS }TRAWING FACILITY LUA-06-073, ECF, SA-M, SA-H, SM
REPORT OF OCT08ER 16, 2006 Page 2 of 16
PART ONE: PROJECT DESCRiPTIONIBACKGROUND, CONTINUED
The proposed project location is a vacant site between the shore of Lake Washington and the NE 44th Street
interchange with Interstate 405 (Exit 7) in Northeast Renton (Exhibit 1). The site consists of two tax parcels, known as
Baxter North and Baxter South Properties. The 19.6 acre Baxter property is a former timber processing/wood
treatment facility (Exhibit 2).
The wood treating operations at the site ended in 1981 and the property was subsequently used for storage of bark
mulch. Cleanup of the property was prescribed by Prospective Purchaser Consent Decrees (North Baxter, #00-2-
11778-7KNT and South Baxter, #00-2-11779-5KNT) negotiated with the Department of Ecology under the Model
Toxics Control Act_ Cleanup of the South Baxter property consisted of excavation and replacement of soils in the
Baxter Cove area and soil stabilization in the uplands. North Baxter remediation, consisting of capping contaminated
soils, has been proposed to occur simultaneously with site construction.
The site is within the Gypsy Subbasin Drainage, a 320 acre area north of and near, but independent of May Creek.
The drainage way for the Gypsy Subbasin enters the property in a pipe from the BNSF Railroad right-of-way. Once on
the property it flows from east to west first in a 125 foot open channel and then for 490 feet in a pipe to an outfall at the
shoreline of Lake Washington.
The dominant character of the site is an abandoned open field. There are no significant buildings on the property at the
present time. A single -story, 1,300 sf wood -frame office building built on Baxter North in 1963, would be removed from
the property, as would asphalt -paved interior roads. An existing boathouse and dock are located at the northwest
shoreline. There is currently no plan to utilize these features and they would be fenced from the area of the site
accessible to the public.
On -site clean-up activities, remediation from the former wood -processing activities, have consisted of soil excavation,
contaminant removal, and in situ soil stabilization. Site grading for the project would be coordinated with continuing
remediation. Calculations indicate the capping of the site (see Environmental Health discussion, below) and grading
for site features would require approximately 29,600 cubic yards of cut and 52,900 cubic yards of fill material. Some
cut material would be removed from the site and the remainder reused. A source statement for fill material would be
required at the time of site construction.
The property is zoned Commercial / Residential / Office 2 (COR 2). The stated purpose of the Commercial /
Residential I Office zone is, "to provide for a mix of intensive office, hotel, convention center, and residential activity in
a high -quality, master -planned development that is integrated with the natural environment." Although a major, national
sports franchise headquarters was not anticipated as a use at the time this policy statement was formed, the following
adopted policy is applicable, "Also, commercial uses that provide high economic value may be allowed if designed with
the scale and intensity envisioned for the COR zone."
The proposed project consists of administrative offices for a professional football franchise and accessory training and
practice facilities (Exhibit 3). The office and an indoor practice field would be within a 215,000 gross square foot
building on the North Baxter property. Administrative offices would be 48,000 sf and technical / support and player
meeting space would be 15,000 sf each.
Four outdoor, practice fields covering 8.3 acres would be located on the Baxter South property. Three would be
natural and one artificial turf.
The proponent's vision is for a building that would be both functional and aesthetically significant. Of the total building
area, 131,000 gross square feet of office space would be located on three levels. Most of the building would be
between 52 and 55 feet in height. The height of the 80,000 gross square foot indoor practice field, situated on the
north and east sides of the building, would be between 95 feet at the center of the field and 120 feet. There would be
three natural grass practice fields, oriented east -west on the South Baxter property. A one-story, 6,000 sf
maintenance / equipment storage building would be located near the south property line.
The steel frame building would be faced in buff/sandstone to light gray synthetic stone, masonry, and storefront
systems on the lower level. Clear -glazed windows and either buff/sandstone to light gray cementious, or nickel to light
gray metal, wall panels in on upper portions. (Building siting and design will be discussed to a greater extent during
the Site Plan Review).
The scale and intensity of the proposed project balances City policies that intend high intensity use, with both the
natural amenities of the shoreline and wetland, Moth of which will have been enhanced by project completion, and
residual contamination from the former industrial use.
Seahawks ERC Report 03
City of Denton P18/PVYDepartmor' �6ental Review Committee Staff Report
SEAHAWKS HEADQUARTER: TRAINING FACILITY LUA-06-073, ECF, SA-M, SA- SM
REPORT OF OCTOBER 16, 2006 Page 3 of 16
Access would be from Lake Washington Boulevard (Ripley Lane) on the east and would require crossing the
Burlington Northern Santa Fe Railroad right-of-way with a private street
On -site roads would be private_ There would be parking for 299 vehicles; 195 stalls for general surface parking and
104 secure (fenced) surface parking stalls for team members. Due to both limited access and on -site parking, the
annual training camp, held for three weeks in August, would require off -site parking with a scheduled shuttle bus
service.
Portions of the site not covered with pavement, buildings, or fields would be either restored with native vegetation
(wetland and shoreline) or landscaped appropriately for its function. Irrigation systems would be installed in all
landscaped areas with temporary irrigation for the shoreline riparian plantings until they are established. (Landscaping
Will be discussed to a greater extent during the Site Plan Review).
A viewpoint at shoreline of Lake Washington would be accessible to the public by means of an east -west paved
walkway located parallel to the north property boundary. This viewpoint would be landscaped and furnished with
benches.
A Category 3 wetland has been restored and would remain in a protected area at the southwest portion of the
property, adjacent to Lake Washington_ The wetland would not be accessible to the public, although public access to
the shoreline of Lake Washington would be provided by the proponent at the northwest corner of the property_
PART TWO: ENVIRONMENTAL REVIEW
In compliance with RCW 43.21 C.240, the following project environmental review addresses only those project impacts
that are not adequately addressed under existing development standards and environmental regulations_
A. Recommendation
Based on analysis of probable impacts from the proposal, staff recommends that the Responsible Officials make
the following Environmental Determination:
DETERMINATION OF
NON -SIGNIFICANCE
Issue DNS with 14-day Appeal Period.
B. Mitigation Measures
DETERMINATION OF
NON- SIGNIFICANCE- MITIGATED.
X Issue DNS-M with 14-day Appeal Period.
Issue DNS-M with 15-day Comment Period
with a Concurrent 14-day Appeal Period-
i _ The applicant shall comply with the recommendations included in the geotechnical report, "Supplemental
Preliminary Geotechnical Report Seahawks Headquarters and Practice Facility Renton, Washington," by
Shannon & Wilson, Inc., dated September 13, 2006, including recommendations for excavation, backfill
materials, structural concrete blocking, and soil remediation for the water mains.
2. This project shall be subject to the 2005 King County Surface Water Design Manual for water quality.
3. The applicant shall be required to provide a Temporary Erosion and Sedimentation Control Plan (TESCP)
designed pursuant to the Department of Ecology's Erosion and Sediment Control Requirements, outlined
in Volume Il of the 2001 Stormwater Management Manual and provide staff with a Construction Mitigation
Plan prior to issuance of construction permits.
4. The applicant shall work with the City to alleviate upstream flooding that may impact access to the site.
Additional details of pipe sizing and/or street improvements would be addressed through site plan review.
5. A traffic mitigation fee of $75 per additional daily trip shall be assessed based on the submitted
calculation of 555 ADT. The fee of $41,625.00 shall be assessed at building permit issue.
6. A fire mitigation fee of $0.52 per square foot of building space shall be assessed at building permit issue.
7. In the event that archaeological deposits are found during construction, work shall stop and the
contractor(s) shall contact the State Archaeologist at the State of Washington Office of Archaeology and
Historic Preservation, phone (360) 586-3065, the Muckleshoot Cultural Resources Program, phone (253)
939-3311, and Duwamish Tribal Services (206) 431-1582.
Seahawks ERC Report 03
City of Renton PBIPW Departmentir En. ,hmental Review Committee Stgff Report
SEAHAWKS HEADQUARTERS 'TRAINING FACILITY LUA-06-073, ECF, SA-M, SA-H, 5M
REPORT OF OCTOBER 16, 2006 Page 4 of 16
C. Exhibits
Exhibit 1 Vicinity Map (September 2006)
Exhibit 2 Historic Aerial Photo of North and South Baxter Properties (date unknown)
Exhibit 3 Seahawks Headquarters and Training Facility, Building Plan (September 2006)
Exhibit 4 Seattle Fault Zone (July 2006)
Exhibit 5 Seahawks Headquarters and Training Facility, Site Plan (September 2006)
Exhibit 6 Baxter Cove Wetland Mitigation Plan (August 2006)
Exhibit 7 Lake Washington Shoreline, Existing Conditions (2006)
Exhibit 8 Riparian Habitat Functions and Values Chart (September 2006)
Exhibit 9 Gypsy Subbasin Culvert Replacement and Relocation Plan (August 2006)
Exhibit 10 Summary of Pest Control Measures (September 2006)
Exhibit 11 Visualization Assessment Viewpoints (September 2006)
Exhibit 12 Visualization Assessment, NE 761h Street Viewshed (September 2006)
Exhibit 13 Visualization Assessment, Misty Cove Unit 312 Viewshed (September 2006)
Exhibit 14 Visualization Assessment, Misty Cove Unit 302 Viewshed (September 2006)
Exhibit 15 Seahawks Headquarters and Training Facility, Elevations (September 2006)
D. Environmental Impacts
The Proposal was circulated and reviewed by various City Departments and Divisions to determine whether
the applicant has adequately identified and addressed environmental impacts anticipated to occur in
conjunction with the proposed development. Staff reviewers have identified that the proposal is likely to have
the following probable impacts.
1. Earth
Impacts: An Environmental Checklist submitted by the project proponent and a report, "Supplemental
Preliminary Geotechnical Report Seahawks Headquarters and Practice Facility Renton, Washington," by
Shannon & Wilson, Inc., September 13, 2006, forms the basis of analysis of impacts classified within the
category of "earth". Additional, existing reports were reviewed for consistency with the literature study and on -
site investigation. Site exploration consisted of drilling 6 borings and excavating 29 backhoe test pits. Borings
were based on proposed location of building corners and the estimated building center. The test pits were
spaced across the site to provide an overview of near -surface soils. Some pits were more closely spaced
where deeper excavation for site preparation would occur.
The subsurface geology is a combination of naturally -occurring and artificial conditions. Fluvial deltaic,
lacustrine near -shore deposits and constructed fill overlie Pleistocene glacial sediments and Eocene volcanic
and sedimentary bedrock.
The site has undergone many influences over past decades including the lowering of the lake approximately 8
feet when the Lake Washington Ship Canal was constructed in 1916. In the mid 1950s, filling occurred on the
site to extend the shoreline and raise the grade for construction of industrial facilities. Ongoing dredging and
backfilling increased the complexity of the soil so that the subsurface material consists of a highly
heterogeneous mix of clay, silt, peat, sand, gravel, and cobbles. Intermixed are abandoned subsurface
structures and discarded debris from past industrial activities on the site.
Generally, subsurface soils in the building and fields locations consist of either fill material to a depth of 2 to 3
feet, soft estuarine deposits and loose alluvial soils to depths of between 17 and 38 feet. The estuarine and
alluvial deposits have layers of loose sand and compressible peat making them subject to liquefaction (see
discussion below).
The depth to bedrock varies greatly across the site with depths from 17.5 feet to more than 50 feet. It consists
of highly weathered Andesite and is a competent bearing material for building foundations.
The site slopes gently at about a 1 percent grade across the property from northeast to southwest. There are
isolated slopes at about 5 percent along the north of.the site. There is an elevation change from 33 feet in the
northeast corner to about 21 feet where a wetland is located in the southwest corner (see below).
The proposed access road would gain elevation between the railroad crossing and the proposed office
building. The elevation of the driveway and parking lot at the building entrance on the east side of the building
Seahawks ERC Report 03
artyof Benton P/B/PW Departmer' ) E . )mental Review Committee Staff Report
SEAHAWKS HEADQUARTERS TRAINING FACILITY LUA-06-073, ECF, SA-M, SA-H, SM
REPORT OF OCTOBER 16, 2006 Page 5 of 16
is proposed to be approximately 14 feet above the existing grade. The parking area would slope downward as
it wraps around the north end of the building to the west, where it would meet the existing grade. A loading
dock at the northwest comer of the office building would be approximately 1 foot above existing grade. This
configuration would require construction of walls designed to retain up to 14 feet of fill adjacent to the office
building.
The remainder of the site, consisting primarily of outdoor practice fields, would require an average of
approximately 4 feet of fill, with cuts on the east side and up to 3 feet of fill on the west.
The site is located approximately 3 miles south of the "Seattle Fault," (Exhibit 4) and is therefore considered to
lie in a moderately active seismic zone. Due to subsurface conditions, the site is subject to earthquake -
induced liquefaction and settlement. This susceptibility to liquefaction extends to a depth of about 40 feet.
The officefindoor practice building would have typical loads for a structure of this type and size (verified by
Magnusson Klemencic Associates, project structural engineers, in conversation with Shannon & Wilson). The
recommended foundation design for the building would include 24- to 36-inch concrete shafts drilled to
bedrock. The practice equipment building would be supported sufficiently on spread footings.
These proposed site improvements would not be anticipated to have adverse long-term impacts on
surrounding properties, although drilling to bedrock may have temporary sound, emissions, and vibration
impacts during construction (see Advisory Notes to Applicant, below).
Mitigation Measures: The applicant will be required to comply with the recommendations included in the
geotechnical report, "Supplemental Preliminary Geotechnical Report Seahawks Headquarters and Practice
Facility Renton, Washington,' by Shannon & Wilson, Inc., dated September 13, 2006, including
recommendations for excavation, backfill materials, structural concrete blocking, and soil remediation for the
water mains..
Nexus: RMC 44-060, "Grading, Excavation and Mining Regulations"
2. Air
Impacts: It is anticipated that some temporary adverse air quality impacts could be associated with site work
and building construction required to develop this property_ Project development impacts during construction
may include dust resulting from grading, exhaust from construction vehicles, odors from roofing installation,
and roadway paving. Dust would be controlled through the use of temporary erosion control measures and
sprinkling of the site with water as needed.
Odor impacts during construction are unavoidable and would be short-term in nature_
Post development impacts potentially include vehicle and heating and cooling systems exhaust. These
emissions are regulated by state and federal agencies. Nor further site specific mitigation for the identified
impacts from exhaust is required.
Mitigation Measures: No further mitigation is required.
Nexus: Not applicable
3. Water
impacts: The site is within the Gypsy Subbasin Drainage of the Lake Washington East Basin. The Gypsy
Subbasin is a 320 acre, Class 2 water north of and near, but independent of May Creek. Class 2 waters are
salmonid-bearing perennial waters during years of normal rainfall. The drainage collects at a point on the west
side of the project site where it flows for 125 feet in an open ditch prior to entering a 24-inch piped culvert. The
culvert length is 490 feet to an outfall at the shore of Lake Washington. Lake Washington is a Class 1 water, a
salmonid-bearing perennial water also classified as Shorelines of Statewide Significance (see Shoreline
discussion below)_
Reconfiguration of this feature of the Gypsy Subbasin (see Stormwater discussion below) and site
development within 200 feet of a Shoreline of the State would occur as a part of the proposed project. For
Seahawks ERC Report 03
City of Renton PIBIPW Department. En- ?mental Review Committee Staff Report,
SEAHAWKS HEADQUARTERS TRAINING FACILITY LUA-06-073, ECF, SA-M, SA-H, SM
REPORT OF OCTOBER 16, 2006 Page 6 of f 6
these reasons, both Standard and Supplemental StreamiLake studies were required. A report, "Stream and
Lake Study, Supplemental Stream and Lake Study, Stream Mitigation Plan, Seahawks Corporate
Headquarters and Training Facility, Renton, Washington," by Cedarock Consultants, Inc. and A.C. Kindig 8
Co, dated September 20, 2006, was submitted for review.
The overall goal of the cumulative remediation, as determined by the Consent Decrees, has been improved
water quality in Lake Washington. The proposed project incorporates the final remediation with the initial
phases of development. This action is laying a 3-foot deep clean soil cap across the site. At the building
location, the floor slab would serve as a part of this cap. Upsizing of the Gypsy Subbasin Drainage culvert,
prior to completing the cap, would alleviate upstream flooding.
Replacement of exotic species along the shoreline and replanting to improve functions and values of the
riparian zone has been proposed. Most native plants and large trees along the shoreline would be preserved.
These improved conditions would improve the shoreline role in protecting aquatic habitat values critical to
Lake Washington.
Mitigation Measures: No further mitigation is required.
Nexus: Not applicable
4. Wetlands
Impacts: Two on -site wetlands were excavated and filled in association with the remediation plan that
resulted from the negotiated Consent Decrees.
Also as part of the Consent Decrees; approximately 0.46 acre of mitigation wetland was restored in November
2002, along 250 feet of the shoreiine of the Lake near the southwest corner of the property (Exhibit 5) at
Baxter Cove. The Baxter Cove wetland is designed to be a forested wetland with open water and emergent
components within the cove_ Ultimately, it will be a forested wetland, but currently trees planted in seasonally
saturated wetland areas have not attained the required height to meet classification standards for this wetland
type. The open water component is less than 40 percent of the total wetland area. The emergent
classification can be applied to the open water area when the lake level is low and to the edges of the cove
when levels are high.
This lake -fed wetland meets the Renton standards for a Class 3 wetland (newly emerging). It complies with
performance standards and is intended to remain as an undisturbed component of the project proposal. (Initial
conceptual plans had a public access to the lake shoreline constructed through this area, but the final plan has
public access to the take outside of the protected wetland and its buffer).
A 50-foot vegetated and enhanced wetland buffer was also restored as part of the mitigation. A portion of this
buffer would be subject to buffer averaging, as allowed by the City of Renton Critical Areas Ordinance, but no
part of the buffer would be reduced to less than 40-feet in width and the total amount of buffer area would not
be reduced. Approximately 1,220 feet of the wetland buffer would be filled, with replacement of buffer area at
a 1:1 ratio (Exhibit 6).
Subsequently, a wetlands site assessment was conducted by The RETEC Group, Inc. in May 2006 and the results
included in their report, "Shoreline and Wetland Survey, North and South Baxter Parcels, Seahawks Headquarters and
Training Facility, City of Renton," dated August 30, 2006. No jurisdictional wetland areas were identified on the project
site during the wetland reconnaissance, other than the Baxter Cove wetland.
Mitigation Measures: No further mitigation is required.
Nexus: Not applicable
6. Shoreline
Impacts: The proposed project site has 1,887 feet of shoreline along Lake Washington, a Class 1 Inventoried
Shoreline of the State (Exhibit 7). There are approximately 1.23 acres of vegetated area within 100-feet of the
shoreline (excluding 0.36 acres of the Baxter Cove area that is part of the restored wetland). The character of
the shoreline is a steep bank of between 2 and 3 feet high with vegetation rooted at the top of bank. A
covered boathouse with pier and a dock are at two locations along the shoreline.
Seahawks ERC Report 03
City of Renton P/B/PW Departme `� s �menlal Review Committee Staff Report
SEAHAWKS HEADQUARTER. TRAINING FACILITY LUA-06-073, ECT, SA-M, SA-H, SM
REPORT OF OCTOBER 16, 2006 Page 7 of 16
The proposed project would require the following work within 200 feet of the shoreline of Lake Washington:
• Capping (soil cover placement) consistent with the Department of Ecology Consent Decree
• Construction of the Seahawks Headquarters building
• Construction of natural grass practice fields
• Shoreline improvements per statute within the 50 foot setback, including riparian plant zone
• Construction of retaining wail and driveways
• Piping a section of Gypsy Creek drainage to an existing Gypsy Creek outfall at the lakeshore
Proposed improvements are features allowed within the Renton Shoreline Master Program under the Urban
Environment designation.
Lake water elevations fluctuate depending on US Army Corps of Engineers regulation of water level at the
Lake Washington Ship Canal. Typically, the elevation of Lake Washington in June is about 18.8 feet above
sea level and 16.8 (the lowest level) during December and January_ An Ordinary High Water Mark of 19.5 has
been noted on this site, however, possibly due to erosion caused by a combination of lack of vegetation on the
steep bank slope and wind and boat -generated waves.
As part of the wetland restoration, large woody debris was anchored along the shoreline at Baxter Cove.
Other logs, pilings, and seawalls along the shoreline may act to reduce the effects of wind and wave erosion.
A Lake Washington shoreline planting plan is part of the proposed project. All trees 10 inches or larger in
diameter at breast height within 100 feet of the shoreline have been inventoried and would be retained
wherever possible. The vegetated area of 1.23 acres would be maintained or increased_ All non-native
vegetation would be removed and replaced with native plants that provide moderate to high shoreline
protection and wildlife function. The existing 0.82 acres of tree canopy would be matched or exceeded, with
cover objectives being met within 5 to 10 years (Exhibit 8).
The shoreline restoration and management program is included in the Shoreline Substantial Development
Permit Application component of this Land Use Action,
Mitigation Measures: [Mitigation of shoreline development is included in the Shoreline Substantial
Development Permit Application component of this Land Use Action.]
Nexus: Not applicable
6. Stormwater
Impacts: The project site is located in the Gypsy Subbasin. Stormwater currently sheet flows from east to
west across the weedy brush -covered, but vacant site, free draining into Lake Washington. An existing,
degraded storm drain system crosses the site conveying stormwater from offsite to an outfall at the Lake.
The site soils are a minor factor when considering the stormwater control system due to their heavily degraded
nature and the manipulation of the site through filling, grading, and dredging over many years. For purposes
of drainage analysis, soils would be designated as from Hydrologic soil Group C, moderate runoff soils (till).
As part of the Consent Decree remediation, a "cap" is to be placed over potentially hazardous materials on site
to prevent incidental contact following site development. This cap would be a factor to be considered during
design of the stormwater control system (see Environmental Health discussion below),
A report, 'Stormwater Technical Information," by Magnusson Klemencic Associates, dated August 30, 2006
has been submitted by the project proponent and would be the primary basis for stormwater control systems
design. Stormwater management would be based on the requirements of the 2005 King County Surface
Water Design Manual (KCSWDM), which would be applicable for this project. The project is exempt from
detention as it discharges into Lake Washington, a direct discharge receiving water. The system would
include water quality treatment, however, prior to discharge. The KCSWDM designates areas draining to
Lake Washington as subject to the requirements of Basic Treatment. The proposed water quality treatment
system, however, would provide Enhanced Basic water quality. Treatment systems would vary according to
functions at different zones on the site, as follows:
Seahawks ERG Report 03
City of Renton PB/PW Departmen En= hmental Review Committee Staff Report,
SEAHA WKS HEADQUARTERS TRAINING FACILITY LUA-06-073, ECF, SA-M, SA-H, SM
REPORT OF OCTOBER 16, 2006 ,Page 6 of 16
Pedestrian hardscape (sidewalks, plaza), non -sports field landscaping, and building/roof areas: As non;
pollution generating surfaces (roofs do not consist of unpainted metal), stormwater runoff will drain to Lake
Washington as direct discharge.
The synthetic turf field consists of a 12-inch base course of imported crushed rock, a minimum 1.5 inch porous
asphalt layer, a fiber polyurethane woven fabric, 5l8 inch energy absorbing layer of granular rubber, 1.5 inch
granular rubber and sand mix overlain by synthetic field turf. Rainwater on the synthetic field would infiltrate
through the surface material and base layers to subdrains to be conveyed to the Lake for discharge.
Natural turf fields: The natural turf fields would overlay an 18 inch layer of sand, which would function as a
filter_ As with the synthetic turf field, subdrains would convey runoff to the Lake. An Integrated Pest
Management (IPM) Plan would be utilized for turf management (see Environmental Health discussion below).
The IPM Plan would address the use of fertilizers, pesticides, and herbicides so that field runoff meets water
quality standards.
Parking lots and driveways: Stormwater runoff from paved areas subject to vehicle traffic would be collected
and directed to four sand filters. Three of the filters would be grass covered to provide pre-treatment and
maintain the surface permeability of the sand filters_ Pretreatment at the fourth filter would be provided by an
additional layer of sand. This filter would function, additionally, as a football practice area. To maintain the
filter system and protect the health of the football players, the sand layer would be cleaned of potential
pollutants annually or more often as needed. Subdrains would convey collected stormwater to the Lake for
discharge. Peak rate runoff control in not required or provided for this project because the site discharges
directly to Lake Washington, a major receiving water body. Therefore, retention/detention analysis and design
would not be required.
The Baxter Cove wetland is hydraulically connected to Lake Washington and will not be part of the project
stormwater management systems.
Discharge to Lake Washington would be through five new drainage system outfalls. The pipe outfalls would
release stormwater above the ordinary high-water mark (OHWM) of Lake Washington and subsequently drain
over energy dissipating rock -lined channels to the OHWM. The channels would be located at areas of the
shoreline where non -erosive material is located that would protect the shoreline during periods of lowered
water levels.
A portion of the Gypsy Subbasin drainage system, which conveys stormwater from the east side of Interstate
405 to the Lake, currently daylights for 125 feet east of the Burlington Northern Santa Fe Railroad right-of-way.
This section consists of a below -grade, man-made ditch with steep, rock -lined side slopes. There is minimal
fish habitat present. This open channel enters a 24-inch corrugated metal pipe that slopes approximately 0.1
percent to the Lake. The outfall is about 1 foot above the lake level, when the lake is at a low elevation. When
the water level is at higher elevations, the culvert experiences backwater that makes upstream fish travel
possible, although it has not been observed.
The proposed project would require replacement and relocation of this Gypsy Subbasin drainage feature. The
Headquarters building footprint conflicts with the current pipe location. The 490 foot pipe would be realigned
around the building and lengthened to approximately 860 feet (Exhibit 9). The existing outfall would remain in
place at its current condition.
The Joint Aquatic Resources Permit Application (DARPA) for this work states the following potential impacts:
"elimination of 125 feet of open channel, a slightly larger culver across the project site, will affect riparian
vegetation along the Gypsy Subbasin and Lake Washington, and will result in some disturbance to the
shoreline of Lake Washington above and below the ordinary high water mark." The existing outfall would be
used and shoreline restoration at the outfall would occur as part of this work.
Alternatives to piping, including daylighting the entire drainage channel and maintaining the existing open
portion were studied. The capping requirement of the Consent Decrees, however, is premised on the need to
avoid direct contact of flowing water with residual contaminated soils on the property. The capping and culvert
together isolate the Gypsy Subbasin Drainage and Lake Washington from site soils_ Therefore, the open
section of the drainage would be included in the new piped system.
5eahawks ERG Report 03
Diity of Renton P/B/PW Departme # J )mental Review Committee Staff Report
SEAHAWKS HEADQUARTERS TRAINING FACILITY LUA-06-073, ECF, SA-M, SA-H SM
REPORT OF OCTOBER 16, 2006 Page 9 of 16
The applicant shall work with the City to alleviate upstream flooding that may impact access to the site.
Additional details of pipe sizing and/or street improvements would be addressed through site plan review.
Surface Water System Development Charges of $0.249 per square foot of new impervious surfaces would be
required.
Mitigation Measures: This project shall be subject to the 2005 King County Surface Water Design Manual.
The applicant shall be required to provide a Temporary Erosion and Sedimentation Control Plan (TESCP)
designed pursuant to the Department of Ecology's Erosion and Sediment Control Requirements, outlined in
Volume II of the 2001 Stormwater Management Manual and provide staff with a Construction Mitigation Plan
prior to issuance of construction permits. The applicant shall work with the City to alleviate upstream flooding
that may impact access to the site. Additional details of pipe sizing and/or street improvements will be
addressed through the site plan review process.
Nexus: SEPA Regulations
7. Transportation
Impacts: Transportation impacts have been analyzed in the report, "Traffic Impact Analysis Seahawks'
Headquarters," by The Transpo Group, dated September 2006_
Vehicle access to the site would be from Ripley Lane (also known as Lake Washington Boulevard North).
Lake Washington Boulevard intersects with Northeast 44th Street near the project site. Exit 7 of Interstate 405
is located at NE 44th St,
Currently, Ripley Lane is improved with minimal pavement and no pedestrian amenities.
There are two existing at -grade crossings of the Burlington Northern Santa Fe Railroad right-of-way. The
southern one crosses the Quendall Terminals property. There is an access easement recorded granting
access rights across the Quendall property to the proposed development site_ The project proponent is
discussing the possibility of a third crossing at a mid -point of the project site. A third crossing would not be a
necessity for project access however.
The City of Renton Transportation Division has requested that street improvements along Ripley Lane include
roadway widening to provide one vehicular traffic lane in each direction, bicycle lanes in each direction, and a
paved shoulder area to serve as a pedestrian walkway (one side only) abutting the bicycle lane. These
improvements should extend from Lake Washington Boulevard/NE 44th St on the south (beyond the project
site) to the north end of the Seahawks Headquarters site. The City of Renton would contribute toward these
improvements.
In is estimated that the proposed project would contribute an additional 555 average daily weekday trips (ADT)
to the City's transportation system, Therefore, the proposed project would be subject to a transportation
mitigation fee of $75 per trip. The fee of $41,625.00 would be assessed at building permit issue.
Parking for up to 315 cars would be provided on -site, with 104 spaces within a secure, fenced parking area.
The site is not served by public transportation_ The nearest transit stops are to the north in the City of
Newcastle at 116m and 76th or south, in Kennydale, at Park Avenue N and N. 33`d St.
Mitigation Measures: A traffic mitigation fee of $75 per additional daily trip shall be assessed based on the
submitted calculation of 555 ADT. The fee of $41,625,00 would be assessed at building permit issue.
Nexus: SEPA
8. Fire Protection
Impacts: Fire Prevention staff indicates that sufficient resources exist to furnish services to the proposed
development; subject to the condition that the applicant provides required improvements (see Advisory Notes
Seahawks ERC Report 03
City of Renton PIBNW Departmem E- nmental Review Comrnfttee Staff Report
SEAHAWKS HEADQUARTERS i TRAINING FACILITY LUA-06-073, ECF, SA-M, SA-H, SM
REPORT OF OCTOBER 16, 200s
Wage 10 of 16
to Applicant, below) and mitigation fees are paid prior to building permit issue. The mitigation fee, for
commercial space, is $0.52 per square foot.
Mitigation Measures: A fire mitigation fee of $0.52 per square foot of building space shall be assessed at
building permit issue.
Nexus: SEPA
9. Vegetation
Impacts: The project site has been periodically cleared of vegetation over the years of its industrial use.
Comprehensive site clearing took place in 1990. Vegetation was also removed during Consent Decree
cleanup activities. Currently, approximately 10 percent of the site has trees and other plants. Final cleanup
including the placement of the 3-foot deep cap will require removal of most existing vegetation from the site,
excluding that in the wetland and wetland buffer.
Existing vegetation varies on the site depending on past activities and current situation. Vegetation zones
include open meadow, which is the predominant condition, BNSF Railroad right-of-way edge, Gypsy Subbasin
Drainage feature, Baxter Cove Wetland, and Lake Washington shoreline.
Past industrial activities on the site, including clearing, have restricted the ability of trees to mature; thereby
growth of tree canopy has been limited. The majority of the site is open meadow_ Non-native grasses (bent
grass, velvet grass, tall and red fescue, and reed canary grass) and weedy herbaceous plants (soft rush,
sickle -leaved rush, bird's foot trefoil, white clover, western dock, vetch, and hairy cat's ear) typical of disturbed
meadows dominate the vegetation on the property.
Trees that are present along the eastern edge of the property, abutting the SNSF Railroad right-of-way,
include black cottonwood, red alder, Scouler's and Pacific willow. Although a tree inventory has been
completed and trees larger than 10 inches in diameter identified, these tree species are exempt from Renton's
tree retention regulations. Preservation of many of these trees has been proposed by the project applicant,
but would not be required by the City of Renton.
The steep banks of the open portion of the Gypsy Subbasin Drainage have cover consisting of red alder, black
cottonwood, willow, Himalayan blackberry, and Scotch broom. The proposed project would relocate this open
channel into a piped culvert and the existing vegetation would be removed.
The lake -fed Baxter Cove wetland has three types of vegetation structure with its 0.46 acre area. They are
aquatic bed, emergent plants, and scrub/shrub. When trees planted in seasonally saturated wetland areas
attain greater height, classification standards for forested wetland will be met. Trees planted in the wetland
include Douglas fir, western hemlock, Sitka spruce, bigleaf maple, black cottonwood, Oregon ash, red alder,
Pacific willow, bitter cherry, and cascara. Shrubs include vine maple, red osier dogwood, hawthorn, western
crabapple, Sitka willow, hazelnut, salmonberry, nootka rose, Oregon grape, sword fern, snowberry, twinberry,
and salal. Emergent plants include lady fern, slough sedge, hardstem bulrush, small -fruited bulrush, water
parsley, and tall mannagrass.
Shoreline vegetation, at the top of a 2- to 3-foot bank, consists of blackberry, purple loosestrife, Scotch broom,
red alder, black cottonwood, and willow. Other than Himalayan blackberry extending several feet over the
bank there is little vegetation along the water edge.
All pervious areas of the development are required to be landscaped. Renton Municipal Code requires that
parking areas be landscaped and all areas planted with plants other than drought -tolerant varieties must be
irrigated.
No known endangered, threatened, or sensitive plant species have been observed on the property
Mitigation Measures: No mitigation required.
Nexus: Not applicable
Seahawks ERC Report 03
'Eity of Renton PIBIPW DepartmP )mental Review Committee Staff Report
SEAHAWKS HF-tDQUARTERS I TRAINING FACILITY L.UA-06-073, ECF, SA-M, SA-H, SM
REPORT of OCTOBER 16, 2006 Page 11 of 16
10. Wildlife
Impacts: Both upland and aquatic habitat value of the site is considered to be low due to the highly disturbed
nature of the property_ On -going and persistent site manipulation associated with the industrial business
conducted on the upland portions of the property has resulted in limited vegetation and residual contamination.
A 4-foot high beaver dam is located at the downstream end of the open portion of the Gypsy Subbasin
Drainage channel at the east side of the site_ This structure currently provides improved habitat value to the
open channel that would otherwise be too shallow, muddy, and lacks instream structure and cover. There is
little protection against winter storm events that result in high velocity flows. Likewise, low flows during
summer also limit habitat quality.
Higher value habitat may be located along the shoreline, although the dominance of non-native invasive plant
species, lack of vegetative diversity and structure, and lack of special habitat features such as snags also
results in limitation on value.
No known endangered, threatened, or sensitive animal species have been observed on the property. Turtles
of unknown species, but probably painted or red -eared sliders, were present near the Baxter Cove wetland, a
killdeer was seen at the center of the property, and Canadian geese were observed on the property to the
north_ Other fowl observed in the vicinity include red -winged blackbird, snipe, and numerous duck species
along the shoreline. Osprey are present in the area from mid -March through August and have nested at
various locations in the area including the Baxter properties and the Barbee Mill property through the years.
Their nests and perch site are also frequented by Canadian geese and bald eagles. Three bald eagle nests
have been known, historically, to be west and northwest of the site on Mercer Island_
Given the size and location of the property it can be expected that deer, beaver, raccoon, opossum, skunk,
and other small mammals and rodents frequent the property.
Mitigation Measures: No mitigation is required
Nexus: Not applicable
11. Environmental Health
Impacts: The wood treating operations at the site ended in 1981 and the property was subsequently used for
storage of bark mulch. Prospective Purchaser Consent Decrees (North Baxter, #00-2-11778-7KNT and South
Baxter, #00-2-11779-5KNT) were negotiated with the Department of Ecology under the Model Toxics Control
Act occurred in 2000. Cleanup of the South Baxter property consisted of excavation and replacement of soils
in the Baxter Cove area and soil stabilization in the uplands. North Baxter remediation, consisting of capping
contaminated soils, has been proposed to occur simultaneously with site construction.
Although site cleanup occurred in 2002, as part of the Consent Decree for the North Baxter property, a "cap" is
to be placed over the site to prevent incidental contact with potentially hazardous residual materials following
site development. This cap would consist of both pervious and impervious materials including pavements,
building foundation pads, athletic field materials, and imported fill. Where the cap consists of pervious
materials, an indicator layer consisting of a fabric or geogrid textile would be placed over the 3 foot deep cap
as a warning device for potential future excavation_
The property abutting to the south, the Quendall Terminals, has been designated a superfund cleanup site.
Cleanup will commence under the direction of the Environmental Protection Agency. The southern -most
property, the Barbee Mill, has on -going, voluntary site remediation. Previous studies of the historic use of the
properties in this area reveal that past industrial use, and resulting contamination, is property distinct, therefore
cleanup plans are appropriately unique to each site.
Natural turf field maintenance would be according to an Integrated Pest Management (IPM) Plan developed by
the applicant. The IPM would address management techniques and potential chemical uses on the natural
turf practice fields. The plan also includes an accidental spill and response plan.
The IPM would utilize Best Management Practices (BPMs) to specify disease -resistant turf species and
varieties, control of drainage and light, fertilization and watering regimes, and soil mechanics (Exhibit 8).
Weed and insect pest damage threshold levels would be established and chemical treatment applied on an
Seahawks ERC Report 03
City of Renton P/B/PW Departraen ) Er. -hmental Review Committee Staff Report..
SEAHAWKS HEADQUARTERS TRAINING FACILITY LUA-06-073, ECF, SA-M, SA-H, SM
REPORT OF OCTOBER f 6. 2006 Page 12 of 16
as -needed basis, if necessary_ Alternative methods of cultural treatment control, however, would be preferred -
and sought. The exception to this approach would be routine, seasonal preventative treatment against fungus
diseases. This would be necessary to prevent development of disease to levels that would require higher
doses that would also render the fields unplayable. Pesticides would not be proposed for use.
An on -site field manager and staff would monitor and record turf health, damage levels, and response
thresholds_ Chemical analysis would be conducted to determine turf requirements. Field maintenance would
comply with Washington State Industrial Safety and Health Act and Occupational Safety and Health
Administration regulations.
The turf fertilizer program includes nutrients and trace minerals to maximize turf health and minimize the need
for pesticides. Slow release fertilizer would be the preferred form at application to reduce nutrient transport
from the turf root zone. Slow release nutrients are insoluble and generally take 4 to 12 weeks to become
completely liberated and available for turf utilization_ Management of application rates would prevent
overapplication of fertilizer.
The potentially adverse impacts to water quality from the nitrogen, phosphorus, and potassium in fertilizer
would also be mitigated through source control. The depth of the sand filter underlying the natural turf fields
has been increased to 18 inches, which would provide a high level of water quality treatment and would
comply with recommendations of the 2006 King County Surface Water Manual for sensitive fish habitat
environments.
Another method of reducing escape of fertilizers from the area of application is through irrigation control to
avoid overwatering.
Preferred management of pests, like disease control, would be through a combination of cultural methods and
accepted tolerance levels. No chemical control would be proposed for insects or broadleaf weeds. Instead,
management would include selection and enhancement of competing vegetation that resists pests and
disease.
Mitigation Measures: No additional mitigation is required.
Nexus: Not applicable
12. Aesthetics
impacts: Proposed site development would include the construction of an office and indoor training facility
building, playing fields, surface parking lots, and landscaping. The aesthetic character of the currently vacant
site would change as a result of the development. The office and indoor training facility structure would range
in height from 55 feet (office) to 120 feet (training facility).
Development of the site raises several issues to be considered related to aesthetics, including building siting
on the property, building massing and architecture, shadows, landscaping, lighting (see discussion below), and
altered and/or obstruction of views to and from the project. An assessment of potential aesthetic impacts was
initiated by the project proponent.
A visual assessment of the proposed project was performed by Crawford Architects, (Addendum 1, dated
September 27, 2006). Over 70 views of the project were photographed and from this data, 11 potential view
corridors to Lake Washington were evaluated. The "worst case" situations are included herein, SE 76" St, a
publicly accessible upslope location, and two top -floor units of the Misty Cove Condominiums (Exhibit 11).
The Headquarters building on the North Baxter property would be visible from off -site areas, and would be
prominent on the site due to its height and bulk. A second, one-story building on the South Baxter property
would not be within view from off -site areas to the east or west because of the screening vegetation of the
wetland and BNSF Railroad right-of-way vegetation. Views of this building would be blocked from Misty Cove
by the Headquarters building.
It is anticipated that the Headquarters building would be visible from areas of both the City of Newcastle and
Renton, from higher elevations. It is not anticipated that views from higher elevations would be obstructed or
altered.
Seahawks ERC Report 03
'City of Renton PAVPW Departmer' i # F mental Review Committee Staff Report
SEAHAWKS HEADQUARTERS ► TRAINING FACILITY LUA-06-073, EGF, SA-M, SA-H, SM
REPQRT OF OCTOBER 16, 200 Page 13 of 16
View impacts were evaluated from off -site areas including SE 76th Street upslope from the site, and from
southwest facing units within the Misty Cove condominium complex, just north of the project site.
Views to and from the site, and to the site from off -site locations, would be affected by the proposal. As
evidenced in Exhibit 12, views from SE 76th Street would change. Views of Mercer Island (to the west) from
this location would be foreshortened. Views of Lake Washington, which are limited at this location due to
existing vegetation on the BNSF Railroad right-of-way, would remain basically unaltered. Views from both the
southbound and northbound lanes of Interstate 405, located between the SE 76th viewpoint and the site would
be similar, with comparable impacts.
Many units of the Misty Cove Condominium have enjoyed territorial views across the property. With
development, foreground views from the Misty Cove Condominiums would be affected by the presence of a
building on what has been a vacant site. Presently, unmanaged site vegetation limits some views across the
project site to Lake Washington_ Industrial activities and outdoor storage of materials have also been largely
screened from view by trees and shrubs between the Misty Cove property and the project site. Exhibit 13
shows the existing and proposed view from a third -floor unit, number 312. Similar views are shown for unit
302, located closer to the lake than the previous unit (Exhibit 14). A derelict office building on the site (to be
demolished) is also within the view corridor of unit 302.
The view to Lake Washington would remain unchanged, while the view of the site would change from vacant
and vegetated to developed and landscaped. The 120-foot high building would be prominent. Measures
proposed to reduce or control aesthetic impacts of the project include architectural design treatments intended
to diminish the bulk of the structure, including roofline treatment, window detailing, and exterior finishes and
colors. In addition, the building is being setback 50 feet from the water's edge and approximately 170 feet
from the common property line. Overhead wires, currently within the Misty Cove view corridor, would be
undergrounded.
Landscaping at the building perimeter and property boundaries would buffer the building from the residential
area to the north. Trees, planted as part of the landscaping proposed to buffer the structure from the Misty
Cove condominiums, would mature to heights greater than the existing trees. On -site vegetation growth has
been limited historically, due to the industrial activities on the property, which resulted in removal of trees
before they reached maturity (see Vegetation discussion, above).
The Headquarters building siting, on the North Baxter property, is based on geotechnical and soil
contamination issues (see discussion above). The office and support functions of the building would be
located on the west side of the structure in order to reduce the apparent mass of the taller portion of the
building in which the practice facility is located (Exhibit 15). The three story Headquarters portion of the
building, at about 55 feet, would be adjacent to the shoreline. This would also maximize views to the lake
from interior office space.
Architectural details, such as arcades, horizontal lines, roof treatments, and window detailing would be used
to reduce the scale and mass of the building. The building color palette would be warm earth tones including
buff/sandstone, light gray, nickel, and chenywood.
Views to roof -mounted mechanical equipment would be limited from ground level on the site, on adjacent
properties, and the Lake.
The environment of the area would be significantly altered by the proposed project, as is almost always the
case when land transitions from vacant to fully developed. Significant adverse impacts are not expected,
however, beyond those impacts that can be mitigated by the project proposal.
Mitigation Measures: NIA
Nexus: NIA
Seahawks ERG Report 03
City of Renton P/BIPW Deparfrrmer4 Ei- )nmental Review Committee Staff Report
SEAHAWKS HEADQUARTER;' ► TRAINING FACILITY LUA-06-073, EGF, SA-M, SA-H, SM
REPORT OF OCTOBFR 16, 2006 Page 14 of 16
13. Light and Glare
Impacts: Although some interior building lights in offices may be on after dark, practice fields would not be lit
because football practice would not occur at night. It is not anticipated that light levels would be higher than
typical for an office structure_
Mitigation Measures: NIA
Nexus: NIA
14. Historic and Cultural Preservation
Impacts: Historic and cultural impacts have been analyzed in relation to information included in the report,
"Cultural Resource Assessment JAG Development, King County, Washington," by Larson Anthropological 1
Archaeological Services, dated march 27, 1997. The 60-acre study area included the properties to the south
of the Baxter site (Quendall Terminals and the Barbee Mill) and to the east (Pan Abode Cedar Homes). In
addition to literature search and on -site subsurface exploration, the study included consultation with
individuals representing the Muckleshoot and Duwamish Tribes.
The area of the study is within the territory of the Duwamish, a Salish-speaking group predominant in the
Seattle area. The Duwamish lived in cedar longhouses in villages located on most of the larger bodies of
water in the central to southern portion of the Seattle area (Elliott Bay, Lake Washington, Lake Union, Salmon
Bay, and on the Duwamish, Green/While, and Cedar/Black Rivers.
A village of the Duwamish tribe was probably located in the vicinity of the Pan Abode property, upstream of
the current mouth of May Creek. The lower portion of May Creek, which crosses the Barbee Mill property,
would have been below the level of the Lake until exposed in 1916.
All of the properties in the study area have been heavily influenced by fluctuations in lake levels over time due
to earthquakes and the lowering of the Lake approximately 9 feet following construction of the Hiram
Chittenden Locks and the opening of the Lake Washington Ship Canal in 1916.
The first non-native inhabitant of the area within the study was James Madison (or Manning) Colman. In about
1875, he acquired 160 acres of property on both sides of May Creek. The study area encompasses this
property. Colman Point, located about 0.5 mile south in Kennydale, is named for him.
Except for about one acre of cleared land for the Colman house, the property was largely unused. The Baxter
property is near an access road located to the north that was used for hauling coal from mines in Newcastle
to Lake Washington for shipment to Seattle. In 1902, the timber on the Colman property was sold. In 1903,
the Northern Pacific Railroad acquired a right-of-way through the property for construction of a railroad spur
along the east side of Lake Washington. The railroad was built along the lake shore in 1905.
The Colman family started selling the land in 1908. The portion that became the Baxter property was sold in
1914 to be used as a shingle production facility. The shingle mill was demolished sometime between 1939
and 1946. The Baxter Company purchased the property after leasing it from 1955. They used it primarily for
wood treatment processes consisting of debarking and treatment for telephone poles and pilings.
If present, it is unlikely that shallow remains of historic activity could have survived the severe manipulation of
this site over the past sixty -plus years it has been used industrially. There may be archaeological features
and artifacts deeply buried below the ground surface, dating from hunter -gatherer communities that existed in
the vicinity of the property during historic times of low lake levels.
Due to Consent Decree restrictions on exposing underlying soils, excavation on the site would be limited to
borings for building structure pilings.
Mitigation Measures: In the event that archaeological deposits are found during construction, work shall stop
and the contractor(s) shall contact the State Archaeologist at the State of Washington Office of Archaeology
Seahawks ERC Report 03
City of Denton P/8/PW Department ki - _)mental Review Committee Staff Report
SFAHAWKS HEADQUARTERS I TRAINING FACILITY LUA-06-073, ECF, SA-M, SA-H, SM
REPORT OF OCTOBER t6, 2006 Page 15 of 16
and Historic Preservation, phone (360) 586-3065, the Muckleshoot Cultural Resources Program, phone (253)
939-3311, and Duwamish Tribal Services (206) 431-1582.
Nexus: SEPA Environmental Regulations
E. Comments of Reviewing Departments
The proposal has been circulated to City Departmental / Divisional Reviewers for their review. Where
applicable, these comments have been incorporated into the text of this report as Mitigation Measures and/or
Notes to Applicant.
X Copies of all Review Comments are contained in the Official File.
Copies of all Review Comments are attached to this report.
Environmental Determination Appeal Process Appeals of the environmental determination must be filed in
writing on or before 5:00 PM, November 6, 2006.
Appeals must be filed in writing together with the required $75.00 application fee with: Hearing Examiner, City of
Renton, 1055 South Grady Way, Renton, WA 98055. Appeals to the Examiner are governed by City of Renton
Municipal Code Section 4-8-110.B_ Additionaf information regarding the appeal process may be obtained from the
Renton City Clerk's Office, (425) 430-6510.
ADVISORY NOTES TO APPLICANT
The following notes are supplemental information provided in conjunction with the administrative land use
action. Because these notes are provided as information only, they are not subject to the appeal process for the land
use actions
Planning
1. RMC section 4-4-030.C.2 limits haul hours between 8:30 am to 3.30 pm, Monday through Friday unless otherwise
approved by the Development Services Division. The Development Services Division reserves the right to rescind
the approved extended haul hours at any time if complaints are received.
2. Within thirty (30) days of completion of grading work, the applicant shall hydroseed or plant an appropriate ground
cover over any portion of the site that is graded or cleared of vegetation and where no further construction work
will occur within ninety (90) days. Alternative measures such as mulch, sodding, or plastic covering as specified in
the King County Surface Water Management Design Manual as adopted by the City of Renton may be proposed
between the dates of November list and March 31st of each year. The Development Services Division's approval
of this work is required prior to final inspection and approval of the permit.
3. Construction activities shall be restricted to the hours between seven o'clock (7:00) a.m. and eight o'clock (8:00)
p.m., Monday through Friday. Work on Saturdays shall be restricted to the hours between nine o'clock (9:00) a.m.
and eight o'clock (8:00) p.m. No work shall be permitted on Sundays.
4. Regarding the wetland and wetland buffer, the applicant shall record a Native Growth Protection Easement.
Fire Prevention
1. The fire flow is 3,000 gpm. Minimum commercial fire hydrant requirements are one hydrant required within 150-
feet of the structures and additional hydrants are required within 300-feet of the structures. Looped fire mains are
required for fire flows exceeding 2,500 gpm with maximum spacing of 300-feet between hydrants.
2. Fire Department access roads are required to be paved, 20-foot wide and within i 50-feet of all portions of the
building exteriors. Dead end roadways over 150 feet in length are required to have an approved turnaround. If
"grasscrete" is proposed, Fire Prevention Bureau specifications for base material and construction must be
followed.
3. The Headquarters and Training Facility building is required to have compete fire sprinkler, standpipe, kitchen hood
suppression and fire alarm systems. The Maintenance building may also need sprinkler and fire alarm systems
depending on the amount of hazardous materials stored in it. Separate plans and permits are required for the
installation of all systems through the Renton Fire Department.
4. Fire lane signage is required per city ordinance on all private streets and fire access roadways.
5_ Minimum vertical height for fire department access is 13 feet 6 inches.
6. For fire planning purposes an electronic copy of the individual building site plans, in acceptable format, shall be
submitted to the Renton Fire Department.
7. Any building classified as "high-rise" shall meet all special requirements of the International Building Code Section
403 and all applicable sections of the International Fire Code.
Seahawks ERC Report 03
City of Renton P431PW Departmen; Err 4nmental Review Committee Staff Report
SEAHA WKS HEADQUARTERS I TRAINING FACILITY LUA-06-073, ECF, SA-M, SA-H, SM
REPORT OF OCTOBER 16, 2006 Page 16 of 16
8. A complete hazardous material inventory statement is required to be submitted for review at time of building permit
application. Use of city form or approved equivalent is required_ Separate plans and permits are required for the
installation of tanks, containing hazardous materials.
Plan Review — Storm Drainage
1. The project does not include any connection to the Gypsy Creek drainage basin conveyance system ("Gypsy
Subbasin") across the site, but the off -site conveyance facility is proposed to be moved outside of the footprint of
the proposed building. Changes to the existing outfall are not proposed or authorized at this time.
2. The Surface Water System Development Charge is $0.249 per square foot of new impervious surface. This fee is
payable at the time the utility construction permit is issued.
Plan Review — Water
1. A looped water main system around the building complex is required. The minimum size of the water main is 10-
inches in order to provide the required fire flow.
2. A double check valve assembly in a vault is required behind the domestic water meter since the building is over 30
feet tall.
3. A pressure reducing valve is required downstream of the water meter since the working pressure is above 80 psi.
4. The maximum distance between fire hydrants for this project shall be 300 feet. Additional hydrants will be required
to comply with City code.
5. New water meter(s) or upsizing of existing meter will trigger Water System Development Charges, in the amount of
$0.2731 sf of the gross site area. This fee is payable at the time the utility construction permit is issued.
Plan Review — Sewer
1. The Sanitary Sewer System Development Charge is $0.1421 sf of the gross site area. This fee is payable at the
time the utility construction permit is issued.
Plan Review —Street Improvements and Transportation
1. Ripley Lane shall be improved to provide a minimum of 20-feet of asphalt from the northerly access to Lake
Washington Boulevard f N 44t' Street intersection. Due to the projected additional daily trips at this location, a
turn -lane design may be required at the intersection in coordination with the City of Renton project.
2. All new wire utilities must be undergrounded.
Plan Review — General
1. All plans shall conform to the Renton drafting standards.
2. Separate permits for side sewers, water meters, and backflow device are required. When plans are complete,
three copies of the drawings, two copies of the drainage report, a construction estimate and application fee shall
be submitted at the sixth floor counter in the Development Services Division, City Hall.
Seahawks ERC Report 03
f
r
C
0 114 1/2 1
E)HIBIT 1i Scale in Miles
NOTE
Reproduced with permission granted. by THOMAS BROS. MAPS®.
This map is copyrighted by THOMAS. BROS. MAPS& It is
unlawful to copy or reproduce all or. any part thereof, whether for
personal use or resale, without permission. AJI rights reserved.
Seahawks Headquarters and Practice t=acilky
Renton, Washington
VICINITY MAP
September 2006 21-1-20525-W3
SHANNON & WILSON, INC. �I�. 1
Oo w6'_ Cw end awk" ,ntw C'nvx-ts
�77-
S r s
L
, F P
^• r f �..�� t � J I fit l.� yfki 1 5 �.L._ � `S�1y �. � f 56 r1 Lf��i1�1�"'�'` 'r Cf.�
h3�1}'
LY1 ,1�. �J,�, r..,l.F� S5�
y
J141-nmr4a
'
{
`
`y
h tl y 'I
L 1
��
6
--lei A
• . `y 4`.. �,.. +} s .. '�_' IS• �'�!'.Ln'MUD
..• .,, •IM r~~� . ,riYOYY �`sl...
tie
W: �. 2.P'p15Y7r
r t,
-fey
pp
r ,
r' !
' J �.�� z �, ^ �r ii ,t�[ 1 �• 2 � +rn _r� 4 9 f�.�� ` 1 ! -'4 I! 4 �'� - ��^, ��,F 5 � ['' y [
y y �: y � '�i[#'wtl} if'�y✓F,� v�� Yyi i � ! � ! ry e j 'yam' H,1 a� i� ,�'�C, 1
i
•�y,�,,�ts ,i •'.. `" t �^!C' Y !•��t�n .�nit� • �t a � .1� Y�'I"- ! �, w'11'. l ! '�srl�- � y r� ,
'L�r'.__� 1c'� w t .r.;� Nzt ! ` �•7',z �Pr�. A �� 7 S. F� �r !' � � '. ! ! Fi r.;.;,u,�i'�' »�`,�., t
r���a�����f,�'_:ti'i, ",�....5.. t>`ry •�iMr�f� "I'r�'i�r r.i`:. 1 lrr,r:!'r�,r.'.s�.A.�� >a�ir,,- .' '��r,��r. 1r
� rs
aa
.r .Yfr..-[''�rv,.. It-,. .< .r, rz ,,: a:__... �t.,s.r"r'�,� !«,�J ,,.i:. 3'S,. ` I.i ..�r I . ...,: �. ✓,.. s...r .d .?' :,,i 7, r,.. S `r,rv.! "._ ? .t. ,..,
gS�vY' cik,5'Fa:�Xrx-
"
c--
r f r��3 Hsi �'"`� � ava� '� r x r• ch � S� L 3 ,�; ± } F
i �f+3'3'"'''F`i
t8tlsis°� •y1-p[�fi n.ssuePizsf'i
v9Y.Y^�� M ;[L
4YI A
�r 7",,�•.i��$ �' w�'rs.,y'' �s s ,�.ic r b�
Was
RE'.L1UD '(FICttE 9.11 j'pR LANDSCAPECt NAF!USC11PE ._2.,�._.
IWONUAMN
i
age,
`Al 1f r
S,..Ar\F. Y4r�J��l`N`� II ON
PSE
,ELECT, r9� NOTE: OHwY,$.g (NaVDSB)
STATION - 'y. -'_• • .. - r
OR 15.2' (NGYo29)
r
100 YEAR FLOOROPLAiN
I AT LAxE WA. C H
I «}. STRUCTURE 76 H£
I - uulr OF 10' PUBLIC ACCESS
PUBLIC ACCESS fxISTNG < ACCESS WAl.it(� r...w..i.w
DOCK SS
'1 CU fEHC�D
r - SERVICE ._
tikt571KG p(ptrCR.. I "--'I"-"' I i R _ �-.�* R t
POLE LOCATION
SOUTH PROPERTY ! f
FENCE LINE 2
#
PSC CASEMENTtr
W
I^~
( J E. / C7 LVN[ 'rBG ''`` ����(�� � m
PULE I.OGF, IOh -4\ I f r Ire--r-_- _ -�--r- ; - %--- - I ` LL
EXISTING POWER 1 �1
Im
i� T' 1 M
NEIY 1 ST OkY
- uraNTENANCE � i; - L_ IHG"
� I SHF.0 _--.��__ ♦ - __ _ __ - _ - _ -WULL 7T_•iL'•IfL"'.l-m - -- .„120'
COVERED CAR WASk PAD
EXISTING POWER , , 11 - - _ uj
iaCLE L0Gi16N ARTIFICIAL YUMF�{ r a I y -
ME 20'
M1W1NT. PANKVNG _ "� .l, : $AND FILTER @ 'a - r I �� I I f i- - _ . I 1
4 STALLS WORRouT AREA
'I SE.CURITr CATS i,-JURFACF f?Ai2KiN
ui
��-
C •.4._... _ ' -- - - - '- -' - - '- - _ - - - I. ,i { ' I I SECURITY GATE`
-.r+....w��,..� �� FENCE ,I i
-
... _... _ _ _ ,
i
Lu
RCPOS RAILWAY CROSSIN
G
' NOiF, NhExt!!YG CQUKf~-.• ••-__..�-.•-W— ..�.wrrr
STRFAh4 CIA55 CF.ki RAL 'iURF.sCE.. PARKING VB5 STALLS
LAKE. WASHINOTON CLASS 1 SrWn TLAAI PARKNC 104 STALLS
(-rPSY SUFJ BASIN DRAINAGE - QVSS 7 (RE: FIGURE $.S) i TOTAL Z99 STALLS
rry
FIGURE 5.2� A001
RECLfi(ED
j
I
fig
A
EXHIBIT
6 /F
NOT FORCONSTWCT(ON
4
Seahawks Headquarters &
[
-4
TmInIng-Fadifty
3
Seaha wks Corporate Heaagrarters and Training Facility
Renton, Washington Stream and Lake Stud lMiti ation'Plan
Table 3
Riparian Habitat Functions and Values, Comparison of Existing versus Proposed Conditions
Water Quality Low to Existing condition lacks
Future development is not Equivalent
Moderate .width, plant density, and plant
dependant on riparian function under
diversity. Lack of native
function for water quality both conditions
vegetation also a minus_
because it employs the
2005 King County Surface
Water Design Manual, so
width for water quality
treatment is not required.
Native vegetation is a plus.
Food Low
Sparse non-native vegetation
Vegetation optimized with
Pro osed action
provides .little beneficial leaf
a diverse mix of native
will have higher
litter and small organic
species. High habitat value
value
debris.
near lake.
Microclimate Low to
Existing shoreline area has
Proposed shoreline area
Equivalent
Moderate
little effect on microclimate.
will have little effect on
function under
microclimate.
both conditions
Temperature Low to
Not a significant issue for
Not a significant issue for
Equivalent
& Shade none
large Class 1 waterbodies.
large Class I. waterbodies.
function under
both conditions
Human Low
Lake Washington is a public
Lake Washington is a
Equivalent
Access
access area so access control
public access area so access
function under
not a habitat function issue
control not a habitat
both conditions
function issue
Large Woody Low
Site periodically cleared so
Planting that will contribute
Proposed action
Debris
unlikely to have any
some minor woody debris
Will have higher
significant future LWD
in the future.
value
contribution.
Channel Low
Controlled lake level and no
Controlled lake level and
Equivalent
Migration
surface channels on -site. No
no surface channels on -site.
function under
potential for channel
No potential for channel
both conditions
migration
migration
Bank Stability Low to
Exotic species dominated
Root strength increased
Proposed action
Moderate
shoreline_ Banks partially
with native shrubs and
will have higher
protected by large logs:
trees. Banks partially
value
protected by large logs.
Wildlife Not Rated Patchy exotic species Native plantings in a dense Proposed action
Habitat dominated riparian vegetation multi -story contiguous will have highest
of relatively low value as canopy will provide high value --
bird, amphibian, reptile, and wildlife habitat value. E)HIBIT li
rodent.habitat.
Adapted from: A.C. Kindig & Co and Cedarock Consultants, Inc. 2003. 8 i
ji
September 20, 2006 CEDAROCK CONSULTANTS; INC and A.0 KINDIG & CO.
Sca4awkrro9-20-06 Lairs Stream Rgoortdoc Page 29
F j ;A
52
f7 G
f I
r �
i
s
F � +
L
}
F. f
t I
3 i -
I
i
f
i.
C^----------------
roll 9
EXHIBIT
� I
w� ' Col' NO.FOR GgNSTRUCTION
- Seahawks Headquarter
Tralthlog lradlft}r
---- azusa FOOTRALL�Tuc Inz J V =
a�a
EXHIBIT
10
Seattle Seahawks Corporate Headquarters and Training Facility
Turf Integrated Pest Management Plan (IPMJ
Table 2
Summary of Pest Control Measures to be used for the Seahawks Practice Fields
Disease or Pest
Cultural Control
Physical f
Mechanical
Control
Chemical Control_
Turfgrass Control
Primo Maxx
Turf growth suppressant
Overseeding with
(Trinexapac-ethyl)
and Annual Bluegrass
desirable
during growing
Poa annua) ntrol
turfgrass;
season
Promote vigorous
Prograss
turf root growth to
(ethofumesate) for
with soil nutrient
curative post -
Weeds
and irrigation
emergence control
Annual Bluegrass
control, to out-
of annual
compete Poa
bluegrass in fall
annua.
and in spring if
warranted.
Fungus Diseases
Brown Patch
(Rhiaoctonia solani; R. blight)
Corticum Red Thread
(Leedsaris fuciformis)
Dollar Spot
(Lan&a spp. And
Moellerodiscus spp.)
Fusarium Blight
Chipco 26GT
(Fusarium spp.)
(iprodione)
Fusarium Patch
(n-ticroduchium nivale)
Good air
as preventative
Gray Snow Mold
(Typhula spp.)
Promote vigorous
circulation;
Good drainage;
method of control
tall and spring
Helminthosporium
turf root.growth to
with soil nutrient
Avoid shading;
(Dreschlera spp.)
Necrotic Ring Spot
and irrigation
Avoid irrigating in
late. aftemoon;
(Leptospheeda korrae)
control, to out-
Limit thatch;
Pink Snow Mold
compete weeds.
Maintain soil pH
(Fusalrum nivale)
<7
Rust
Puccinia coranet
Fungus Diseases
Brown Patch
(Rhizoctonia solani; R. blight)
Heritage
Fusarium Patch
(azoxystrobin)
(Microduchium nivale)
as preventative
Rust
method of control
(Puccinia connate)
in fall and winter
Take -all Patch
Gaeumennom ces ramnis
September 20, 2006 — ----- - -A.0 FJNDIG & Co.
Page 7
f/
4q
till
3MI,•Y
R 1 • C
--`.i Tom, � � �•�✓� - �• - f�
i 4 f:y�R
gtiL r
y Zi
ti a Y•.. ■ t7 - y -..
rr ice? t3 re r:'
Z` Qs�es9= ..ram
Y�' � 61�tr ihyy•rr�tks � �y� ���_
r Y ,..
� 9'■ •b o s -fir
�, � � s 4.,+• ��; t 'pia'_
5k
L,'A%t:.
i y
r' a tint
+ � '. ' a •4,. fig" ,a6 _'�
��� a $f � � }i, ,.emu: •'�� �4 •
? ,.S•i � M1t
=MSIM
Fi7
k0
A
�
`
D
a
�.,
Q
Ll
IdP>j
I iIT
i
S
�; L
} i i i I
m
a
DESIQN DEVELOPMENTS NOT fOR CONSTRUCTION
Seahawks Headquarters &
'training Facility
Foote riMTHWr s i LLc
rtrnrtorr wnsrtrnrcra�
`
►� .-�...� - EXHIBIT',
15
CITY OF RENTON
City Clerk Division
1055 South Grady Way
Renton, WA 98055
425-4M-6510
Chock NoJ
Description:tom;%
❑ Copy Fee
Q'Appeal Fee
Receipt N
El
❑ Notary Service
t i-L
Amount $ ,`75 . ' O
Ci , St osignature
Seahawks' Headquarters and Tng Facility
File No.: LUA-06-073, SA-H, *M, SM, ECF
•
December 7, 2006
Page 17
Football Northwest
505 Fifth Avenue S., Ste. 900
Seattle, WA 98104
Michael Cero
8300 Avalon Drive
Mercer Island, WA 98040
Brian T. Sabey
5021 Ripley Lane N, Ste, 304
Renton, WA 98056
Steve Jansen
5021 Ripley Lane N, Ste. 4
Renton, WA 98056
Aaron Belenky, President
Williamsburg Condo HOA
1800 NE 40'' Street, Ste. H-4
Renton, WA 98056
Barbara Paxhia
5021 Ripley Lane N, Ste. 104
Renton, WA 98056
Richard Wagner
Port Quendall Company
505 Fifth Avenue S., Ste. 900
Seattle, WA 98104
Thomas Peterson
Socius Law Group PLLC
Two Union Square
601 Union Street, Ste. 4950
Seattle, WA 98101
Eleanor Maargo Kennamer, President
Misty Cove Condo Association
5021 Ripley Lane N, Ste_ 309
Renton, WA 98056
Steve Gregerson
5021 Ripley Lane N, Ste. 302
Renton, WA 98056
Shelly Munkberg
SECO Development
1083 Lake Washington Blvd N., Ste, 50
Renton, WA 98056
Baylis Architects Jeffrey Taraday
10801 Main Street, Ste. 110 Foster Pepper
Bellevue, WA 98004 1111 Third Avenue, Ste. 3400
Seattle, WA 98101
TRANSMITTED THIS 7th day of December 2006 to the following:
Mayor Kathy Keolker
Jay Covington, Chief Administrative Officer
Julia Medzegian, Council Liaison
Gregg Zimmerman, PBPW Administrator
Alex Pietsch, Economic Development
Jennifer Henning, Development Services
Stacy Tucker, Development Services
King County Journal
Woodinville, WA 98077
Ray Colliver
505 Fifth Avenue S., Ste. 900
Seattle, WA 98104
Thelma Sutherland
1205 N 291h Street
Renton, WA 98056
Jared Salstrom
5021 Ripley Lane N, Ste. 213
Renton, WA 98056
Elya George Baches
1414 N 34`h Street
Renton, WA 98056
Elaine Wine
Vulcan
505 Fifth Avenue S, Ste. 900
Seattle, WA 98104
Tom Ehrlichman
Socius Law Group
Two Union Square
601 Union Street, Ste. 4950
Seattle, WA 98101
Stan Engler, Fire
Larry Meckling, Building Official
Planning Commission
Transportation Division
Utilities Division
Neil Watts, Development Services
Janet Conklin, Development Services
Pursuant to Title IV, Chapter 8, Section 100Gof the City's Code, request for reconsideration must be filed in
writingon n or before 5:00 p.m., December 21, 2006. Any aggrieved person feeling that the decision of the
Examiner is ambiguous or based on erroneous procedure, errors of law or fact, error in judgment, or the
discovery of new evidence which could not be reasonably available at the prior hearing may make a written
request for a review by the Examiner within fourteen (14) days from the date of the Examiner's decision. This
request shall set forth the specific ambiguities or errors discovered by such appellant, and the Examiner may,
after review of the record, take further action as he deems proper.
Y '
CIT' - OF RENTON
""R)7 ; Kathy Keolker, Mayor
N
April 25, 2007
David M. Murphy, Partner
CRAWFORD ARCHITECTS LLC
1901 Main Street — Suite 200
Kansas City, MO 64108
Planning/Building/PublicWorks Department
Gregg Zimmerman IP.E., Administrator
Re: Seattle Seahawks Headquarters & Practice Facility, LUA06-073, SA-H, SA-M,
SM, ECF Request for Minor Adjustment to the Site Plan
Dear Mr. Murphy
1 am in receipt of your letter dated April 9, 2007, wherein you request approval of a
revision to the approved site plan for the Seahawks Headquarters and Training Facility
As your letter states, a minor adjustment to the approved site plan is proposed, as
follows:
Maximum Building Height — 115'-0" feet in lieu of 110 =6" feet as noted on Figure
10.6 (Sheet A40.1) of the Land Use, Shoreline & Master Plan Permit Application —
Volume 1.
Our understanding is that the -requested adjustment is based on refinements to the final
structural design and would accommodate a clear inside height dimension of 95 feet as
noted in the application_ Furthermore, the referenced height is measured to the highest
point of the roof deck from the finished floor slab.. The City of Renton Hearing Examiner
approved the Practice facility at a height of 111 feet above grade.
Renton Municipal Code Section 4-9-2001, allows minor adjustments to an approved site
plan, provided:
1. The adjustment does not involve more than a fen percent (10%) increase in area.
or scale of the development in the approved site plan; or
2. The adjustment does not have a significantly greater impact on the environment
and facilities than the approved plan; or
3. The adjustment does not change the boundaries.of the originally approved plan.
Analysis of .Request
The site plan modification requested has been compared to the site plan as approved by
the City of Renton Hearing Examiner on December 7, 2006.
The proposed change in building height from 111 feet, as stated in the "Findings,
Conclusions, and Recommendations" section of the Hearing Examiner's decision
(numbers 19 and 22) to the proposed modified height of 115 feet would result in an
additional 4 feet of building height and approximately 350,064 square feet of building
area.
1055 South Grady Way - Renton, Washington 98057
Lim
RENTON
AHEAD of THE CURVE
David M. Murphy
April 25, 2007
Page 2
The proposed increase in area would not result in more than a 10 percent increase in
area or scale of the development.
Although the increased height could impact views from nearby properties, the
modification would not have a substantial impact on the environment or facilities.
The requested modification would not change the boundaries of the originally approved
site plan.
The project site is zoned Commercial 1 Office 1 Residential.. All applicable setback, lot
coverage, and landscaping standards would be achieved. The requested modification
would not impact the building facades or other architectural features as proposed.
Decision
Based on the analysis and recommendation of staff,. I have determined the proposed
revision is within the parameters deiraedtjfith'Rton Municipal Code.
Therefore, the.proposed modift fson 0 the site
therefore, is approved sui jest to the f6ilowing
1. Prior to the issuaxac of the final building pet
and Training Fscrlity, three full size pr pt an
revised buildin elevations:8hall "+
Division projet manager,
Thisdetermination will be find unless ;Vw E
determination, accompanied try there iced -00
Hearing Examiner witho 14_c ays of the di to o
If yota have any questiorit r+ arding this deterrntnmf
this letter, please contact l tza eth gin s, sentorig
Sincere
Neil Watts, Director
Development Services Division
cc: Parties of Record
.Jim Levin
Lance Lopes
Ray Coffiver
Torun Chlado
Elaine Wine
Roger Pearce
Brian Dickson
Jennifer Henning
Elizabeth Higgins
Fife
deemed to be "minor" and
H'fi Ah6Seahawks Headquarters
o8`% k 11 inch contact print of
tope Development Services
l ofthrg adirainistrative
lira. fee, is�filed with the City's
�c�lsi�ra.
a'r the4equirements discussed in
`lar n ' at (425) 430-73k,
C" OF RENTON
Larry and Esther Barber MAY 0 8 2007
6940 96fb Ave. S.E.
Mercer 15121nd, Washington 98040 RECEIVED
CITY CLERK'S OFFICE
2O6-212-928O....lesbar@comcast.net 12�3y fAk
City Clerk May S, 2007
City of Renton
10.55 South Grady Way Appeal al 4d fleafl'A9 �XaMltte►"
Edenton, WA 98057
LC(A-Db--473, SA N, sA-M, ACeF
Re: Seattle Seahawks Headquarters & Practice Facility, Request for Minor Adjustment
We appeal the City of Renton's April 25, 2007 determination decision allowing; the Seattle
Seahawks Headquarters & Practice Facility, now under construction, to increase the height of
the building; to 115 feet. This decision was based on the determination the request is a minor
modification as defined by The City of Renton. Code, which we also appeal.
An increase of 4 and 112 feet in height is not a minor modification. It will make an already
imposing; (I 11 foot high by 340 long) large building even more imposing; and larger to
hundreds of people who view it across the lake on. Mercer Island. This increase creates a
significantly greater impact on the environment. which Code Sec 4-9-2001 does not allow.
At the initial examiner's hearing on November 21, 20061. stated my family did not object to the
construction ofthe facility and thought it would be a very attractive building; viewed up close,
however the structure will look like an enormous box as viewed from homes only one mile
across the lake. We recommended that large evergreen trees reaching; the height of at least
100 feet at maturity be planted judiciously in front of the building to mitigate and soften its
imposing size. Such landscaping; would go a long; way to return what use to be a tranquil vista
of homes, a modest apartment building (Misty Cove) and a hillside covered with trees. Much
to our chagrin the hearing; examiner's approval of the project did not include this modest
landscape addition_
Now the request is for the "enormous box" to get even larger, which we appeal. However we
would not object to an approval that included the addition of large evergreen trees reaching to
approximately the roof elevation at maturity and planted judiciously close to the building;. The
trees would mitigate and soften its size and greatly reduce the enlarged Seahawk Facility's
environmental impact on those viewing; the building from a distance. This landscape
requirement should be added as an additional condition to the proposed modification. The
change will benefit hundreds of Mercer Islanders now and for generations to come.
We contacted neighbors that live near us and they agree with our concern and solution. The
attachment is a list with their addresses and phone numbers.
16rGL�3rr�
The required $75 appeal fee is enclosed. rPt ��"
Sincerely,
Lot,,, and Esther Barsher L�
r
Mercer Island Neighbors Agreeing With This Appeal and Mitigating; Solution
Name Address Phone #
Dan & Jody Samson 6952 96th Ave. SE 232-0151
Dwight & Christine Schaeffer 6958 96th Ave. SE 236-2580
Les & Denise Klaff 6915 96th Ave. SE 232-4435
Carl Lindstrom 6910 96 Ave. SE 232-0933
Howard & Sue Robboy 6944 96th AVE SE 23 6-1162
Steven & Deanna Marshall 6934 96th Ave. SE 425-747-6755
Hal & Gerry Fardal 6920 96th Ave. SE 232-1936
Dr. Robert and Bee Dietz 7906 E. Mercer Way 230-6989
r.
a
C'IT=T OF RENTON
+"R)�,,'+`)Kathy Keolker, Mayor
May 10, 2007
Larry and Esther Barsher
6940 96"' Ave. SE
Mercer Island, WA 98040
Re: Seattle Seahawks Headquarters & Practice Facility Appeal
LUA 06-073, SA-H, SA-M, SM, ECF
Dear Mr. & Mrs. Barsher:
Hearing Examiner
Fred J. Kaufman
We are in receipt of your Appeal in regards to the above referenced matter. The appeal hearing
has been scheduled for Tuesday, May 29, 2007 at 9:00 a.m. The hearing will take place in the
Council Chambers on the seventh floor of the Renton City Hall. The address is 1055 S Grady
Way in Renton.
If this office can provide any further assistance, please address those comments in writing.
Sincerely,
Fred Kaufman
Hearing Examiner
City of Renton
FK/nt
cc: Larry Warren, City Attorney
Neil Watts, Development Services
Elizabeth Higgins, Development Services
Stacy Tucker, Development Services
Roger Pearce, Foster Pepper Law Firm
All Parties of Record
1055 South Grady Way - Renton, Washington 98055 - (425) 430-6515
q@ This paper confains5U%recydedmaterial.30%post consumer
R E N'I O N'
ArifAD Of TFIE CURVE:
CO Y CIT" OF REN.T"N•
+4"' R
+ Hearing Examiner
.t. O Kathy Keolker, Mayor Fred J. Kaufman
May 10, 2007
Larry and Esther Barsher
6940 96's Ave. SE
Mercer Island, WA 98040
Re: Seattle Seahawks Headquarters & Practice Facility Appeal
LUA 06-073, SA-H, SA-M, SM, ECF
Dear Mr. & Mrs. Barsher;
We are in receipt of your Appeal in regards to the above referenced matter_ The appeal hearing
has been scheduled for Tuesday, May 29, 2007 at 9:00 a.m. The hearing will take place in the
Council Chambers on the seventh floor of the Renton City Hall. The address is 1055 S Grady
Way in Renton.
If this office can provide any further assistance, please address those comments in writing.
Sincerely,
Fred Kaufman
Hearing Examiner
City of Renton
FK/nt
cc: Larry Warren, City Attorney
Neil Watts, Development Services
Elizabeth Higgins, Development Services
Stacy Tucker, Development Services
Roger Pearce, Foster Pepper Law Firm
All Parties of Record
1055 South Grady Way - Renton, Washington 98055 - (425) 430-6515
0 This paper oontains50%recWAedmaterial. 30°/npcstconsumer
RENTON
AHEAD OF THE CURVE
a
R12
71
i
2
3
4
5
6
7
9
10
II i
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
BEFORE THE HEARING EXAMINER FOR THE CITY OF RENTON
LARRY BARSHER and ESTHER BARSHER,
Appellants, File No. LUA06-073
V.
CITY OF RENTON, and FOOTBALL
NORTHWEST LLC,
Respondents.
SA-H, SA-M, SM, ECF
HEARING BRIEF OF FOOTBALL
NORTHWEST LLC
I. INTRODUCTION
Respondent Football Northwest LLC (" FNW") requests the Hearing Examiner to dismiss
the appeal of Larry Barsher and Esther Barsher (the "Barshers"). The Barshers have appealed
the issuance of a minor adjustment to the approved site plan for the Seattle Seahawks Corporate
Headquarters and Training Facility. The only issue before the Examiner is whether the minor
adjustment criteria in Renton Zoning Code §4-9-200(I) have been met.
The only change to the approved site plan is that the Indoor Practice Facility (the "IPF")
will be allowed to be several feet higher than described in the City's original site plan approval.
Because this minor change to the approved site plan clearly meets the minor adjustment criteria
in Renton Zoning Code §4-9-200(I), the Examiner should dismiss the Barshers' appeal.
HEARING BRIEF OF FOOTBALL
NORTHWEST LLC - 1
ORIGINAL
FOSTER PEPPER PLLC
I171 THIRD AVENUE, Sum 3400
SEATTLE, WASHINGTON 98101-3299
PI LONE (206) 447-4400 FAX (206)447-9700
508167-422
l
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
II. FACTUAL BACKGROUND
The evidence at the hearing will show the following:
The City's environmental review analyzed an IPF structure of up to 120 feet in height
above slab, with a 95-foot clear interior space over the indoor practice field. The 95-foot clear
interior space is required for the facility to operate in the manner designed for professional
football practices. Based on its analysis of that proposal, the City issued a Determination of
Nonsignificance ("DNS").
After the issuance of the DNS, the project applicant moved the IPF structure (and other
project buildings) approximately 62 feet further back from the shoreline, in order to minimize
view impacts to the neighboring condominium owners to the north of the site. In addition,
design development for the IPF structure showed that the interior 95-foot clear height could
likely be accomplished with an overall building height of approximately 11 I feet in height.
Those design development drawings were the basis of the drawings and renderings presented to
the Examiner at the hearing on the original site plan for the Seahawks Corporate Headquarters
and Training Facility. Accordingly, the Examiner's site plan approval described the IPF as being
"up to I I I feet"' and "approximately I I I feet tall. ,2
Subsequent to the Hearing Examiner's December 6, 2006, Site Plan Approval, the City
and FNW's contractors have been moving toward final design of the IPF. In response to City
building code requirements, FNW has made changes to the truss structure of the roof. In order to
maintain the 95-foot clear interior space for the IPF, this change to the truss structure will require
a building height of approximately 113 feet. To be cautious, FNW requested a minor adjustment
to allow up to 115 feet in height, although approximately 113 feet is the anticipated height.
This minor height variation to the IPF is the only change to the approved site plan. No
additional lot coverage is proposed, no expansion of the site plan boundary is proposed, and no
1 Examiner Site Plan Approval at Finding 19.
2 Examiner Site Plan Approval at Finding 22.
HEARING BRIEF OF FOOTBALL
NORTHWEST LLC - 2
FOSTER PEPPER PLLC
1111 THIRD AVENUE, SUITE 3400
SEATTLE, WASHINGTON 99101-3299
PHONE (206) 447-4400 FAXJ200 447-4700
50916742.2
It expansion of any other planned building on the site is proposed. Transportation and parking
2 impacts would be unchanged. Use of public services and utilities would be unchanged. The
3 only impact will be to allow a small increase in the scale of the IPF building.
4 The massing of the IPF itself will increase less than four percent (4%) if the full 11.5 feet
5 in height were utilized. At the anticipated final IPF height of approximately It 3 feet, there
6 would be only a two percent (2%) increase to the scale of the IPF. With respect to the scale of
7 all development approved by the site plan, the total building volume would increase only three
8 percent (3%) if the full 115 feet in height were utilized for the IPF. At the anticipated final IPF
9 height of approximately 113 feet, the overall site massing would only increase by one and one-
10 half percent (1 I/z %).
11 III. LEGAL ARGUMENT
12 A. Burden of Proof and Standard of Review on Appeal.
13 The Barshers have the burden of proof to show that the City staff's approval of a minor
14 adjustment was either an error of law or clearly erroneous in view of the entire record. Renton
15 Zoning Code §4-8-1 10(E)(7)(b).
16 The Examiner is required to give substantial weight to the City staff's decision to allow
17 the minor adjustment to the approved site plan. Renton Zoning Code §4-8-110(E)(7)(a).
18 B. The Small Increase to the IPF Height Clearly Meets the City's Minor Adjustment
Criteria.
19
The only issue before the Examiner is whether the slight increase in the height of the IPF
20
21 building (up to four feet) meets the City's criteria for a minor adjustment to an approved site
22 plan. The criteria in the Renton Zoning Code are as follows:
23 MINOR ADJUSTMENTS TO AN APPROVED SITE PLAN:
24 Minor modifications may be permitted by administrative determination. To be
considered a minor modification, the amendment must not:
25
1. Involve more than a ten percent (10%) increase in area or scale of the
26 development in the approved site development plan; or
HEARING BRIEF OF FOOTBALL FOSTERPEPPEAPLLC
NORTHWEST LLC - 3 1111'rwRDAVENUE,Suin3400
S EAITLE, WASHINGTON 98101-3299
PHONE (206) 447-4400 FAX (206) 447-9700
SQRlfi7h? 2
I
1
2. Have a significantly greater impact on the environment and facilities than the
2 approved plan; or
3 3 Change the boundaries of the originally approved plan.
4 Renton Zoning Code §4-9-200(I).
5 Here, the IPF height increase clearly meets these criteria.
6 First, the ten percent limitation on area or scale of development is met. The area of
7 development is not increased whatsoever. The scale of development is increased slightly up to
8 three percent (3%) if the full allowed 115 height for the IPF is utilized. While the IPF building is
9 anticipated to be only approximately 113 feet in height, even at 115 feet in height, the increase in
10 scale of development is far below the allowable ten percent in the Renton Zoning Code.
I 1 Second, there are no new significant environmental impacts. The City's DNS analyzed
12 an IPF building of approximately 120 feet in height and over 60 feet closer to the shoreline. That
13 DNS concluded that a building of that size in that location would not have any significant
14 adverse envirorunental impacts. The current proposal is for a shorter building (up to 115 feet in
15 height) that is further back from the shoreline. In addition, the only change to the approved site
16 plan is the minor height addition to the IPF building. There is no additional impervious surface,
17 no additional grading or earth movement, no additional traffic or parking, no landscaping areas
18 are being eliminated, and no additional use of public services or facilities. The only possible
19 impact would be an aesthetic impact. As shown in the elevations and simulations submitted at
20 the hearing, a four -foot increase in height (up to 115 feet in height) will be barely noticeable.
21 And the actual impact of the City decision will be an even smaller impact, because the likely
22 height will be approximately 113 feet.
23 Third, the boundaries of the original approved plan are unchanged.
24 The Barshers assume that this appeal is an opportunity to reargue the overall size and
25 view impacts of the Seahawks Corporate Campus and Training Facility. That is incorrect. The
26 only issue is whether the minor adjustment criteria in Renton Zoning Code §4-9-200(1) are met.
HEARING BRIEF OF FOOTBALL FOSTER PEPPER PLLC
NORTHWEST LLC - 4 1111 THIM) AVENUE, SUITE 3400
SEATTLE, WASHINGTON 98101.3299
PHONE (206) 447-4400 FAX (206) 447-9700
s0 inaa2
S - i
i I it
1:
2
3
4
5
6
7
8
9
10
11
12
13
14
i
15
16
17
18
19
20
21
22
23
24
25
26 1
Because those criteria are clearly met — especially after giving substantial weight to the City
staff s decision to allow the minor adjustment the Barshers' appeal must be dismissed.
RESPECTFULLY SUBMITTED this 29" day of May, 2007.
HEARING BRIEF OF FOOTBALL
NORTHWEST LLC - 5
FOSTER PEPPER PLLC
Roger A earce, WSBA No. 21113
Attorneys for respondent Football Northwest LLC
FOSTER PEPPER PLLC
1111 THIRD AVENUE, SurrE 3400
SEATTLE, WASHINGTON 9810I-3299
PHONE (2(16) 447-4400 FAx (206)447-9700
50816742.2
0 X 5 - eah� mks
as Ale s�
C° c Vt
s o} CITY OF RFNTON
+ y
Office o- __le City Clerk
1N 1055 South Grady Way - Renton WA 98057
CITY OF RENTON
JUNqq 2 7 2007
CITY t:LERK , QFFICE
A22'0z �Q.373
RAFTER
Eileen Halverson
5021 Ripley Lane N., Ste. 302
Renton, WA 98056
NIXIE Sao om :1 OD Q5/2e
RETURN) TO SENDER
ATTEMPTED - NOT XNOWN
BC : SOOS73232SS *2:189-- 03117 —26
- � __S 11,1,11,111Ili rii11111111111111IJ1311111
C`ty o CITY OF RENTON
r�� > Office of the City Clerk
1055 South Grady Way - Renton WA 98057
C"OF RENTON
JUNK 2 7 2007
GRY CLERIC'S OFFICE
Steve Janson
5021 Ripley Lane N., Ste, 302
Renton, WA 98056
AN 2 2V7 )wk
RETURN TO SENDER
ATTEMPTED -- NOT KNOW)y
Uldf- M.E TO F'C7Rwf4po
Lai 9DOZ702325.'S
E-Y tRff 9 11,1„1„1111,,,,1,1111,11„11),z1►1,111„1111,1,1„1I1I,,,111
:,± Ti J,REH 1,0N
1
2
3
4
5
6,
711
8!,
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
ORIGINAL
, '!J� , I - -1
RECEIVED
CITY C;I F-W9 nFFlr;
BEFORE THE CITY COUNCIL OF THE CITY OF RENTON
In re Appeal of City of Renton Hearing
Examiner Decision re Minor Adjustment to File No. LUA06-073
Approved Site Plan SA-H, SA-M, SM, ECF
DECLARATION OF SERVICE
Helen M. Stubbert declares:
I am a legal assistant to Roger A. Pearce. I am now, and at all times hereinafter
mentioned was, a resident of the State of Washington,
over the age of 18 years, and competent to
be a witness in the above -entitled proceeding, and that, on July 2, 2007, I caused to be served, in
the manner indicated, true and correct copies of-
1 . Pre -Appeal Hearing Brief of Football Northwest LLC; and
2. this Declaration of Service
on the following:
Bonnie Walton
Paul O'Hainle
City Clerk
Socius Law Group PLLC
City of Renton
Two Union Square, 44950
1055 S. Grady Way
601 Union St.
Renton WA 98055
Seattle WA 98101
[Original + 3 copies]
Via Legal Messenger
Via Legal Messenger
Lawrence J. Warren
Larry & Esther Barsher
Warren Barber & Fontes, P.S.
6940 96"' Ave. S.E.
100 South Second St.
Mercer Island WA 98040
Renton WA 98055
Via U.S. Mail
Via Legal Messenger
DECLARATION OF SERVICE - I ORIGINAL FOSTER PEPPER PLLC
1111 THIRD AwNuE, SUITE 3400
SEATTLE, WASHWGTON 98101-3299
PHONE (206) 447-4400 FAX (206) 447-9700
50824 z3 1
1
2
3
4
5
6
7
S
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Declared under penalty of perjury under the laws of the State of Washington that the
foregoing is true and correct.
DATED this 2"0 day of July, 2007, at Seattle, Washington,
DECLARATION OF SERVICE - 2
Helen M. Stubbert
FOSTER PEPPER PLLC
1111 THIRD AVENUE:, SUITE 3400
SEATTLE, WASHINGTON 98101-3299
P[IONF. (206) 447-4400 FAX (206) 447-9700
50924123.1
June 21, 2007
CERTIFICATE OF MAILING
STATE OF WASHINGTON
COUNTY OF KING
BONNIE I. WALTON, City Clerk for the City of Renton, being first duly sworn on oath,
deposes and says that she is a citizen of the United States and a resident of the State of
Washington, over the age of 21 and not a party to nor interested in this matter.
That on the 21 st day of June, 2007, at the hour of 5:00 p.m. your affiant duly mailed and placed
in the United States Post Office at Renton, King County, Washington, by first class mail to all
parties of record, notice of appeal filed by Northwest Football, LLC, represented by Roger A.
Pearce, foster Pepper, PLLC of the Hearing Examiner's decision regarding the Scahawks
Headquarters and Training Facility Site Plan application. (File No. LUA-06-073, SA-H, SA-M,
SM, ECF)
�d• �a-
Bonnie I. Walton, City Clerk
SUBSCRIBED AND SWORN TO BEFORE me this 21 st day of June, 2007.
( /,, I
Jas A. Seth
Not ry Public in and for the State of
Wa ington, residing in Renton
Kathy Keolker, Mayor
June 21, 2007
CITY OF RENTON
City Clerk
Bonnie I. Walton
APPEAL FILED BY: Football Northwest, LLC, represented by Roger A. Pearce, Foster Pepper
PLLC
RE: Appeal of Hearing Examiner's decision dated 6/11/2007 regarding the Seahawks
Headquarters and Training Facility Site Plan application, 5015 Ripley Ln N. (File No
LUA-06-073, SA-H, SA-M, SM, ECF)
To Parties of Record:
Pursuant to Title IV, Chapter 8, Renton City Code of Ordinances, written appeal of the hearing
examiner's decision on the Barsher appeal of Seahawks Building Height has been filed with the
City Clerk.
In accordance with Renton Municipal Code Section 4-8-11OF, the City Clerk shall notify all
parties of record of the receipt of the appeal. Other parties of record may submit letters limited
to support of their positions within ten (10) days of the date of mailing of the notification of the
filing of the appeal. The deadline for submission of additional letters is 5:00 pm, July 2, 2007,
NOTICE IS HEREBY GIVEN that the written appeal and other pertinent documents will be
reviewed by the Council's Planning and Development Committee at 2:00 p.m. on Thursday, July
5, 2007, in the Council Chambers, 7th Floor of Renton City Hall, 1055 South Grady Way,
Renton, WA, 98057. The recommendation of the Committee will be presented for consideration
by the full Council at a subsequent Council meeting.
Attached are a copy of the appeal and a copy of the Renton Municipal Code regarding appeals of
Hearing Examiner decisions or recommendations. Please note that the City Council will be
considering the merits of the appeal based upon the written record previously established.
Unless a showing can be made that additional evidence could not reasonably have been available
at the prior hearing held by the Hearing Examiner, no further evidence or testimony on this
matter will be accepted by the City Council.
For additional information or assistance, please feel free to call me at 425-430-6502.
Sincerely,
Bonnie I. Walton
City Clerk
Attachments
cc: Council Liaison
1055 South Grady Way - Renton, Washington 98057 - (425) 430-6510 / FAX (425) 430-6516
9 7hispaperoontains5o%recydedmate6al,30%postconsumer
I
RENTo
AHEAD OF THE CURVE
City of Renton Municipal Coue• Title IV Chapter 8 Section 110 -- Appeals
4-8-11 OC4
The notice of appeal shall be accompanied by a fee in accordance with RMC 4-1-170, the fee schedule of
the City. (Ord. 3658, 9-13-82)
4-8-110F: Appeals to City Council — Procedures
1. Time for Appeal: Unless a specific section or State law providing for review of decision of the
Examiner requires review thereof by the Superior Court or any other body, any interested party
aggrieved by the Examiner's written decision or recommendation may submit a notice of appeal to the
City Council, upon a form furnished by the City Clerk, within fourteen (14) calendar days from the
date of the Examiner's written report.
2. Notice to Parties of Record: Within five (5) days of receipt of the notice of appeal, the City
Clerk shall notify all parties of record of the receipt of the appeal.
3. Opportunity to Provide Comments: Other parties of record may submit letters in support of
their positions within ten (10) days of the dates of mailing of the notification of the filing of
the notice of appeal.
4. Transmittal of Record to Council: Thereupon the Clerk shall forward to the members of the
City Council all of the pertinent documents, including the written decision or
recommendation, findings and conclusions contained in the Examiner's report, the notice of
appeal, and additional letters submitted by the parties. (Ord. 3658, 9-13-1982)
5. Council Review Procedures: No public hearing shall be held by the City Council. No new or
additional evidence or testimony shall be accepted by the City Council unless a showing is made by
the party offering the evidence that the evidence could not reasonably have been available at the time
of the hearing before the Examiner_ If the Council determines that additional evidence is required,
the Council shall remand the matter to the Examiner for reconsideration and receipt of additional
evidence. The cost of transcription of the hearing record shall be borne by the applicant. In the
absence of an entry upon the record of an order by the City Council authorizing new or additional
evidence or testimony, and a remand to the Hearing Examiner for receipt of such evidence or
testimony, it shall be presumed that no new or additional evidence or testimony has been accepted by
the City Council, and that the record before the City Council is identical to the hearing record before
the Hearing Examiner. (Ord. 4389, 1-25-1993)
6_ Council Evaluation Criteria: The consideration by the City Council shall be based solely
upon the record, the Hearing Examiner's report, the notice of appeal and additional
submissions by parties.
7. Findings and Conclusions Required. If, upon appeal of a decision of the Hearing Examiner
on an application submitted pursuant to RMC 4-1-05OF1, and after examination of the
record, the Council determines that a substantial error in fact or law exists in the record, it
may remand the proceeding to Examiner for reconsideration, or modify, or reverse the
decision of the Examiner accordingly.
8. Council Action: If, upon appeal from a recommendation of the Hearing Examiner upon an
application submitted pursuant to RMC 4-1-05OF2 and F3, and after examination of the record, the
Council determines that a substantial error in fact or law exists in the record, or that a
recommendation of the Hearing Examiner should be disregarded or modified, the City Council may
remand the proceeding to the Examiner for reconsideration, or enter its own decision upon the
application.
9. Decision Documentation: In any event, the decision of the City Council shall be in writing and shall
specify any modified or amended findings and conclusions other than those set forth in the report of
the Hearing Examiner. Each material finding shall be supported by substantial evidence in the record.
The burden of proof shall rest with the appellant. (Ord 3658, 9-13-1982)
10. Council Action Final: The action of the Council approving, modifying or rejecting a decision
of the Examiner shall be final and conclusive, unless appealed within the time frames
established under subsection G5 of this Section. (Ord. 4660, 3-17-1997)
Larry & Esther Barsher
6940 96th Ave. SE
Mercer Island, WA 98040
Port Quendall Company
505 Fifth Ave. S., Ste. 900
Seattle, WA 98104
Carl Hadley
Cedar Rock Consultants
19609 224th Ave.
Woodinville, WA 98077
Michael Cero
8300 Avalon Drive
Mercer Island, WA
Roger Pearce
Foster Pepper
1111 Third Ave., Ste. 3400
Seattle, WA 98101
Lance Lopes
VP Seahawks
800 Occidental Ave. S.
Seattle, WA 98034
Eileen Halverson
5021 Ripley Lane N., Ste. 302
Renton, WA 98056
Thelma Sutherland
1205 N 29th St.
98040 Renton, WA 98056
Jared Salstrom
5021 Ripley Lane N., Ste. 213
Renton, WA 98056
Steve Gregerson
5021 Ripley Lane N., Ste 302
Renton, WA 98056
Torn Ehrlichman
Socius Law Group
601 Union St., Ste. 4950
Seattle, WA 98101
Dwight & Christine Schaeffer
6958 96th Ave. SE
Mercer Island, WA 98040
Jeffrey Taraday
Foster Pepper
1111 Third Ave., 34th Floor
Seattle, WA 98101
Steve Janson
5021 Ripley Lane N., Ste
Renton, WA 98056
Elaine Wine
Football Northwest, LLC
505 Fifth Ave. S., Ste, 900
Seattle, WA 98104
Thomas Peterson
Socius Law Group, PLLC
601 Union St., Ste. 4950
Seattle, WA 98101
Joe Burcar
3190 160th Ave. SE
Bellevue, WA 98008
Brian T. Sabey
5021 Ripley Lane N., Ste. 304
Renton, WA 98056
Elya G. Baches
302 1414 N. 34th St.
Renton, WA 98056
Eleanor M. Kennamer, President
Misty Cove Condo Association
5021 Ripley Lane N., #309
Renton, WA 98056
Barbara Paxhia
5021 Ripley Lane N., Ste
Renton, WA 98101
Aaron Belenky, President
Williamsburg Condo Association
1800 NE 40th St., Ste. H-4
Renton, WA 98056
Dan & Jody Samson
104 6952 96th Ave. SE
Mercer Island, WA 98040
Shelly Munkberg
SECO Development
1083 Lk. Washington Blvd N
Renton, WA 98056
Les & Denise Klaff
6915 96th Ave. SE
Mercer Island, WA
Richard Wagner
Baylis Architects
Ste. 50 10801 Main St., Ste. I10
Bellevue, WA 98004
Howard & Sue Robboy
6944 96th Ave. SE
98040 Mercer Island, WA 98040
Steve & Deanna Marshall Hal & Gerry Fardal Dr. and Mrs. Robert Dietz
69]JI96th Ave. SE 69;.,5 96th Ave. SE 7906 E. Mercer Way
Mercer Island, WA 98040 Mercer Island, WA 98040 Mercer Island, WA 98040
Carl Lindstrom
6910 96th Ave. SE
Mercer Island, WA 98040
U Fy OF RENTON
Ai VEAL TO RENTON CITY COUNCIL UN .i 6 2007
OF HEARING EXAMINER'S DECISIONIRECOMMENDATION
RECEIVED
�r����.,y,,
ICE
APPLICATION NAME A ('PA,., of Ilrrzi,.lGx�M""� �Cc./Sr�� FILE NO.- LUR
SR - ,S - M a ,L-," C
The undersigned interested party hereby files its Notice of Appeal from the decision or recommendation o? the
Land Use Hearing Examiner, dated
1. IDENTIFICATION OF PARTY
APPELLANT:
Name: FOO-ra a u . ^/0 fi--z- /twos r L+r C_
Address: Pr-r F.J. ILR C-4D4-�W&Ol
505 - "AJE . S. #' 00 S-6 4TT7-E WA -7'8/0�
Phone Number:
Email:
REPRESENTATIVE (IF ANY):
Name: 2OGE2 R P-_A 2CL 0-5-1_4/L Pf—POOCA
LL �-
Address: IIII r,3 0# 3 0<D
Phone Number: ��6�-
Email: PER r-rz
2. SPECIFICATION OF ERRORS (Attach additional sheets, if necessary)
Set forth below are the specific errors or law or fact upon which this appeal is based:
Findinjj of Fact: (Please designate number as denoted in the Examiner's Report)
No. O Error: 566
Correction:
Conclusions:
No.5tError: EE,—G t4EET-
Correction:
Other:
No. Error:
Correction:
3, SUMMARY OF ACTION REQUESTED The City Council is requested to grant the following relief;
(Attach explanation, if desired)
Reverse the decision or recommendation and grant the following relief. _
Modify the decision or recommendation as follows: S�-�,+� s
Remand to the Examiner for further consideration as follows -
Other:
jqj &(�, —
PLA2 eE n1E 15 p?,pp�
Appellan epresentati�ve Signature Type/Printed Name tiKB = I //_3 Date
NOTE: Please refer to Title IV, Chapter 8, of the Renton Municipal Code, and Section 4-8-114F, for specific appeal procedures,
t I i✓G WS, Deb S e"c5 sri°C '✓
�rGvl k:::C_0 , wt-4---/ "J^
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
BEFORE THE CITY COUNCIL OF THE CITY OF RENTON
In re Appeal of City of Renton Hearing
Examiner Decision re Minor Adjustment to
Approved Site Plan
File No. LUA06-073
SA-H, SA-M, SM, ECF
NOTICE OF APPEAL OF FOOTBALL
NORTHWEST LLC
I. INTRODUCTION
Football Northwest LLC ("FNW") requests the City Council to modify the June 11, 2007
decision of the City of Renton Hearing Examiner in File Nos. LUA-06-073, SA-H, SA-M, SM,
ECF. This supplements the City's Notice Of Appeal form.
The appeal before the Examiner involved a minor adjustment to the approved site plan
for the Seattle Seahawks Corporate Headquarters and Training Facility. The only change to the
approved site plan was to allow the Indoor Practice Facility (the "IPF") to be several feet higher
than described in the City's original site plan approval. Because this minor change to the
approved site plan clearly met the minor adjustment criteria in Renton Zoning Code §4-9-200(I),
the City's Department of Development Services issued the minor adjustment. On appeal, the
Examiner was required to give substantial weight to that administrative decision from the
Department of Development Services. In the Examiner's decision, the Examiner concluded that
26 11 all criteria for the issuance of the minor adjustment were satisfied.
NOTICE OF APPEAL - 1
FOSTER PEPPER PLLC
1111 THIRD AVENUE, SUITE 3400
SEAT► .E, WASHINGTON 99101-3299
PHONE (206)447-4400 FAX (206)447.9700
50916742.2
1
2
3
4
5
6
7
S
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Rather than uphold Development Services' decision, as the Examiner was required to do
once he found that the criteria for an approval of a minor adjustment were met, the Examiner
placed an additional condition on the Corporate Headquarters project. This additional condition
violated the review criteria in the Renton Zoning Code, failed to give substantial weight to the
decision of City staff, was unsupported by the evidence on appeal, was unrelated to any impact
from the minor adjustment, and imposed an unreasonable condition on the project. In particular,
the Examiner required 12 to 24 evergreen trees "along the lakeshore facade of the Indoor
Practice Field [sic]." Even if the Examiner had authority to impose conditions on the project
after finding that all minor adjustment criteria had been met, this condition is not supported by
any evidence in the record, which showed that the IPF would not look noticeably different from
the I I I -foot tall building already approved. Moreover, the condition purports to require trees
along the IPF's "lakeshore fagade" but the great majority of that lakeshore fagade of the
Scahawks Corporate Headquarters does not even begin until an elevation of 55 feet in the air. It
is certainly unreasonable to plant evergreen trees 55 feet in the air on the roof of another
structure.
Because the Examiner's decision is not supported by the record or by the City's Code,
fails to give any deference to the City staff decision, and imposes an unreasonable condition, the
Council should modify the Examiner's decision to eliminate the "additional condition" required
by the Examiner.
II. FACTUAL BACKGROUND
The evidence at the hearing and in the record of the hearing shows the following:
The City's environmental review for the Seahawks Corporate Headquarters master plan
analyzed an IPF structure of up to 120 feet in height above slab, with a 95-foot clear interior
space over the indoor practice field. The 95-foot clear interior space is required for the facility to
operate in the manner designed for professional football practices. Based on its analysis of that
proposal, the City issued a Determination of Nonsignificance ("DNS")
NOTICE OF APPEAL - 2
FoSTER PEPPER PLLC
1111 THIRD AVENUE, SUITE 3400
SEATTLE� WASHINGTON 98101-3299
PHONE (206) 447-44D0 FAX (206) 447-9700
508167422
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
After the issuance of the DNS, the project applicant moved the IPF structure (and other
project buildings) approximately 62 feet further back from the shoreline, in order to minimize the
impact to the neighboring condominium owners to the north of the site. Design development for
the IPF structure showed that the interior 95-foot clear height could likely be accomplished with
an overall building height of approximately I I I feet in height. Those design development
drawings were the basis of the drawings and renderings presented to the City at the hearing on
the original site plan for the Seahawks Corporate Headquarters and Training Facility.
Accordingly, the City's site plan approval described the IPF as being "up to 111 feet" and
"approximately I I I feet tall."
After to the December 6, 2006, site plan approval, FNW worked with the City on the
final structural design of the IPF. In response to City building code requirements, FNW was
required to make changes to the truss structure of the IPF roof. In order to maintain the 95-foot
clear interior space for the IPF, the new truss structure requires a building height of
approximately 113 feet. To be cautious, FNW requested a minor adjustment to allow up to 115
feet in height, even though only approximately 113 feet in height is anticipated and currently
submitted to the City for permits.
This minor height variation to the IPF is the only change to the approved site plan. No
additional lot coverage is proposed, no expansion of the site plan boundary is proposed, and no
expansion of any other planned building on the site is proposed. Transportation and parking
impacts would be unchanged. Use of public services and utilities would be unchanged. The
only impact will be to allow a small increase in the scale of the IPF building.
The massing of the IPF itself will increase less than four percent (4%) if the full 115 feet
in height were utilized. At the anticipated final IPF height of approximately 113 feet, there
would be only a two percent (2%) increase to the scale of the IPF. With respect to the scale of
all development approved by the site plan, the total building volume would increase only three
percent (3%) if the full 115 feet in height were utilized for the IPF. At the anticipated final IPF
NOTICE OF APPEAL - 3
FOSTER PEPPER PLLC
1111 THIRD AVENUE, Sum 3400
SEAITLE, WASHINGTON 98101-3299
PHONE (206) 447-4400 FAX (206) 447-97DD
50916742.2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
height of approximately 113 feet, the overall site massing would only increase by one and one-
half percent (1'/2 %).
III. APPEAL CRITERIA
A. Standing.
FNW is the permit applicant, one of the parties to the appeal hearing before the
Examiner, the owner of the property affected by the Examiner's appeal decision, and the ultimate
user of the Seahawks Corporate Headquarters. FNW will be directly affected by the Examiner's
decision and has standing to bring this appeal.
B. Time to File.
The Examiner's decision on the appeal of Development Services minor adjustment
approval was issued June 11, 2007. This appeal is filed within the required time limit in Renton
Zoning Code 4-8-11OF.
C. Notice of Appeal and Filing Fee.
The notice of appeal form from the Renton City Clerk accompanies this Notice. A check
for the filing fee specified in Renton Zoning Code 4-1-170 is enclosed.
B. Assignments of Error.
1. Finding of Fact 10.
In Finding of Fact 10, the Examiner purports to explain his authority on appeal. The
Examiner claims to have "all the powers of the office from whom the appeal is taken." This
finding ignores controlling City ordinances, which require the Examiner to give substantial
weight to any discretionary decision of City staff and require the Examiner to review the City
staff decision under the appropriate standard of review and modify that decision only if it is
made on unlawful procedure, is clearly erroneous, or is arbitrary and capricious. Renton Zoning
Code 4-8-110E7(a and b). Nothing in the record shows that staff followed any erroneous
procedure, committed any clear error of law, and made any arbitrary and capricious decision.
I NOTICE OF APPEAL - 4
FOSTER PEPPER PLLC
1111 THIRD AVENUE, SUITE 3400
SEATTLE, WASHINGTON 98101-3299
PHONE (206) 4474400 FAX (206) 447-9700
50916?42.2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
The Examiner did not find that any of those standards of review were violated, and the Examiner
did not give any deference to the City staff decision as required by law.
2. Conclusions of Law 5, 6 and 7.
In Conclusions 5, 6 and 7, the Examiner makes multiple errors of law including the
following.
First, the Examiner fails to grant deference to the decision of Development Services to
issue the minor adjustment.
Second, the Examiner imposes an additional condition to the minor adjustment even after
concluding that all required criteria for issuance of the minor adjustment were met.
Third, the Examiner misinterprets the wording of the minor adjustment Code section
("Minor modifications may be permitted by administrative determination") to aggrandize
conditioning authority unto himself. That section of the Code merely distinguishes minor
adjustments from major adjustments. If the criteria for a minor adjustment are met, then
Development Services makes the decision on the site plan change. If the minor adjustment
criteria are not met, then a major adjustment application and public hearing are required.
Nothing in that Code section gives the Examiner authority to impose additional conditions.
Fourth, the conditions imposed by the Examiner are not even related to the change to the
project proposed by the minor adjustment. The only change to the IPF is a slight height increase
(from approximately I I I feet to approximately 113 feet in height at the crest of the IPF roof).
The condition imposed by the Examiner, however, does nothing to address this tiny increase in
height, but only addresses the overall bulk of the building, which was already approved in the
original site plan approval.
Fifth, the Examiner's condition is not supported by any evidence in the record. Both the
expert testimony and the photosimulation exhibits show that the additional height of the IPF
would not even be a noticeable change to the project. While the IPF is admittedly a significant
structure, the only issue when issuing the minor adjustment is the difference between the
NOTICE OF APPEAL - 5
FOSTER PEPPER PLLC
1111 THIRo AVENUE, Sum 3400
$EATTLE� WASHINGTON 96101-3299
PHONE (206) 447-4400 FAx (206) 447-9700
50916742.2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
is
19
20
21
22
23
24
25
26
structure as already permitted and the structure as amended (approximately two feet higher).
Because the Examiner's condition is not related to an impact of the minor adjustment, it is
plainly unlawful under controlling Washington law.
Sixth, the Examiner's condition is unreasonable. The existing site plan already has
significant landscaping along the shoreline, which will screen views from the water and provide
habitat amenities for the shoreline environment. The existing site plan proposed lower level
plantings in the northwest corner of the site in order to mitigate any view impacts that new
construction would have on the immediate project neighbors. The Examiner's condition would
require additional trees along the lakeshore fagade of the IPF. This condition ignores the fact
that the 55-foot high administrative office building is shoreward from majority of the IPF.
According, the majority of the IPF facade does not even begin until 55-feet in the air. A
condition purporting to require trees 55 feet in the air — on the roof of another structure — is
unreasonable.
IV. CONCLUSION
For all the reasons above and for the reasons to be shown at the closed record hearing
before the City Council, FNW respectfully requests the City Council to modify the Examiner's
decision by striking the additional condition added by the Examiner in his June 11, 2007,
decision on appeal of Development Services minor adjustment decision.
DATED this 15th day of June 2007.
NOTICE OF APPEAL - 6
FOSTER PEPPER PLLC
Roger A. earce, WSBA No. 21113
Attorneys for Football Northwest LLC
FosTER PEPPER PLLC
1111 THIRD AVENUE, SUITE 3400
SEATTLE, WASHINGTON 98101.3299
PHONE (206) 447-4400 FAx (206) 447-9700
508167422
CITY OF RENTON
City Clerk Division
1055 South Grady Way
Renton, WA 98055
425-430-6510
❑ Cash ❑ Copy Fee
Check No. 0 Iq 1"77 LXAppeal Fee
Receipt N ° 0 891
Date
❑ Notary Service
Description: � vH C r 42 4&ld -G 4 -7
Funds Received From: Amount $
Nam' e �� &L- / cJ , on
Address j { { rpC )V("Ie!l ae 'I 3VI90
City/Zip —�r ifle kz !?Ff 6)1 v�-kz
Ci Stuff Sigiaature
-06/15/,2007 15:20 FAX
a 0 0 1 / 0 0 9
® FOSTER PEPPERrLLC
FACSIMILE TRANSMITTAL SHEET
June 15, 2007
TO: FAX NL]MHER VOICE CONTACT: VOICE CONFIRM:
Clerk, City of Renton (425) 430.6516
From: Roger A. Pearce
Direct Dial. (206) 447-4676
Direct Fax; (206) 749-1997
Attachments; Notice of Appeal
Number of Pages (Including this cover page): 8
User & Client/Matter Number. 0487 76938-20
Retum to/Location: 33-57
(425) 430.6510
Message: We are sending you the original Notice and Check via messenger this
afternoon.
IF YOU HAVE QUESTIONS REGARDING rHE TRANSMISSION OF THIS FAX
PLEASE CONTACT THFFAX DEPARTMENT AT (206) 447-4660
THE INFORMATION CONTAINED IN THIS FACSIMILE COMMUNICATION IS PRIVILEGED AND/OR CONFIDEN77AL
INFORMATION INTENDED ONLY FOR THE USE OF, EACH INDIWDUAL OR ENTTTY NAMED ABOVE. IF THE READER
OF THIS COVER PAGE IS NOT AN INTENDED RECIPIENT, YOU ARE HEREBY NOTIFIED THAT ANY DISSEMINATION,
DISTRIBUTION OR COPYING OF THIS COMMUNICATION OR THE INFORMATION CONTAINED IN THIS
COMMUNICATION IS STRICTLY PROHMITED. IF YOU HAVE RECEIVED THIS COMMUNICATION IN ERROR, PLEASE
IMMEDL4TELY NOTIFY US BY TELEPHONE AND RETURN THIS FACSIMILE TO US AT THE ABOVE ADDRESS VIA THE
U.S. POSTAL SERVICE. THANK YOU.
TSU 206.447.4" FAx, 206.4V.9700 1111 moo AVENL , SMT6 mm, SEATTLE, WASHINGI'ON 991oi-am W WW.F'QSTER.COM
SEATTLE wAWNGTON SPOKANE wwsfuNcroN PORT[.Ar;D onwN
�06/15/2007 15 21 FAX
10002/a09
APPEAL TO RENTON CITY COUNCIL
OF HEARING EXAMInRIS DECISIONMECON94ENDATION
APPLICATION NAME A PPF� OF 2rrJ ,,,r . ,DEus« FILE_ O _ � M ?C
The undersigned interested pany hereby files its Notice of Appeal from the decision or recommendation o? the
Land Use Hearing Examiner, dated _ 1-04E. 11 , 200'7.
1. M5NTZFiCATION OF PARTY
APPELLANT:
Name: Fo0-r'43 0=1- tri. CJ,QI1,x-&'-ftJAX I-
Address. A-=4- R- R Y C4 L-L r k Ems=
5-C6
Phone Number:
Email, --
REPRESENTATIVE (7 ANY):
Name: 2 A . 91<RJLCI Fasr A�AP�R
2-LU
Address; 1111 r 3AnD &vE . * 3 q-o O
.Phone Number: (Cag1@ — L'q'00
Etnaal: PEAA.rz
2. SPECIFICATION OF ERRORS (Attach additional sheets, if necessary)
Set forth below are the specific errors or law or fact upon which this appeal is based:
Finding o a t: (Please designate number as denoted in the Eltatniner's Report)
No. J0 Error: 54f- ATrAG
Correction:
ColnclusJ9ns:
No.j Error. EL �nG F r
Correction:
Uhl ;
No. Error:
Correction -
SUMMARY OF ACTION REQUESTED The City Council is regtiested to grant the following relief:
(Attach explanation, if desired)
Reverse the decision or recommendation and grant the following relief:
Modify the decision or reconu=dation as follows:
Remand to the Examiner for further consideration as follows:
Other:
P�EA,2 eE JrJt= / S o 1
Appeilan eprasentative Signetutre TypefFrltnted Name �//� Date
NOTE. P1ensc refer to Tit1G W, Chapter S, of the Rtnwio Municipal Code, and Section 4.9-11017, for specific: appeal procedures,
08/15/2007 15:21 FAX
m 003/009
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
BEFORE THE CITY COUNCIL OF THE CITY OF RENTON
In re Appeal of City of Renton Hearing
Examiner Decision re Minor Adjustment to
Approved Site Plan
File No. LUA06-073
SA-H, SA-M, SM, ECF
NOTICE OF APPEAL OF FOOTBALL
NORTHWEST LLC
I. INTRODUCTION
Football Northwest LLC ("FNW ') requests the City Council to modify the June 11, 2007
I decision of the City of Renton Hearing Examiner in File Nos. LUA-06-073, SA-H, SA-M, SM,
ECF. This supplements the City's Notice Of Appeal form.
The appeal before the Examiner involved a minor adjustment to the approved site plan
for the Seattle Seahawks Corporate Headquarters and Training Facility. The only change to the
approved site plan was to allow the Indoor Practice Facility (the "IPF") to be several feet higher
Om described in the City's original site plan approval. Because this minor change to the
approved site plan clearly met the minor adjustment criteria in Renton honing Code §4-9�200(1),
the City's Department of Development Services issued the minor adjustment. On appeal, the
Examiner was required to give substantial weight to that administrative decision from the
Department of Development Services. In the Examiner's decision, the Examiner concluded that
all criteriat for the issuance of the minor adjustment were satisfied.
NOTICE OF APPEAL - I
F0MR Ft?,mR FLLC
1111 TR" AYSHMk SVere 34M
S%nsr 4 WASHNOVO" 1MA47"
Fmon (M) 4474AOD FAX 1206)4i7r?700
SM16741.s
06/15/,2007 15 21 FAX
1� 004/008
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Rather than uphold Development Services' decision, as the Examiner was required to do
once he found that the criteria for an approval of a minor adjustment were met, the Examiner
placed an additional condition on the Corporate Headquarters project. This additional condition
violated the review criteria in the Renton Zoning Code, failed to give substantial weight to the
decision of City staff, was unsupported by the evidence on appeal, was unrelated to any impact
from the minor adjustment, and imposed an unreasonable condition on the project_ In particular,
the Examiner required 12 to 24 evergreen trees "along the lakeshore fagade of the Indoor
Practice Field [sic]." Even if the Examiner had authority to impose conditions on the project
after finding that all minor adjustment criteria had been met, this condition is not supported by
any evidence in the record, which showed that the IPF would not look noticeably different from
the I I I -foot tall building already approved. Moreover, the condition purports to require trees
along the IPF's "lakeshore facade" but the great majority of that lakeshore facade of the
Seahawks Corporate Headquarters does not even begin until an elevation of 55 feet in the air. It
is certainly unreasonable to plant evergreen trees 55 feet in the air on the roof of another
structure,
Because the Examiner's decision is not supported by the record or by the City's Code,
fails to give any deference to the City staff decision, and imposes an unreasonable condition, the
Council should modify the Examiner's decision to eliminate the "additional condition" required
by the Examiner.
H. FACTUAL BACKGROUND
The evidence at the hearing and in the record of the hearing shows the following;
The City's environmental review for the Seahawks Corporate Headquarters master plan
analyzed an IPF structure of up to 120 feet in height above slab, with a 95-foot clear interior
space over the indoor practice held. The 95-foot clear interior space is required for the facility to
operate in the manner designed for professional football practices. Based on its analysis of that
proposal, the City issued a Determination of Nonsigaificance C DNS').
NOTICE OF APPEAL - 2
POSTER PEPPER IFLLC
1171 THW A,MUM SUM "00
SL& nk WAMMY4N 4i IM 42"
FWM (206) "7400 FAX (206) 447-4700
501 J 6742.2
06I15"2007 15:22 FAX
[0 0051009
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
After the issuance of the DNS, the project applicant moved the IPF structure (and other
project buildings) approximately 62 feet further back from the shoreline, in order to minimize the
impact to the neighboring condominium owners to the north of the site. Design development for
the IPF structure showed that the interior 95-foot clear height could likely be accomplished with
an overall building height of approximately 111 feet in height. Those design development
drawings were the basis of the drawings and renderings presented to the City at the hearing on
the original site plan for the Seahawks Corporate Headquarters and Training Facility.
Accordingly, the City's site plan approval described the IPF as being `dip to I I I feet" and
"approximately I I I feet tall."
After to the December 6, 2006, site plan approval, FNW worked with the City on the
final structural design of the IPF. In response to City building code requirements, FNW was
required to make changes to the truss structure of the IPF roof In order to maintain the 95-foot
clear interior space for the IPF, the new truss structure requires a building height of
approximately 113 feet. To be cautious, FNW requested a minor adjustment to allow up to 115
feet in height, even though only approximately 113 feet in height is anticipated and currently
submitted to the City for permits.
This minor height variation to the IPF is the only change to the approved site plan. No
additional lot coverage is proposed, no expansion of the site plan boundary is proposed, and no
expansion of any other planned building on the site is proposed_ Transportation and parking
impacts would be unchanged. Use of public services and utilities would be unchanged. The
only impact will be to allow a small increase in the scale of the IPF building.
The massing of the IPF itself will increase less than four percent (4%) if the full 115 feet
in beigbt were utilized. At the anticipated final IPF height of approximately 113 feet, there
would be only a two percent (21/6) increase to the scale of the IPF. With respect to the scale of
all development approved by the site plan, the total building volume would increase only three
percent (3%) if the full 115 feet in height were utilized for the IPF. At the anticipated final IPF
NOTICE OF APPEAL - 3
FOSTER PS"ea PUC
I111 TMAb A'VAM16, 8vas "M
SiAM& WAMNGRON 9810142"
PwNi (706) 417i400 VAX CA) 447--9700
06/15/,2007 15 22 FAX
12006/006
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
height of approximately 113 feet, the overall site massing would only increase by one and one-
half percent (1'l2 '%).
III. APPEAL CRITERIA
A. Standing.
FNW is the permit applicant, one of the parties to the appeal hearing before the
Examiner, the owner of the property affected by the Examiner's appeal decision, and the ultimate
user of the 5eahawks Corporate Headquarters. FNW will be directly affected by the Examiner's
decision and has standing to bring this appeal.
B. Time to File.
The Examiner's decision on the appeal of Development Services minor adjustment
approval was issued June 11, 2007. This appeal is filed within the required time limit in Renton
Zoning Code 4-8-11OF.
C. Notice of Appeal and Filing Fee.
The notice of appeal form from the Renton City Cleric accompanies this Notice, A check
for the filing fee specified in Renton Zoning Code 4-1-170 is enclosed.
B. Assignments of Error.
1. Finding of Fact 10.
In Finding of Fact 10, the Examiner purports to explain his authority on appeal. The
Examiner clalirns to have "all the powers of the office from whom the appeal is taken." This
finding ignores controlling City ordinances, which require the Examiner to give substantial
weight to any discretionary decision of City staff and require the Examiner to review the City
staff decision under the appropriate standard of review and modify that decision only if it is
made on unlawful procedure, i9 clearly erroneous, or is arbitrary and capricious, Renton Zoning
Code 4-8-110E7(a and b). Nothing in the record shows that staff followed any erroneous
procedure, committed any clear error of law, and made any arbitrary and capricious decision.
NOTICE OF APPEAL - 4
FOSTER PEPPER PLLC
1171 THMV AVENUE, SUM 34M
5Z^rM4. WAsnz acmN 9MI-3299
PkOM (206)967-U00 Pax 000 447-9700
J"16142.2
06f15;2007 15.23 FAX
007/009
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
CJ The Examiner did not find that any of those standards of review were violated, and the Examiner
did not give any deference to the City staff decision as required by law.
2. Conclusions of Law 5, 6 and 7.
In Conclusions 5, 6 and 7, the Examiner makes multiple errors of law including the
following.
First, the Examiner fails to grant deference to the decision of Development Services to
issue the minor adjustment.
Second, the Examiner imposes an additional condition to tke minor adjustment even after
concluding that all required criteria for issuance of the minor adjustment were met.
Third, the Examiner misinterprets the wording of the minor adjustment Code section
('Minor modifications maybe permitted by administrative determinataion'l to aggrandize
conditioning authority unto himself. That section of the Code merely distinguishes minor
adjustments from major adjustments. If the criteria for a minor adjustment are met, then
Development Services makes the decision on the site plan change. If the minor adjustment
criteria are not met, then a major adjustment application and public hearing are required.
Nothing in that Code section gives the Examiner authority to impose additional conditions.
Fourth, the conditions imposed by the Examiner are not even related to the change to the
project proposed by the minor adjustment. The only change to the IPF is a slight height increase
(from approximately 111 feet to approximately 113 feet in height at the crest of the 1PF roof).
The condition imposed by the Examiner, however, does nothing to address this tiny increase in
height, but only addresses the overall bulk of the building, which was already approved in the
original site plan approval.
Fifth, the Examiner's condition is not supported by any evidence in the record. Both the
expert testimony and the photosimulation exhibits show that the additional height of the IPF
would not even be a noticeable change to the project. While the IPF is admittedly a significant
structure, the only issue when issuing the minor adjustment is the difference between the
NOTICE OF APPEAL - 5
Fosrex Pam ]PLLC
11x17tmw Avg Sum Um
8a MA, wASMaMN "101-49s
F m?a WN 44 -IM FAX ON) 447-4700
509167a1.3
06/1512007 13 23 FAX
[� 008/008
1
2
3
4
5
6
7
8
9
10
it
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
structure as already permitted and the strucnue as amended (approximately two feet higher).
Because the Examiner's condition is not related to an impact of the minor adjustment, it is
plainly unlawful under controlling Washington law.
Sixth, the Examiner's condition is unreasonable. The existing site plan already has
significant landscaping along the shoreline, which will screen views from the water and provide
habitat amenities for the shoreline environment. The existing site plan proposed lower level
plantings in the northwest corner of the site in order to mitigate any view impacts that new
construction would have on the immediate project neighbors. The Examiner's condition would
require additional trees along the iakeshore facade of the IPF. This condition ignores the fact
that the 55-foot high administrative office building is shoreward from majority of the iPF.
According, the majority of the iPF facade does not even begin until 55-feet in the air. A
condition purporting to require trees 55 feet in the air -- on the roof of another structure — is
unreasonable.
]IV. CONCLUSION
For all the reasons above and for the reasons to be shown at the closed record hearing
before the City Council, FNW respectfully requests the City Council to modify the Examiner's
decision by striking the additional condition added by the Examiner in his June 11, 2007,
decision on appeal of Development Services minor adjustment decision.
DATED this 15" day of June 2007,
NOTICE OF APPEAL - 6
FOSTER PEPPER PLLC
1-2:;� 0-", a�4
Roger AAYearce, WSBA No. 21113
Attorneys for Football Northwest LLC
Foma FEmx FLLC
1111 drip G A VRNVk SUM M00
SmT n4. WAblmdc:oX 98IM42"
Mona (M0 447-400 FAX (M) 447-9700
50610742,2
.06/15/2007 15:24 FAX
PAY >.. . .
TO THE
ORDER OF
• , City.pf f�er�ti�n.
FOSTER PEPPER PLLC SEATTLE, WA 98101
146774
Clfy of Renton
Invoice # Involce Date
61 S07/RENTON 6/15/2007
ClientlMatter Code
76938.20 6/15/2007 Appeal fee
DATE
Jun15 2007
AMOUNT
Q "wfr "75.00*
6/15/2007 P 729877
75.00
75.00
._............
FOSTER PEPPER PLLC SEATTLE, WA U101 `
**Mya,)e,�
City Clerk's Office Distribution List
Appeal, Seahawks Headquarter & Training Facility
LUA-06-073, SA-H, SA-M, SM, ECF
June 21, 2007
1
Renton R orter
1
City Attorney
Warren
1
City Council *
Julia Medzegian
1
EDNSP/Economic Development
Alex Pietsch
1
Fire Dept/Fire Prevention
I. David Daniels
7
Plannin Commission
Judith Subia
31
Parties of Record**
see attached list
1
PBPW/Administration
GreggZimmerman
4
PBPW/Development Services
Neil Watts
Jennifer Henning
Stacy Tucker
Elizabeth Hi jns
1
PBPW/Trans ortation Services
Peter Hahn
I
PBPW/Utilities & Tech Services
Lys Hornsb
1
LUA-06-073
0 *City Clerk's Letter & POR List only 1111
Appeal 6/15/07
AFFIDAVIT OF SERVICE BY MAILING
STATE OF WASHINGTON )
County of King )
ss.
Nancy Thompson being first duly sworn, upon oath, deposes and states:
That on the 1 lch day of June 2007, affiant deposited via the United States Mail a sealed
envelope(s) containing a decision or recommendation with postage prepaid, addressed to
the parties of record in the below entitled application or petition.
Signature:'
SUBSCRIBED AND SWORN to before me this 21day of , 2007.
Application, Petition or Case No.
iblic in and for the State of Washington
at _ f�-z, therein.
Barsher Appeal of Seahawks Building Height
LUA 06-073, SA-H, SA-M, SM, ECF
The Decision or Recommendation contains a complete list of the Parties of Record.
June 11, 2007
OFFICE OF THE HEARING EXAMINER
CITY OF RENTON
REPORT AND DECISION
APPELLANT: Larry & Esther Barsher
6940 96"' Ave SE
Mercer Island, WA 98040
Barsher Appeal of Seahawks Building Height
LUA-06-073, SA-H, SA-M, SM, ECF
PUBLIC HEARING: After reviewing the Appellant's written requests for a hearing
and examining available information on file, the Examiner
conducted a public hearing on the subject as follows:
MINUTES
The following minutes are a summary of the May 29, 2007 hearing.
The legal record is recorded on CD.
The hearing opened on Tuesday, May 29, 2007, at 8:59 a.m. in the Council Chambers on the seventh floor of the
Renton City Hall. Parties wishing to testify were affirmed by the Examiner.
The following exhibits were entered into the record.
Exhibit No. 1: Yellow file containing the original
appeal letter and site information_
Exhibit No. 2: Topographic Map of Mercer Island
Exhibit No. 3: Photograph of Seahawk's site from
Barsher property
Exhibit No. 4: Photograph of Boeing site at south end
of Lake Washington
Exhibit No. 5: Photograph of east Boeing site
Exhibit No. 6: Site Plan File LUA 06-073
Exhibit No. 7: Environmental Checklist
Exhibit No. 8: October 19, 2006 letter from the City
of Renton regarding the Seahawks Headquarters and
Training Facility, acceptance from Environmental
Review Committee
Exhibit No. 9: Original Elevations (2 sheets)
submitted with the Site Plan application
Exhibit No. 10: Hearing Examiner Decision dated
December 8, 2006
ExhibitNo 11: VA 102 —view study from Misty
Cove (2 sheets)
Parties Present:
Larry Barsher, 6940 96`" Ave SE, Mercer Island, WA 98040
Barsher Appeal of Seahawks Buiwing Height
LUA-06-037, SA-H, SA-M, SM, ECF
June 11, 2007
Page 2
Larry Warren, City Attorney, City of Renton
Roger Pearce, Foster Pepper, 1111 Third Ave, Ste. 3400, Seattle, WA 98101
Larry Barsher stated that he is a State of Washington Licensed Professional Civil Engineer and that he has lived
on Mercer Island since 1980 and enjoyed the views and vistas for 27 years. He and his wife are alanned by the
fact that the City would allow this large building to get even larger and not include in this modification some
landscaping to soften and mitigate the appearance of this structure.
He produced a topographic map of Mercer Island and surrounding areas. He pointed out where his home lies
and where the new Seahawk facility will be located. The distance from their home to the Seahawk building is
approximately 3,700 feet or s/a of a mile. He took more photographs of the Boeing plant, the width of that
building is 840-feet and the height is approximately the same as the Seahawks is proposed to be. It shows
approximately how much space the Seahawk building will actually take and the views that will be covered.
There is a crane in the first photograph, it is 120-feet long, the Seahawk building is planned to be 1 15-feet tall.
The new building will take up almost half of the hillside. A third photograph of the Boeing site shows an
apartment building that is approximately 60-feet tall.
They would not object to an approval of this increase in height provided it included the addition of some large
evergreen trees that would reach approximately the roof elevation at maturity and planted judiciously close to
the building. The trees would greatly reduce the facility's impact on those viewing the building from a distance.
This small modification would greatly benefit the people of Mercer Island and generations to come.
It seems reasonable that some large trees could be planted there. He is not asking for a total camouflage of the
entire building. There should be some attention given to this matter.
Esther Barsher, 6940 96°i Ave SE, Mercer Island, WA 98040 stated that large specimens could be used_
Planting smaller trees further from the building will not have the same softening effect as if you planted larger
trees now.
Larry Warren, City Attorney stated that there is an underlying presumption that the Barshers have a right to a
view, however, there is no such right that is recognized. Secondly their entire argument is based upon
environmental impact of this particular project, this is not a SEPA Appeal, in fact the original proposal reviewed
by the Environmental Review Committee has the height of the building between 9S-feet at the center of the field
and 120-feet altogether, which is under the elevation that is now being approved by the minor modification. The
actual building height will be approximately 113-feet rather than 11 S-fect.
This issue must focus on Code or 9-200.i on minor modifications. A four -foot increase and 120-feet is not 10%.
Take into fact that 360-feet was the width and the increase in the facade area, it is much smaller in percentage
basis so it is much less than 10%. The second factor, adding a significantly greater impact on the environment,
this does not have a significantly greater impact on the environment. This project was already reviewed by the
Environmental Review Committee, and their decision was not appealed. The third item of the criteria changes
the boundaries of the original approved plan, that does not occur at all.
Mr. Warren referred the Examiner to the Staff Report to the ERC, page 2 of 16, third paragraph from the
bottom, third line from the bottom of that paragraph.
Barsher Appeal of Seahawks Buiwing Height
LUA-06-037, SA-H, SA-M, SM, ECF
June 11, 2007
Page 3
Roger Pearce, Foster Pepper, 1111 Third Ave, Ste. 3400, Seattle, WA 98101 submitted a short hearing brief to
the Examiner. The only issues before the Examiner are ones that require minor adjustments. The only change
to the approved site plan is that the indoor practice facility is required to have a 95-foot height so that they can
plan professional football inside. It required being 7-feet higher than it was described in the Examiner's
original site plat approval. In the original application, the building was described as 120-feet high, and that was
what the DNS was based on and the City found there was no environmental impact from a building of that
height. Since that time, the building actually came down significantly in height. The Seahawks have no
incentive to overbuild, all they need is a building that looks good and that has 95-feet clear height in the center
of the field. At that time that the structure would be adequate and that the building could be 111-feet and at that
time they also moved the entire building back 62-feet to help out the view from the Misty Cove Apartments.
They have had some unexpected seismic issues that must be dealt with so the roof structure had to be beefed up
a little bit, they asked for 115-feet just to make sure they don't have to come back again in addition to this
proceeding today, they now believe that the height of the building will actually be in the range of 112-113-feet
when they get to the final building approval. The main issue today is the incremental change in the height of the
building, which is two to four feet.
There is not a significantly greater impact at 115-feet from 1 l 1-feet, in fact, from the Misty Cove building the
increase in building mass is not going to be noticeable.
They request that the Examiner uphold the City's Decision.
Elaine Wine, Football NW, 505 Fifth Avenue S., Ste, 900, Seattle, WA 98104 stated that she is a licensed
architect in the State of Washington and the project manager for Football NW design and construction of this
facility.
The Indoor Practice Facility (1PF) clear height has been specified to be 95-feet at the mid -point of the practice
field_ That is the optimal height where the kickers can actually punt the ball and not interfere with any of the
roof structure. She was involved with all the land use permitting that occurred back in the fall of 2006.
The Environmental Checklist lists the approximate overall height of the building at 120-feet from the lowest
elevation. In Exhibit 8, page 12 of 16 it describes the height of the IPF building to range in height from 55-feet
to 120-feet.
The facility was originally designed using a single member structural steel roof rafter that would have
minimized the height of the IPF, which was the goal at that time. They were required to add a substantial
amount of bracing in the walls and roof, which required roof trusses. Those trusses are deeper than a single
member rafter and that caused the height of the facility to increase approximately 18-inches.
On Exhibit 10, page 8, paragraph 19 states that the office building would be located closest to the lake to take
advantage of lake views, it would be "L" shaped and wrap around the southwest corner of the larger indoor
practice field. The IPF situated on the north and east sides of the building would be up to 1 I 1-feet. And on the
next page, paragraph 22 states that the office building would be 55-feet while the practice facility will be
approximately 111-feet tall.
VA102 was a view study showing what the impact of the adjusted height would be if it reached a maximum of
115-feet. A second study showed the view from the lake shows the added impact with the additional four feet of
height added to the building. At this time the expectation is that the building height would be 113-feet.
Barsher Appeal of Seahawks Bu_._ing Height
LUA-06-037, SA-H, SA-M, SM, ECF
June 11, 2007
Page 4
There have been no site plan boundary changes, the footprint of the building has not been increased. The added
volume to the IPF is approximately 4% and with the overall site the added impact was about 3% total volume.
At 113-feet, which it is believed the building will actually be, the increase is about 2% to the overall volume to
the IPF and 1.5% increase to the entire project.
At a distance of/4 of a mile the proposed increase would not be noticeable.
The Examiner called for further testimony regarding this project. There was no one else wishing to speak, and
no further comments from staff. The hearing closed at 10:00 am.
FINDINGS, CONCLUSIONS & RECOMMENDATION
Having reviewed the record in this matter, the Examiner now makes and enters the following:
FINDINGS:
The appellants, Larry and Esther Barsher, hereinafter appellants, filed an appeal of an administrative
decision approving an increase in the height of a building allowed under a previously approved Site
Plan. The underlying proposal is for the development of the Seattle Seahawks Headquarters and
Practice Facility. The height adjustment addresses the height of the Indoor Practice Facility.
The appeal was filed in a timely manner May 8, 2007.
The appellants were parties to the original Site Plan public hearing. They were concerned about the
height of the original facility at that time.
4. The original Site Plan decision was issued on December 7, 2006. In that decision Finding 19 noted that
the height of the indoor Practice Facility would be up to 111 feet:
"The height of the indoor practice field ... would be up to 111 feet."
(Page 8, Seahawks' Headquarters and Training Facility, LUA-06-073).
Similarly at Page 9:
"The office building will be 55 feet tall while the practice facility will
be approximately 111 feet tall."
At Page 13 of the same report in Conclusion 8, the report states:
"The building complex has been designed to terrace upward from the
lake with the office building scaled to approximately 55 feet and the
more easterly element, the indoor practice fields, at I I I feet."
The ERC, the body responsible for the original environmental determination, noted in its staff report:
"The height of the 80,000 gross square foot indoor practice field, situation
on the north and east sides of the building, would be between 95 feet at the
center of the field and 120 feet."
Barsher Appeal of Seahawks Bu—ing Height
LUA-06-037, SA-H, SA-M, SM, ECE
June 11, 2007
Page 5
6. A representative of the applicant submitted a written request for an adjustment to the height of the
building on April 9, 2007. The request stated:
" 1. Maximum Building Height - 115'0" feet in lieu of 110'6" feet as
noted on figure 10.6 (Sheet A401) of the Land Use, Shoreline & Master
Plan Permit Application - Volume 1.
The requested adjustment is based on the refinements to the final structural
design and accommodates a clear inside height dimension of 95 feet as noted
in our application. The referenced height is measured to the highest point of
the roof deck from the finished floor slab."
The Director, Development Services Division, issued a decision on the requested "Minor Adjustment to
the Site Plan" on April 25, 2007. The Director approved the request. The Director noted:
"... the proposed modified height of 115 feet would result in an additional 4 feet
of building height and approximately 350,064 square feet of area.
The proposed increase in area would not result in more than a 10 percent increase
in area or scale of the development.
Although the increased height could impact views from nearby properties, the
modification would not have a substantial impact on the environment or facilities.
The requested modification would not change the boundaries of the originally
approved site plan."
The Director's decision itself states:
"Based on the analysis and recommendation of staff, I have determined the proposed
revision is within the parameters defined by the Renton Municipal Code.
Therefore, the proposed modification of the site plan is deemed to be 'minor' and
therefore, is approved ..."
The appellants in their letter did indicate that they could accept the proposed height increase if the
facade that faced their home and Mercer Island were screened with evergreen trees to soften the
appearance of the facade. The appellants provided exhibits that provide a frame of reference for the
final structure from their viewpoint (their home). These purport to show the mass of the building, how
it will affect their view of the shoreline and background hillside. They use the relatively similar facade
width and height of the Boeing complex to provide a concrete example of the scale of the proposed
complex from their distance and vantage point. There was concern by the applicant that landscaping
might affect the view from the condominiums.
9. The provisions allowing "minor adjustments" to a site plan are contained in Section 4-9-200I.
"MINOR ADJUSTMENTS TO AN APPROVED SITE DEVELOPMENT PLAN:
Minor modifications may be permitted by administrative determination. To be
considered a minor modification, the amendment must not:
Barsher Appeal of Seahawks Buiiuing Height
LUA-06-037, SA-H, SA-M, SM, ECF
June 11, 2007
Page 6
1. Involve more than a ten percent (10%) increase in area or scale of the development
in the approved site development plan; or
2. Have a significantly greater impact on the environment and facilities than the
approved plan; or
3. Change the boundaries of the originally approved plan. (Ord. 4802, 10-25-1999;
Amd. Ord. 4954, 2-1 1-2002; Ord. 5028, 11-24-2003)"
10. Section 4-8-110.E. provides the authority of the Examiner on appeal:
"APPEALS TO EXAMINER OF ADMINISTRATIVE DECISIONS AND
ENVIRONMENTAL DETERMINATIONS: (Amd. Ord. 4827, 1-24-2000)
1. Applicability and Authority:
c. Authority: To that end, the Examiner shall have all of the powers
of the office from whom the appeal is taken insofar as the decision
on the particular issue is concerned."
CONCLUSIONS;
The appellant has the burden of demonstrating that the decision of the City Official was either in error,
or was otherwise contrary to law or constitutional provisions, or was arbitrary and capricious (Section 4-
8-110(E)(7)(b). The appellants have demonstrated that the action of the City should be modified.
2. Arbitrary and capricious action has been defined as willful and unreasoning action in disregard of the
facts and circumstances. A decision, when exercised honestly and upon due consideration of the facts
and circumstances, is not arbitrary or capricious (Northern Pacific Transport Co. v Washington Utilities
and Transportation Commission, 69 Wn. 2d 472,478 (1966).
An action is likewise clearly erroneous when, although there is evidence to support it, the reviewing
body, on the entire evidence, is left with the definite and firm conviction that a mistake has been
committed. (Ancheta v Daly, 77 Wn. 2d 255, 259 (1969). An appellant body should not necessarily
substitute its judgment for the underlying agency with expertise in a matter unless appropriate.
4. In this case the original Site Plan was reviewed and approved by the Hearing Examiner. That was the
original reviewing body or "the underlying agency with expertise." The Director was then asked to
approve a minor adjustment to that Hearing Examiner approved Site Plan. The Director's decision as to
whether the adjustment was minor is correct and the appellants have not demonstrated that part of the
decision should be reversed. The increase proposed by the applicant does not exceed ten percent in area
or scale. The increase does not appear to have a greater impact on the environment and facilities than
the approved plan and it does not change the boundaries, at least, the footprint of the originally
approved plan although it does change the boundaries if one uses vertical extent as a delimiter in
boundaries.
But the plans have been changed. The appellants produced evidence showing the scale of the building
in reasonable juxtaposition to its locale and a frame of reference showing the similarly scaled Boeing
complex. While the building might have nice design elements, it is still large. The applicant has
Barsher Appeal of Seahawks Buuding Height
L.UA-06-037, SA-H, SA-M, SM, ECF
June 11, 2007
Page 7
demonstrated a willingness to provide a "green screen" to soften the view from the northerly
condominium and a softened appearance from lake Washington of this now even taller building is
reasonable. Code states:
"Minor modifications may be permitted by administrative determination."
Code does not require that minor modifications be approved. Minor modifications MAY be permitted
by administrative determination. The term "may" denotes discretionary authority. That does not mean
it must be approved. So while the Director is correct about this being a minor modification, that does
not mean it should necessarily be granted or that it should not be subject to a reasonable condition or
conditions.
The appellants have demonstrated the building's facade will increase in height and while it may not be a
monumental change, the addition of landscaping cannot help but soften that view. Significant impact is
not necessarily required to condition a project so that it blends better with its environment and provides
a reasonable "streetscape" or in this case "waterscape." The originally proposed shoreward landscaping
will not help soften the facade as well as plantings closer to the facade. While these plantings could
affect the view from the adjacent condominium complex, trees could also naturally spring up along the
boundaries of the site and alter that view and there would be no requirement to remove them.
Therefore, to the extent that the Director did not consider requiring landscaping to soften the impact of
the facade change, the Director's decision is modified. The applicant shall be required to plant
evergreen trees along the lakeshore facade of the Indoor Practice Field. The plantings should reflect a
more natural arrangement and not necessarily be the same species or evenly spaced along the facade.
Nor at maturity should the all trees necessarily reach the height of the facility. This office will defer to
the Development Services Division to determine the spacing and species but the applicant shall plant
between 12 and 24 trees of a reasonable specimen size at maturity.
DECISION:
The decision of the Director is modified and an additional condition shall be required as follows:
The applicant shall be required to plant evergreen trees along the lakeshore facade of the Indoor Practice
Field. The plantings should reflect a more natural arrangement and not necessarily be the same species
or evenly spaced along the facade. Nor at maturity should the all trees necessarily reach the height of the
facility. This office will defer to the Development Services Division to determine the spacing and
species but the applicant shall plant between 12 and 24 trees of a reasonable specimen size at maturity.
ORDERED THIS I I"' day of June 2007.
FRED J. KA
AN
HEARING EXAMINER
Barsher Appeal of Seahawks BL ing Ilei ght
LUA-06-037, SA-H, SA-M, SM, ECF
June 11, 2007
Page 8
TRANSMITTED THIS 1 l `i' day of June 2007 to the parties of record:
Larry Warren
City Attorney
City of Renton
Roger Pearce
Foster Pepper
I I I I Third Ave, Ste. 3400
Seattle, WA 98101
Lance Lopes
VP Seahawks
800 Occidental Ave S
Seattle, WA 98034
Eileen Halverson
5021 Ripley Lanc N., #302
Renton, WA 98056
Thelma Sutherland
1205 N 29"' Street
Renton, WA 98056
Steve Jansen
5021 Ripley Lane N., 4302
Renton, WA 98056
Elizabeth Higgins
Development Services
City of Renton
Elaine Wine
Football NW
505 Fifth Avenue S., Ste. 900
Seattle, WA 98104
Thomas Peterson
Socius Law Group PLLC
601 Union Street, Ste 4950
Seattle, WA 98101
Joe Burcar
3190 1600' Ave SE
Bellevue, WA 98008
Brian T. Sabey
5021 Ripley Lane N., #304
Renton, WA 98056
Ilya G. Baches
1414 N 30 Street
Renton, WA 98056
Eleanor M. Kennamer, President Aaron Belenky, President
Misty Cove Condo Assoc. Williamsburg Condo HOA
5021 Ripley Lane N., #309 1800 NE 40`h Street, Ste. H-4
Renton, WA 98056 Renton, WA 98056
Barbara Paxhia
5021 Ripley Lane N., #104
Renton, WA 98056
Dan & Jody Samson
6952 90' Ave SE
Mercer Island, WA 98040
Shelly Munkberg Richard Wagner
SECO Development Baylis Architects
1083 Lk. Washington Blvd N, Ste., 50 10801 Main Street, Ste. 110
Renton, WA 98056 Bellevue, WA 98004
Les & Denise Kiaff
6915 96`f' Ave SE
Mercer Island, WA 98040
Carl Lindstrom
6910 96"' Ave SE
Mercer Island, WA 98040
Larry & Esther Barsher
6940 96" Ave SE
Mercer Island, WA 98040
Port Quendall Company
505 Fifth Avenue S., Ste. 900
Seattle, WA 98104
Carl Hadley
Cedar Rock Consultants
19609 244`}' Avenue
Woodinville, WA 98077
Michael Cero
8300 Avalon Drive
Mercer Island, WA 98040
Jared Salstrom
5021 Ripley Lane N., #213
Renton, WA 98056
Steve Gregerson
5021 Ripley Lane N., #302
Renton, WA 98056
Tom Fhrlichman
Socius Law Group
601 Union Street, Ste. 4950
Seattle, WA 98101
Dwight & Christine Schaeffer
6958 W" Ave SE
Mercer Island, WA 98040
Jeffrey Taraday
Foster Pepper
11 i I Third Ave, 34" Floor
Seattle, WA 98101.
Howard & Sue Robboy
6944 96"' Ave SE
Mercer Island, WA 98040
Steve & Deanna Marshall Hal & Gerry Fardal Dr. and Mrs. Robert Dietz
6915 961h Ave SE 6915 960' Ave SE 7906 E Mercer Way
Mercer Island, WA 98040 Mercer Island, WA 98040 Mercer Island, WA 98040
Barsher Appeal of Seahawks Bk ing Height
LUA-06-037, SA-H, SA-M, SM, ECF
June 11, 2007
Page 9
TRANSMITTED THIS I I"' day of June 2007 to the following:
Mayor Kathy Keolker
Jay Covington, Chief Administrative Officer
Julia Medzegian, Council Liaison
Gregg Zimmerman, PBPW Administrator
Alex Pietsch, Economic Development
Jennifer Henning, Development Services
Stacy Tucker, Development Services
King County Journal
Larry Rude, Fire Marshal
Larry Meckling, Building Official
Planning Commission
Transportation Division
Utilities Division
Neil Watts, Development Services
Janet Conklin, Development Services
Pursuant to Title IV, Chapter S, Section 100Gof the City's Code, request for reconsideration must he filed in
writing on or before 5:00 p.m., June 25, 2007. Any aggrieved person feeling that the decision of the
Examiner is ambiguous or based on erroneous procedure, errors of law or fact, error in judgment, or the
discovery of new evidence which could not be reasonably available at the prior hearing may make a written
request for a review by the Examiner within fourteen (14) days from the date of the Examiner's decision. This
request shall set forth the specific ambiguities or errors discovered by such appellant, and the Examiner may,
after review of the record, take further action as he deems proper.
An appeal to the City Council is governed by "Title 1V, Chapter 8, Section 1 10, which requires that such appeal
be filed with the City Clerk, accompanying a filing fee of $75.00 and meeting other specified requirements.
Copies of this ordinance are available for inspection or purchase in the Finance Department, first floor of City
Ball. An appeal must be filed in writing on„or before 5.00 p.m., June 25, 2007.
If the Examiner's Recommendation or Decision contains the requirement for Restrictive Covenants, the
executed Covenants will be required prior to approval by City Council or final processing of the file. You
may contact this office for information on formatting covenants.
The Appearance of Fairness Doctrine provides that no ex parte (private one-on-one) communications may occur
concerning pending land use decisions_ This means that parties to a land use decision may not communicate in
private with any decision -maker concerning the proposal. Decision -makers in the land use process include both
the Hearing Examiner and members of the City Council.
All communications concerning the proposal must be made in public. This public communication permits all
interested parties to know the contents of the communication and would allow them to openly rebut the
evidence. Any violation of this doctrine would result in the invalidation of the request by the Court.
The Doctrine applies not only to the initial public hearing but to all Requests for Reconsideration as well as
Appeals to the City Council.
s
N �.
1 /` .41` ! ,P' ' � 1 1 � � a,� � _ �; �t�•' ', I ! b94t7 °fG�`b�•�•� � � �� ,�y �. ' � r
{ �' • _ ,v.
South Point `• M `
1` i ennydale
Coleman Roinfl
179
i i 29.0'
�.. / 1 7IY CdVio►� _ � � _ i
PARK
79
�`ram � � _"'.k• ��� � -� � — - ~ � i" �r{r+l 1��Y� �'• r ��
st
r
f
!°df'r t'tr .�: -'1" �` _ .L. _ - �� k•� Hµ
+1
CRAWRC7RD
9 April 2007
Mr. Neil R. Watts
Director: Development Services Division
City of Renton
Renton City Hall - 6th Floor
1055 South Grady Way
Renton, WA 98055
Regarding: SEATTLE SEAHAWKS HEADQUARTERS & PRACTICE FACILITY
Renton, WA
Project No. KC005-031 File No.IPF1
Subject: MINOR ADJUSTMENT TO SITE PLAN REQUEST
Dear Neil
We have been informed by Bayley Construction that the engineer of record for the Indoor
Practice Facility (IPF), Mr. H. David Jeter PE SE of HCI Steel Building System Inc. has
requested a minor adjustment to the approved Site Plan consisting of:
1. Maximum Building Height — 115'-0" feet in lieu of 110'-6" feet as noted on Figure 10.6
(Sheet A401) of the Land Use, Shoreline & Master Plant Permit Application — Volume 1.
The requested adjustment is based on refinements to the final structural design and
accommodates a clear inside height dimension of 95 feet as noted in our application. The
referenced height is measured to the highest point of the roof deck from the finished floor slab.
Crawford Architects and the applicants — Port Quendall Company and Football Northwest LLC
concur with this request. Please contact me at this office if you have any questions or require
further information.
Sincerely,
CRAWFORD ARCHITECTS LLC
David M. Murphy
Partner
Page 1
9 April 2007
Crawford Architects
1901 Main Street — Suite 200
Kansas City, MO 64108
816 421 2640 telephone
816 421 2650 facsimile
david.mu rphyC@crawford-usa.com
Enclosure: None
Copies: Jim Levin — Bayley Construction (for distribution)
Lance Lopes — Seattle Seahawks
Ray Colliver - Vulcan
Tom Chiado — Vulcan
Elaine Wine — Vulcan
Roger Pearce — Foster Pepper
Brian Dickson — MKA Structural
Filer
Page 2
9 April 2007
Crawford Architects
1901 Main Street — Suite 200
Kansas City, MO 64108
816 421 2640 telephone
816 421 2650 facsimile
david. murphy@crawford-usa.corn
W
'm
�rn
T
0 Z
3 n o C
c T
j o A
n n o
o s
< Col
o
T (n
T y y Ci
ov
C _ z i m 1•'•`�
C li, -•
Il•l •...;. II c O
O
O
4
y
y.
T
I. ti
f
i
r
e I _
Seahawks Headquarters &
Training Facility;
m� FOOTBALL NORTHWEST LLC ci#
RENTON, WASHINGTON In
]
.
\\
;
-
-
,
�.
�2
�:.
t�-
{�
�/��\
�
-
\!\'.
[�
-
.
'
-
�
SeahwsHeadquarters &
.!Training
Facility
k
!
\\ © \
FOOTBALL mr_e!L
Rm»,_aINGn,
§ •
E
m
Cl)
-f
m
r-
m
0
z
I
a
T
L M.
W I i irmliffm
m
Cl)
--I
m
7
m
jj
•
North and South Baxter �Il:e Development Plan
New Seattle Seahawks Headquarters & Training Facility
Renton, WA
DEVELOPMENT SERVICES DIVISION
ENVIRONMENTAL CHECKLIST
City of Renton Development Services Division
1055 South Grady Way, Renton, WA 98055
Phone: 425-430-7200 Fax, 425-430-7231
A. BACKGROUND
1. Name of proposed project, if applicable:
North and South Baxter Site Development Plan
2. Name of applicant:
Port Quendall Company and Football Northwest LLC
3. Address and phone number of applicant and contact person:
Mr. Ray Colliver
Senior Director
505 Fifth Avenue South
Suite 900
Seattle, WA 98104
206 342 2000 telephone
206 342 3554 facsimile
rayc9vulcan.com email
4. Date checklist prepared:
24 May 2006
Revised 6 September 2006
4. Agency requesting checklist:
City of Renton, Washington
6. Proposed timing or schedule (including phasing, if applicable):
a. Design and Documentation March 2006 to May 2007
b. Final Remediation and Cap on Overall Site* November 2006 until May 2007
c. Final Remediation and Cap under building footprint* December 2006 until June 2007
d. Building Construction above the Cap January 2007 until July 2008
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 1
North and South Baxter OlLe Development Plan
New Seattle Seahawks Headquarters & Training Facility
Renton, WA
*Pursuant to Department of Ecology Approval as lead agency (Items b and c).
The project is required to open in June of 2008.
7. Do you have any plans for future additions, expansion, or further activity related to or
connected with this proposal? If yes, explain.
No plans for future additions, expansion or further activity are anticipated with the proposal.
8. List any environmental information you know about that has been prepared, or will be
prepared, directly related to this proposal.
The following information has been prepared:
Past Studies
In the past, several investigations of potential contamination at the Baxter Property have
been performed, generating a large volume of chemical data and visual observations of
soil quality. Comprehensive summaries of project area historical information, regulatory
records and environmental data were provided in the Draft Remedial Investigation Report
(Woodward Clyde, 1990). Those data were incorporated with data collected by
ThermoRetec during the previous due diligence process and during 1998 and 2000 to
develop an interpretation of site conditions currently present. These data were presented
in the South Property Feasibility Study ([FS]; ThermoRetec, 2000) and the North
Property Feasibility Study and Cleanup Action Plan ([FS/CAP]; ThermoRetec, 2000).
SEPA was completed in 2000 for the site representing compliance with the State
Environmental Policy Act ("SEPA") environmental review requirements for the proposed
remedial actions to be performed as stated in the Consent Decree. Ecology has been
established as the agency lead pursuant to SEPA for all cleanup actions under the
consent decree. Remedial actions occurred in 2002 and 2004 at the South Baxter
property. Baxter Cove Wetland Monitoring Reports have been prepared in 2005 and
2006.
In 1989, the City of Renton began work on development of a Comprehensive Plan
affecting the Property and surrounding properties. Between 1990 and 1993, extensive
public hearings and meetings were held, and notification was provided to impacted
property owners and the general public concerning Comprehensive Plan land use
alternatives and proposed Renton Zoning Code amendments.
In addition, in 1996 and 1997, an Environmental Impact Statement ("EIS") scoping
process was conducted in association with proposed development of the Facility. This
EIS scoping process involved significant public participation, including mailings, formal
comment, and public meetings. The proposed development was never pursued.
In preparing this submittal, the following reports were referenced:
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 2
North and South Baxter �lte Development Plan
New Seattle Seahawks Headquarters & Training Facility
Renton, WA
OTHER REFERENCES — Past Studies
City,of Renton Gypsy Sub Basin Analysis Technical Memorandum No. 2 April 1995
City of Renton Gyipsy Sub Basin Drainage Improvements Design Memorandum Se tember
1997
City of Renton Zoning Map, updated 10 January 2006
Washington Department of Transportation, 1-405 Renton to Bellevue Proiect Environmental
Assessment, March 2006
Washington State Department of Ecology —Consent Decree #00-2-11778-7KNT and #00-2-
11779-5KNT.
9. Do you know whether applications are pending for governmental approvals of other
proposals directly affecting the property covered by your proposal? If yes, explain.
Remediation and mitigation has been substantially completed on the South Baxter property as
documented in the Completion Report (2005) and approved by the Department of Ecology by
the April 10, 2006 Partial Certificate of Completion. Capping of residual soil impacts to
prevent direct contact to humans, institutional controls to insure cap integrity and future
groundwater monitoring remain to be completed pursuant to the Consent Decrees and
Cleanup Action Plans which were previously subject to a SEPA review and a Mitigated
Determination of Significance issued by the Department of Ecology in 2000.
10. List any governmental approvals or permits that will be needed for your proposal, if
known.
a. City of Renton Master Plan approval
b. City of Renton Shoreline Substantial Development Permit
c. City of Renton Critical Areas Review
d. City of Renton SEPA Review
Remaining cleanup (capping and institutional controls) will be performed under Consent
Decrees between the Department of Ecology and Port Quendall Company as part of
initial work on the properties. As a result, certain state and local permits are preempted
pursuant to the Model Toxics Control Act, although substantive requirements of those
statutes and regulations will be satisfied by the cleanup approval.
11. Give brief, complete description of your proposal, including the proposed uses and the
size of the project and site.
Proposed Uses
Proposed uses include administrative offices for professional football franchise and accessory
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 3
Noah and South Baxter ::)Ite Development Plan
New Seattle Seahawks Headquarters & Training Facility
Renton, WA
training and practice facilities. Potential tenant space may include accessory retail and office
uses.
Size of the Site
The Project site is approximately 19.6 acres (853,776 square feet) in size.
Facility Features
• A permanent indoor practice field structure
• Approximately 215,000 gross square feet of enclosed space will be constructed including
the indoor practice field
• Approximately 50,000 gross square feet of training facilities will be provided.
• Approximately 15,000 gross square feet of player meeting space will be provided.
• Approximately 48,000 gross square feet of administrative offices will be provided.
• Approximately 15,000 gross square feet of technical and support areas will be provided.
• Approximately 6,000 gross square feet of freestanding maintenance/ storage building.
Training Camp
The new facility will accommodate annual training camp on site. Training camp parking
demand in excess of normal operations will be accommodated off -site. The Transportation
Impact Analysis from TRANSPO Group, Inc., discusses parking and transportation issues in
greater detail. Please refer to Section 12.
On Site Parking
275 to 315 Cars (final count to be verified)
Setbacks & Wetlands
A fifty foot setback from Lake Washington for structures will be provided consistent with
Renton development regulations and the Renton Shoreline Master Program. Existing
wetlands that are constructed on South Baxter with 50 foot buffer pursuant to Consent
Decree, CAP and mitigation analysis in 2000 will be maintained.
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 4
North and South Baxter olte Development Plan
New Seattle Seahawks Headquarters & Training Facility
Renton, WA
' 12. Location of the proposal. Give sufficient information for a person to understand the
precise location of your proposed project, including a street address, if any, and
section, township, and range if known. If a proposal would occur over a range of area,
provide the range or boundaries of the site(s). Provide a legal description, site plan,
vicinity map, and topographic map, if reasonably available. While you should submit
any plans required by the agency, you are not required to duplicate maps or detailed
plans submitted with any permit applications related to this checklist.
Location
As indicated by the attached site plans, the Baxter properties are located at 5015 Lake
Washington Boulevard North, in the northeastern portion of Renton, Washington. They
are located in the Southwest'/a of Section 29, Township 24 North, Range 5 East, King
County. The Baxter site occupies approximately 19.6 acres adjacent to Lake
Washington, three miles south of the junction of Interstate Highways 405 and 90, and
has approximately 1,887 feet of shoreline. The legal descriptions of the North and South
properties are provided below.
Access
Interstate 405 provides regional access to the site. Other vehicular access is also provided by
Lincoln Avenue from the east, Ripley Avenue from the north and Lake Washington Avenue SE
from the northeast via 441h Street interchange.
Legal Description
BAXTER SOUTH PROPERTY
That portion of the "South Parcel," as shown on Survey recorded under King County
Recording No. 20000209900005, Records of King County, Washington, lying Southerly
of the following described line: Beginning at the most Northerly corner of said "North
Parcel"; Thence S 45 26'31" W along the Northwesterly fine thereof a distance of 912.56
feet to the True Point of Beginning of the herein described line; Thence S 58 13'14" E a
distance of 918.82 feet to a point on the Southeasterly line of said "North Parcel," distant
thereon 267.64 feet Northerly of the angle point in said Southeasterly line and the
terminus of the said line.
BAXTER NORTH PROPERTY
That portion of the "North Parcel", as shown on Survey recorded under King County
Recording No. 20000209900005, Records of King County, Washington, lying Northerly of
the following described line: Beginning at the most Northerly corner of said "North
Parcel"; Thence S 45 26'31" W along the Northwesterly line thereof a distance of 912.56
feet to the True Point of Beginning of the herein described line; Thence S 58 13'14" E a
distance of 918.82 feet to a point on the Southeasterly line of said "North Parcel", distant
thereon 267.64 feet Northerly of the angle point in said Southeasterly line and the
terminus of the said line.
Please refer to Section 1 for detailed Title Report.
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 5
North and South Baxter cite Development Plan
New Seattle Seahawks Headquarters & Training Facility
Renton, WA
Location and Vicinity Map
Please refer to the attached location and vicinity map for additional detail.
Topographic Map
Please refer to the attached topographic map in Section 8 (Figure 8.1 and Figure 8.2) for
additional detail regarding existing conditions.
B. ENVIRONMENTAL ELEMENTS
1. EARTH
a. General description of the site (circle one); flat, rolling, hilly, steep slopes,
mountainous, or other.
The site is located on the shore of Lake Washington and is generally flat.
b. What is the steepest slope on the site (approximate percent slope?)
The slope of the site is generally 1 % to 2% with a maximum slope of approximately 5%.
c. What general types of soils are found on the site (for example, clay, sand, gravel,
peat, muck)? If you know the classification of agricultural soils, specify them and
note any prime farmland.
The Baxter Property (both North and South) is located on the eastern shore of Lake
Washington on the former delta of May Creek, which is an under fit stream remaining
within the glacial Kennydale Channel. The subsurface geology of the site is a
combination of fluvial deltaic, lacustrine near shore and constructed fill deposits
overlying Pleistocene glacial sediments and Eocene volcanic and sedimentary
bedrock. The shallow geology at the project area has been heavily influenced by
recent human activity, beginning with construction of the Lake Washington Ship
Canal in 1916. This lowered the level of Lake Washington approximately 8 feet, and
exposed a significant area of the May and Gypsy Creek Sub Basin Deltas which had
formerly been submerged.
Subsequent filling of low-lying areas was performed in 1955 to extend the shoreline
and raise the grade for construction of industrial facilities at the Baxter North and
South Properties. The source of the fill material is not well documented. The
combination of naturally complex deltaic deposits with numerous dredging and
backfiiling episodes has resulted in a highly heterogeneous subsurface mixture of
clay, silt, peat, sand, gravel and cobbles, as well as discarded debris and abandoned
subsurface structures from former site activities.
Geology and subsurface conditions for the project area were determined based on
the geologic field reconnaissance, current and previous borings and published
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 6
North and South Baxter cite Development Plan
New Seattle Seahawks Headquarters & Training Facility
Renton, WA
geologic data. Based on field explorations, the depth to bedrock is varied with
depths from 17.5 feet to depths greater than 50 feet.
In general, the subsurface soils under the building footprint and fields consist of either
fill material, soft estuarine deposits, loose alluvial soils and underlying very dense
bedrock, or stiff to very stiff silt and clay and medium dense sand overlying bedrock.
The fill is generally 2 to 3 feet thick, while the soft estuarine and loose alluvial soils
extend to depths ranging from 17 to 38 feet below the existing ground surface under
most of the building footprint. The alluvial and estuarine deposits contain layers of
loose sand that are susceptible to liquefaction, as well as layers of highly
compressible peat. The bedrock consists of highly weathered Andesite and is a
competent bearing material for building foundations.
The professional geotechnical report submitted in conjunction with this Environmental
Checklist provides additional detail, including detail regarding constructability
concerns for larger structures on the south portion of the site. Please refer to Volume
2, Appendix 2 of this application for additional information.
d. Are there surface indications or history of unstable soils in the immediate vicinity?
If so, describe.
Recent subsurface exploration in 2006 included 6 borings and 29 backhoe test
excavations.
Liquefaction and settlement were identified as potential concerns. The upper 50 to
60 feet of soil within the May Creek delta are loose and potentially susceptible to
liquefaction during a strong earthquake. In addition, consolidation of near -surface
peats and clays from placement of the environmental cap fill upon this material may
result in minor surface settlement.
Please refer to Volume 2, Appendix 2 of this application for additional information.
e. Describe the purpose, type, and approximate quantities of any filling or grading
proposed. Indicate source of fill.
Filling and grading will proceed pursuant to the Consent Decrees and Cleanup Action
Plans, and subject to review and approval by the Department of Ecology. Some cleanup
work and associated grading have been performed and documented in the Completion
Report (2005) and approved by the Department of Ecology by the April 10, 2006 Partial
Certificate of Completion.
f. Could erosion occur as a result of clearing, construction, or use? If so, generally
describe.
Final capping of site will be conducted to complete remediation and cleanup activities
in accordance with the Consent Decree. As a result erosion could occur but is not
likely due to the shallow grade of the site.
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 7
Noah and South Baxter �Ite Development Plan
New Seattle Seahawks Headquarters & Training Facility
Renton, WA
Please refer to Sections 5 and 6 for additional detail regarding TESC Plan.
g. About what percent of the site will be covered with impervious surfaces after
project construction (for example, asphalt or buildings)?
Approximately 40% of the site will be covered by impervious materials including buildings,
plazas, surface parking and driveways.
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if
any:
Erosion will be controlled by maintaining a shallow grade to the site. Storm water will
be managed consistent with best management practices to prevent any adverse
effects from erosion.
2. AIR
a. What types of emissions to the air would result from the proposal (i.e., dust,
automobile, odors, industrial wood smoke) during construction and when the
project is completed? If any, generally describe and give approximate quantities if
known.
Dust may be generated during construction activities_ On -site construction
equipment and hauling vehicles will generate emissions from internal combustion
engines.
b. Are there any off -site sources of emission or odor that may affect your proposal? If
so, generally describe.
No, there are no off -site sources of emission or odor that will affect the new facility.
c. Proposed measures to reduce or control emissions or other impacts to air, if any:
Dust will be suppressed by spraying water, as necessary, during construction. Stockpiles
will be covered to the extent practicable to further minimize dust during construction.
3. WATER
a. Surface Water:
1) Is there any surface water body on or in the immediate vicinity of the site
(including year-round and seasonal streams, saltwater, lakes, ponds,
wetlands)? If yes, describe type and provide names. If appropriate, state
what stream or river it flows into.
The project area includes approximately 1,887 feet of Lake Washington
shoreline. 250 feet of shoreline is adjacent to the Baxter Cove inlet and wetland
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 8
North and South Baxter cite Development Plan
New Seattle Seahawks Headquarters & Training Facility
Renton, WA
which is not being altered. The current shoreline characteristics range from
gently sloping vegetated shorelines to vertical exposed dirt banks, with a minor
portion of bulkhead. As part of cleanup activities, a 0.46-acre wetland and a 50-
foot vegetated buffer was restored along the South Baxter shoreline. In
addition, the Gypsy Sub Basin drainage is located on the North Property; this
system conveys storm water from I-405 and the interchange to Lake
Washington. A minor portion of this drainage is exposed while most is piped.
The Ordinary High Water (OHW) is approximately 18.8 feet (NAVD88) or 15.2
feet (NGVD29).
2) Will the project require any work over, in, or adjacent to (within 200 feet) the
described waters? If yes, please describe and attach available plans.
Yes. The following work efforts are anticipated:
a. Soil cover placement will occur within 200 feet of the shoreline on the North and
South Properties consistent with the Department of Ecology Consent Decree
requirements.
b. Construction of Headquarters Facility
c. Construction of natural grass Practice Fields
d. Shoreline improvements within 50 foot setback per statute including riparian plant
zone.
e. Construction of retaining walls and driveways.
f. Capping the site pursuant to Ecology regulations will require covering the short
stretch of Gypsy Sub Basin that is not piped. Mitigation for any lost functions will
be provided pursuant to Ecology capping approval.
3) Estimate the amount of fill and dredge material that would be placed in or
removed from surface water or wetlands and indicate the area of the site that
would be affected. Indicate the source of fill material.
No fill or dredge will be placed in or removed from surface water or wetlands.
4) Will the proposal require surface water withdrawals or diversions? Give general
description, purpose, and approximate quantities if known.
5) Does the proposal lie within a 100-year flood plain? If so, note location on the
site plan.
iri7
6) Does the proposal involve any discharges of waste materials to surface waters?
If so, describe the type of waste and anticipated volume of discharge.
There will be no discharge of waste material into surface waters.
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 9
North and South Baxter OlLe Development Plan
New Seattle Seahawks Headquarters & Training Facility
Menton, WA
b. Ground Water:
1) Will ground water be withdrawn, or will water be discharged to ground water?
Give general description, purpose, and approximate quantities if known.
No
2) Describe waste material that will be discharged into the ground from
septic tanks or other sources, if any (for example: Domestic sewage;
industrial, containing the following chemicals...; agricultural; etc.).
Describe the general size of the system, the number of such
systems, the number of houses to be served (if applicable), or the
number of animals or humans the system(s) are expected to serve.
There will be no discharge of waste material into the ground from septic
tanks or other sources.
c. Water Runoff (including storm water):
1) Describe the source of runoff (including storm water) and method of collection
and disposal, if any (include quantities, if known). Where will this water flow?
Will this water flow into other waters, If so, describe?
Storm water is the only source of runoff at the site. Stormwater will be
collected and managed in accordance with applicable regulations and
best management practices. Some storm water will infiltrate or evaporate
but most will drain to Lake Washington after proper treatment.
2) Could waste material enter ground or surface waters? If so, generally describe.
No.
d. Proposed measures to reduce or control surface, ground, and runoff water impacts,
if any:
Storm water runoff from impervious surfaces subject to vehicular use will be treated
prior to release. Best construction management practices will be in -place to prevent
erosion and sedimentation impacts to surface water. Previous cleanup has improved
ground water quality at the site. Final storm water controls will be designed to
applicable Ecology and/or City of Renton storm water management requirements.
4. PLANTS.
a. Check or circle types of vegetation found on the site:
1) X deciduous tree: alder, maple, aspen, other
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 10
North and South Baxter OlLe Development Plan
New Seattle Seahawks Headquarters & Training Facility
Renton, WA
j a. Including: Red alder saplings, sapling and seedling sized black
cottonwood, red -osier dogwood, sitka willow, Pacific Madrone, Pacific
willow
2) _X evergreen tree: fir, cedar, pine other
a. Including in restored wetland and buffer area: Douglas fir, Sitka spruce,
western red cedar
3) X shrubs
a. Himalayan blackberry, Scotch broom, willow
b. Restored wetland and buffer area: willows, snowberry, nootka rose, black
twinberry, salmon berry, vine maple
4) X grass
a. Non-native grasses and soft rush , bentgrass, red fescue, rye grass, white
clover
5) pasture
6) crop or grain
7) X wet soil plants: cattail, buttercup, Ibu (rush, skunk cabbage, other: spit ru_ h
iris,flag canary grass, small fruited bulrush, slough -sedge
8) water plants: water lily, eel grass, milfoil, other
9) other types of vegetation
Please refer to the Stream and rake Study in Section 7 for additional habitat data.
b. What kind and amount of vegetation will be removed or altered?
A great deal of pre-existing vegetation was removed during cleanup activities as
prescribed in the 2000 SE=PA. The North and South Properties are largely devoid of
vegetation -- approximately 10% of the property contains trees/brush. Almost all
vegetation on the South Property will be removed to facilitate final cleanup and capping
activities; however, no native vegetation in the restored wetland will be removed. Most
vegetation, including grasses, invasive shrubs (Himalayan blackberry and Scotch broom),
and trees (sapling red alder, willow, and cottonwood) on the North Property will be
removed prior to placement of the soil cover.
c. List threatened or endangered species known to be on or near the site.
To the best of our knowledge, there are no threatened or endangered plant species known
to be on or near the site.
d. Proposed landscaping, use of native plants, or other measures to preserve or
enhance vegetation on the site, if any:
Previous mitigation for wetland removal included creation of 0.46-acres of enhanced,
forested wetland. Previous planting in this wetland and the any new planting in the
associated 50-foot buffer will be maintained with native vegetation as described in the
Mitigation Analysis Memorandum.
If removed due to construction, existing vegetation along the shoreline, whether invasive
or native species, will be replaced per the City of Renton Critical Areas Ordinance and
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 11
North and South Baxter cite Development Plan
,New Seattle Seahawks Headquarters & Training Facility
Renton, WA
associated Shoreline Master Program. Mature native trees immediately adjacent to the
shoreline (outside of the limit of grading) will be preserved where possible. All invasive
shrubs along the shoreline will be removed and replaced with native shrub species as
indicated in the current drawings. The proposed vegetation for this area will consist of
native riparian species found in the King County Native Plant Guide and the King County,
Washington — Surface Water Design Manual. Existing concrete and pavement debris that
currently exists along the water's edge will be removed and replaced with large woody
debris such as root wads and large trunk sections. Preserving mature trees, removing
invasive species, planting native species, removing shoreline debris, and providing large
woody debris are all actions that will provide enhanced functional habitat compared to pre -
development conditions along the shoreline_
5. ANIMALS
a. Circle or underline any birds and animals which have been observed on or near the
site or are known to be on or near the site:
1) Birds: hawk, heron, eagle, songbirds, other
a. Red -winged blackbird, snipe, mallards, Canada geese, osprey
2) Mammals: deer, bear, elk, beaver, other
3) Fish: bass, salmon, trout, herring, shellfish, other
a. Lake Washington contains Chinook, Coho, and sockeye salmon, steelhead,
cutthroat trout, bull trout, kokanee salmon, speckled dace, three -spine
stickleback, northern squawfish, yellow perch, black crappie, largemouth
bass, smallmouth bass, mountain whitefish, large scale sucker, longfin smelt,
^� prickly sculpin — See Mitigation Analysis Memorandum (AES, 2000).
b. Crayfish, freshwater shrimp, freshwater clams — See Mitigation Analysis
Memorandum (AES, 2000).
c. ALSO: Turtles (painted and slider)
Please refer to the Stream and Lake Study in Section 7 for additional habitat data.
b. List any threatened or endangered species known to be on or near the site.
Chinook salmon, bull trout, bald eagle
c. Is the site part of a migration route? if so, explain
Adult Chinook Salmon in Lake Washington migrate past the site on their way to the
Cedar River each summer. Juvenile Chinook pass the site on their way back to
Puget Sound, and may spend some time rearing in the site vicinity. Sockeye
juveniles rear in Lake Washington and may utilize the shoreline and offshore habitat
along the project for rearing.
d. Proposed measures to preserve or enhance wildlife, if any:
None
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 12
North and South Baxter cite Development Plan
New Seattle Seahawks Headquarters & Training Facility
Renton, WA
6. ENERGY AND NATURAL RESOURCES
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to
meet the completed project's energy needs? Describe whether it will be used for
heating, manufacturing, etc.
Electricity will likely be used for cooling. Natural gas will be used for cooking and
potentially heating. During final capping and construction, the only energy to be used
is diesel to operate construction equipment. No manufacturing will be conducted on
site.
No. The project will not affect potential use of solar energy by adjacent properties.
c. What kinds of energy conservation features are included in the plans of this
proposal? List other proposed measures to reduce or control energy impacts, if
any:
7. ENVIRONMENTAL HEALTH
a. Are there any environmental health hazards, including exposure to toxic chemicals,
risk of fire and explosion, spill, or hazardous waste that could occur as a result of
this proposal? If so, describe.
The South Baxter remediation will restore a contaminated, abandoned
industrial/manufacturing site to allow project redevelopment. Adherence to
institutional controls will minimize the potential for releases during development
construction and thereafter. Where warranted, a site -specific health and safety plan
will be prepared and used to limit worker exposure to hazards on site.
1) Describe special emergency services that might be required.
The site -specific health and safety plan will include emergency contacts and procedures.
2) Proposed measures to reduce or control environmental health hazards, if any:
Adherence to institutional controls will minimize the potential for releases during
development construction and thereafter. Where warranted, a site -specific health
and safety plan will be prepared and used to limit worker exposure to hazards on
site.
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 13
North and South Baxter bite Development Plan
New Seattle Seahawks Headquarters & Training Facility
Renton, WA
' b. Noise
1) What types of noise exist in the area which may affect your project (for example:
traffic, equipment, operation, other)?
There are no noises in the area that occur on a regular basis that will adversely
impact the project. Interstate 405 is located near the site, although traffic noise is
not expected to adversely affect the project. There is periodic railroad traffic on
the adjacent rail line.
2) What types and levels of noise would be created by or associated with the
project on a short-term or a long-term basis (for example: traffic, construction,
operation, other)?
During construction, there will be noise from construction equipment that will have
minimal impact to adjacent uses. impact -type noises will be limited and will occur
during restricted hours to minimize any potential adverse impacts to adjacent uses.
Indicate what hours noise would come from the site.
These noises will occur during daylight hours and will vary seasonally. Once the
building is enclosed, these noises will be contained within the enclosed building.
Construction is anticipated to take approximately 18 months with approximately 6
months of exterior noise possible. Hours of construction operation will likely be 7:00
AM-5:00 PM, 5 days a week.
Based on project needs, weekend work may be required to keep the project on
schedule to meet occupancy dates. If this measure is necessary, adjoining property
owners will be notified in advance.
3) Proposed measures to reduce or control noise impacts, if any:
Any adverse noise impacts will be minimal and will likely be lower in frequency to
the adjacent Interstate 405 and adjacent railroad. Exterior construction will be
limited to daylight hours as permitted by the City of Renton. Contact with
adjacent neighbors who may be adversely impacted will be made and information
provided when loud noises, if any, will occur. The applicant is evaluating a
request for restrictions on horn operation by the railroad at adjacent crossings.
8. LAND AND SHORELINE USE
a. What is the current use of the site and adjacent properties?
Current Use of the North Baxter Site: Vacant
Current Use of the South Baxter Site: Vacant
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 14
North and South Baxter bite Development Plan
New Seattle Seahawks Headquarters & Training Facility
Renton, WA
At the Baxter Property, wood treating operations ceased in 1981. Adjacent properties
include:
• Quendall Terminals, a former refining facility that is currently used
for log sorting and storage, is located to the south;
■ Barbee Mills, a former lumber mill, is located south of Quendall
Terminals;
• Pan Abode, a cedar homes manufacturing facility, is located to the
southeast;
• Lake Washington Boulevard and 1-405 are located to the east;
• Lake Washington is located to the west;
■ Condominiums and residences are located to the north.
b. Has the site been used for agriculture? If so, describe.
No, the site has not been used for agriculture in the recent past.
c. Describe any structures on the site.
Asphalt pad, a small one-story office building, and a small dock and boathouse are
located on the North Property.
d. Will any structures be demolished? If so, what?
The small one-story office building will be demolished.
e. What is the current zoning classification of the site?
Commercial/Office/Residential (COR-2)
f. What is the current comprehensive plan designation of the site?
Commercial/Office/Residential
g. If applicable, what is the current shoreline master program designation of the site?
Urban
h. Has any part of the site been classified as an "environmentally sensitive" area? If
so, specify.
L Approximately how many people would reside or work in the completed project?
Daily on -site personnel - approximately 200 people on a typical work day.
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 15
North and South Baxter ,.,Ite Development Plan
New Seattle Seahawks Headquarters & Training Facility
Renton, WA
j. Approximately how many people would the completed project displace?
None
k. Proposed measures to avoid or reduce displacement impacts, if any:
Not Applicable
I. Proposed measures to ensure that the proposal is compatible with existing and
projected land uses and plans, if any:
Adjacent Use to the North: Landscape buffers and potential fencing will be provided to
buffer the project from adjacent residential uses
Adjacent Use to the South: Landscape buffers and fencing will be provided to provide
necessary visual separation between the project and adjacent
fogging operation and storage and remediation activity.
9. HOUSING
a. Approximately how many units would be provided, if any? Indicate whether high,
middle, or low-income housing.
No housing will be provided.
b. Approximately how many units, if any, would be eliminated? Indicate whether high,
middle, or low-income housing.
No housing will be eliminated.
c. Proposed measures to reduce or control housing impacts, if any:
Not Applicable.
10. AESTHETICS
a. What is the tallest height of any proposed structure(s), not including antennas; what
is the principal exterior building material(s) proposed.
The bulk of the building is approximately 52 to 55 feet in height. The indoor practice
facility is approximately 120 feet in height from its lowest elevation.
b. What views in the immediate vicinity would be altered or obstructed?
Views from the lake will be altered because the site is currently vacant. Views to the lake
from adjacent uses located to the north and south should not be adversely affected_
Views to the lake from structures located to the east, across Interstate 405 may be altered
above existing tree lines. In this instance, approximately 30 to 40 feet of view above
existing trees could be obstructed by the highest building masses. Visual simulations
showing the view impact on nearby residential properties are being provided to the City of
Renton in conjunction with the submittal of this Environmental Checklist.
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 16
North and South Baxter cite Development Plan
New Seattle Seahawks Headquarters & Training Facility
Renton, WA
The design of the facility has maintained view corridors to Lake Washington from adjacent
properties. The bulk of the building on site has been sited furthest from the shoreline to
mitigate visual impacts to the condos located to the north. The majority of the site has no
structures above grade, thus preserving views to the lake. As detailed design proceeds,
these view corridors will be developed further.
c. Proposed measures to reduce or control aesthetic impacts, if any:
Traditional architectural devices to reduce the apparent scale and mass of the project are
being explored including.
1. horizontal expression lines at changes of materials and fenestration
2. roof treatments
3. fenestration and glazing systems
4. Setbacks of building mass from the shoreline
5. Maintaining view corridors to Lake Washington.
At the lakefront, the office components are placed in front of high mass elements
associated with indoor, practice facility in order to minimize view impacts from neighboring
properties. This approach occurs at the south fagade as well. To the north, landscaping
will be incorporated at the building perimeter as well as the property line to buffer the
facility from the adjacent residential uses. The majority of the site will have little or no
structure above grade, which will effectively preserve a view corridor to Lake Washington
over the majority of the site.
The building has been set back from the north property line, and the higher element of the
building has been located on the furthest landward part of the building, in order to mitigate
view impacts from the residential use to the north. Significant view impacts are not
anticipated from that site. The building has been sited to take advantage of the most
stable soils and to minimize deep foundations.
The south portion of the site is the area containing the soils of most environmental
concern, and the applicant does not wish to disturb the Ecology -approved cap with
foundation elements on that portion of the site. And functionally, the south portion of the
site is further from the site entries and other structures, so it is more suitable for the
training field elements of the proposed facility.
11. LIGHT AND GLARE
a. What type of light or glare will the proposal produce? What time of day would it
mainly occur?
No permanent field lighting will be provided. Thus, no glare or light is anticipated that will
adversely impact adjacent land Uses, or land uses located in adjacent municipalities to the
east or west with views of the properties from upland locations or across portions of Lake
Washington.
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 17
North and South Baxter cite Development Plan
New Seattle Seahawks Headquarters & Training Facility
Renton, WA
j b. Could tight or glare from the finished project be a safety hazard or interfere with
views?
No. It is not anticipated that any light or glare will pose a safety hazard.
c. What existing off -site sources of light or glare may affect your proposal?
There are no off -site sources of light or glare that we are currently aware of that will impact
the project.
d. Proposed measures to reduce or control tight and glare impacts, if any:
Not Applicable
12. RECREATION
a. What designated and informal recreational opportunities are in the immediate
vicinity?
Public access to the shoreline will be provided as indicated by the Conceptual Site Plan.
Access is proposed along the north property line with connections to the lakefront. The
proposed access will include seating areas, a landscaped walkway and access to the lake
for active and passive recreational use.
Due to the security requirements associated with the daily operation of the Practice
Facility, public access to the overall site is limited to the designated public access areas.
b. Would the proposed project displace any existing recreational uses? If so, describe.
None
c. Proposed measures to reduce or control impacts on recreation, including recreation
opportunities to be provided by the project or applicant, if any:
Not Applicable
13. HISTORIC AND CULTURAL PRESERVATION
a. Are there any places or objects listed on, or proposed for, national state, or local
preservation registers known to be on or next to the site? If so, generally describe.
No
b. Generally describe any landmarks or evidence of historic, archaeological, scientific,
or cultural importance known to be on or next to the site.
A Cultural Resource Assessment (Larson, 1997) was performed for the Baxter Properties
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 18
North and South Baxter cite Development Plan
New Seattle Seahawks Headquarters & Training Facility
Renton, WA
' and properties south of Baxter in 1997. This assessment did not identify any cultural
resources eligible for listing on the National Register of Historic Places were identified in
the area. Literature review suggested that a Duwamish site may have been present at the
historic mouth of May Creek, assumed to have been located on a nearby property south of
the Baxter Properties. A copy of the Larson report is being submitted with this
Environmental Checklist.
c. Proposed measures to reduce or control impacts, if any:
Monitoring for archeological materials will be included in development activities
involving excavation in portions of the site designated "High Probability Areas" in the
Cultural Resource Assessment (Larson, 1997). Monitoring could include having a
professional archeologist on site to monitor any subsurface excavation to insure that
no intact archeological materials or features are adversely affected by such activities.
14. TRANSPORTATION
a. Identify public streets and highways serving the site, and describe proposed access
to the existing street system. Show on site plans, if any.
Greater detail on all transportation and parking issues can be found in the
Transportation Impact Analysis (TRANSPO 2006) in Section 12. A more general
discussion is provided below.
Interstate 405 provides regional access to the site. The site is served by Lake
Washington Boulevard, the primary access to which is via exit 7 (NE 44th Street) from
1-405. Other vehicular access is also provided by Lincoln Avenue from the east,
Ripley Avenue from the north and Lake Washington Avenue SE from the northeast
via 44t" Street interchange.
Two existing on grade crossings provide access to the site as shown on the attached site
plans. Preliminary discussions between the Seahawks and the BNSF Railroad have
commenced regarding a third (new) crossing, located halfway between existing crossings.
b. Is site currently served by public transit? If not, what is the approximate distance to
the nearest transit stop?
The site is not served by public transit. The nearest transit stops are located at Park
Ave N/N 33rd and 116`h/76 .
c. How many parking spaces would the completed project have? How many would the
project eliminate?
New Parking: 275 to 315 cars
Displaced Parking: No parking will be displaced or eliminated
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 19
North and South Baxter oite Development Plan
New Seattle Seahawks Headquarters & Training Facility
_. Renton, WA
d. Will the proposal require any new roads or streets, or improvements to existing
roads or streets, not including driveways? If so, generally describe (indicate
whether public or private?
Improvements will likely be required at the following areas:
1. Ripley Avenue
2. Existing at grade crossings @ BNSF Railroad right of way
3. Potential new at grade crossing @ BNSF Railroad right of way as indicated above
e. Will the project use (or occur in the immediate vicinity of) water, rail, or air
transportation? If so, generally describe.
The Seahawks will continue to use commercial and charter air transportation at their
current levels_
Please refer to Section 12 for additional information,
g. Proposed measures to reduce or control transportation impacts, if any:
Please refer to Section 12 for proposed measures.
15. PUBLIC SERVICES
a. Would the project result in an increased need for public services (for example: fire
protection, police protection, health care, schools, other)? If so, generally describe.
a
No.
b. Proposed measures to reduce or control direct impacts on public services, if any.
Not applicable
16. UTILITIES
a. Circle or underline utilities currently available at the site: electricity, natural „gas,
water, refuse service telephone, sanitary sewer, septic system, other.
Describe the utilities that are proposed for the project, the utility providing the
service, and the general construction activities on the site or in the immediate
vicinity which might be needed.
The following utilities will be provided by municipal systems
1. Water
2. Sanitary Sewer
Other utilities will be required including.
1. Electricity -- Puget Sound Energy
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 20
North and South Baxter jite Development Plan
New Seattle Seahawks Headquarters & Training Facility
Renton, WA
2. Natural Gas -- Puget Sound Energy
3. Fiber - Qwest
4. DSL or T1 Telecommunication Lines - Qwest
These utilities are available immediately adjacent to the site. Please refer to Section 5 for
preliminary utility plans.
C. SIGNATURE
I, the undersigned, state that to the best of my knowledge the above
information is true and complete. It is understood that the lead agency may
withdraw any declaration of non -significance that it might issue in reliance
upon this checklist should there be any willful misrepresentation or willful
lack of full disclosure on my part.
Proponent:
Name Printed: Ray Colliver
Date:
D. SUPPLEMENTAL SHEETS FOR NONPROJECT ACTIONS
Not Used
Environmental Checklist
24 May 2006
Revised 6 September 2006
Page 21
!.
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
BEFORE THE HEARING EXAMINER FOR THE CITY OF RENTON
LARRY BARSHER and ESTHER BARSHER,
Appellants, File No. LUA06-073
V.
CITY OF RENTON, and FOOTBALL
NORTHWEST,
Respondents.
SA-H, SA-M, SM, ECF
NOTICE OF APPEARANCE ON
BEHALF OF FOOTBALL NORTHWEST
LLC
TO: Fred Kaufman, City of Renton Hearing Examiner; and
AND TO: Larry Barsher and Esther Barsher, Appellants
PLEASE TAKE NOTICE that Roger A Pearce, and Foster Pepper PLLC, enter
their appearance as counsel for Respondent Football Northwest LLC, by and through the
undersigned attorney, and request that service of all papers and pleadings in this lawsuit, except
original process, be made upon the undersigned attorney at the address stated below.
DATED this 91h day of May, 2007.
NOTICE OF APPEARANCE ON BEHALF
OF FOOTBALL NORTHWEST - 1
FOSTER PEPPER PLLC
Roger A0earce, WSBA No. 21113
Attorney for Respondent Football Northwest LLC
POSTER PEPPER PLLC
1111 TmRD AVENUF, SU]T$ 3400
SEATTLE, WASHINGTON 98101.3299
PI{ONE (206)447-4940 rnx (206)447-9704
50813270.1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
DECLARATION OF SERVICE
Helen M. Stubbert declares:
I am a legal assistant to Roger A. Pearce, and competent to be a witness in the above -
entitled proceeding. On May 9, 2007,1 caused to be delivered in the manner indicated below
true and correct copies of a Notice of Appearance and this Certificate of Service to the following:
Fred J. Kaufman Larry and Esther Barsher
Hearing Examiner 6940 96t1i Ave. S.E.
City of Renton Mercer Island WA 98040
1055 South Grady Way Via U.S. Mad
Renton, Washington 98055
Via U-S. Mail
I declare under penalty of perjury under the laws of the State of Washington that the
foregoing is true and correct.
DATED this 9"' day of May, 2007, at Seattle, Washington.
.1
k LL
Helen M. Stubbert
NOTICE OF APPEARANCE ON BEHALF
OF FOOTBALL NORTHWEST - 2
FosTER PEPPER PLLC
1111 THIRD AVENUE, SUPCE 3400
SEATTLE, WASIIINGTON 98101-3299
PHONE (206) 447-4400 FAX (206) 447-9740
50813270,1
Seahawks' Headquarters and Training Facility
File No.: LUA-06-073, SA-H, SA-M, SM, ECF
December 7, 2006
Page 16
Fan parking during training camp will be accommodated at a parking lot or parking facility off the
project site, with fans then being bused to the site.
The project dumpster/recycling area will use containers with lids, and the container storage area will be
screened from the Misty Cove property. The garbage and recycling pickups will occur during normal
business hours on weekdays — not at nights or very early morning hours. All non -recyclable materials
placed in the containers will be in sealed plastic bags.
9. FNW shall replace the existing property line fence between the Misty Cove property and the project site
with a new fence of at least equal quality.
10. No athletic field lighting is being proposed under the permit. The Seahawks agree not to seek any
permit to do so for a period of 15 years from the date of this Agreement. All project exterior lighting
will be designed so that the lighting is directed away from the Misty Cove residences.
i 1. FNW will provide signage that clearly indicates the main entrance to the project site, so that visitors to
the site can easily find the entrance. Any signage will have to comply with City and State regulations.
12. The proposed shoreline area planting plan shall include lower -level plantings in the north section of the
project shoreline area, in order to minimize impacts of views of the water from the adjacent Misty Cove
Condominium property.
13. The mitigation and design measures in the Lake and Stream Study and the Turf Integrated Pest
Management Plan submitted to the City as part of the project application shall be conditioned to permit
approval.
ORDERED THIS 7`' day of December 2006.
FRED J. KAUFMAN
HEARING EXAMINER
TRANSMITTED THIS 7ch day of December 2006 to the parties of record:
Elizabeth Higgins
1055 S Grady Way
Renton, WA 98055
Lance Lopes
VP Seahawks
800 Occidental Avenue S
Seattle, WA 98034
Kayren Kittrick
Development Services
Renton, WA 98055
David Murphy
Crawford Architects
1801 McGee St., Ste. 200
Kansas City, MO 64108
Roger Pearce
Foster Pepper
I I I 1 Third Avenue, 341h Floor
Seattle, WA 98101
Larry & Esther Barsher
6940 96 h Avenue SE
Mercer Island, WA 98040
Eileen Halverson Joe Burcar Carl Hadley
5021 Ripley Lane N, #302 3190 160`11 Avenue SE Cedar Rock Consultants
Renton, WA 98056 Bellevue, WA 98008 19609 244`h Avenue
December 7, 2006
OFFICE OF TAE HEARING EXAMINER
CITY OF RENTON RECEIVED
Minutes DEC 8 2006
APPLICANT: Football Northwest
505 Fifth Avenue S., Ste. 900 FASTER PEPPER i'LLG
Seattie, WA 98104
OWNER: Port Quendall Company
505 Fifth Avenue S., Ste. 900
Seattle, WA 98104
CONTACT: Ray Colliver
505 Fifth Avenue S., Ste. 900
Seattle, WA 98104
Seattle Seahawks' 1-leadquarters and Training Facility
File No.: LUA 06-073, SA-H, SA-M, SM, ECF
LOCATION: 5015 Lake Washington Boulevard N (also addressed as 5015,
4901, and 4635 Ripley Lane)
SUMMARY OF RE -QUEST: Applicant requested Master Ilan and Site Plan Review for the
development of the Seattle Seahawks' Headquarters and
Training Facility. The project would be a single building
consisting of 135,534 sf of office space on two levels and
89,423 sf indoor practice facility. There would be up to four
outdoor practice fields, The zoning designation is
Commercial -Office -Residential.
SUMMARY OF ACTION: Development Services Recommendation: Approve with
conditions
DEVELOPMENT SERVICES REPORT: The Development Services Report was received by the
Examiner on November 14, 2006.
PUBLIC HEARING: After reviewing the Development Services Report, examining
available information on file with the application, field
checking the property and surrounding; area; the Examiner
conducted a public hearing on the subject as follows:
MINUTI✓S
The following minutes are a sunimmy Of the November 21, 2006 hearing.
The legal record is recorder! on CD.
The hearing opened on Tuesday, November 21, 2006, at 9:01 a.m. in the Council Chambers on the seventh floor
of the Renton City Hall. Parties wishing to testify were affimied by the Examiner.
Scahawks' Headquarters and `Training Facility
Tile No.: LUA-06-073, SA-14, SA-M, SM, 11CF
December 7, 2006
Page 2
The follo■ving exhibits were entered into the record;
Exhibit No. 1: Yellow file containing the original
application, proof of posting, proof of publication and
other documentation pertinent to this request.
Exhibit No. 2: Vicinity Map
Exhibit No. 3: Historic Aerial Photo of North and
South Baxter Properties
Exhibit No. 4: Zoning Map
Exhibit No. 5: Mitigation Site Plan - Alternative
Plan
Exhibit No. G: Plan Diagrams
Exhibit No. 7: North and South Building Elevations
Exhibit No. 8: South View Transverse Section
Exhibit No, 9: Base Site Plan
Exhibit No. 10:
Building Location Options
—
Exhibit No. 11: Green Screen Wall A
Exhibit No. 12:
Green Scicen Wall B
Exhibit No. 13: Existing View from Misty Cove Unit
302
Exhibit No. 14:
Base Site Plan
View from Misty Cove Unit 302,
Exhibit No. 15. View from Misty Cove Unit 302,
Mitt ated Site Plan
Exhibit No 16:
Comparison
View from Misty Cove Unit 302,
Exhibit No- 17. Existing View from Misty Cove Unit
312
Exhibit No. 18:
Base Site Plan
View from Misty Cove Unit 312,
Exhibit No. 19: View from Misty Cove Unit 312,
Mitigated Site Plan
Exhibit No. 20:
Com arison
View from Misty Cove Unit 312,
Exhibit No. 21: Daily Shadow Studies — Base Plan
Exhibit No. 22:
Altemative Plan
Daily shadow Studies — Mitigated
Exhibit No. 23: Seasonal Shadow Studies — Existing
Conditions
Exhibit No. 24:
Plan
Seasonal Shadow Studies— Base
Exhibit No. 25: Seasonal Shadow Studies -- Mitigated
Alternative Plan
Exhibit No. 26:
List of 25 Exhibits from Staff Report
Exhibit No.. 27:. Poster Pepper Appeal Settlement
Letter
Exhibit No. 28:
Petersen Appeal Settlement Letter
Exhibit No. 29: Appeal File by Reference
Exhibit No. 30:
Shoreline
Exhibit No. 31. Geotech Summa
Exhibit No. 32:
Power Point Presentation
Exhibit No. 33: Draft Engineering Design Plan
Seahawks' Headquarters and Training Facility
bile No.: LUA-06-073, SA-H, SA-M, SM, ECI'
December 7, 2006
Page 3
The Examiner stated there were two appeals, which had been filed by the Misty Cove Association of
Apartments Owners and Steve Jensen, who filed on his own behalf as a separate individual. Letters have been
received stating that the parties had reached a settlement in those two appeals.
Zanetta Fontes stated that that was correct. She had been notified and she would let the parties go over the
conditions to which they have agreed. It was noted that Mr. Jensen was not in the hearing room.
Roger Pearce, Foster Pepper stated that they had reached a formal settlement agreement with Misty Cove
Association of Apartment Owners who are represented by Mr. Peterson. The settlement letter did include 7
permit conditions that should be placed on the project. With respect to Mr. Jensen's appeal, he indicated the he
was withdrawing and would fax a formal withdrawal to the Hearing Examiner's Office. lie did ask that Mr,
Jensen's appeal be dismissed if a letter were not forthcoming from Mr. Jensen.
Tom Peterson stated that he represents Misty Cove, they have filed a dismissal of their appeal along with a letter
identifying permit conditions, which are identical to the ones that Mr. Pearce submitted.
The Examiner stated that Mr. Jensen's appeal is dismissed, The settlement is acceptable and the appeal is
dismissed for both Misty Cove and Mr. Jensen.
The Land Use Hearing began at 9:11 am with a presentation of the staff report by Elizabeth Higgins, Senior
Planner, Development Services_ The applicant is requesting both Master Plan and Site Plan review of currently
vacant 19.6-acre property in the Kennydale area of northeast Renton. The project consists of one building at
approximately 135,534 square feet, outdoor and indoor practice fields and an accessory building that would be
used for maintenance. The project is located in the area known as Port Quendall in northeast Menton, just west
of I-405. To the south is the Quendall terminals property, south of that the Barbee Mill property, the entire area
is zoned Commercial -Office -Residential (COR). North of the project site is the Misty Cove Condominium and
north of that the Ripley Lane neighborhood. To the east of the property is the Ilan Abode property and the
interchange to 1-405.
The site was considered to be in the distant country early on, and was used for wood processing after it was
logged off It has remained vacant since wood processing ended in 1981. It has been used for storage since
then_ The site has been subject to clean up by consent decree with the Department of Ecology. A cap will be
required to be placed over soil that still has residual contamination.
Currently, the site is largely vacant, there is one building that will be removed.
The indoor practice facility would be the farthest away from the lake and (lie office building would be a 2-story
with a mezzanine level between the two stories and closest to the lake. This is par( of the settlement between
Misty Cove owners and the Seahawks, the fields were shifted around but remain on the south side of the
property. The public access to the lake was extended to approximately 250 feet along the lake. The public
access will be handled as a county park, open only during the daylight hours. The Shoreline Management Act
allows uses that are water related, this is not water related, however the access to the lake for the public allows
this property to meet the requirements.
Access to the property currently is at the northeast corner and the southeast comer of the property. There are
ongoing negotiations with the Burlington Northern Santa Fe Railroad to have an additional private crossing at
about the mid -point of the property_ This would be the primary entrance for the site.
This project went to the Environmental Review Committee, the decision was appealed and has been settled.
There were seven mitigation measures.
Scahawks' HeadgUarters and Training Facility
File No_: LUA-06-073, SA-14, SA-M, SM, ECF
December 7, 2006
Page 4
The redevelopment of CUR sites is intended to provide economic development and remediation of formerly
impacted industrial sites. This site certainly provides that criteria. The Seahawks' building has been designed
to be an architecturally significant state of the art facility for a professional football team. The community
design element is met through the design of the project. The north facade of the indoor practice facility will be
softened by use of a "green -screen wall", The project meets the development standards by being lower than the
maximum building height, by covering only 17% of the property with buildings and by moving the project the
applicant has attempted to mitigate the impacts of this building on the neighboring property.
Visual assessment studies were done as well as shadow studies in order to study impacts to the Misty Cove
condominiums. The outside practice fields will not be lit and not used at night so there will be no lighting that
would interfere with the Misty Cove condominiums.
There are no regulations on the types of fencing provided in this area, they will be replacing the fence along the
border of Misty Cove Apartment Condominiums. The general parking consists of 91 stalls would be along the
east side of the building, the secured team parking would be along the north and northwest corner of the
building. The field is open to the public for three weeks in August and it is presumed that thousands of people
will attend training. There will be a plan to shuttle people from off -site parking areas.
Roger Pearce, Foster Pepper, 1 I I I Third Avenue, 34d' Floor, Seattle 98101 stated that he is the Attorney for
Seahawks and that there were several people that would be speaking today. There are no specific height limits
in the urban environment, the Shoreline Master Program does allow new commercial uses if public access to and
along the water is provided. A significant public access has been provided and it will be open just like a City
park. It will only be open during the day, there will be on -site security,
Lance Lopes, VP Scahawks, 800 Occidental Avenue S., Seattle, WA 98034 stated that he also serves as the
general manager for this project. Ile identified goals in acquiring this location, the Kirkland facility was too
small and had become obsolete in terms of what teams need to handle their requirements. The site in eastern
Washington has served them well for many years, in recent times there has been a drop-off in attendance at the
training camp, the fans from western Washington have not been able to get over there.
The number of users for this property varies, there are approximately 130 full-time employees and a varying
number between 30 and 90 players depending on the time of year.
The site is laid out with the fields to the south, with three fields they can rotate during the training camp, the
fourth field may or may not be built. That location will provide an area where fans will be able to view the
practices of the team_ The office building was built with the views in mind, both lake and practice fields.
The nineteen acres is really the minimal amount and just about all of it has been used for this facility. The
month of August is the best time to think about training camp, it typically is a 25-clay period and can vary from
year to year, That is the time of year that the players are trying out for the team, the public is very interested in
that process. The number of fans coining out for (raining camp could be in the range of 1,500 and 2,000 per
day. A Saturday or Sunday could rise to perhaps 2,500. Practice is in the morning and the afternoon each day.
They have asked the City about developing a bus turnaround on Ripley Lane, which can be shared with the
current school bus stop, they propose to make it a nicer bus stop. That would allow the shuttle busses to drop
people off right at the front gate. Burlington Northern Railway has indicated they would allow an easement
over the center entrance area. Offsite parking has not yet been determined. There are some locations that they
are looking at currently.
Seahawks' headquarters and Training Facility
Pile No.: LUA-06-073, SA-11, SA-M, SM, LCF
December 7, 2006
Page S
The indoor facility is standard for the industry, which allows special teams to practice their punting and kicking
Public access will be from the north side of the property down to the lake and still keep the practice fields
private. The plan is for a cyclone fence with a green screen on the fence. Between the Misty Cove and
Seahawks a quality wood fence has been planned.
David Murphy, Crawford Architects, 1801 McGee St., Sle. 200, Kansas City, MO 64108 gave a power point
presentation of the project with site layout, vegetation and design details. The design materials allow them the
ability to create a corporate image that is appropriate for the City of Renton and the Seattle Scahawks. The
facility will be designed specifically to the Pacific Northwest. They are currently in design development stages
the south side of the office will be facing the practice fields and would be constructed with a series of
cementiuous materials. The practice facility would consist of cementiuous panels or metal panels that would
make up the composition of the fayade. On the east elevations there would be cementiuous panels, wood, and
translucent materials that would allow daylight to come into the indoor practice facility. The north side, facing
Misty Cove would be designed with horizontal lines with shadows to break down the scale of the building. The
green screen at the base would be 30-feet of lattice with green plantings to cover and allow for privacy. The
west elevation of the building is proposed to be two stories and the south three stories. However, the west may
go to 3 stories, it has not been fully determined as yet. The dumpsters and loading dock areas will be screened
from the public.
To study the view impacts on the project from the Misty Cove property, the owners of units 302 and 317
allowed access to their property and they were able to photograph views from those sites. The lower levels on
the south side have blocked views to the shoreline and to the site. Several photos were shown with various
views to the south. Their goal was to maintain and enhance as many view corridors as possible_
A 5-minute break was taken.
Larry 13arsher, 6940 96''' Avenue SE, Mercer Island, WA 98040 stated that he lives directly west of the facility
across Take Washington and from the front of his house lie can see the training facility. From a close up
perspective, it looks very attractive however, from a mile away it still is going to appear as a big box. When the
final landscape plan is prepared he would like to suggest that some consideration would be given to soften ]he
view as much as possible by the addition of perhaps some trees that could reach heights of 100-feet at maturity.
In addition, perhaps a green wall could be installed on the roof of the office building in the center to add some
contrast and softening. He did appreciate the fact that the lights would not be on in the evening.
Eileen Halverson, 5021 Ripley Lane N, tt302, Renton, WA would like to know where the parking would be
located for the public access.
Esther Barsher, 6940 96"' Avenue SE, Mercer Island, WA 98040 stated that she was concerned about the
lighting for the parking area, would it be lit all night'?
Joe Burcar, 3190 160"' Avenue SE, Bellevue, WA 98008 stated that he is a shoreline specialist with the
Washington Stale Department of Ecology. Considering the City Shoreline Master Program, would the use of
this facility be considered a Conditional Use within the Master Program or is it in fact a permitted use and haw
would that translate into the final shoreline permitting, would it be a substantial shoreline permit or a conditional
use permit?
Ms. Higgins stated that there would be some buffer averaging. The wetland buffer is 50-feet and extends into the
field area, however there is some buffer mitigation outside the field area that has been approved. The indoor
practice facility which is 95-feel to the center clear height on the interior is outside of the 200 foot line. The
Seahawks` Headquarters and Training Facility
File No.: LUA-06-073, SA-14, SA-M, SM, ECF
December 7, 2006
Page G
City of Renton Shoreline Master Program does not regulate buildings below 75-feet that are within the 200-foot
buffer.
Mr. Burcar stated that he is testifying on behalf of the State. And finally, the parking area along the north of the
facility, is there any buffer averaging happening in that area as well? lie further was concerned as to the use of
fertilizers and pesticides and what kind of plan would be in place 10 ensure that water quality of the lake would
be protected.
MsJjiggins stated that this project does not require a Conditional Use Permit. The Shoreline permit is being
processed separately, The ERC report states that the applicant is proposing an integrated pest management
program with extremely limited use of chemicals on the fields and landscape areas.
CarlHadley, Cedar Rock Consultants, 19609 244"' Avenue, Woodinville, WA 98077 stated that he is a
professional fisheries biologist with 18 years of experience in the Seattle area. He was part of the team that
wrote the lake and stream study, which was a requirement of the Renton Municipal Code. That study was
required because there is a direct impact to a water body, the Gypsy sub -basin drainage and secondly, the site
contains a shoreline of the state. The study takes a look at existing functions and values and compares that to
future conditions based on mitigation and other things that are proposed for the site. It must be shown that there
are equivalent or better values for the fish habitat and wildlife habitat on the site. The Gypsy sub -basin has been
declared a fish bearing water, it drains 320 acres of the slope to the east with runoff from paved surfaces via
roadside ditches, culverts, and parking lots with a bad history of flooding. There is a 500-foot long, 2-foot wide
culvert, with a 125-foot open reach at the bottom of a 15-foot deep manmade ditch. The €25-foot open reach
will be filled with capping, there can be no exposed water. The culvert will run between the playing fields and
the side of the building. A new outfall will be built for the pipe with a 25-foot channel on the lake as mitigation
for filling that existing open section of channel. The Department of Fish and Wildlife has initially approved the
proposed plan.
An Integrated Pest Management plan has been established for the site and will include a set ofruies regarding
the use of pesticide and fertilizer. Air, sunlight and drainage for the fields are an important part of pest control.
A small amount of chemicals will be used for fungus only.
Mr. Pearce stated that there is no proposed parking for the public access to the lake, the public most likely will
use it more when the Burlington Northern tracks become a trail.
There is a landscape plan in the application materials that points out species that will be planted including some
larger species such as Douglas Fir and Western Red Cedar.
Regarding Mr. Burcar's comments, this is a permitted use so long as significant public access is provided to and
along the shoreline. No variance is required for height under the City Shoreline Master Program.
There is a 50-foot setback for commercial buildings from the shoreline, not for paved surfaces or playing fields
or grading.
Kayren Kittrick, Development Services stated that they are working with the applicant regarding Ripley Lane
and the Gypsy Creek flooding onto Ripley Lane. If a security gate is being provided for Misty Cove, is there a
turnaround being provided for those people that like to wander in and will then need access to get out. That will
all be covered during; the design phase,
The Examiner called for further testimony regarding this project. There was no one else wishing to speak, and
no further comments from staff. The hearing Closed at 11:34 am.
Scahawks' Headquarters and Training Facility
Pile No.: LUA-06-073, SA-H, SA-M, SM, LCF
December 7, 2006
Page 7
FINDINGS CONCLUSIONS & RECOMMENDATION
Having reviewed the record in this matter, the Examiner now makes and enters the following:
FINDINGS:
1. The applicant, Football Northwest, for the Seatile Seahawks' Headquarters and Training Facility, filed a
request for a Master Plan and Site Plan review.
2. The yellow file containing the staff report, the State Environmental Policy Act (SEPA) documentation
and other pertinent materials was entered into the record as Exhibit 41.
3. The Environmental Review Committee (ERC), the City's responsible official issued a Determination of
Non -Significance - Mitigated (DNS-M). An appeal of this determination was filed by adjacent property
owners. The appeal was settled with an agreement to include certain additional conditions on the
development of the subject site if those conditions were found appropriate after public hearing and
review.
4. The subject proposal was reviewed by all departments with an interest in the matter.
5. The subject site is located at 5015 Lake Washington Boulevard N and is also addressed as 5015, 4801
and 4635 Ripley Lane. The site is just north or west of the NE 44th Street (Exit 7) 1-405 interchange.
The site is located on the shoreline of Lake Washington. The Burlington -Northern railroad tracks run
between the site and Ripley Lane.
6. The site actually runs at a diagonal from the southwest toward the northeast along the lakeshore but is
commonly thought of as running south to north. Therefore for illustrative purposes and descriptions this
common reference will be used and so the lake will be considered the western edge of the site and
Ripley Lane the eastern edge of the site - readers will be able to orient facilities and buildings to their
location on the site from the lake and roadway locations.
7. Misty Cove residential complex is located immediately north of the site. As noted above, the
homeowners in Misty Cove had fled an appeal of the SEPA decision but they, along with a separate
resident of that complex settled the appeal prior to the hearing after reaching an agreement with the
applicant.
8. immediately south of the subject site is the Port Quendall site. That site is a "Superfund Site" that is
highly contaminated and subject to separate cleanup regulations.
9. The map element of the Comprehensive Plan designates the area in which the subject site is located as
suitable for the development of commercial, office and residential uses, but does not mandate such
development without consideration of other policies of the Plan.
10. The subject site is currently zoned COR-2 (Commercial, Office, Residential).
11. The subject site was annexed to the City with the adoption of Ordinance 1823 enacted in April 1960.
12. The size of parcel is approximately 19,6 acres or 853,776 square feet.
Seahawks' Headquarters and Training Facility
File No.: LUA-06-073, SA -I -I, SA-M, SM, LCF
December 7, 2006
Page S
13. The site is essentially flat_ Gypsy Creek runs through the site in an open ditch for approximately 12S
feet before entering a 490-foot culvert. The culvert empties above the surface of the lake in an
unnatural drop. Plans are to restore the shoreline in this area, create a cove and create a more natural
entry into the culvert.
14. A Category 3 wetland has been restored. It would remain in a protected area at the southwest portion of
the property, adjacent to Lake Washington. It probably would not be open to the public.
15_ The subject site is under a cleanup agreement with the State. Remediation involves removing
contaminated soils and capping depending on the proposed use and contaminants involved. The
contamination was the result of the former use of the property for wood -processing activities. Site
grading for the project would be coordinated with continuing remediation. Calculations indicate the
capping of the site and grading would require approximately 29,600 cubic yards of cut and 52,900 cubic
yards of fill material. Some cut material would be removed from the site and the remainder reused.
Any fill material will be tested or require a "source statement" to assure clean materials. As noted, the
adjacent site to the south is under Superfund cleanup governance.
16. Two existing structures remain on the site_ A single -story, 1,300 square foot woad -frame office
building on the north portion of the site that would be removed. An existing boathouse and dock are
located at the northwest shoreline. Currently, there are no plans for these facilities.
17_ The underlying geology of soils dictated where the building would be located. Soils generally dictated
that the large building would need piles for structural support and the soils on the south half of the site
were not appropriate without additional remediation. In addition, the proposed practice playing fields
require more and appropriately shaped space, which the wider south half provided.
18. The proposed complex consists of the Seahawks administrative offices and accessory training and
practice facilities and a smaller maintenance building. The two major components are the attached
office and indoor practice facility located on the north portion of the subject site and four practice fields
including three with natural turf and one with artificial turf on the south portion of the property. The
maintenance shed will be located at the southeast corner of the property.
19. Offices, meeting and classrooms, kitchen and dining area, lockers and exercise areas, football
equipment storage areas, and an indoor practice field would be within a 224,957 square foot building on
the North Baxter property. The office or Headquarters portion of the building would be up to 55 feet in
height and contain two stories and a mezzanine level that would be open to the indoor practice field.
The office building would be located closest to the lake to take advantage of the lake views. It would be
L-shaped and wrap around the southwest corner of the larger indoor practice field. The height of the
indoor practice field, situated on the north and east sides of the building, would be up to I I I feet.
Originally, the roof was designed to swing upward along its edges to screen rooftop mechanical
equipment. That equipment has since been moved into the building proper. The practice building has
been designed to have an inside height clearance of approximately 95 feet to accommodate realistic
passing and kicking moves.
20, The building would be a steel frame building. It would be faced with synthetic stone, masonry, and
storefront systems on the lower level. Clear -glazed windows and cementiuous or metal wall panels
would be used on upper portions and vary depending on location. The color palette would be earth
tones with light beiges, buff, light gray and browns and greens would be used for exterior treatments.
The settlement agreement requires a green -screen or lattice wall with vegetation growing on it on the
north facade, the facade facing Misty Cove. There will be horizontal banding breaking the building into
Seahawks' Headquarters and Training Facility
File No,: LUA-06-073, SA-H, SA-M, SM, ECF
December 7, 2006
Page 9
thirds to reduce the apparent height and vertical modulations and articulations will also be used to
reduce the apparent bulk of the building_ Additionally, the administrative office portion of the building
will be about half as tall as the indoor practice portion, providing a terraced or stepped aspect. There
will be a formal entry along the Ripley Lane facade and a canopy will connect parkins with the fornial
entrance. Other entries are provided along various aspects of the building complex.
21. The appeal settlement resulted in the building being moved toward the east approximately 62 feet and
away from the shoreline. The taller indoor practice building is now located outside of the 200-foot
shoreline management area. The move will reveal more of the shoreline and sky for the residents of
Misty Cove. It will also move the mass of the building away from the shoreline.
22. The COR 2 zone permits lot coverage of 65 percent and a building height of 10-storics or 125 feet. The
office building has a footprint of approximately 55,674 square feet, the indoor practice complex has a
footprint of approximately 89,423 square feet and there is the 6,000 square foot maintenance shed for a
total of 151,097 square feet or 17.7 percent of the 19.6 acre site. The office building will be 55 feet tall
while the practice facility will be approximately 1 I 1 feet tall. Staff reports that the office building
which falls within the 200-foot shoreline management zone complies with the Urban Shoreline
designation of Renton's Shoreline Master Program. Although it is not a water -dependent use, the
complex will provide access to the portions of the shoreline that have been off-limits to the public in the
past. The one-story, 6,000 square foot maintenance and equipment storage building would be located in
the southeast corner of the site.
23. "mere would be three or four outdoor practice fields. Some of the fields can be rotated to account for
wear patterns_ The three natural grass practice fields would be located on the portion of the property.
The one artificial turf practice field would be parallel and adjacent to the east property line. The four
practice fields would cover 8.3 acres.
24. The site would contain secured area to protect the practice fields, the players and to provide security and
privacy during practices.
25_ There is a variety of vegetation on the subject site including weeds, weed trees and some limited natural
vegetation along the lake shore. The site will be landscaped with a variety of native trees and shrubs.
Some of the larger trees would be preserved. As indicated a "green wall" would be located along the
north facade as part of landscaping and screening.
26_ Parties from Mercer Island with a view across the lake to this facility were concerned about views and
screening as well as night lighting.
27. Primary access to the site would be from Lake Washington Boulevard and Ripley l..ane. Any access or
accesses will have to cross the Burlington Northern Santa Fe Railroad right-of-way. Currently, the
primary access would be at the northeast comer of the subject site near the Misty Cove complex. A
secondary access is available at the southeast corner of the property to Lake Washington Boulevard.
Negotiations are underway with the railroad for a crossing about midway along the east property line.
This would become the primary access if agreement can be reached.
28, On -site roads would be private and there would be parking for 252 vehicles. Parking would include 91
stalls for general surface parking and 161 secure (fenced) surface parking stalls for team members. Due
to both limited access and on -site parking, the annual training camp, held for three weeks in August,
would require off -site parking with a scheduled shuttle bus service in order to accommodate visitors.
Scahawks' Headquarters and Training Facility
File No.: LUA-06-073, SA-11, SA-M, SM, ECF
December 7, 2006
Page 10
29. As no(ed, there will be access to approximately 250 feet of Lake Washington shoreline. Access to the
shoreline path would be via an east -west paved walkway located parallel to the north property boundary.
A landscaped seating area and viewpoint would be provided. This path will typically be available to the
public on the same schedule as City parks.
30. The development will increase traffic approximately 555 average vehicle trips per day. Traffic during
open public sessions, mainly in August would be generally confined to normal traffic as ),yell as some
forni of shuttle service to limit the amount of traffic and avoid taxing the local roads and the parking
facility.
31 _ The applicant proposes using an "integral pest management plan" to limit the use of chemicals on the
site.
CONCLUSIONS:
The following general criteria are applicable to the subject site, which is zoned COR:
Section 2 4-9-200 SITE DEVELOPMENT PLAN REVIEW:
A PURPOSE AND INTENT:
The purpose of site development plan review shall be to assure that proposed
development is compatible with the plans, policies and regulations of the City
of Renton as outlined in the City's Comprehensive Plan and the City's Business
Plan Goals. Site development plan review may be used to analyze plans at
varying levels of detail to ensure continuity of project concept and consistent
implementation. Elements subject to this Section include, but are not limited to,
site layout, building orientation and design, pedestrian and vehicular
environment, signage, landscaping, natural features of the site, screening and
buffering, parking and loading facilities, and illumination. Site development
plan review is divided into two types: Master Plan and Site Plan.
1. Master Plan: The purpose of the Master Plan process is to guide
phased planning of development projects with multiple buildings on a
single large site. The Master Plan is required to demonstrate how the
major elements of a development are proposed on the site at sufficient
detail to demonstrate the overall project concept_ In addition, the
Master Plan must illustrate how the major project elements, combined,
create an urban environment that implements City goals. An additional
purpose is to allow consideration and mitigation of potential irrrpaos
that could result from large-scale site and facility development, and to
allow coordination with City capital improvement planning. Master
Plan review should occur at an early stage in the development of a
project, when the scale, intensity and layout of a project are known.
2. Site flan Review; The purpose of the Site Plan process is the
detailed arrangement of project elements so as to be compatible with
the physical characteristics of a site and with the surrounding area. An
additional purpose of Site Plan is to ensure quality development
consistent with City goals and policies. For those developments that do
not require Master Plan first, Site Plan Review should occur at an early
stage in the development of a project, when the scale, intensity and
layout of a project are known.
Seahawks' Headquarters and 'Training Facility
File No.: LUA-06-073, SA-H, SA-M, SM, ECF
December 7, 2006
Page 1 I
The intent of the tiered site development plan review process is to provide an
opportunity to review projects at broad levels for the Master Plan and with
increased specificity as development plans becomes refined to the level of Site
Plan. Intent statements below shall guide review of the plans at a specificity
appropriate to the level of review.
1. To promote the orderliness of community growth, protect and
enhance property values and minimize discordant and undesirable
impacts of development both on- and off -site;
2. To promote high quality design meeting criteria set forth in the City's
Urban Center Design Overlay, where applicable;
3. To protect and enhance the desirable aspects of the natural landscape
and environmental features of the City;
4. To ensure convenience and safety of vehicular and pedestrian
movement within the site and in relation to adjacent areas, and ensure
that road and pedestrian circulation systems implement land use
objectives for the zone in which the project occurs;
5. "To promote coordination of public or quasi -public elements, such as
walkways, driveways, paths, and landscaping within segments of larger
developments and between individual developments;
G_ To protect neighboring owners and uses by assuring that reasonable
provisions have been made for such matters as sound and sight buffers,
light and air, and those other aspects of site plans which may have
substantial effects on neighboring land uses;
7. To minimize conflicts that might othenvisc be created by a mix of
uses within allowed zones;
8. 'fo provide for quality, multiple family or clustered housing while
minimizing the impacts of high density, heavy traffic generation, and
intense demands on City utilities and recreational facilities;
9. To provide a mechanism to more effectively rneet the purposes and
intent of the State Environmental Policy Act;
l0. To supplement other land use regulations by addressing site plan
elements not adequately covered elsewhere in the City Code and to
avoid violation of the purpose and intent of those codes.
More specific guidance is provided in the following criteria:
General Review Criteria for Both Master Plans and Site Plan Review;
a. Conformance with the Comprehensive Plan, its elements,
goals, objectives, and policies, In determining compliance with
the Comprehensive Plan, conformance to the objectives and
policies of the specific land use designation shall be given
consideration over city-wide objectives and policies;
b. Conformance with existing land use regulations;
C. Mitigation of impacts to surrounding properties and uses;
d. Mitigation of impacts of the proposed site plan to the site;
e_ Conservation of area -wide property values;
f. Safety and efficiency of vehicle and pedestrian circulation;
9- Provision of adequate light and air;
h. Mitigation of noise, odors and other harmful or unhealthy
conditions;
Seahawks' Headquarters and Training Facility
File No.: LUA-06-073, SA-H, SA-M, SM, CCI'
December 7, 2006
Page 12
Availability of public services and facilities to accommodate
the proposed use; and
Prevention of neighborhood deterioration and blight.
The criteria for a Master Plan and Site Plan review overlap or coincide in a number of particulars.
Frankly, the Master Plan criteria are intended for a large multi -dimensional project with a variety of
components, probably spread over a larger area. The Master plan would be more appropriately applied
to a large, multi -phase or multi -building project where the aim is to achieve a cohesive, blended,
harmonious whole. The Master Plan review would be to make sure to knit a uniform project that looks
as if all of the elements and a variety of buildings had a basic design theme or one which made sure that
all of the clements worked together as far as access, circulation and similar features spread over a larger
proposal. A Master Plan review does not necessarily identify with the current proposal where one
purpose is identified by the applicant - a complex in which to manage and train a professional football
team, In the current proposal there really is only the one building, served by one, linear access road and
the associated outdoor sports fields. The site pretty much stands alone_ If and when development
occurs south of the proposed complex on additional COR 2 property that will be under separate
ownership and development criteria.
4. A fair number of City goals and objectives all point to redeveloping this very under-utilized property.
The City has always envisioned more interesting, one could say, grand plans for this former industrial
area along the lakeshore. It has been years since a major industrial use that was water -related could
utilize lakeshore property and not potentially inflict environmental damage on the shoreline or the lake
and its water duality, Of course, some questions could be raised about the limited scope of this proposal
in terms of creating new as opposed to relocated employment and of basically leaving fallow, the spaces
dedicated to practice fields that might have been developed with additional office buildings or research
park. Might a mixed -use complex been more appropriate rather than one focused solely on the
Seahawks football team? Possibly, but than again, a portion of this property still requires remedial
capping of environmentally questionable soils probably mediating against development of housing.
Similarly, disturbance of some portion of the underlying soils would not be advisable for building
foundation work whereas outdoor practice fields present a good match since there would be limited
disturbance of the soils. The proposed plan will bring executive and administrative offices to this site.
The site will be a focus for public visitation - practice and pre -season games. The proposed complex is
also quite well -designed and has metamorphcd into a better plan. The building has been moved further
from the lake to reduce its visual impacts on both neighbors and those using the lake itself or viewing it
across the lake. The four playing fields also keep about half of the site visually unencumbered. The
complex will also be screened by landscaping along its facades and the site's perimeter. The building
couplet has been scaled and terraced and utilizes visual ciements to reduce its bulk and increase its
visual interest. Clearly, any permissible use of the site, other than open space or parkland would create
impacts on neighbors, boaters and Mercer Island residents. The plan also accommodates public use of a
shoreline that has been closed to the public for decades.
The comprehensive plan suggests the redevelopment of former industrial sites with large-scale projects
while remediating the impacts of the former industrial pollution. The proposed Seattle Seahawks
administrative offices and practice facilities appear to fulfill these objectives with a high profile tenant
in a highly styled complex. The complex as noted offers a mix of structural components, the office
building and the indoor practice facility, and open space and landscaping, the four open-air practice
fields and the general landscaping found around the grounds. The shoreline location suggests public
access and that will be provided by the approximately 250 feet of trail along the lake shore as well as the
connecting trail to the public rights -of -way east of the subject site. The offices will provide an urban
focus and a center for employment. The site, of course, provides built-in amenities. It has the lakeshore
Scahawks' Headquarters and Training Facility
File No.: LUA-06-073, SA-H, SA-M, SM, ECF
December 7, 2006
Page 13
and wetlands and views out over the lake. These will be well exploited by the orientation of the
building.
6. The building meets the bulk standards for the CUTE 2 zone in teems of height and lot area coverage.
Staff reported that it complies with the urban definition requirements of the City's current Shoreline
regulations_ Compliance with building and fire code requirements will be determined when appropriate
permits are submitted for actual development.
7. The building complex has been moved away from the lake an additional 62 feet to offset to some extent
its impacts on the adjacent residential complex. It has also redesigned its north facade treatment to
reduce its visual impact on its near neighbors. There is no question that any permissible development of
this site that adds buildings above grade will have an impact. That cannot be prevented save for keeping
privately owned property as open space. That is not currently an option and the proposed plan appears
to have achieved some reasonable compromise. After all, approximately half of the site, the entire south
portion of the property will be open space - it will be practice fields. The applicant is seeking to create
its own, new crossing of the railroad to reduce traffic impacts on its northerly residential neighbors who
all share Ripley Lane_ The applicant proposes replanting areas of the lakeshore with native plants and
some larger specimens, Those efforts will serve to provide some screening without closing off the site's
own visual access to the lake view.
8. The building complex has been designed to terrace upward from the lake with the office building scaled
to approximately 55 feet and the more easterly element, the indoor practice fields, at 1 I I feet. Open
space is a featured element on the entire south half of the parcel. Landscaping will be used to soften
facades and enhance the perimeter of the site near the railway and the road system. The building has a
formal entry and focal point. It also has the public shoreline walkway. The exterior treatment combines
a variety of high -quality materials and finishes, colors and textures. Both horizontal and vertical
banding and articulation will also be used in the facades to add visual interest and break the bulk into
faceted planes. Recognizing past industrial pollution and current sensitivities, the applicant will be
using Integrated Pest Management (IPM) techniques on all ornamental landscaped areas and natural turf
practice fields.
9. The redevelopment of this will increase property values although there is no avoiding the fact that
construction and occupancy on what has been a vacant site for quite a while will have an impact on the
immediate community. The construction impacts should be relatively short-lived. The impacts of reuse
and occupancy were anticipated when this site was comprehensively planned and the zoning was put in
place. It was expected that this site and its neighbors to the south would be developed with a variety of
more intensive uses bringing with those more intensive uses additional traffic, people, urban scale
development and the general tumult of a vibrant urban lake shore.
10_ The settlement agreement provides assurances that for an extended period of time there would be no
night activities or lighting to accommodate night activities. Normal considerations will limit exterior
lighting and parking lots and building entrances would be equipped with cut-off features to avoid light
spillage onto adjacent properties. Again, though, interior lights will change the character or visual
canvas that a vacant site provided from the lake's vantage point or even for those looking down on the
site from the east.
11. The site's somewhat isolated location limits the complexity of access and circulation although the site
does share Ripley Lane with others north of the site_ The applicant is seeking an additional access
which, would help improve access for both visitors to the site and to adjacent properties. The internal
circulation appears reasonable_ Additional visitor access during open events on the campus will be
Seahawks' Headquarters and Training Facility
File No.: LUA-06-073, SA -II, SA-M, SM, ECF
December 7, 2006
Page 14
accommodated by shuttle vehicles from remote parking areas to help limit the amount of traffic to the
site, A canopied walkway connects parking to the main entrance. Interior walkways will accommodate
pedestrians moving between facilities on the property.
12, The large open spaces on the south as well as the setback between the residential complex to the north
and the current proposal allows entry of light and air to both the side and neighboring properties. The
east aspect is already fairly open given the parallel roadways and railroad. The relocation of the
building will reduce some shadow impacts although, again, any development of the subject site by
legally permissible development would have an impact. The impacts have been reduced but not
eliminated,
13- Construction will generate the most noise and this should be limited in duration. As noted above, there
will be additional hubbub when the site is occupied and a bit more during the open practices during the
summer season.
14, The site will be served by City water and sewer service. The Baxter Lift Station will need to be utilized
and appropriately updated. Stormwater will be directed to the lake. The development will comply
with the Department of Ecology and King County regulations. The creek's alignment will be altered
and its outfall enhanced but it will remain culverted for a majority of its run through the subject site.
The applicant will be paying mitigation fees imposed by the ERC to offset some impacts of the
development on the City's facilities.
15, The redevelopment of the subject site will enhance the site and prevent deterioration or additional blight
on the subject site
16. In addition to the above criteria the COR Zones provide additional criteria for reviewing a proposal.
Those criteria include:
a. The plan is consistent with a Planned Action Ordinance, if applicable;
b. The plan creates a compact, urban development that includes a
compatible mix of uses that mccts the Comprehensive Ilan vision and
policy statements for the CommerciaUOffice/Residential or Urban
Center North Comprehensive Plan designations;
C. The plan provides an overall urban design concept that is internally
consistent, and provides quality development;
d. The plan incorporates public and private open spaces to provide
adequate areas for passive and active recreation by the occupants/users
of the site, and/or to protect existing natural systems;
e. The plan provides view corridors to the shoreline area and Mt. Rainier
where applicable;
f. Public access is provided to water and/or shoreline areas;
g. The plan provides distinctive focal points such as public area plazas,
prominent architectural features, or other items;
h. Public and/or private streets are arranged in a layout that provides
reasonable access to property and supports the land use envisioned; and
i. The plan accommodates and promotes transit, pedestrian, and other
alternative modes of transportation.
17, There is no Planned Action Ordinance involving the subject site.
Scahawks' I-Ieadquarters and Training Facility
File No.: LUA-06-073, SA-1-1, SA-M, SM, ECF
December 7, 2006
Page 15
Is. The proposal is basically self-contained. The site's limitations include the poor and/or contaminated
soils on the south half leaving commercial and office development a reasonable accomplishment. In
addition, the COR zoned property to the south provides a residential component. It meets the
comprehensive plants goal of redeveloping the subject site with high quality uses.
19. The plan provides both public and private open space_ There is the walking path along the shoreline and
there are the open practice fields for team workouts. The applicant proposes to enhance the shoreline by
restoring natural plants and protecting the existing wetland.
20_ Shoreline view corridors will be provided both by the shoreline trail as well as the open views across the
playing fields_ Views of the take will be available from the office building and other open areas on the
subject site.
21. The proposal will provide a focal point as an icon of a professional football teatn as well as when it is
open to the public for practice sessions in the summer. The building is well designed and should be
attractive even at its larger scale.
21 The access for the site is focused along Ripley Lane and/or Lake Washington Boulevard_ It should
reasonably serve the site for both vehicles and pedestrians.
DECISION;
The proposed Master Site Plan and Site Plan are approved subject to the following conditions:
The applicant shall submit a color and materials board demonstrating exterior materials and finishes to
the Development Services project manager for approval prior to obtaining building permits.
2. The applicant shall submit a detailed landscape plan for the riparian zone along the shoreline of Lake
Washington and install landscaping of a type and in a manner so as to enhance wildlife riparian habitat_
Such submittal shall be prior to obtaining building permits and installation of landscaping shall be
completed prior to building occupancy.
The applicant shall submit a detailed project landscape plan, meeting the requirements of RMC 4-8-
120DI2, to the Development Services project manager for approval prior to obtaining building permits.
4. The applicant shall submit a detailed landscape plan and maintenance program for the public right-of-
way landscaping along Ripley Lane abutting the Burlington Northern Santa Fe Railroad right-of-way.
The plan shall be submitted to the Development Services project manager for approval prior to
obtaining building permits and installation shall be prior to building occupancy.
5. The applicant shall submit a plan demonstrating locations of outdoor light fixtures, their function, light
levels, and illumination coverage to the Development Services project manager for approval prior to
obtaining building permits-
G. Football Northwest shall develop the project with the office building and the indoor Practice Facility
located as shown in the Mitigation Site Plat -Alternative. FNW shall develop a green screen wall,
planted with ivy or other appropriate landscaping materials, along the bottom thirty (30) feet of the
northeasterly elevation of the indoor practice facility. In addition, FNW will develop the north elevation
of the indoor practice facility substantially in accordance with the principles stated in the Settlement
Agreement.
Seahawks' Headquarters and Training Facility
File No.: LUA-06-073, SA-H, SA-M, SM, I C)f:
December 7, 2006
Page 16
7. Fan parking during training camp will be accommodated at a parking lot or parking facility off the
project site, with fans then being bused to the site,
8, The project dumpsterlrecycling area will use containers with lids, and the container storage area will be
screened from the Misty Cove property. The garbage and recycling pickups will occur during normal
business hours on weekdays -- not at nights or very early morning hours. All non -recyclable materials
placed in the containers will be in sealed plastic bags.
9. FNW shall replace the existing property line fence between the Misty Cove property and the project site
with a new fence of at least equal quality.
10, No athletic field lighting is being proposed under the permit. The Seahawks agree not to seek any
permit to do so for a period of 15 years from the date of this Agreement. All project exterior lighting
will be designed so that the lighting is directed away from the Misty Cove residences.
11. FNW will provide signage that clearly indicates the main entrance to the project site, so that visitors to
the site can easily find the entrance. Any signage will have to comply with City and State regulations.
12. The proposed shoreline area planting plan shall include lower -level plantings in the north section of the
project shoreline area, in order to minimize impacts of views of the water from the adjacent Misty Cove
Condominium property.
13. The mitigation and design measures in the Lake and Stream Study and the Turf Integrated Pest
Management Plan submitted to the City as part of the project application shall be conditioned to permit
approval.
ORDERED THIS 7"' day of December 2006.
1
FRED J. KAU AN
HEARING EX WER
TRANSMITTED THIS 7"' day of December 2006 to the parties of record:
Elizabeth Higgins
1055 S Grady Way
Renton, WA 98055
Lance Lopes
VP Seahawks
800 Occidental Avenue S
Seattle, WA 98034
Kayren Kittrick
Development Services
Renton, WA 98055
David Murphy
Crawford Architects
1801 McGee St., Ste. 200
Kansas City, MO 64108
Roger Pearce
Foster Pepper
I I I 1 Third Avenue, 34i' Floor
Seattle, WA 98101
I.,arry & Esther Harsher
6940 96"' Avenue SE
Mercer island, WA 98040
Eileen Halverson Joe Burcar Carl Hadley
5021 Ripley Lane N, ##302 3190 160"' Avenue SE Cedar Rock Consultants
Renton, WA 98056 Bellevue, WA 98008 19609 244" Avenue
Seahawks' Headquarters and Training facility
File No.: LUA-06-073, SA-H, SA-M, SM, ECF
December 7, 2006
Page 17
Football Northwest
505 Fifth Avenue S., Ste. 900
Seattle, WA 98104
Michael Cero
8300 Avalon Drive
Mercer Island, WA 98040
Brian T. Sabey
5021 Ripley Lane N, Ste. 304
Renton, WA 98056
Steve Jansen
5021 Ripley Lane N, Ste, 4
Renton, WA 98056
Aaron Belenky, President
Williamsburg Condo HOA
1800 NE 40"' Street, Ste, 11-4
Renton, WA 98056
Barbara Paxhia
5021 Ripley Lane N, Ste. 104
Renton, WA 98056
Richard Wagner
Baylis Architects
10801 Main Street, Ste. 110
Bellevue, WA 98004
Port Quendall Company
505 Fifth Avenue S., Ste. 900
Seattle, WA 98104
Thomas Peterson
Socius Law Group PLLC
Two Union Square
601 Union Street, Ste. 4950
Seattle, WA 98101
Eleanor Maargo Kennamer, President
Misty Cove Condo Association
5021 Ripley Lane N, Ste, 309
Renton, WA 98056
Steve Gregerson
5021 Ripley Lane N, Ste. 302
Renton, WA 98056
Shelly Munkberg
SECO Development
1083 Lake Washington Blvd N., Ste_ 50
Renton, WA 98056
Jeffrey Taraday
Foster Pepper
I 1 I I Third Avenue, Ste. 3400
Seattle, WA 98101
TRANSMITTED THIS 7"` day of December 2006 to the following:
Mayor Kathy Keolker
Jay Covington, Chief Administrative Officer
Julia Medzegian, Council Liaison
Gregg Zimmerman, PBPW Administrator
Alex Pietsch, Economic Development
Jennifer Henning, Development Services
Stacy Tucker, Development Services
K ing County Journal
Woodinville, WA 98077
Ray Col I iver
505 Fifth Avenue S., Ste. 900
Seattle, WA 98104
Thelma Sutherland
1205 N 29"' Street
Renton, WA 98056
Jared Salstrom
5021 Ripley Lane N, Ste. 213
Renton, WA 98056
Elya George Baches
1414 N 34"' Street
Renton, WA 98056
Elaine Wine
Vulcan
505 Fifth Avenue S, Ste. 900
Seattle, WA 98104
Tom Ehrlichman
Socius Law Group
Two Union Square
601 Union Street, Ste. 4950
Seattle, WA 98101
Stan Engler, Fire
Larry Meckling, Building Official
Planning Commission
Transportation Division
Utilities Division
Neil Watts, Development Services
Janet Conklin, Development Services
Pursuant to ,ritte IV, Chapter 8, Section I OOGof the City's Code, request for reconsideration must be filed in
writing on or before 5:00 p.m., December 21, 2006, Any aggrieved person feeling that the decision of the
Examiner is ambiguous or based on erroneous procedure, errors of law or fact, error in judgment, or the
discovery of new evidence which could not be reasonably available at the prior hearing may make a written
request for a review by the Examiner within fourteen (14) days from the date of the Examiner's decision. This
request shall set forth the specific ambiguities or errors discovered by such appellant, and the Examiner may,
after review of the record, take further action as he deems proper.
Scaliawks' licadquarlcrs and Training Facility
File No.: LUA-06-073, SA-H, SA-M, SM, ECP
December 7, 2006
Page 18
An appeal to the City Council is governed by Title 1V, Chapter 8, Section 110, which requires that such appeal
be filed with the City Clerk, accompanying a filing fee of $75.00 and meeting, other specified requirements,
Copies of this ordinance are available for inspection or purchase in the finance Department, first floor of City
Hall. An appeal must be filed in writing on or before 5:00 p.m„ December 21, 2006,
If the Examiner's Recommendation or Decision contains the requirement for Restrictive Covenants, the
executed Covenants_ will. be required prior to -approval by City Council or final processing of the file. You
may contact this office for inforniation on formatting covenants.
The Appearance of Fairness Doctrine provides that no ex parte (private one-on-one) communications may occur
concerning pending land use decisions. This means that parties to a land use decision may not communicate in
private with any decision -maker concerning the proposal. Decision -makers in the land use process include both
the Hearing Examiner and members of the City Council.
All communications concerning the proposal must be made in public. This public communication permits all
interested parties to know the contents of the communication and would allow theni to openly rebut the
evidence. Any violation of this doctrine would result in the invalidation of the request by the Court.
The Doctrine applies not only to the initial public hearing but to all Requests for Reconsideration as well as
Appeals to the City Council.
Project Location: 5015 Lake Washington Boulevard N (also addressed as 5015, 4801,
4635 Ripley Lane)
a
A
9
EL
0 114 112 1
EXHIBIT Scale In Mies
2
NOTE
ke- produced with pennlssim granted by THOMAS BROS. MAPS0.
This map is copyrighted by THOMAS. BROS. MAPS0. It Is
unlawful to copy or reproduce all or any part thereof, whether for
personal use or resale, without Permission. All rights reserved.
Seahawks Headquarters and Practice Facility
Renton, Washington
VICINITY MAP
September2006 21-1-20525-003
SlilkNNON & WILSON, INC.
owwr"Wdw"off"Orb
_ CA
ict
- - 6-
CDR CKi�3
CDR
sti
i AIN
�a ate.
...._ _
_ EXHIBIT
4
ZONING MAP -
Y
1
F� LAKE WASHINGTON
PSE .-
E1ECr. COL
R STATION j
t ' �� tiyETlAM05 •�. IST7NG BwLD:NG _
STRUCTURE TO BE
U
KK/ * •- StEVOJED
w �i , p •� ^ A EXTENT OF
OUR I ``�„�• PVBUC ACCESS F_7[r5T IVACCESS WALK
ExlSnNG POWER Lam, G DOCK SECuRrrY PENCE
POLE
.I 2D' SERVCE RO&O
LOCAnDN
SOVK PROPERTY
FENCE LINE t
PSE EASEUEN' '1 v
ulae (Tao)
EXISTING PDWFE!-
I
POLE LOCATION H ` I { - i�'.-,. LLl 6U
L
CUR ul
J i
�- c
w Z _C
NEW t- STORY
h 5Nw D +ANCE
EK! �, cu
COVERED CAR WASH PAD
ExrSnNG POWER
PCLE LOCATION CURS _ n i 7
"NT. PARK04 _
ID STALLS -- A4ii�lEll4E.fS4144i4�I44E4Ji
lllllll
SECURITY GATE SURFACE PARKING
B FILTC f 7 r LJ SECURITY GATE
' PROPOSED RAILWAY CROSSINC - � z
EXHIBIT o c)
lZ
11m eh Zma cOLrrrr 7 �
1 _ $$ GERMAL SURFACE PARKING 141 STALLS T hl l� r
GYPSY B BASIN DRAINA E t CLASS 2 (RE: FTCURE 61) _ ARE TEAM PARKING 254 Ll`��F 05
SU
B z Q `
�pc
Lu
so' ,es f-dlti � a
1 AL Pf.AN lncKsa� m ui✓aa, � Z -(}.�
:.�i: -r .....r}.«,ram,,-....-..�....
it
a
M
97
OF I
Cily of Renton PAWW Department Preliminary Report to the Hearing Examir}er
SEATTLE SEAHA WKS' HEADQUARTERS AND TRAINING FACILITY LUA-06-073, SA-H, SA-M, SM, ECF
PUBLIC HEARING DATE. November 21, 2006 Page 7 of 20
appeal period commenced on October 23, 2006 and ended on November 6, 2006. Two appeals of the
threshold determination were filed. It is anticipated that these appeals would be heard on November
21, 2006, prior to the public hearing on the Master and Site Plan Reviews,
3. ERC MITIGATION MEASURES
Based on an analysis of probable impacts from the proposed project, the following mitigation measures
were issued for the Determination of Non -Significance -- Mitigated:
1. The applicant shall comply with the recommendations included in the geotechnical report,
"Supplemental Preliminary Geotechnical Report Seahawks Headquarters and Practice Facility
Renton, Washington," by Shannon & Wilson, Inc., dated September 13, 2006, including
recommendations for excavation, backfill materials, structural concrete blocking, and soil
remediation for the water mains.
2. This project shall be subject to the 2005 Icing County Surface Water Design Manual for water
quality.
3. The applicant shall be required to provide a Temporary Erosion and Sedimentation Control
Plan (TESCP) designed pursuant to the Department of Ecology's Erosion and Sediment
Control Requirements, outlined in Volume 11 of the 2001 Stormwater Management Manual and
provide staff with a Construction Mitigation Man prior to issuance of construction permits.
4. The applicant shall work with the City to alleviate upstream flooding that may impact access to
the site. Additional details of pipe sizing and/or street improvements would be addressed
through site plan review_
5. A traffic mitigation fee of $75 per additional daily trip shall be assessed based on the submitted
calculation of 555 ADT. The fee of $41,625.00 shall be assessed at building permit issue.
6. A fire mitigation fee of $0.52 per square foot of building space shall be assessed at building
permit issue.
7. In the event that archaeological deposits are found during construction, work shall stop and the
contractor(s) shall contact the State Archaeologist at the State of Washington Office of
Archaeology and Historic Preservation, phone (360) 586-3065, the Muckleshoot Cultural
Resources Program, phone (253) 939-3311, and Duwamish Tribal Services (206) 431-1582.
4. STAFF REVIEW COMMENTS
Representatives from various city departments have reviewed the application materials to identify and
address site plan issues from the proposed development. These comments are contained in the
official file, and the essence of the comments has been incorporated into the appropriate sections of
this report and the Departmental Recommendation at the end of the report.
5. SITE DEVELOPMENT PLAN REVIEW
The purpose of site development plan review is to assure that proposed development is compatible
with the plans, policies, and regulations of the City of Renton as outlined in the City's Comprehensive
Plan and the City's Business Plan Goals. Site development plan review is divided into two types.
Master Plan and Site Plan.
HEM( -Staff rpt Q"73.doc
FOSTER PEPPER.,.
November 17, 2006
VIAMFS.�NGUR
Mr. Fred J. Kaufinan
Hearing Examiner
City of Renton
1055 South Grady Way
Renton, Washington 98055
Re: Seattle Seahawks Headquarters Facility
City of Renton Application No. LUA06-073
Dear Mr, Kaufinan:
Direct Phone (206) A47 4676
Direct Facsimile (206) 7 i9-1997
E-Mail PearRO(oster.com
FARING OrAM NFR r
As part of its settlement with the Misty Cove Association of Apartment Owners, permit applicant
Football Northwest LLC ("FNW") agrees to the following permit conditions with respect to its
Master Plan and Shoreline Pennit Applications for the Seahawks Corporate Headquarters and
Training Facility under the above -referenced project number (the "Project") and respectfully
requests they be made conditions of permit approval.
Building Location/Indoor Practice Facility North Elevation Design. FNW shall develop the
Project with the office building and the Indoor Practice Facility ("IPF") located as shown in the
Mitigation Site Plan -Alternative, which is attached as Exhibit A to this letter. FNW shall
develop a green screen wall, planted with ivy or other appropriate landscaping materials, along
the bottom thirty (30) feet of the northeasterly elevation of the IPF (the IPF elevation to the south
of the Misty Cove Condominium). In addition, FNW will develop the north elevation of the IPF
substantially in accordance with the principles stated in Exhibit 13 to this letter.
Training Camp Off -Site Fan Parking. Fan parking during training camp will be accommodated
at a parking lot or parking facility off the Project site, with fans then being bused to the Project
site.
Project Dum ster/Rec lin Area. The Project dumpster/recycling area will use containers with
lids, and the container storage area will be screened from the Misty Cove property. The garbage
and recycling pickups will occur during normal business hours on weekdays -- not at nights or
very early morning hours. All non -recyclable materials placed in the containers will be in sealed
plastic bags.
_Mist Cy Ovg/FNW Property Line Fence. FNW shall replace the existing property line fence
between the Misty Cove property and the Project site with a new fence of at least equal quality.
SOi.IJ613?
Mr_ Fred J. Kaufman
November I7, 2006
Page 2
Project Outdoor Lighting. No athletic field lighting is being proposed under the permit. The
Seahawks agree not to seek any permit to do so for a period of 15 years from the date of this
Agreement. All project exterior lighting will be designed so that the lighting is directed away
from the Misty Cove residences.
Sign e, FNW will provide signage that clearly indicates the main entrance to the Project site;,
so that visitors to the site can easily find the entrance. Any signage will have to comply with
City and state regulations.
Shoreline Plantings. The proposed shoreline area planting plan shall include lower -level
plantings in the north section of the Project shoreline area, in order to minimize impacts of views
of the water froin the adjacent Misty Cove Condominium property.
Shoreline Impacts_ The mitigation and design measures in the Lake and Stream Study and the
Turf integrated rest Management Plan submitted to the City as part of the Project application
shall be conditions to permit approval.
Thank you for your consideration of this request.
Very truly yours,
FOSTER PEPPER PLLC
r
Roger A. Pearce
Attorneys for applicant Football Northwest LLC
cc; Ms. Elizabeth Higgins, City of Renton
Tom Peterson, Esq.
Mr, Lance Lopes
Ms_ Elaine Wine
30 44613.2
rz=_
CURB -------------------
EXtSEMC POWER
PCILC LOCATI,
SOUTH PROPERTY I: „ , I \ ,_L. _ I ' .._�
rcNr£ LI PSE [A
LINE (TBDj if NI7U3LL CRASS PRACTICE FIELDS
vs7wc Pc'-LR
C_E LOCATION
P K)
CARED CAR WAS- PAD
77
�—ll
EXISUNG POWER
POLOLOCATION
-ij .
1AAJNT. PI,RKI.Nc
3 STALLS
LAKE WASHNGi
3J' rlR
ACCESS
EXTOT 0-
Pue. is ACCESS
m
x
ry
EXISTING 50401nG
5TPUCIVRL TO BE
RE vowo
5' ACCESS WALK
SEC" rtry r(!.lcE
20' SERVICE ROLZ
SECURITY rA7F
& E
:iA.* FLTZ41:'
...........
Lj
SECLA �Y I GATE
�VR&G-mN N R'HERIq SA.NTA FE
RQ1 '-VAY
:7'
7, ... .........
......
CWOVA" CR05Si-mS
LD
LLJ
LAKE LA
WASH[NGTC).14 SS
CESIMAL $1.)RFACZ PARKING
�SECLjK TZAJ) PARKING
91 STALLS
1 151� $T�,_Ls
S
W
Z
z 0
GYPSY 5QFl BASIN D AlKAGZ CLASS 2 (RE- FIGVF 8 3)
iTOTAL
252 STALLS
--------
(D
C
0 LL
Ai NIITIGATION SITE PLAN - ALTERNATIVr=
rro. Uch
Lr) Z
Indoor Practice Facility (IPF) — North Elevation
The design features the use of traditional architectural devices to reduce the apparent
scale and mass of the project including: horizontal expression lines, special roof
treatments plus fenestration and glazing systems. At the north elevation of the IPF,
three exterior wall systems are being developed:
1. Base — The first 30 feet of the fagade will consist of cementious wall panels
and/or nonreflective metal siding to a height of approximately 30 feet.
Additional shade and shadow will be created by a "green -screen" that is
comprised of a metal lattice grid with vegetation.
2. Middle - The middle portions of the elevation will consist of cementious wall
panels and/or nonreflective metal siding to a height of approximately 80 feet
with no "green screen."
3, Top — The "top" portions of the elevation will include a high percentage (up to
70% to 88% of translucent panels) and sculpted roof. The sculpted component
of the roof would add visual interest and reduce the apparent scale of the
fagade by casting varying shadow on the IPF fagade.
Each layer of the fagade will be defined by horizontal expression lines as mentioned
above. In addition, the composition of the materials being proposed for the fagade will
have a texture which will further reduce the apparent mass of the structure.
A range of color palettes are being studied for the fagade including:
1. Metal Panels/Siding — Nickel to light gray
2. Cementious Panels — Buff/Sandstone to light gray/nickel
3. Translucent Panels — white to "off-white"/light gray
4. "green -screen" — stainless/metal wire mesh with vegetation growing on the
screen.
Final color palettes will be based on actual materials selected. An example of potential
final colors, massing and roof design is included on the following page.
�:;EXHIBIT ��
El
W_�
a.XHIBIT
2 ate'
CIT*0F RENTON
T
Kathy Keolker, Mayor
October 19, 2006
Ray Colliver
Port Quendall Company
505 5th Avenue S ste: #900
Seattle, WA 98104
PlanningBuilding/Publie Works Department
Gregg Zimmerman P.R., Administrator
SUBJECT: Seahawks Headquarters and Training Facility
LUA06-073, SA-M, SA-H, SM, ECF
Dear Mr. Colliver:
liECEIVED
OCT 2
TER PEPPER Pt_LC
This letter is written on behalf of the Environmental Review Committee (ERC) to advise you that they
have completed their review of the subject project, and -have issued a threshold Determination of Non-
Signffcance-Mitigated with Mitigation Measures. Please refer to the enclosed ERC Report and Decision,
Part 2, Section B .for a list of'the Mitigation Measures.
Appeals of the environmental determination must be fledin writing on or before 5:00 PM- on
November 6, 2006. Appeals must be filed. in writing together with the required $75.00 application fee
with: Hearing Examiner, City of'Renton, 1055 South Grady Way, Renton, WA 98055. Appeals to .the
Examiner are governed by City of Renton Municipal Code "Section 4-8-110.B. Additional information
regarding the appeal process may be obtained -from the Renton City Clerk's Office, (425) 430-6510.
A Public Hearing will be held by the Renton Hearing Examiner in the Council Chambers on the seventh
floor of City Hall, 1055 South Grady Way, Renton, Washington, on November 2T, 2006 at 9:00 AM to
consider. the Master Site Plan.. and Site Plan. The applicant or representative(p) of the applicant is
required to be present at the public hearing. A copy of the staff report will be mailed to you one week
before the hearing. If the Environmental Determination is appealed, the appeal will be heard as part of
this public hearing.
The preceding information will assist you in planning for implementation of your project and enable you to
exercise your appeal. rights more fully, if you choose td do so. If you have any questions or desire
clarification of the above, please call me at (425) 430-7382.
For the Environmental Review Committee,
Elizabeth Higgins
Senior Planner
cc: Parties of Record
Enclosure
1055 South Grady Way - Renton, Washington 98055
RENTO N.
AHFAD OF THE CURVE
REPORT
1 City of Renton
Department of Planning 1 Building / Public Works
DECISION
ENVIRONMENTAL REVIEW COMMITTEE REPORT
ERC MEETING DATE.,
October 16, 2006
Project Name:
Seahawks Headquarters and Training Facility
Owner:
Port Quendall Company
Applicant:
Football Northwest
Contact:
Mr. Ray Colliver
505 Fifth Avenue S, Suite 900
Seattle, WA 98104
File Number.
LUA06-073, ECF, SA-M, SA-H, SM
Project Manager.
Elizabeth Higgins, Senior Planner
Project Description:
The project proponent is requesting SEPA environmental review for development of the
Seahawks Headquarters and Training Facility. The proposed project would consist of
a three-story office building and indoor practice facility in a single structure and four
outdoor practice fields for the sport of professional football. An ancillary building for
football -related equipment storage is also planned.
Continued next page
Project Location:
5015 Lake Washington Boulevard N (also addressed as 5015, 4801, 4635 Ripley Lane)
Exist. Bldg. Area SF:
NIA Proposed New Bldg. Area (footprint): 129,595 sf
Proposed New Bldg. Area (gross): 215,000 sf
Site Area:
19.68 acres (853,776 sf) Total Building Area GSF. 215,000 sf
RECOMMENDATION:
Staff recommends that the Environmental Review Committee issue a Determination of
Non -Significance — Mitigated (DNS-M).
Project Location Map Seahawks ERC Report 03
City of Renton P/S/PW Departme E hmentat Review Committee Staff Report
S!✓AHA WKS HEADQUARTERS TRAINING FACILITY LUA-06-073, ECF, SA-M, SA-H, SM
REPORT OF OCTOBER 16, 2006 Page 2 of 16
PART ONE: PROJECT DESCRIPTIONIBACKGROUND, CONTINUED
The proposed project location is a vacant site between the shore of Lake Washington and the NE 441" Street
interchange with Interstate 405 (Exit 7) in Northeast Renton (Exhibit 1). The site consists of two tax parcels, known as
Baxter North and Baxter South Properties. The 19.6 acre Baxter property is a former timber processing/wood
treatment facility (Exhibit 2).
The wood treating operations at the site ended in 1981 and the property was subsequently used for storage of bark
mulch. Cleanup of the property was prescribed by Prospective Purchaser Consent Decrees (North Baxter, #00-2-
11778-7KNT and South Baxter, #00-2-11779-5KNT) negotiated with the Department of Ecology under the Model
Toxics Control Act. Cleanup of the South Baxter property consisted of excavation and replacement of soils in the
Baxter Cove area and soil stabilization in the uplands. North Baxter remediation, consisting of capping contaminated
soils, has been proposed to occur simultaneously with site construction.
The site is within the Gypsy Subbasin Drainage, a 320 acre area north of and near, but independent of May Creek.
The drainage way for the Gypsy Subbasin enters the property in a pipe from the BNSF Railroad right-of-way. Once on
the property it flows from east to west first in a 125 foot open channel and then for 490 feet in a pipe to an outfall at the
shoreline of Lake Washington.
The dominant character of the site is an abandoned open field. There are no significant buildings on the property at the
present time. A single -story, 1,300 sf wood -frame office building built on Baxter North in 1963, would be removed from
the property, as would asphalt -paved interior roads. An existing boathouse and dock are located at the northwest
shoreline. There is currently no plan to utilize these features and they would be fenced from the area of the site
accessible to the public.
On -site clean-up activities, remediation from the former wood -processing activities, have consisted of soil excavation,
contaminant removal, and in situ soil stabilization. Site grading for the project would be coordinated with continuing
remediation. Calculations indicate the capping of the site (see Environmental Health discussion, below) and grading
for site features would require approximately 29,600 cubic yards of cut and 52,900 cubic yards of fill material. Some
cut material would be removed from the site and the remainder reused. A source statement for fill material would be
required at the time of site construction.
The property is zoned Commercial I Residential I Office 2 (COR 2). The stated purpose of the Commercial /
Residential I Office zone is, "to provide for a mix of intensive office, hotel, convention center, and residential activity in
a high -quality, master -planned development that is integrated with the natural environment." Although a major, national
sports franchise headquarters was not anticipated as a use at the time this policy statement was formed, the following
adopted policy is applicable, "Also, commercial uses that provide high economic value may be allowed if designed with
the scale and intensity envisioned for the COR zone."
The proposed project consists of administrative offices for a professional football franchise and accessory training and
practice facilities (Exhibit 3). The office and an indoor practice field would be within a 215,000 gross square foot
building on the North Baxter property. Administrative offices would be 48,000 sf and technical / support and player
meeting space would be 15,000 sf each.
Four outdoor, practice fields covering 8.3 acres would be located on the Baxter South property. Three would be
natural and one artificial turf.
The proponent's vision is for a building that would be both functional and aesthetically significant. Of the total building
area, 131,000 gross square feet of office space would be located on three levels. Most of the building would be
between 52 and 55 feet in height. The height of the 80,000 gross square foot indoor practice field, situated on the
north and east sides of the building, would be between 95 feet at the center of the field and 120 feet. There would be
three natural grass practice fields, oriented east -west on the South Baxter property. A one-story, 6,000 sf
maintenance / equipment storage building would be located near the south property line.
The steel frame building would be faced in bufflsandstone to light gray synthetic stone, masonry, and storefront
systems on the lower level. Clear -glazed windows and either bufffsandstone to light gray cementious, or nickel to light
gray metal, wall panels in on upper portions. (Building siting and design will be discussed to a greater extent during
the Site Plan Review).
The scale and intensity of the proposed project balances City policies that intend high intensity use, with both the
natural amenities of the shoreline and wetland, both of which will have been enhanced by project completion, and
residual contamination from the former industrial use.
Seahawks ERC Report 03
City of Renton PIBIPW Departme, I E )mental Review Committee Staff Report
SEAHAWKS HEADQUARTERS A.. — TRAINING FACILITY LUA-06-073, ECF, SA-M, SA-K SM
REPORT OFOCTOBER 16, 2006 Page 3 of 16
Access would be from Lake Washington Boulevard (Ripley Lane) on the east and would require crossing the
Burlington Northern Santa Fe Railroad right-of-way with a private street
On -site roads would be private. There would be parking for 299 vehicles; 195 stalls for general surface parking and
104 secure (fenced) surface parking stalls for team members. Due to both limited access and on -site parking, the
annual training camp, held for three weeks in August, would require off -site parking with a scheduled shuttle bus
service.
Portions of the site not covered with pavement, buildings, or fields would be either restored with native vegetation
(wetland and shoreline) or landscaped appropriately for its function. Irrigation systems would be installed in all
landscaped areas with temporary irrigation for the shoreline riparian plantings until they are established. (Landscaping
will be discussed to a greater extent during the Site Plan Review).
A viewpoint at shoreline of Lake Washington would be accessible to the public by means of an east -west paved
walkway located parallel to the north property boundary. This viewpoint would be landscaped and furnished with
benches.
A Category 3 wetland has been restored and would remain in a protected area at the southwest portion of the
property, adjacent to Lake Washington. The wetland would not be accessible to the public, although public access to
the shoreline of Lake Washington would be provided by the proponent at the northwest corner of the property.
PART TWO: ENVIRONMENTAL REVIEW
In compliance with RCW 43.21 C.240, the following project environmental review addresses only those project impacts
that are not adequately addressed under existing development standards and environmental regulations.
A. Recommendation
Based on analysis of probable impacts from the proposal, staff recommends that the Responsible Officials make
the following Environmental Determination:
DETERMINATION OF
NON SIGNIFICANCE
Issue DNS with 14-day Appeal Period.
B. Mitigation Measures
DETERMINATION OF
NON- SIGNIFICANCE- MITIGATED.
X I Issue DNS-M with 14-day Appeal Period.
Issue DNS-M with 15-day Comment Period
with a Concurrent 14-day Appeal Period.
1. The applicant shall comply with the recommendations included in the geotechnical report, "Supplemental
Preliminary Geotechnical Report Seahawks Headquarters and Practice Facility Renton, Washington," by
Shannon & Wilson, Inc., dated September 13, 2006, including recommendations for excavation, backfill
materials, structural concrete blocking, and soil remediation for the water mains.
2. This project shall be subject to the 2005 King County Surface Water Design Manual for water quality.
3. The applicant shall be required to provide a Temporary Erosion and Sedimentation Control Plan (TESCP)
designed pursuant to the Department of Ecology's Erosion and Sediment Control Requirements, outlined
in Volume II of the 2001 Stormwater Management Manual and provide staff with a Construction Mitigation
Plan prior to issuance of construction permits_
4. The applicant shall work with the City to alleviate upstream flooding that may impact access to the site.
Additional details of pipe sizing and/or street improvements would be addressed through site plan review.
5. A traffic mitigation fee of $75 per additional daily trip shall be assessed based on the submitted
calculation of 555 ADT. The fee of $41,625.00 shall be assessed at building permit issue.
6. A fire mitigation fee of $0.52 per square foot of building space shall be assessed at building permit issue.
7. In the event that archaeological deposits are found during construction, work shall stop and the
contractor(s) shall contact the State Archaeologist at the State of Washington Office of Archaeology and
Historic Preservation, phone (360) 586-3065, the Muckleshoot Cultural Resources Program, phone (253)
939-3311, and Duwamish Tribal Services (206) 431-1582,
Seahawks ERG Report 03
City of Renton P/B/PW Departme 1 E Jimental Review Committee Staff Report
SEAHAWKS HEADQUARTERS TRAINING FACILITY LUA-06-073, ECF, SA-M, SA-H, SM
REPORT OF OCTOBER 16, 2006 Page 4 of 16
C. Exhibits
Exhibit 1 Vicinity Map (September 2006)
Exhibit 2 Historic Aerial Photo of North and South Baxter Properties (date unknown)
Exhibit 3 Seahawks Headquarters and Training Facility, Building Plan (September 2006)
Exhibit 4 Seattle Fault Zone (July 2006)
Exhibit 5 Seahawks Headquarters and Training Facility, Site Plan (September 2006)
Exhibit 6 Baxter Cove Wetland Mitigation Plan (August 2006)
Exhibit 7 Lake Washington Shoreline, Existing Conditions (2006)
Exhibit 8 Riparian Habitat Functions and Values Chart (September 2006)
Exhibit 9 Gypsy Subbasin Culvert Replacement and Relocation Plan (August 2006)
Exhibit 10 Summary of Pest Control Measures (September 2006)
Exhibit 11 Visualization Assessment Viewpoints (September 2006)
Exhibit 12 Visualization Assessment, NE 76t" Street Viewshed (September 2006)
Exhibit 13 Visualization Assessment, Misty Cove Unit 312 Viewshed (September 2006)
Exhibit 14 Visualization Assessment, Misty Cove Unit 302 Viewshed (September 2006)
Exhibit 15 Seahawks Headquarters and Training Facility, Elevations (September 2006)
D. Environmental Impacts
The Proposal was circulated and reviewed by various City Departments and Divisions to determine whether
the applicant has adequately identified and addressed environmental impacts anticipated to occur in
conjunction with the proposed development. Staff reviewers have identified that the proposal is likely to have
the following probable impacts:
1. Earth
Impacts: An Environmental Checklist submitted by the project proponent and a report, "Supplemental
Preliminary Geotechnical Report Seahawks Headquarters and Practice Facility Renton, Washington," by
Shannon & Wilson, Inc., September 13, 2006, forms the basis of analysis of impacts classified within the
category of "earth". Additional, existing reports were reviewed for consistency with the literature study and on -
site investigation. Site exploration consisted of drilling 6 borings and excavating 29 backhoe test pits. Borings
were based on proposed location of building corners and the estimated building center. The test pits were
spaced across the site to provide an overview of near -surface soils. Some pits were more closely spaced
where deeper excavation for site preparation would occur.
The subsurface geology is a combination of naturally -occurring and artificial conditions. Fluvial deltaic,
lacustrine near -shore deposits and constructed fill overlie Pleistocene glacial sediments and Eocene volcanic
and sedimentary bedrock.
The site has undergone many influences over past decades including the lowering of the lake approximately 8
feet when the Lake Washington Ship Canal was constructed in 1916. In the mid 1950s, filling occurred on the
site to extend the shoreline and raise the grade for construction of industrial facilities. Ongoing dredging and
backfiifing increased the complexity of the soil so that the subsurface material consists of a highly
heterogeneous mix of clay, silt, peat, sand, gravel, and cobbles. Intermixed are abandoned subsurface
structures and discarded debris from past industrial activities on the site.
Generally, subsurface soils in the building and fields locations consist of either fill material to a depth of 2 to 3
feet, soft estuarine deposits and loose alluvial soils to depths of between 17 and 38 feet. The estuarine and
alluvial deposits have layers of loose sand and compressible peat making them subject to liquefaction (see
discussion below).
The depth to bedrock varies greatly across the site with depths from 17.5 feet to more than 50 feet. It consists
of highly weathered Andesite and is a competent bearing material for building foundations.
The site slopes gently at about a 1 percent grade across the property from northeast to southwest. There are
isolated slopes at about 5 percent along the north of the site. There is an elevation change from 33 feet in the
northeast corner to about 21 feet where a wetland is located in the southwest corner (see below).
The proposed access road would gain elevation between the railroad crossing and the proposed office
building. The elevation of the driveway and parking lot at the building entrance on the east side of the building
Seahawks ERC Report 03
City of Renton P/B/PW Departmer J E mental Review Committee Staff Report
SEAHAWKS HEADQUARTERS A.— TRAINING FACILITY LUA-06-073, ECF, SA-M, SA
REPORT OF OCTOBER 16, 2006 Page 5 of 16
is proposed to be approximately 14 feet above the existing grade. The parking area would slope downward as
it wraps around the north end of the building to the west, where it would meet the existing grade. A loading
dock at the northwest corner of the office building would be approximately 1 foot above existing grade. This
configuration would require construction of walls designed to retain up to 14 feet of fill adjacent to the office
building.
The remainder of the site, consisting primarily of outdoor practice fields, would require an average of
approximately 4 feet of fill, with cuts on the east side and up to 3 feet of fill on the west.
The site is located approximately 3 miles south of the "Seattle Fault," (Exhibit 4) and is therefore considered to
lie in a moderately active seismic zone. Due to subsurface conditions, the site is subject to earthquake -
induced liquefaction and settlement. This susceptibility to liquefaction extends to a depth of about 40 feet.
The office/indoor practice building would have typical loads for a structure of this type and size (verified by
Magnusson Klemencic Associates, project structural engineers, in conversation with Shannon & Wilson). The
recommended foundation design for the building would include 24- to 36-inch concrete shafts drilled to
bedrock. The practice equipment building would be supported sufficiently on spread footings.
These proposed site improvements would not be anticipated to have adverse long-term impacts on
surrounding properties, although drilling to bedrock may have temporary sound, emissions, and vibration
impacts during construction (see Advisory Notes to Applicant, below).
Mitigation Measures: The applicant will be required to comply with the recommendations included in the
geotechnical report, "Supplemental Preliminary Geotechnical Report Seahawks Headquarters and Practice
Facility Renton, Washington," by Shannon & Wilson, Inc., dated September 13, 2006, including
recommendations for excavation, backfill materials, structural concrete blocking, and soil remediation for the
water mains..
Nexus: RMC 44-060, "Grading, Excavation and Mining Regulations"
2. Air
Impacts: It is anticipated that some temporary adverse air quality impacts could be associated with site work
and building construction required to develop this property. Project development impacts during construction
may include dust resulting from grading, exhaust from construction vehicles, odors from roofing installation,
and roadway paving. Dust would be controlled through the use of temporary erosion control measures and
sprinkling of the site with water as needed.
Odor impacts during construction are unavoidable and would be short-term in nature.
Post development impacts potentially include vehicle and heating and cooling systems exhaust. These
emissions are regulated by state and federal agencies. Nor further site specific mitigation for the identified
impacts from exhaust is required.
Mitigation Measures: No further mitigation is required.
Nexus: Not applicable
3. Water
Impacts: The site is within the Gypsy Subbasin Drainage of the Lake Washington East Basin. The Gypsy
Subbasin is a 320 acre, Class 2 water north of and near, but independent of May Creek. Class 2 waters are
salmonid-bearing perennial waters during years of normal rainfall. The drainage collects at a point on the west
side of the project site where it flows for 125 feet in an open ditch prior to entering a 24-inch piped culvert. The
culvert length is 490 feet to an ouifall at the shore of Lake Washington. Lake Washington is a Class 1 water, a
salmonid-bearing perennial water also classified as Shorelines of Statewide Significance (see Shoreline
discussion below).
Reconfiguration of this feature of the Gypsy Subbasin (see Stormwater discussion below) and site
development within 200 feet of a Shoreline of the State would occur as a part of the proposed project. For
Seahawks ERC Report 03
City of Renton P18 PW Departme E ,hmentai Review Committee Staff Report
SEAHA WKS HEADQUARTERS TRAINING FACILITY LUA-06-073, ECF, SA-M, SA-H, SM
REPORT OF OCTOBER 16, 2006 � --- --� Page 6 of 16
these reasons, both Standard and Supplemental Stream/Lake studies were required, A report, "Stream and
Lake Study, Supplemental Stream and Lake Study, Stream Mitigation Plan, Seahawks Corporate
Headquarters and Training Facility, Renton, Washington," by Cedarock Consultants, Inc. and A.C. Kindig &
Co, dated September 20, 2006, was submitted for review.
The overall goal of the cumulative remediation, as determined by the Consent Decrees, has been improved
water quality in Lake Washington. The proposed project incorporates the final remediation with the initial
phases of development. This action is laying a 3-foot deep clean soil cap across the site. At the building
location, the floor slab would serve as a part of this cap. Upsizing of the Gypsy Subbasin Drainage culvert,
prior to completing the cap, would alleviate upstream flooding.
Replacement of exotic species along the shoreline and replanting to improve functions and values of the
riparian zone has been proposed. Most native plants and large trees along the shoreline would be preserved
These improved conditions would improve the shoreline role in protecting aquatic habitat values critical to
Lake Washington.
Mitigation Measures: No further mitigation is required.
Nexus: Not applicable
4. Wetlands
Impacts: Two on -site wetlands were excavated and filled in association with the remediation plan that
resulted from the negotiated Consent Decrees.
Also as part of the Consent Decrees, approximately 0.46 acre of mitigation wetland was restored in November
2002, along 250 feet of the shoreline of the Lake near the southwest comer of the property (Exhibit 5) at
Baxter Cove. The Baxter Cove wetland is designed to be a forested wetland with open water and emergent
components within the cove. Ultimately, it will be a forested wetland, but currently trees planted in seasonally
saturated wetland areas have not attained the required height to meet classification standards for this wetland
type. The open water component is less than 40 percent of the total wetland area. The emergent
classification can be applied to the open water area when the lake level is low and to the edges of the cove
when levels are high.
This lake -fed wetland meets the Renton standards for a Class 3 wetland (newly emerging). It complies with
performance standards and is intended to remain as an undisturbed component of the project proposal. (Initial
conceptual plans had a public access to the lake shoreline constructed through this area, but the final plan has
public access to the lake outside of the protected wetland and its buffer).
A 50-foot vegetated and enhanced wetland buffer was also restored as part of the mitigation. A portion of this
buffer would be subject to buffer averaging, as allowed by the City of Renton Critical Areas Ordinance, but no
part of the buffer would be reduced to less than 40 feet in width and the total amount of buffer area would not
be reduced. Approximately 1,220 feet of the wetland buffer would be filled, with replacement of buffer area at
a 1:1 ratio (Exhibit 6).
Subsequently, a wetlands site assessment was conducted by The RETEC Group, Inc. in May 2006 and the results
included in their report, "Shoreline and Wetland Survey, North and South Baxter Parcels, Seahawks Headquarters and
Training Facility, City of Renton," dated August 30, 2006_ No jurisdictional wetland areas were identified on the project
site during the wetland reconnaissance, other than the Baxter Cove wetland.
Mitigation Measures: No further mitigation is required.
Nexus: Not applicable
5, Shoreline
Impacts: The proposed project site has 1,887 feet of shoreline along Lake Washington, a Class 1 Inventoried
Shoreline of the State (Exhibit 7). There are approximately 123 acres of vegetated area within 100-feet of the
shoreline (excluding 0.36 acres of the Baxter Cove area that is part of the restored wetland). The character of
the shoreline is a steep bank of between 2 and 3 feet high with vegetation rooted at the top of bank. A
covered boathouse with pier and a dock are at two locations along the shoreline.
Seahawks ERC Report 03
City of Renton P/B✓PW Departme E mental Review Committee Staff Report
SEAHAWKS HEADQUARTERS TRAINING FACILITY LUA-06-073, ECF, SA-M, SA-H, SM
REPORT 4F OCTOBER 16, 2006 Page 7 of 16
The proposed project would require the following work within 200 feet of the shoreline of Lake Washington:
• Capping (soil cover placement) consistent with the Department of Ecology Consent Decree
■ Construction of the Seahawks Headquarters building
• Construction of natural grass practice fields
■ Shoreline improvements per statute within the 50 foot setback, including riparian plant zone
• Construction of retaining wall and driveways
• Piping a section of Gypsy Creek drainage to an existing Gypsy Creek outfall at the lakeshore
Proposed improvements are features allowed within the Renton Shoreline Master Program under the Urban
Environment designation.
Lake water elevations fluctuate depending on US Army Corps of Engineers regulation of water level at the
Lake Washington Ship Canal. Typically, the elevation of Lake Washington in .tune is about 18.8 feet above
sea level and 16.8 (the lowest level) during December and January. An Ordinary High Water Mark of 19.5 has
been noted on this site, however, possibly due to erosion caused by a combination of lack of vegetation on the
steep bank slope and wind and boat -generated waves.
As part of the wetland restoration, large woody debris was anchored along the shoreline at Baxter Cove.
Other logs, pilings, and seawalls along the shoreline may act to reduce the effects of wind and wave erosion.
A Lake Washington shoreline planting plan is part of the proposed project. All trees 10 inches or larger in
diameter at breast height within 100 feet of the shoreline have been inventoried and would be retained
wherever possible. The vegetated area of 1.23 acres would be maintained or increased. All non-native
vegetation would be removed and replaced with native plants that provide moderate to high shoreline
protection and wildlife function. The existing 0.82 acres of tree canopy would be matched or exceeded, with
cover objectives being met within 5 to 10 years (Exhibit 8).
The shoreline restoration and management program is included in the Shoreline Substantial Development
Permit Application component of this Land Use Action.
Mitigation Measures: [Mitigation of shoreline development is included in the Shoreline Substantial
Development Permit Application component of this Land Use Action.]
Nexus: Not applicable
6. Stormwater
impacts: The project site is located in the Gypsy Subbasin. Stormwater currently sheet flows from east to
west across the weedy brush -covered, but vacant site, free draining into Lake Washington. An existing,
degraded storm drain system crosses the site conveying stormwater from offsite to an outfall at the Lake.
The site soils are a minor factor when considering the stormwater control system due to their heavily degraded
nature and the manipulation of the site through filling, grading, and dredging over many years. For purposes
of drainage analysis, soils would be designated as from Hydrologic soil Group C, moderate runoff soils (till).
As part of the Consent Decree remediation, a "cap" is to be placed over potentially hazardous materials on site
to prevent incidental contact following site development. This cap would be a factor to be considered during
design of the stormwater control system (see Environmental Health discussion below).
A report, "Stormwater Technical Information,' by Magnusson Klemencic Associates, dated August 30, 2006
has been submitted by the project proponent and would be the primary basis for stormwater control systems
design. Stormwater management would be based on the requirements of the 2005 King County Surface
Water Design Manual (KCSWDM), which would be applicable for this project. The project is exempt from
detention as it discharges into Lake Washington, a direct discharge receiving water. The system would
include water quality treatment, however, prior to discharge. The KCSWDM designates areas draining to
Lake Washington as subject to the requirements of Basic Treatment. The proposed water quality treatment
system, however, would provide Enhanced Basic water quality. Treatment systems would vary according to
functions at different zones on the site, as follows:
Seahawks ERC Report 03
City of Renton PIB/PW Departme, E imental Review Committee Staff Report
SEAHAWKS HEADQUARTERS....,.i TRAINING FACILITY LUA-06-073, ECF, SA-M, SA
REPORT OF OCTOBER 16, 2006 Page 8 of 16
Pedestrian hardscape (sidewalks, plaza), non -sports field landscaping, and building/roof areas: As non -
pollution generating surfaces (roofs do not consist of unpainted metal), stormwater runoff will drain to Lake
Washington as direct discharge.
The synthetic turf field consists of a 12-inch base course of imported crushed rock, a minimum 1.5 inch porous
asphalt layer, a fiber polyurethane woven fabric, 5/8 inch energy absorbing layer of granular rubber, 1.5 inch
granular rubber and sand mix overlain by synthetic field turf. Rainwater on the synthetic field would infiltrate
through the surface material and base layers to subdrains to be conveyed to the Lake for discharge.
Natural turf fields: The natural turf fields would overlay an 18 inch layer of sand, which would function as a
filter. As with the synthetic turf field, subdrains would convey runoff to the Lake. An Integrated Pest
Management (IPM) Plan would be utilized for turf management (see Environmental Health discussion below).
The IPM Plan would address the use of fertilizers, pesticides, and herbicides so that field runoff meets water
quality standards.
Parking lots and driveways: Stormwater runoff from paved areas subject to vehicle traffic would be collected
and directed to four sand filters. Three of the filters would be grass covered to provide pre-treatment and
maintain the surface permeability of the sand fillers. Pretreatment at the fourth filter would be provided by an
additional layer of sand. This filter would function, additionally, as a football practice area. To maintain the
filter system and protect the health of the football players, the sand layer would be cleaned of potential
pollutants annually or more often as needed. Subdrains would convey collected stormwater to the Lake for
discharge. Peak rate runoff control in not required or provided for this project because the site discharges
directly to Lake Washington, a major receiving water body. Therefore, retention/detention analysis and design
would not be required.
The Baxter Cove wetland is hydraulically connected to Lake Washington and will not be part of the project
stormwater management systems.
Discharge to Lake Washington would be through five new drainage system outfalls. The pipe outfalls would
release stormwater above the ordinary high-water mark (OHWM) of Lake Washington and subsequently drain
over energy dissipating rock4ined channels to the OHWM. The channels would be located at areas of the
shoreline where non -erosive material is located that would protect the shoreline during periods of lowered
water levels.
A portion of the Gypsy Subbasin drainage system, which conveys stormwater from the east side of Interstate
405 to the Lake, currently daylights for 125 feet east of the Burlington Northern Santa Fe Railroad right-of-way.
This section consists of a below -grade, man-made ditch with steep, rock -lined side slopes. There is minimal
fish habitat present. This open channel enters a 24-Inch corrugated metal pipe that slopes approximately 0.1
percent to the Lake. The outfall is about 1 foot above the lake level, when the lake is at a low elevation. When
the water level is at higher elevations, the culvert experiences backwater that makes upstream fish travel
possible, although it has not been observed.
The proposed project would require replacement and relocation of this Gypsy Subbasin drainage feature. The
Headquarters building footprint conflicts with the current pipe location. The 490 foot pipe would be realigned
around the building and lengthened to approximately 860 feet (Exhibit 9). The existing outfall would remain in
place at its current condition.
The Joint Aquatic Resources Permit Application (DARPA) for this work states the following potential impacts:
"elimination of 125 feet of open channel, a slightly larger culver across the project site, will affect riparian
vegetation along the Gypsy Subbasin and Lake Washington, and will result in some disturbance to the
shoreline of Lake Washington above and below the ordinary high water mark." The existing outfall would be
used and shoreline restoration at the outfall would occur as part of this work.
Alternatives to piping, including daylighting the entire drainage channel and maintaining the existing open
portion were studied. The capping requirement of the Consent Decrees, however, is premised on the need to
avoid direct contact of flowing water with residual contaminated soils on the property. The capping and culvert
together isolate the Gypsy Subbasin Drainage and Lake Washington from site soils. Therefore, the open
section of the drainage would be included in the new piped system.
Seahawks ERC Report 03
City of Renton P/B/PW Departme, ? E ,)mental Review Committee Staff Report
SEAHAWKS HEADQUARTERS A#Yv TRAINING FACILITY LUA-06-073, ECF, SA-M, SA-H, SM
REPORT OF OCTOBER 16, 2606 Page 9 of 16
The applicant shall work with the City to alleviate upstream flooding that may impact access to the site.
Additional details of pipe sizing and/or street improvements would be addressed through site plan review.
Surface Water System Development Charges of $0.249 per square foot of new impervious surfaces would be
required.
Mitigation Measures: This project shall be subject to the 2005 King County Surface Water Design Manual.
The applicant shall be required to provide a Temporary Erosion and Sedimentation Control Plan (TESCP)
designed pursuant to the Department of Ecology's Erosion and Sediment Control Requirements, outlined in
Volume II of the 2001 Stormwater Management Manual and provide staff with a Construction Mitigation Plan
prior to issuance of construction permits. The applicant shall work with the City to alleviate upstream flooding
that may impact access to the site. Additional details of pipe sizing and/or street improvements will be
addressed through the site plan review process.
Nexus: SEPA Regulations
7. Transportation
impacts: Transportation impacts have been analyzed in the report, "Traffic impact Analysis Seahawks'
Headquarters," by The Transpo Group, dated September 2006.
Vehicle access to the site would be from Ripley Lane (also known as Lake Washington Boulevard North).
Lake Washington Boulevard intersects with Northeast 44t' Street near the project site. Exit 7 of Interstate 405
is located at NE 440 St.
Currently, Ripley Lane is improved with minimal pavement and no pedestrian amenities.
There are two existing at -grade crossings of the Burlington Northern Santa Fe Railroad right-of-way. The
southern one crosses the Quendall Terminals property. There is an access easement recorded granting
access rights across the Quendalf property to the proposed development site. The project proponent is
discussing the possibility of a third crossing at a mid -point of the project site. A third crossing would not be a
necessity for project access however.
The City of Renton Transportation Division has requested that street improvements along Ripley Lane include
roadway widening to provide one vehicular traffic lane in each direction, bicycle lanes in each direction, and a
paved shoulder area to serve as a pedestrian walkway (one side only) abutting the bicycle lane. These
improvements should extend from Lake Washington Boulevard/NE 441h St on the south (beyond the project
site) to the north end of the Seahawks Headquarters site. The City of Renton would contribute toward these
improvements.
In is estimated that the proposed project would contribute an additional 555 average daily weekday trips (ADT)
to the City's transportation system. Therefore, the proposed project would be subject to a transportation
mitigation fee of $75 per trip. The fee of $41,625.00 would be assessed at building permit issue.
Parking for up to 315 cars would be provided on -site, with 104 spaces within a secure, fenced parking area.
The site is not served by public transportation. The nearest transit stops are to the north in the City of
Newcastle at 1161h and 761h or south, in Kennydale, at Park Avenue N and N. 33`d St.
Mitigation Measures: A traffic mitigation fee of $75 per additional daily trip shall be assessed based on the
submitted calculation of 555 ADT. The fee of $41,625.00 would be assessed at building permit issue.
Nexus: SEPA
8. Eire Protection
Impacts: Fire Prevention staff indicates that sufficient resources exist to furnish services to the proposed
development; subject to the condition that the applicant provides required improvements (see Advisory Notes
Seahawks ERC Report 03
City of Renton PISIPW Qepartmc 1 L ,nmental Review Committee Staff Report
SI=AHA WIGS HEADQUARTERS .- L) TRAINING FACILITY LUA-06-073, FCF, SA-M, SA-H, SM
REPORT OF OCTOB R 16, 2006 Page 10 of 16
to Applicant, below) and mitigation fees are paid prior to building permit issue. The mitigation fee, for
commercial space, is $0.52 per square foot.
Mitigation Measures: A fire mitigation fee of $0.52 per square foot of building space shall be assessed at
building permit issue.
Nexus: SEPA
9. Vegetation
Impacts: The project site has been periodically cleared of vegetation over the years of its industrial use.
Comprehensive site clearing took place in 1990. Vegetation was also removed during Consent Decree
cleanup activities. Currently, approximately 10 percent of the site has trees and other plants. Final cleanup
including the placement of the 3-foot deep cap will require removal of most existing vegetation from the site,
excluding that in the wetland and wetland buffer.
Existing vegetation varies on the site depending on past activities and current situation. Vegetation zones
include open meadow, which is the predominant condition, BNSF Railroad right-of-way edge, Gypsy Subbasin
Drainage feature, Baxter Cove Wetland, and Lake Washington shoreline.
Past industrial activities on the site, including clearing, have restricted the ability of trees to mature; thereby
growth of tree canopy has been limited. The majority of the site is open meadow. Non-native grasses (bent
grass, velvet grass, tall and red fescue, and need canary grass) and weedy herbaceous plants (soft rush,
sickle -leaved rush, bird's foot trefoil, white clover, western dock, vetch, and hairy cat's ear) typical of disturbed
meadows dominate the vegetation on the property.
Trees that are present along the eastern edge of the property, abutting the SNSF Railroad right-of-way,
include black cottonwood, red alder, Scouler's and Pacific willow. Although a tree inventory has been
completed and trees larger than 10 inches in diameter identified, these tree species are exempt from Renton's
tree retention regulations. Preservation of many of these trees has been proposed by the project applicant,
but would not be required by the City of Renton.
The steep banks of the open portion of the Gypsy Subbasin Drainage have cover consisting of red alder, black
cottonwood, willow, Himalayan blackberry, and Scotch broom. The proposed project would relocate this open
channel into a piped culvert and the existing vegetation would be removed.
The lake -fed Baxter Cove wetland has three types of vegetation structure with its 0.46 acre area. They are
aquatic bed, emergent plants, and scrub/shrub. When trees planted in seasonally saturated wetland areas
attain greater height, classification standards for forested wetland will be met. Trees planted in the wetland
include Douglas fir, western hemlock, Sitka spruce, bigleaf maple, black cottonwood, Oregon ash, red alder,
Pacific willow, bitter cherry, and cascara. Shrubs include vine maple, red osier dogwood, hawthorn, western
crabapple, Sitka willow, hazelnut, salmonberry, nootka rose, Oregon grape, sword fern, snowberry, twinberry,
and shaal. Emergent plants include lady fern, slough sedge, hardstem bulrush, small -fruited bulrush, water
parsley, and tall mannagrass.
Shoreline vegetation, at the top of a 2- to 3-foot bank, consists of blackberry, purple loosestrife, Scotch broom,
red alder, black cottonwood, and willow. Other than Himalayan blackberry extending several feet over the
bank there is little vegetation along the water edge.
All pervious areas of the development are required to be landscaped. Renton Municipal Code requires that
parking areas be landscaped and all areas planted with plants other than drought -tolerant varieties must be
irrigated.
No known endangered, threatened, or sensitive plant species have been observed on the property
Mitigation Measures: No mitigation required.
Nexus: Not applicable
Seahawks ERC Report 03
City of Renton P/$/PW Departme L )mental Review Committee Staff Report
SEAHA WKS HEADQUARTERS Amu TRAINING FACILITY LUA-06-073, ECF, SA-M, SA-H, SM
REPORT OF OCTOBER 16, 2006 Page 1 i of 16
10. Wildlife
Impacts: Both upland and aquatic habitat value of the site is considered to be low due to the highly disturbed
nature of the property. On -going and persistent site manipulation associated with the industrial business
conducted on the upland portions of the property has resulted in limited vegetation and residual contamination.
A 4-foot high beaver dam is located at the downstream end of the open portion of the Gypsy Subbasin
Drainage channel at the east side of the site. This structure currently provides improved habitat value to the
open channel that would otherwise be too shallow, muddy, and lacks instream structure and cover. There is
little protection against winter storm events that result in high velocity flows. Likewise, low flows during
summer also limit habitat quality.
Higher value habitat may be located along the shoreline, although the dominance of non-native invasive plant
species, lack of vegetative diversity and structure, and lack of special habitat features such as snags also
results in limitation on value.
No known endangered, threatened, or sensitive animal species have been observed on the property. Turtles
of unknown species, but probably painted or red -eared sliders, were present near the Baxter Cove wetland, a
killdeer was seen at the center of the property, and Canadian geese were observed on the property to the
north. Other fowl observed in the vicinity include red -winged blackbird, snipe, and numerous duck species
along the shoreline. Osprey are present in the area from mid -March through August and have nested at
various locations in the area including the Baxter properties and the Barbee Mill property through the years.
Their nests and perch site are also frequented by Canadian geese and bald eagles. Three bald eagle nests
have been known, historically, to be west and northwest of the site on Mercer Island.
Given the size and location of the property it can be expected that deer, beaver, raccoon, opossum, skunk,
and other small mammals and rodents frequent the property.
Mitigation Measures: No mitigation is required.
Nexus: Not applicable
11. Environmental: Health
Impacts: The wood treating operations at the site ended in 1981 and the property was subsequently used for
storage of bark mulch. Prospective Purchaser Consent Decrees (North Baxter, #00-2-11778-7KNT and South
Baxter, #00-2-11779-5KNT) were negotiated with the Department of Ecology under the Model Toxics Control
Act occurred in 2000. Cleanup of the South Baxter property consisted of excavation and replacement of soils
in the Baxter Cove area and soil stabilization in the uplands. North Baxter remediation, consisting of capping
contaminated soils, has been proposed to occur simultaneously with site construction.
Although site cleanup occurred in 2002, as part of the Consent Decree for the North Baxter property, a "cap" is
to be placed over the site to prevent incidental contact with potentially hazardous residual materials following
site development. This cap would consist of both pervious and impervious materials including pavements,
building foundation pads, athletic field materials, and imported fill. Where the cap consists of pervious
materials, an indicator layer consisting of a fabric or geogrid textile would be placed over the 3 foot deep cap
as a warning device for potential future excavation.
The property abutting to the south, the Quendall Terminals, has been designated a superfund cleanup site.
Cleanup will commence under the direction of the Environmental Protection Agency. The southern -most
property, the Barbee Mill, has on -going, voluntary site remediation. Previous studies of the historic use of the
properties in this area reveal that past industrial use, and resulting contamination, is property distinct, therefore
cleanup plans are appropriately unique to each site.
Natural turf field maintenance would be according to an Integrated Pest Management (IPM) Plan developed by
the applicant. The IPM would address management techniques and potential chemical uses on the natural
turf practice fields. The plan also includes an accidental spill and response plan.
The IPM would utilize Best Management Practices (BPMs) to specify disease -resistant turf species and
varieties, control of drainage and light, fertilization and watering regimes, and soil mechanics (Exhibit 8).
Weed and insect pest damage threshold levels would be established and chemical treatment applied on an
Seahawks ERC Report 03
City of Renton PA31PW Departme j E nmental Review Committee Staff Report
SEAHAWKS HEADQUARTERS —0 TRAINING FACILITY LUA-06-073, ECF, SA-M, SA -
REPORT OF OCTOBER 16, 2006 Page 12 of 16
as -needed basis, if necessary. Alternative methods of cultural treatment control, however, would be preferred
and sought. The exception to this approach would be routine, seasonal preventative treatment against fungus
diseases. This would be necessary to prevent development of disease to levels that would require higher
doses that would also render the fields unplayable. Pesticides would not be proposed for use.
An on -site field manager and staff would monitor and record turf health, damage levels, and response
thresholds. Chemical analysis would be conducted to determine turf requirements. Field maintenance would
comply with Washington State Industrial Safety and Health Act and Occupational Safety and Health
Administration regulations.
The turf fertilizer program includes nutrients and trace minerals to maximize turf health and minimize the need
for pesticides. Slow release fertilizer would be the preferred form at application to reduce nutrient transport
from the turf root zone. Slow release nutrients are insoluble and generally take 4 to 12 weeks to become
completely liberated and available for turf utilization. Management of application rates would prevent
overapplication of fertilizer.
The potentially adverse impacts to water quality from the nitrogen, phosphorus, and potassium in fertilizer
would also be mitigated through source control. The depth of the sand filter underlying the natural turf fields
has been increased to 18 inches, which would provide a high level of water quality treatment and would
comply with recommendations of the 2005 King County Surface Water Manual for sensitive fish habitat
environments.
Another method of reducing escape of fertilizers from the area of application is through irrigation control to
avoid overwatering.
Preferred management of pests, like disease control, would be through a combination of cultural methods and
accepted tolerance levels. No chemical control would be proposed for insects or broadleaf weeds. Instead,
management would include selection and enhancement of competing vegetation that resists pests and
disease.
Mitigation Measures: No additional mitigation is required
Nexus: Not applicable
12. Aesthetics
Impacts: Proposed site development would include the construction of an office and indoor training facility
building, playing fields, surface parking lots, and landscaping. The aesthetic character of the currently vacant
site would change as a result of the development. The office and indoor training facility structure would range
in height from 55 feet (office) to 120 feet (training facility).
Development of the site raises several issues to be considered related to aesthetics, including building siting
on the property, building massing and architecture, shadows, landscaping, lighting (see discussion below), and
altered and/or obstruction of views to and from the project. An assessment of potential aesthetic impacts was
initiated by the project proponent.
A visual assessment of the proposed project was performed by Crawford Architects, (Addendum 1, dated
September 27, 2006). Over 70 views of the project were photographed and from this data, 11 potential view
corridors to take Washington were evaluated. The "worst case" situations are included herein, SE 76" St, a
publicly accessible upslope location, and two top -floor units of the Misty Cove Condominiums (Exhibit 11).
The Headquarters building on the North Baxter property would be visible from off -site areas, and would be
prominent on the site due to its height and bulk. A second, one-story building on the South Baxter property
would not be within view from off -site areas to the east or west because of the screening vegetation of the
wetland and BNSF Railroad right-of-way vegetation. Views of this building would be blocked from Misty Cove
by the Headquarters building.
It is anticipated that the Headquarters building would be visible from areas of both the City of Newcastle and
Renton, from higher elevations. It is not anticipated that views from higher elevations would be obstructed or
altered.
Seahawks E=RC Report 03
City of Renton PIEWW Departmet E mental Review Committee Staff Report
SEAHA WKS HEADQUARTERS A... TRAINING FACILITY LUA-06-073, ECF, SA-M, SA-H, SM
REPORT OF OCTOBER i6, 2006 Page t3 of 16
View impacts were evaluated from off -site areas including SE 76th Street upslope from the site, and from
southwest facing units within the Misty Cove condominium complex, just north of the project site.
Views to and from the site, and to the site from off -site locations, would be affected by the proposal. As
evidenced in Exhibit 12, views from SE 76th Street would change. Views of Mercer Island (to the west) from
this location would be foreshortened. Views of Lake Washington, which are limited at this location due to
existing vegetation on the BNSF Railroad right-of-way, would remain basically unaltered. Views from both the
southbound and northbound lanes of Interstate 405, located between the SE 76th viewpoint and the site would
be similar, with comparable impacts.
Many units of the Misty Cove Condominium have enjoyed territorial views across the property. With
development, foreground views from the Misty Cove Condominiums would be affected by the presence of a
building on what has been a vacant site. Presently, unmanaged site vegetation limits some views across the
project site to Lake Washington. Industrial activities and outdoor storage of materials have also been largely
screened from view by trees and shrubs between the Misty Cove property and the project site. Exhibit 13
shows the existing and proposed view from a third -floor unit, number 312. Similar views are shown for unit
302, located closer to the lake than the previous unit (Exhibit 14). A derelict office building on the site (to be
demolished) is also within the view corridor of unit 302.
The view to Lake Washington would remain unchanged, while the view of the site would change from vacant
and vegetated to developed and landscaped. The 120-foot high building would be prominent. Measures
proposed to reduce or control aesthetic impacts of the project include architectural design treatments intended
to diminish the bulk of the structure, including roofline treatment, window detailing, and exterior finishes and
colors. In addition, the building is being setback 50 feet from the water's edge and approximately 170 feet
from the common property line. Overhead wires, currently within the Misty Cove view corridor, would be
undergrounded.
Landscaping at the building perimeter and property boundaries would buffer the building from the residential
area to the north. Trees, planted as part of the landscaping proposed to buffer the structure from the Misty
Cove condominiums, would mature to heights greater than the existing trees. On -site vegetation growth has
been limited historically, due to the industrial activities on the property, which resulted in removal of trees
before they reached maturity (see Vegetation discussion, above).
The Headquarters building siting, on the North Baxter property, is based on geotechnical and soil
contamination issues (see discussion above). The office and support functions of the building would be
located on the west side of the structure in order to reduce the apparent mass of the taller portion of the
building in which the practice facility is located (Exhibit 15). The three story Headquarters portion of the
building, at about 55 feet, would be adjacent to the shoreline. This would also maximize views to the lake
from interior office space.
Architectural details, such as arcades, horizontal lines, roof treatments, and window detailing would be used
to reduce the scale and mass of the building. The building color palette would be warm earth tones including
buff/sandstone, light gray, nickel, and cherrywood.
Views to roof -mounted mechanical equipment would be limited from ground level on the site, on adjacent
properties, and the Lake.
The environment of the area would be significantly altered by the proposed project, as is almost always the
case when land transitions from vacant to fully developed. Significant adverse impacts are not expected,
however, beyond those impacts that can be mitigated by the project proposal.
Mitigation Measures: NiA
Nexus: NIA
Seahawks ERC Report 03
City of Renton PiB/PW Departmer E 7mental Review Committee Staff Report
SEAHAWKS HEADQUARTERS. __ __ TRAINING FACILITY LUA-06-073, ECF, SA-M, SA-H, SM
REPORT OF OCTOBER 16, 2006 Page 14 of 16
13. Light and Glare
Impacts: Although some interior building lights in offices may be on after dark, practice fields would not be lit
because football practice would not occur at night. It is not anticipated that light levels would be higher than
typical for an office structure.
Mitigation Measures: NIA
Nexus: NIA
14. Historic and Cultural Preservation
Impacts: Historic and cultural impacts have been analyzed in relation to information included in the report,
"Cultural Resource Assessment JAG Development, King County, Washington," by Larson Anthropological 1
Archaeological Services, dated march 27, 1997. The 60-acre study area included the properties to the south
of the Baxter site (Quendall Terminals and the Barbee Mill) and to the east (Pan Abode Cedar Homes). In
addition to literature search and on -site subsurface exploration, the study included consultation with
individuals representing the Muckleshoot and Duwamish Tribes_
The area of the study is within the territory of the Duwamish, a Salish-speaking group predominant in the
Seattle area. The Duwamish lived in cedar longhouses in villages located on most of the larger bodies of
water in the central to southern portion of the Seattle area (Elliott Bay, Lake Washington, Lake Union, Salmon
Bay, and on the Duwamish, GreenlWhite, and Cedar/Black Rivers.
A village of the Duwamish tribe was probably located in the vicinity of the Pan Abode property, upstream of
the current mouth of May Creek. The lower portion of May Creek, which crosses the Barbee Mill property,
would have been below the level of the Lake until exposed in 1916.
All of the properties in the study area have been heavily influenced by fluctuations in lake levels over time due
to earthquakes and the lowering of the Lake approximately 9 feet following construction of the Hiram
Chittenden Locks and the opening of the Lake Washington Ship Canal in 1916.
The first non-native inhabitant of the area within the study was James Madison (or Manning) Colman. In about
1875, he acquired 160 acres of property on both sides of May Creek. The study area encompasses this
property. Colman Point, located about 0.5 mile south in Kennydale, is named for him.
Except for about one acre of cleared land for the Colman house, the property was largely unused. The Baxter
property is near an access road located to the north that was used for hauling coal from mines in Newcastle
to Lake Washington for shipment to Seattle. In 1902, the timber on the Colman property was sold. In 1903,
the Northern Pacific Railroad acquired a right-of-way through the property for construction of a railroad spur
along the east side of Lake Washington. The railroad was built along the lake shore in 1905.
The Colman family started selling the land in 1908. The portion that became the Baxter property was sold in
1914 to be used as a shingle production facility. The shingle mill was demolished sometime between 1939
and 1946. The Baxter Company purchased the property after leasing it from 1955. They used it primarily for
wood treatment processes consisting of debarking and treatment for telephone poles and pilings.
If present, it is unlikely that shallow remains of historic activity could have survived the severe manipulation of
this site over the past sixty -plus years it has been used industrially. There may be archaeological features
and artifacts deeply buried below the ground surface, dating from hunter -gatherer communities that existed in
the vicinity of the property during historic times of low lake levels.
Due to Consent Decree restrictions on exposing underlying soils, excavation on the site would be limited to
borings for building structure pilings.
Mitigation Measures: In the event that archaeological deposits are found during construction, work shall stop
and the contractor(s) shall contact the State Archaeologist at the State of Washington Office of Archaeology
Seahawks ERC Report 03
City of Renton P/BIPW Departmer ! E )mental Review Committee Staff Report
SEAHAWKS HEADQUARTERS Air,, TRAINING FACILITY LUA-06-073, ECF, SSA-M, SA-H, SM
REPORT OF OCTOBER 16, 2006 Page 15 of 16
and Historic Preservation, phone (360) 586-3065, the Muckleshoot Cultural Resources Program, phone (253)
939-3311, and Duwamish Tribal Services (206) 431-1582.
Nexus: SEPA Environmental Regulations
E. Comments of Reviewing Departments
The proposal has been circulated to City Departmental 1 Divisional Reviewers for their review. Where
applicable, these comments have been incorporated into the text of this report as Mitigation Measures and/or
Notes to Applicant.
X Copies of all Review Comments are contained in the Official File.
Copies of all Review Comments are attached to this report
Environmental Determination Appeal Process Appeals of the environmental determination must be filed in
writing on or before 5:00 PM, November 6, 2006.
Appeals must be filed in writing together with the required $75.00 application fee with: Hearing Examiner, City of
Renton, 1055 South Grady Way, Renton, WA 98055. Appeals to the Examiner are governed by City of Renton
Municipal Code Section 4-8-110.B. Additional information regarding the appeal process may be obtained from the
Renton City Cleric's Office, (425) 430-6510.
ADVISORY NOTES TO APPLICANT
The following notes are supplemental information provided in conjunction with the administrative land use
action. Because these notes are provided as information only, they are not subject to the appeal process for the land
use actions
Planning
1 _ RMC section 4-4-030.C.2 limits haul hours between 8.30 am to 3.30 pm, Monday through Friday unless otherwise
approved by the Development Services Division. The Development Services Division reserves the right to rescind
the approved extended haul hours at any time if complaints are received.
2. Within thirty (30) days of completion of grading work, the applicant shall hydroseed or plant an appropriate ground
cover over any portion of the site that is graded or cleared of vegetation and where no further construction work
will occur within ninety (90) days. Alternative measures such as mulch, sodding, or plastic covering as specified in
the King County Surface Water Management Design Manual as adopted by the City of Renton may be proposed
between the dates of November 1 st and March 31st of each year. The Development Services Division's approval
of this work is required prior to final inspection and approval of the permit.
3. Construction activities shall be restricted to the hours between seven o'clock (7:00) a.m. and eight o'clock (8:00)
p.m., Monday through Friday. Work on Saturdays shall be restricted to the hours between nine o'clock (9:00) a.m.
and eight o'clock (8:00) p.m. No work shall be permitted on Sundays.
4. Regarding the wetland and wetland buffer, the applicant shall record a Native Growth Protection Easement.
Fire Prevention
1. The fire flow is 3,000 gpm. Minimum commercial fire hydrant requirements are one hydrant required within 150-
feet of the structures and additional hydrants are required within 300-feet of the structures. Looped fire mains are
required for fire flows exceeding 2,500 gpm with maximum spacing of 300-feet between hydrants.
2. Fire Department access roads are required to be paved, 20-foot wide and within 150-feet of all portions of the
building exteriors. Dead end roadways over 150 feet in length are required to have an approved turnaround. if
"grasscrete" is proposed, Fire Prevention Bureau specifications for base material and construction must be
followed.
3. The Headquarters and Training Facility building is required to have compete fire sprinkler, standpipe, kitchen hood
suppression and fire alarm systems. The Maintenance building may also need sprinkler and fire alarm systems
depending on the amount of hazardous materials stored in it. Separate plans and permits are required for the
installation of all systems through the Renton Fire Department.
4. Fire lane signage is required per city ordinance on all private streets and fire access roadways.
5. Minimum vertical height for fire department access is 13 feet 6 inches.
6. For fire planning purposes an electronic copy of the individual building site plans, in acceptable format, shall be
submitted to the Renton Fire Department.
7. Any building classified as "high-rise" shall meet all special requirements of the International Building Code Section
403 and all applicable sections of the International Fire Code.
5eahawks ERC Report 03
City of Renton PIBIPW Departmet E 'nmentat Review Committee Staff Report
SEAHAWKS HEADQUARTERS A.._ TRAINING FACILITY LUA-06-073, ECF, SA-M, SA-H, SM
REPORT OF OCTOBER 16, 2006 Page 16 of 16
8. A complete hazardous material inventory statement is required to be submitted for review at time of building permit
application. Use of city form or approved equivalent is required. Separate plans and permits are required for the
installation of tanks, containing hazardous materials.
Plan Review — Storm Drainage
1. The project does not include any connection to the Gypsy Creek drainage basin conveyance system ("Gypsy
Subbasin") across the site, but the off -site conveyance facility is proposed to be moved outside of the footprint of
the proposed building. Changes to the existing outfall are not proposed or authorized at this time.
2. The Surface Water System Development Charge is $0.249 per square foot of new impervious surface. This fee is
payable at the time the utility construction permit is issued.
Plan Review — Water
1. A looped water main system around the building complex is required. The minimum size of the water main is 10-
inches in order to provide the required fire flow.
2. A double check valve assembly in a vault is required behind the domestic water meter since the building is over 30
feet tall.
3. A pressure reducing valve is required downstream of the water meter since the working pressure is above 80 psi.
4. The maximum distance between fire hydrants for this project shall be 300 feet. Additional hydrants will be required
to comply with City code.
5. New water meter(s) or upsizing of existing meter will trigger Water System Development Charges, in the amount of
$0.273 / sf of the gross site area. This fee is payable at the time the utility construction permit is issued.
Plan Review — Sewer
1. The Sanitary Sewer System Development Charge is $0.142 / sf of the gross site area. This fee is payable at the
time the utility construction permit is issued.
Plan Review — Street Improvements and Transportation
1. Ripley Lane shall be improved to provide a minimum of 20-feet of asphalt from the northerly access to Lake
Washington Boulevard / N 44"' Street intersection. Due to the projected additional daily trips at this location, a
turn -lane design may be required at the intersection in coordination with the City of Renton project.
2. All new wire utilities must be undergrounded.
Plan Review —General
1. All plans shall conform to the Renton drafting standards.
2. Separate permits for side sewers, water meters, and backflow device are required. When plans are complete,
three copies of the drawings, two copies of the drainage report, a construction estimate and application fee shall
be submitted at the sixth floor counter in the Development Services Division, City Hall.
Seahawks ERC Report 03
0
0 1/4 1/2
EXHIBIT 1 Scale in Miles
1 �
i NOTE
Reproduced with permission granted by THOMAS OROS, MAPSe
This map is copyrighted by THOMAS BROS. NIAPSO. It is
unlawful to copy or reproduce all or any part thereof, whether for
personal use or resale, without permission. All rights reserved.
Seahawks Headquarters and Practice Facility
Renton, Washington
VICINITY MAP
September 2006 21-1-20525-003
SHANNON & WILSON, INC. FIB.
�8Mft CansdWtl
If
my
} � �
D
�!
AJ
�d
i
ha
ax
im
o x
k..,
wn
M!
i
i -
' i 4
_" ter. _ --__."__'--__ _""-�---�_-_'__.•-_"_.__._ 1
oe
5' r 1
s a d
IJ
r
! L
I I `
I t
F.
I'
I lam• r fr � i
i
i
Q I T
n - . rn
of
cm ;e
„m $
fv O i Q
Z '
r
E' EXHIBIT � F
W
m I ;r
r-
NOT FORZONSaCTION
Seahawks Headquarters &
f ' ----- Training Facility
7T- — — — - - FooTML N0RrHWEFT u,c a
f�
Photo 5
Photo of pilings (background) and washed up logs (foreground) along the northern portion
of the restored Baxter Cove wetland.
EXHIBIT
Photo 6 7
Aerial view looking east at north Baxter. Piles and a small dock are present along the
shoreline.
Page 3 of 8
Seahawks Corporate Headquarters and Training Facility
Renton, Washington Stream and Lake Stud /Miligation Plan
Table 3
Riparian Habitat Functions and Values, Comparison of Existing versus Proposed Conditions
Water Quality Low to Existing condition lacks
Future development is not Equivalent
Moderate width, plant density, and plant
dependant on riparian function under
diversity. Lack of native
function for water quality both conditions
vegetation also a minus.
because it employs the
2005 King County Surface
Water Design Manual, so
width for water quality
treatment is not required.
Native vegetation is a plus.
Food Low
Sparse non-native vegetation
Vegetation optimized with
Proposed action
provides .little beneficial leaf
a diverse mix of native
will have higher
litter and small organic
species. High habitat value
value
debris.
near lake.
Microclimate Low to
Existing shoreline area has
Proposed shoreline area
Eguivalent
Moderate
little effect on microclimate.
will have little effect on
function tinder
microclimate.
both conditions
Temperature Low to
Not a significant issue for
Not a significant issue for
FAuivalent
& Shade none
1
large Class I waterbodies.
large Class l waterbodies.
function under
both conditions
Human Low
Lake Washington is a public
Lake Washington is a
FAuivalent
Access
access area so access control
pubic access. area so access
function under
not a habitat function issue
control not a habitat
both conditions
function issue
Large Woody Low
Site periodically cleared so
Planting that will contribute
Proposed action
Debris
unlikely to have any
some minor woody debris
will have higher
significant future LWD
in the future.
value
contribution.
Channel Low
Controlled lake level and no
Controlled lake level and
Equivalent
Migration
surface channels on -site. No
no surface channels on -site.
function under
potential for channel
No potential for channel
both conditions
migration
migration
Bank Stability Low to
Exotic species dominated
Root strength increased
Proposed action
Moderate
shoreline- Banks partially
with native shrubs and
will have higher
protected by large logs.
trees. Batiks partially
value
protected by large logs.
Wildlife Not Rated -Patchy exotic species Native plantings in a dense Proposed action
Habitat dominated riparian vegetation multi -story contiguous will have highest
of relatively low value as canopy will provide high value
bird, amphibian, reptile, and wildlife habitat value.
rodent.habitat. EXHIBIT
Adapted from: A.C. Kindig & Co and Cedarock Consultants, Inc. 2003.
September 20, 2006 CEDAROCK CONSULTANTS, INC and A-C. KINDIG & -CO.
SeahawhI09-20-W LdUr &Foam Rgwa.&o Page 29
d r
3
Y
€ C S Y
s ti L._ �
47-
- - m- --- -- - -
f'
�j
t
i --
NOIFOR
- WN."
�8
—_— --
- - -- _-�� EXHIBIT -a
CONSTRUCTION
Seahawks Headquarters 8 W
i4 Training Facilityoil
FOO• aAUNORnfMTUC �E _girri �oiri"'
fiENTOTi N1A5HtMOTON � 1�
EXHIBIT
10
Seattle Seahawks Corporate Headquarters and Training Facility
Turf Integrated Pest Management Plan aPM)
Table 2
Summary of Pest Control Measures to be used for the Seahawks Practice Fields
Disease or Pest
Cultural Control
Physical!
Mechanical
Control
Chemical Control
Turfgrass Con -trot
Primo Maxx
Turf growth suppressant
4verseeding with
(Trinexapac-ethyl)
and Annual Bluegrass
desirable
during growing
Poa annua control
turfgrass;
season
Promote vigorous
Prograss
turf root growth to
(ethofumesate) for
with soil nutrient
curative post -
Weeds
and irrigation
emergence control
Annual Bluegrass
control, to out-
of annual
compete Poa
bluegrass in fall
annua.
and in spring if
warranted.
Fungus Diseases
Brown Patch
(Rhizoctonia solani; R. blight)
Corticum Red Thread
(L.aefisaria fuciformis)
Dollar Spot
(i.anzia spp. And
Moellerodiscus spp.)
Fusarium Blight
Chipco 26GT
(Fusarium spp.)
(Iprodione)
Fusarium Patch
(Microduchium nivale)
Good air
as preventative
Gray Snow Mold
(T'yphula spp.)
Promote vigorous
circulation;
Good drainage;
method of control
fall and spring
Helminthospodum
turf root growth to
with soil nutrient
Avoid shading;
(Dreschlera spp.)
and irrigation
Avoid irrigating in
Necrotic Ring Spot
(Leptosphaeria korrae)
control, to out-
late. afternoon;
Limit thatch;
Pink Snow Mold
compete weeds.
Maintain soli pH
(Fuseirum nivale)
�7
Rust
Puccinia coronata
Fungus Diseases
. Brown Patch
(Rhizoetonia solani; R. blight)
Heritage
Fusarium Patch
(azoxystrobin)
(Microduchium nivale)
as preventative
Rust
method of control
(Puccinia coronata)
in fall and winter
Take -all Patch
Gaeumannom ces raminis
September 20, 2006 A_C. KINDIG & CO.
Page 7
� r �
-
h
r
_
� Y.t
M
-S
� -
Yti
j
II
�
ilm
0
eE�*,MN,
CITY OF RENTON
City Clerk Division
1055 South Grady Way
Renton, WA 48055
425-430-6510
®`Check No. J
Description:
;r•
❑ Copy Fee
2'Appeal Fee
Funds Received From:
Name Lt^ - f
l
Address `-1-v'_-
City/ZipYL
Receipt N:. 0856
t
Datey !
❑ Notary Service
❑ I
i
�� , s
i
Amount $ ,` _00
i
i
Ci Staff Signature
Seahawks' Headquarters and Tr4... ing Facility
File No.: LUA-06-073, SA-H, SA-M, SM, ECF
December 7, 2006
Page 17
Football Northwest Port Quendall Company
505 Fifth Avenue S., Ste. 900 505 Fifth Avenue S., Ste. 900
Seattle, WA 98104 Seattle, WA 98104
Michael Cero
8300 Avalon Drive
Mercer Island, WA 98040
Brian T. Sabey
5021 Ripley Lane N, Ste. 304
Renton, WA 98056
Steve Jansen
5021 Ripley Lane N, Ste
Renton, WA 98056
Thomas Peterson
Socius Law Group PLLC
Two Union Square
601 Union Street, Ste. 4950
Seattle, WA 98101
Eleanor Maargo Kennamer, President
4 Misty Cove Condo Association
5021 Ripley Lane N, Ste. 309
Renton, WA 98056
Aaron Belenky, President
Williamsburg Condo HOA
1800 NE 40 Street, Ste. H-4
Renton, WA 98056
Barbara Paxhia
5021 Ripley Lane N, Ste. 104
Renton, WA 98056
Richard Wagner
Baylis Architects
10801 Main Street, Ste. 110
Bellevue, WA 98004
Steve Gregerson
5021 Ripley Lane N, Ste. 302
Renton, WA 98056
Shelly Munkberg
SECO Development
1083 Lake Washington Blvd N., Ste. 50
Renton, WA 98056
Jeffrey Taraday
Foster Pepper
1111 Third Avenue, Ste. 3400
Seattle, WA 9810I
TRANSMITTED THIS 7`1' day of December 2006 to the following:
Mayor Kathy Keolker
Jay Covington, Chief Administrative Officer
Julia Medzegian, Council Liaison
Gregg Zimmerman, PBPW Administrator
Alex Pietsch, Economic Development
Jennifer Henning, Development Services
Stacy Tucker, Development Services
King County Journal
Woodinville, WA 98077
Ray Colliver
505 Fifth Avenue S., Ste. 900
Seattle, WA 98104
Thelma Sutherland
1205 N 29"' Street
Renton, WA 98056
Jared Salstrom
5021 Ripley Lane N, Ste. 213
Renton, WA 98056
E1ya George Baches
1414 N 34`h Street
Renton, WA 98056
Elaine Wine
Vulcan
505 Fifth Avenue S, Ste. 900
Seattle, WA 98104
Tom Ehrlichman
Socius Law Group
Two Union Square
601 Union Street, Ste. 4950
Seattle, WA 98101
Stan Engler, Fire
Larry Meckling, Building Official
Planning Commission
Transportation Division
Utilities Division
Neil Watts, Development Services
Janet Conklin, Development Services
Pursuant to Title IV, Chapter 8, Section 100Gof the City's Code, request for reconsideration must be filed in
writing on or before 5:00 p.m., December 21, 2006. Any aggrieved person feeling that the decision of the
Examiner is ambiguous or based on erroneous procedure, errors of law or fact, error in judgment, or the
discovery of new evidence which could not be reasonably available at the prior hearing may make a written
request for a review by the Examiner within fourteen (14) days from the date of the Examiner's decision. This
request shall set forth the specific ambiguities or errors discovered by such appellant, and the Examiner may,
after review of the record, take further action as he deems proper.
CITY 3F RENTON
4r�j — Kathy Keolker, Mayor
April 25, 2007
David M. Murphy, Partner
CRAWFORD ARCHITECTS LLC
1901 Main Street — Suite 200
Kansas City, MO 64108
Planning/Building/PublicWorks Department
Gregg Zimmerman P.E., Administrator
Re: Seattle Seahawks Headquarters & Practice Facility, LUA06-073, SA-H, SA-M,
SM, ECF — Request for Minor Adjustment to the Site Plan
Dear Mr. Murphy
I am in receipt of your letter dated April 9, 2007, wherein you request approval of a
revision to the approved site plan for the Seahawks Headquarters and Training Facility
As your letter states, a minor adjustment to the approved -site plan is proposed, as
follows:
Maximum Building Height --- 115`4' feet in lieu of 110' 6" feet as noted on Figure
10.6 (Sheet A401) of the Land Use, Shoreline & Master Plan Permit Application —
Volume 1.
Our understanding is that the requested` adjustment is based on refinements to the final
structural design and would accommodate a clear inside height dimension of 95 feet as
noted in the application. Furthermore, the referenced height is measured to the highest
point of the roof deck from the finished floor slab. The City of Renton Hearing Examiner
approved the Practice Facility at a.height of 111 feet above'grade.
Renton Municipal Code Section 4-9-2001, allows minor adjustments to an approved site
plan, provided:
1. The adjustment does not involve more than a ten percent (10%) increase in area.
or scale of the development in the approved site plan; or
2. The adjustment does not have a significantly greater impact on the environment
and facilities than the approved plan; or
3. The adjustment does not change the boundaries of the originally approved plan.
Analysis of Request
The site plan modification requested has been compared to the site plan as approved by
the City of Renton Hearing Examiner on December 7, 2006.
The proposed change in building height from 111 feet, as stated in the "Findings,
Conclusions, and Recommendations" section of the Hearing Examiner's decision
(numbers 19 and 22) to the proposed modified height of 115 feet would result in an
additional 4 feet of building height and approximately 350,064 square feet of building
area.
11155 South Grady Way -Renton, Washington 98057 R E N T Q
AHEAD OF THE CURVE
David M. Murphy
April 25, 2007
Page 2
The proposed increase in area would not result in more than a 10 percent increase in
area or scale of the development.
Although the increased height could impact views from nearby properties, the
modification would not have a substantial impact on the environment or facilities_
The requested modification would not change the boundaries of the originally approved
site plan.
The project site is zoned Commercial / Office / Residential All applicable setback, lot
coverage, and landscaping standards would be achieved. The requested modification
would not impact the building facades or other architectural features as proposed.
Decision
Based on the analysis and recommendation of staff, I have determined the proposed
revision is within the parameters defined`-bY th6>Relgton Municipal Code.
Therefore, the proposed modif ation of the site
therefore, is approved subject to the following
1. Prior to the issuance of the final building pe'rrn
and Training F.Icilitry, three full size prints and
revised building elevations shall be'sub+rd
Division project manager.
;r
deemed to be "minor" and
itfor-th,e-Seahawks Headquarters
one 8 Mi z,11 inch contact print of
to'the Devo.lopment Services
This. determihation will be final unless a udr iera peal of this administrative
determination, accompanied by the required 00 filing fee, is filed with the City's
Hearing Examiner within 14.d6ys of the date of t:hl decision.
If u have an uestiori5 re 'ardin this determination dr the to uire ments discussed in
you yq � � � g� q .
this letter, please contact Elizableth Higgins, SeniorPla0ner at (425) 430-7382.
incere , Y'
roe Nei I waifs
Nell Watts, Director
Development Services Division
cc: Parties of Record
Jim Levin
Lance Lopes
Ray Colliver
Tom Chiado
Elaine Wine
Roger Pearce
Brian Dickson
Jennifer Henning
Elizabeth Higgins
File
r
J
CITY OF RENTON
Larry and Estber Barsher
6940 966 Ave. S.E.
Mercer Island, Washington 98040
2D6-232-92M... le5bar0komcasf.net
City Clerk
City of Renton
MAY 4 g 2007
RECEIVED
CITY CLERKS OFFICE
f 2�L) fAA
May 8, 2007
1.0.55 South Grady Way r �� lccz�r'rty�y��r
I,enton, WA 98057 Aplx
LUR•06-0V, SA-H,, sA-'Yt, 5MI'6CF
Re: Seattle Seahawks Headquarters & Practice Facility, Request. for Minor Adjustment
We appeal the City of Renton's April 25, 2007 determination decision allowing the Seattle
Seahawks Headquarters & :Practice Facility, now under construction, to increase the height of
the building to 115 feet. This decision was based on the determination the request is a minor
modification as defined by The City of Renton Code, which we also appeal.
An increase of 4 and 1/2 feet in height is not a minor modification. It will make an already
imposing (111 foot high by 340 long) large building even more imposing and larger to
hundreds of people who view it across the lake on. Mercer Island, This increase creates a
significantly greater impact on the environment which Code Sec 4-9-2001 does not allow.
At the initial examiner's hearing on November 21, 2006 I stated my family did not object to the
construction of the facility and thought it would be a very attractive building viewed up close,
however the structure will look like an enormous box as viewed from homes only one smile
across the lake. We recommended that large evergreen trees reaching the height of at least
100 feet at maturity be planted judiciously in front of the building to mitigate and soften its
imposing size. Such landscaping would go a long way to return what use to be a tranquil vista
of homes, a modest apartment building (Misty Cove) and a hillside covered with trees. Much
to our chagrin the hearing examiner's approval of the project did not include this modest
landscape addition.
Now the request is for the "enormous box" to get even larger, which we appeal. However we
would not object to an approval that included the addition of large evergreen trees reaching; to
approximately the roof elevation at maturity and planted judiciously close to the building;. The
trees would mitigate and soften its size and greatly reduce the enlarged Seahawk :Facility's
environmental impact on those viewing the building from a distance. This landscape
requirement should be added as an additional condition to the proposed modification. The
change will benefit hundreds of Mercer islanders now and for generations to come.
We contacted neighbors that live near us and they agree with our concern and solution. The
attachment is a list with their addresses and phone numbers.
The required $75 appeal fee is enclosed. Pr r �ci
Sincerely,
Larry and Esther Barsher
Mercer Island Neighbors Agreeing With This Appeal and Mitigating Solution
Name Address Phone 4
Dan & Jody Samson 6952 96th Ave. SE 232-0151
Dwight & Christine Schaeffer 6958 96th Ave. SE 236-2580
Les & Denise Klafl 6915 96th Ave. SE 232-4435
Carl Lindstrom 6910 96 Ave. SE 232-0933
Howard & Sue Robboy 6944 96th AVE SE 236-1.1.62
Steven & Deanna Marshall 6934 96th Ave. SE 425-747-6755
Hal & Gerry Fardal 6920 96th Ave. SE 232-1936
Dr_ Robert and Bee Dietz 7906 L. Mercer Way 230-6989
Y
CIT OF RENTON
""R'
+ +
,� Kathy Keolker, Mayor
May 10, 2007
Larry and Esther Barsher
6940 96"` Ave. SE
Mercer Island, WA 98040
Re: Seattle Seahawks Headquarters & Practice Facility Appeal
LUA 06-073, SA-H, SA-M, SM, ECF
Dear Mr. & Mrs. Barsher:
Hearing Examiner
)Fred J. Kaufman
We are in receipt of your Appeal in regards to the above referenced matter. The appeal hearing
has been scheduled for Tuesday, May 29, 2007 at 9:00 a.m. The hearing will take place in the
Council Chambers on the seventh floor of the Renton City Hall. The address is 1055 S Grady
Way in Renton.
If this office can provide any further assistance, please address those comments in writing.
Sincerely,
Fred Kaufman
Hearing Examiner
City of Renton
FK/nt
cc: Larry Warren, City Attorney
Neil Watts, Development Services
Elizabeth Higgins, Development Services
Stacy Tucker, Development Services
Roger Pearce, Foster Pepper Law Firm
All Parties of Record
1055 South Grady Way - Renton, Washington 98055 - (425) 430-6515
This paper contains 50% recycled material, 30% post consumer
RENTON
AHEAD OF THE CURVE
CIT OF RENTON
Kathy Keolker, Mayor
May 10, 2007
Larry and Esther Barsher
6940 96"' Ave. SE
Mercer Island, WA 98040
Re: Seattle Seahawks Headquarters & Practice Facility Appeal
LUA 06-073, SA-H, SA-M, SM, ECF
Dear Mr. & Mrs. Barsher:
Hearing Examiner
Fred J. Kaufman
We are in receipt of your Appeal in regards to the above referenced matter. The appeal hearing
has been scheduled for Tuesday, May 29, 2007 at 9:00 a.m. The hearing will take place in the
Council Chambers on the seventh floor of the Renton City Hall. The address is 1055 S Grady
Way in Renton.
If this office can provide any further assistance, please address those comments in writing.
Sincerely,
Fred Kaufman
Hearing Examiner
City of Renton
FK/nt
cc: Larry Warren, City Attorney
Neil Watts, Development Services
Elizabeth Higgins, Development Services
Stacy Tucker, Development Services
Roger Pearce, Foster Pepper Law Firm
All Parties of Record
1055 South Grady Way - Renton, Washington 98055 - (425) 430-6515
SThis paper contains 50%recycledmaterial, 30%postconsumer
RE NTON
AHEAD OF THE CURVE
� I
:. r 1 I I
�r�.' -
____.ate= _�_" _- —_ � -- _ _ _ - - - _ !.. _ _ - � --
1. - `' - � - ��i�+�- �� � �1-- � � _ � � ���-
w-
_ .. �;4.�
I, _ � �f'�_` ivy' '' � .....� ���. - _ ... ._ --
e
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
BEFORE THE HEARING EXAMINER FOR THE CITY OF RENTON
LARRY BARSHER and ESTHER BARSHER,
Appellants, File No. LUA06-073
V.
CITY OF RENTON, and FOOTBALL
NORTHWEST LLC,
Respondents.
SA-H, SA-M, SM, ECF
HEARING BRIEF OF FOOTBALL
NORTHWEST LLC
I. INTRODUCTION
Respondent Football Northwest LLC ("FNW") requests the Hearing Examiner to dismiss
the appeal of Larry Barsher and Esther Barsher (the "Barshers"). The Barshers have appealed
the issuance of a minor adjustment to the approved site plan for the Seattle Seahawks Corporate
Headquarters and Training Facility. The only issue before the Examiner is whether the minor
adjustment criteria in Renton Zoning Code §4-9-200(I) have been met.
The only change to the approved site plan is that the Indoor Practice Facility (the "IPF")
will be allowed to be several feet higher than described in the City's original site plan approval.
Because this minor change to the approved site plan clearly meets the minor adjustment criteria
in Renton Zoning Code §4-9-200(I), the Examiner should dismiss the Barshers' appeal.
HEARING BRIEF OF FOOTBALL
NORTHWEST LLC - 1
ORIGINAL
FOSTER PEPPFR PLLC
1111 THIRD AVENUE, SUITE 3400
SEAT 1-F, WASHINGTON 98101.3299
PHONE (206) 447-4400 FAX (206) 447_9700
1 508167422
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
II. FACTUAL BACKGROUND
The evidence at the hearing will show the following:
The City's environmental review analyzed an IPF structure of up to 120 feet in height
above slab, with a 95-foot clear interior space over the indoor practice field. The 95-foot clear
interior space is required for the facility to operate in the manner designed for professional
football practices. Based on its analysis of that proposal, the City issued a Determination of
Nonsignificanec ("DNS").
After the issuance of the DNS, the project applicant moved the IPF structure (and other
project buildings) approximately 62 feet further back from the shoreline, in order to minimize
view impacts to the neighboring condominium owners to the north of the site. In addition,
design development for the IPF structure showed that the interior 95-foot clear height could
likely be accomplished with an overall building height of approximately I I I feet in height.
Those design development drawings were the basis of the drawings and renderings presented to
the Examiner at the hearing on the original site plan for the Seahawks Corporate Headquarters
and Training Facility. Accordingly, the Examiner's site plan approval described the IPF as being
"up to 111 feet" ( and "approximately I I I feet tall."2
Subsequent to the Hearing Examiner's December 6, 2006, Site Plan Approval, the City
and FNW's contractors have been moving toward final design of the IPF. In response to City
building code requirements, FNW has made changes to the truss structure of the roof In order to
maintain the 95-foot clear interior space for the IPF, this change to the truss structure will require
a building height of approximately 113 feet. To be cautious, FNW requested a minor adjustment
to allow up to 115 feet in height, although approximately 113 feet is the anticipated height.
This minor height variation to the IPF is the only change to the approved site plan. No
additional lot coverage is proposed, no expansion of the site plan boundary is proposed, and no
Examiner Site Plan Approval at Finding 19.
2 Examiner Site Plan Approval at Finding 22.
HEARING BRIEF OF FOOTBALL FOSTER PEPPER PLLC
NORTHWEST LLC - 2 1111THIRD AVENUE, SurrE3400
SEArnE, WASHINGTON 98101-3299
PHONE (206) 447-4400 FAx (206) 447-9700
50916742.2
r
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
expansion of any other planned building on the site is proposed. Transportation and parking
impacts would be unchanged. Use of public services and utilities would be unchanged. The
only impact will be to allow a small increase in the scale of the IPF building.
The massing of the IPF itself will increase less than four percent (4%) if the full 115 feet
in height were utilized. At the anticipated final IPF height of approximately 113 feet, there
would be only a two percent (2%) increase to the scale of the IPF. With respect to the scale of
all development approved by the site plan, the total building volume would increase only three
percent (3%) if the full 115 feet in height were utilized for the IPF. At the anticipated final IPF
height of approximately 113 feet, the overall site massing would only increase by one and one-
half percent (11/2
III. LEGAL ARGUMENT
A. Burden of Proof and Standard of Review on Appeal.
The Barshers have the burden of proof to show that the City staff s approval of a minor
adjustment was either an error of law or clearly erroneous in view of the entire record. Renton
Zoning Code §4-8-110(E)(7)(b).
The Examiner is required to give substantial weight to the City staff's decision to allow
the minor adjustment to the approved site plan. Renton Zoning Code §4-8-110(E)(7)(a).
B. The Small Increase to the IPF Height Clearly Meets the City's Minor Adjustment
Criteria.
The only issue before the Examiner is whether the slight increase in the height of the IPF
building (up to four feet) meets the City's criteria for a minor adjustment to an approved site
plan. The criteria in the Renton Zoning Code are as follows:
MINOR ADJUSTMENTS TO AN APPROVED SITE PLAN:
Minor modifications may be permitted by administrative determination. To be
considered a minor modification, the amendment must not:
1. Involve more than a ten percent (10%) increase in area or scale of the
development in the approved site development plan; or
HEARING BRIEF OF FOOTBALL FOSTER PEPPER PLLC
NORTHWEST LLC - 3 1111 THIRD AVENUE, Sum 3400
SEATTLE, WASHTNGTON 96101-3299
PHONE (206) 447-44D0 FAX (206) 447'9700
5091674ZZ
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
2. Have a significantly greater impact on the environment and facilities than the
approved plan; or
3 Change the boundaries of the originally approved plan.
Renton Zoning Code §4-9-200(I).
Here, the IPF height increase clearly meets these criteria.
First, the ten percent limitation on area or scale of development is met. The area of
development is not increased whatsoever. The scale of development is increased slightly — up to
three percent (3%) if the full allowed 115 height for the IPF is utilized. While the IPF building is
anticipated to be only approximately 113 feet in height, even at 115 feet in height, the increase in
scale of development is far below the allowable ten percent in the Renton Zoning Code.
Second, there are no new significant environmental impacts. The City's DNS analyzed
an IPF building of approximately 120 feet in height and over 60 feet closer to the shoreline. That
DNS concluded that a building of that size in that location would not have any significant
adverse environmental impacts. The current proposal is for a shorter building (up to 115 feet in
height) that is further back from the shoreline. In addition, the only change to the approved site
plan is the minor height addition to the IPF building. There is no additional impervious surface,
no additional grading or earth movement, no additional traffic or parking, no landscaping areas
are being eliminated, and no additional use of public services or facilities. The only possible
impact would be an aesthetic impact. As shown in the elevations and simulations submitted at
the hearing, a four -foot increase in height (up to 115 feet in height) will be barely noticeable.
And the actual impact of the City decision will be an even smaller impact, because the likely
height will be approximately 113 feet.
Third, the boundaries of the original approved plan are unchanged.
The Barshers assume that this appeal is an opportunity to reargue the overall size and
view impacts of the Seahawks Corporate Campus and Training Facility. That is incorrect. The
only issue is whether the minor adjustment criteria in Renton Zoning Code §4-9-200(1) are met.
HEARING BRIEF OF FOOTBALL FOSTER PEPPER PLLC
NORTHWEST LLC - 4 1111 THIRD AVENUE, SUITE 3400
SEATTLE, WASHINGTON 98101-3299
PHONE (206) 447-44DO FAX (2D6) 447-9700
50816742,2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Because those criteria are clearly met — especially after giving substantial weight to the City
staff s decision to allow the mirror adjustment -- the Barshers' appeal must be dismissed.
RESPECTFULLY SUBMITTED this 29`h day of May, 2007.
HEARING BRIEF OF FOOTBALL
NORTHWEST LLC - 5
FOSTER PEPPER PLLC
ZZ4 A 9��41 C
Roger A Marie, WSBA No. 21113
Attorneys for respondent Football Northwest LLC
FOSTER PEPPER PLLC
1111 THIRD AVENUE, Sum 3400
SEATILE, WASHINGTON 981013299
PHONE (206) 447 1400 FAX (206) 447-9700
1 50U6742.2
Lth4 a4-c7!
�`65 x ° City of Renton
+ + Development Services Division
Planning/Building/Public Works Department
NTH Renton City Hall, Sixth Floor
1055 South Grady Way
Renton, WA 98055
TO: Roger Pearce
Address: Foster Pepper PLLC
1111 -- Third Ave, Suite 3400
Seattle WA 98101-3299
Phone: (206)447-4400
Fax: (206)44 7-9 700
ISUBJECT: Seahawks/BarsherAppeal
LETTER
TRANSMITTAL
Date: May 16, 2007
FROM: Elizabeth Higgins, AICP
Senior Planner
Current Planning
Phone: (425)430-7382
Fax: (425) 430-7300
!Number of items including cover sheet: 10
REMARKS: ® As ❑ Urgent ❑ Reply ❑ Please ® For your
Requested ASAP Comment review
• Letter of April 9, 2007 Murphy to Watts requesting minor modification
• Decision of April 25, 2007 Watts to Murphy approving request for minor modification
• LUA06-073, Parties of Record, dated April 26, 2007
• Barsher appeal letter of May 8, 2007
• Letter of May 10, 2007 Hearing Examiner to Barsher re: appeal hearing date
�\�✓11 LVi •
Ahead of the curve
1
2�
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
BEFORE THE HEARING EXAMINER FOR THE CITY OF RENTON
LARRY BARSHER and ESTHER BARSHER,
Appellants, File No. LUA06-073
V.
CITY OF RENTON, and FOOTBALL
NORTHWEST,
Respondents.
SA-H, SA-M, SM, ECF
NOTICE OF APPEARANCE ON
BEHALF OF FOOTBALL NORTHWEST
LLC
TO: Fred Kaufman, City of Renton Hearing Examiner; and
AND TO: Larry Barsher and Esther Barsher, Appellants
PLEASE TAKE NOTICE that Roger A Pearce, and Foster Pepper PLLC, enter
their appearance as counsel for Respondent Football Northwest LLC, by and through the
undersigned attorney, and request that service of all papers and pleadings in this lawsuit, except
original process, be made upon the undersigned attorney at the address stated below.
DATED this 9"' day of May, 2007.
NOTICE OF APPEARANCE ON BEHALF
OF FOOTBALL NORTHWEST - I
FOSTER PEPPER PLLC
ter., (GF%Ui G
Roger A(yearce, WSBA No. 21113
Attorney for Respondent Football Northwest LLC
FOSTER PEPPER PLLC
1111 THIRD AVENUE, SUITE 3400
SEATTLE, WA5KTNC:T0N 98101-3299
Pt10NL (206) 447-4400 FIX (206) 447.9700
SOS 13210.1
1
2
3
4;
5
6
i
7
81
9
10
I
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
DECLARATION OF SERVICE
Helen M. Stubbert declares.
I am a legal assistant to Roger A. Pearce, and competent to be a witness in the above -
entitled proceeding. On May 9, 2007, I caused to be delivered in the manner indicated below
true and correct copies of a Notice of Appearance and this Certificate of Service to the following:
Fred J. Kaufman Larry and Esther Barsher
Hearing Examiner 6940 96"' Ave. S.E.
City of Renton Mercer Island WA 98040
1055 South Grady Way Via US. Mail
Renton, Washington 98055
Via U.S. Mail
I declare under penalty of perjury under the laws of the State of Washington that the
foregoing is true and correct.
DATED this 9`h day of May, 2007, at Seattle, Washington.
Helen M. Stubbert
NOTICE OF APPEARANCE ON BEHALF
OF FOOTBALL NORTHWEST - 2
POSTER PEPPER PLLC
1111 T'H[RD AVENUE, SUITE 3400
SEATTLE, WASH]NGTON 9810E-3299
PI[ONE4206)447-4400 FAX(206)447-9700
5M2274.1
9 April 2007
Mr. Neil R. Watts
Director: Development Services Division
City of Renton
Renton City Hall - 6th Floor
1055 South Grady Way
Renton, WA 98055
Regarding: SEATTLE SEAHAWKS HEADQUARTERS & PRACTICE FACILITY
Renton, WA
Project No. KC 005-03 / File No.I PF1
Subject: MINOR ADJUSTMENT TO SITE PLAN REQUEST
Dear Neil:
We have been informed by Bayley Construction that the engineer of record for the Indoor
Practice Facility (IPF), Mr. H_ David Jeter PE SE of HCI Steel Building System Inc. has
requested a minor adjustment to the approved Site Plan consisting of:
1. Maximum Building Height — 115'-0" feet in lieu of 110'-6" feet as noted on Figure 10.6
(Sheet A401) of the Land Use, Shoreline & Master Plan Permit Application — Volume 1.
The requested adjustment is based on refinements to the final structural design and
accommodates a clear inside height dimension of 95 feet as noted in our application. The
referenced height is measured to the highest point of the roof deck from the finished floor slab.
Crawford Architects and the applicants — Port Quendall Company and Football Northwest LLC
concur with this request. Please contact me at this office if you have any questions or require
further information.
Sincerely,
CRAWFORD ARCHITECTS LLC
David M. Murphy
Partner
Page 1
9 April 2007
Crawford Architects
1901 Main Street —Suite 200
Kansas City, MO 64108
816 421 2640 telephone
816 421 2650 facsimile
david.murphy@crawford-usa.com
Enclosure: None
Copies: Jim Levin — Bayley Construction (for distribution)
Lance Lopes — Seattle Seahawks
Ray Coliiver - Vulcan
Tom Chiado — Vulcan
Elaine Wine — Vulcan
Roger Pearce — Foster Pepper
Brian Dickson — MKA Structural
Filer
Page 2
9 April 2007
Crawford Architects
1901 Main Street — Suite 200
Kansas City, MO 64108
816 421 2640 telephone
816 421 2650 facsimile
david. murphy@crawford-usa.com
Y
CITY )OF RENTON
Kathy Keolker, Mayor
April 25, 2007
David M. Murphy, Partner
CRAWFORD ARCHITECTS LLC
1901 Main Street — Suite 200
Kansas City, MO 64108 .
Planning/Building/PublicWorks Department
Gregg Zimmerman P.E., Administrator
Re: Seattle Seahawks Headquarters & Practice Facility, LUA06-073, SA-H, SA-M,
SM, ECF — Request for Minor Adjustment to the Site Plan
Dear Mr. Murphy
I am in receipt of your letter dated April 9, 2007, wherein you request approval of a
revision to the approved site plan for the Seahawks Headquarters and Training Facility.
As your letter states, a minor adjustment to the approved site plan is proposed, as
follows:
Maximum Building Height — 115'-0" feet in lieu of 110'-6" feet as noted on Figure
10.6 (Sheet A401) of the Land Use, Shoreline & Master Plan Permit Application —
Volume 1.
Our understanding is that the requested adjustment is ,based on refinements to the final
structural design and would accommodate a clear inside height dimension of 95 feet as
noted in the application. Furthermore, the referenced height is measured to the highest
point of the roof deck from. the finished floor slab. The City of Renton Hearing Examiner
approved the Practice Facility at a. height of 111 feet above grade.
Renton Municipal Code Section 4-9-2001, allows minor adjustments to an approved site
plan, provided:
1. The adjustment does not involve more than a ten percent (10%) increase in area
or scale of the development in the approved site plan, or
2. The adjustment does not have a significantly greater impact on the environment
and facilities than the approved plan; or
3. The adjustment does not change the boundaries of the originally approved plan,
Analysis of Request
The site plan modification requested has been compared to the site plan as approved by
the City of Renton Hearing Examiner on December 7, 2006.
The proposed change in building height from 111 feet, as stated in the "Findings,
Conclusions, and Recommendations" section of the Hearing Examiner's decision
(numbers 19 and 22) to the proposed modified height of 115 feet would result in an
additional 4 feet of building height and approximately 350,064 square feet of building
area. ►�+
1055 South Grady Way - Renton, Washington 98057 R E N 1 O N
�y AHPAD OF THE CURVE
David M. Murphy
April 25, 2007
Page 2
The proposed increase in area would not result in more than a 10 percent increase in
area or scale of the development.
Although the increased height could impact views from nearby properties, the
modification would not have a substantial impact on the environment or facilities.
The requested modification would not change the boundaries of the originally approved
site plan.
The project site is zoned Commercial 1 Office I Residential. All applicable setback, lot
coverage, and landscaping standards would be achieved. The requested modification
would not impact the building facades or other architectural features as proposed.
Decision
Based on the analysis and recommendation of staff, I have determinedthe proposed
revis.ion is within the parameters g9fined Y`ffVWRqAton Municipal Code.
Therefore, the proposed madifldl tlion of the site gh s deemed to be "minor" and
therefore, its approved sdt,�ject to tlhe fd1IowJ! g nd ti'i :
1. Prior to the issuance of the final building peer i e"f eS�Seahawks Headquarters
and Training Facility, three full size „prints -and .er 8°'is;11 inch contact print of
revised building elevations. s%aiit. I� d to"he Development Services
Division project manager
This,determination will befinal unless a + deal of thi -administrative
determination, accompanied by the-re4. e oo filing fee, is filed with the City's
S. -
Hearing Examiner within 14,days of the da#e of _ de stun'
If you have any questioh8. regarding this determijomi r#he'tequirements discussed in
this letter, please contact Elizalr'eth Higgins; SenioilRPta net, at (425) 430-7382.
Sincere
Neil Watts, Director
Development Services Division
cc: Parties of Record
Jiro Levin
.Lance Lopes
Ray Colliver
Tom Chiado
Elaine Wine
Roger Pearce
Brian Dickson
Jennifer Henning
Elizabeth Higgins
File
PARTIES OF RECORD
Seahawks Training Facility
LUA06-073, SA-H, SA-M, SM, ECF
Ray Colliver
Port Quendall Company
505 5th Avenue S ste: #900
Seattle, WA 98104
tel: (206) 342-2000
eml: rayc@vulcan.com
(owner / applicant / contact)
Thelma Sutherland
1205 N 29th Street
Renton, WA 98056
(party of record)
Jared Salstrom
5021 Ripley Lane N ste: #213
Renton, WA 98056
eml:
jared.salstrom@villanova.edu
(party of record)
Eileen Halverson
16226 Crystal Drive E
Enumclaw, WA 98022
(party of record)
Michael Cero
8300 Avalon Drive
Mercer Island, WA 98040
tel: (206) 419-0657
eml: mscero@comcast.net
(party of record)
Joe Burcar
Department of Ecology
Shorelands & Environmental
Assistance Program
3190 160th Avenue SE
Bellevue, WA 98008
tel: (425) 649-7145
(party of record)
Steve Jansen
5021 Ripley Lane N ste: #4
Renton, WA 98056
eml: smjansen@msn.com
(party of record)
Elya George Baches
1414 N 34th Street
Renton, WA 98056
(party of record)
Roger A. Pearce Steve Gregerson
Foster Pepper PLLC 5021 Ripley Lane N ste: #302
1111 Third Avenue ste: #3400 Renton, WA 98056
Seattle, WA 98101-3299 (party of record)
(party of record)
Elaine Wine
Vulcan
505 Fifth Avenue S ste: #900
Seattle, WA 98104
tel: (206) 342-2397
eml: elainew@vulcan.com
(party of record)
Thomas F. Peterson
Socius Law Group PLLC
Two Union Square
601 Union Street ste: #4950
Seattle, WA 98101
tel: (206) 838-9112
eml: tpeterson@sociuslaw.com
(party of record)
Brian T. Sabey
5021 Ripley Lane N ste: #304
Renton, WA 98056
eml: bsabey@comcast.net
(party of record)
Eleanor Maargo Kennamer,
President
Misty Cove Condo Association
5021 Ripley Lane N ste: #309
Renton, WA 98056
tel: (206) 650-8855
eml: margok@msn.com
(party of record)
Aaron Belenky, President
Williamsburg Condo HOA
1800 NE 40th Street ste: #H-4
Renton, WA 98056
(party of record)
Lance Lopes
Qwest Field
800 Occidental Avenue S ste:
#100
Seattle, WA 98134
tel: (206) 381-7835
eml: lance)@sea hawks. com
(party of record)
Barbara Paxhia Shelly Munkberg
5021 Ripley Lane N ste: #104 SECO Development
Renton, WA 98056 1083 Lake Washington Blvd N
(party of record) ste: #50
Renton, WA 98056
(party of record)
Updated: 04/26/07 (Page 1 of 2)
Larry Barsher
6940 96th Avenue SE
Mercer Island, WA 98040
(party of record)
PARTIES OF RECORD
Seahawks Training Facility
LUA06-073, SA-H, SA-M, SM, ECF
Tom Ehrlichman
Socius Law Group
Two Union Square
601 Union Street ste
Seattle, WA 98101
(party of record)
Jeffrey Taraday
Mike Creegan
Foster Pepper
1236 S Director Street
1111 Third Avenue ste: #3400
Seattle, WA 98108
Seattle, WA 98101
(party of record)
(party of record)
Tom Chlado
Chiado LLC
tel: (206) 550-8363
eml: tom@chiadollc.com
(party of record)
Richard Wagner
Baylis Architects
10801 Main Street ste: # 110
#4950 Bellevue, WA 98004
(party of record)
David M. Murphy, Partner
Crawford Architects LLC
1901 Main Street ste: #200
Kansas City, MO 64108
(contact)
Jim Levin
Bayley Construction
8005 SE 28th Street
PO Box 9004
Mercer Island, WA 98040-9004
tel: (206) 621-8884
eml: jimlevin@bayley.com
(party of record)
Updated: 04/26/07 (Page 2 of 2)
CITY OF RENTON
Lirry and Esther Bar-sher MAY 4 8 2007
694-0 96th Ave, 5. E.
Mercer 151404, Wash it)gton 9SQ40 CITY CLERK'S OFFICE
206-232-9280.... Iesl),arOa come A.net
City Clerk May 8, 2007
City of Renton
1055 South Grady WayXc7Ih��?�r
Renton, WA 98057
Re: Seattle Seahawks Headquarters & Practice Facility, Request for Minor Adjustment
We appeal the City ofRenton's April 25, 2007 determination decision allowing the Seattle
Seahawks Headquarters & Practice Facility, now under construction, to increase the height of
the building to 115 feet. This decision was based on the determination the request is a minor
modification as defined by The City of Renton Code, which we also appeal.
An increase of 4 and 1/2 feet in height is not a minor modification_ It will make an already -
imposing (l 11 foot high by 340 long) large building even more imposing and larger to
hundreds of people who view it across the lake on Mercer Island. This increase creates a
significantly greater impact on the environment which Code Sec 4-9-2001 does not allow.
At the initial examiner's hearing on November 21, 2006 I stated my family did not object to the
construction of the facility and thought it would be a very attractive building viewed up close,
however the structure wi11 look like an enormous box as viewed from homes only one mile
across the lake. We recommended that large evergreen trees reaching the height of at least
100 feet at maturity be planted judiciously in front of the building to mitigate and soften its
imposing size. Such landscaping would go a long way to return what use to be a tranquil vista
of hones, a modest apartment building (Misty Cove) and a hillside covered with trees. Much
to our chagrin the hearing examiner's approval of the project did not include this modest
landscape addition_
Now the request is for the "enormous box" to get even larger, which we appeal. However we
would not object to an approval that included the addition of large evergreen trees reaching to
approximately the roof elevation at maturity and planted judiciously close to the building. The
trees would mitigate and soften its size and greatly reduce the enlarged Seahawk Facility's
environmental unpact on those viewing the building from a distance. This landscape
requirement should be added as an additional condition to the proposed modification, The
change will benefit hundreds of.Mercer islanders now and for generations to cone.
We contacted neighbors that live near us and they agree with our concern and solution. The
attachment is a list with their addresses and phone numbers_ /
Th required 75 r
e qu ed $ appeal fee is enclosed.
Sincerely,
and Esther Barsher
Mercer Island Neighbors Agreeing With This Appeal and Mitigating Solution
Name Address Phone 4
Dan & Jody Samson 6952 96th Ave. SE 232-0151
Dwight & Christine Schaeffer 6958 96th Ave. SE 236-2580
Les & Denise Klafi' 6915 96th Ave. SE 232-4435
Carl Lindstrom 6910 96 Ave. SE 232-0933
Howard & Sue Robboy 6944 96th AVE SE 236-1162
Steven & Deanna Marshall 6934 96th Ave, SE 425-747-6755
Hal & Gerry Fardal 6920 96th Ave_ SE 232-1936
Dr. Robert and Bee Dietz 7906 E. Mercer Way 230-6989
CIT OF RENTON
Hearing Examiner
Kathy Keolker, Mayor Fred J. Kaufman
May 10, 2007
Larry and Esther Barsher
6940 96" Ave. SE
Mercer Island, WA 98040
Re: Seattle Seahawks Headquarters & Practice Facility Appeal
LUA 06-073, SA-H, SA-M, SM, ECF
Dear Mr. & Mrs. Barsher:
We are in receipt of your Appeal in regards to the above referenced matter. The appeal hearing
has been scheduled for Tuesday, May 29, 2007 at 9:00 a.m. The hearing will take place in the
Council Chambers on the seventh floor of the Renton City Hall. The address is 1055 S Grady
Way in Renton.
If this office can provide any further assistance, please address those comments in writing.
Sincerely,
Fred Kaufman
Hearing Examiner
City of Renton
FK/nt
cc: Larry Warren, City Attorney
Neil Watts, Development Services
Elizabeth Higgins, Development Services
Stacy Tucker, Development Services
Roger Pearce, Foster Pepper Law Firm
All Parties of Record
1055 South Grady Way - Renton, Washington 98055 - (425) 430-6515
MThis oweroantains 50% mrvrk- i—t—r i wrr ' r t--r
RENTON
AHEAD OF THE CURVE
Y
CITY F RENTON
"R
Kathy Keotker, Mayor
April 25, 2007
David M. Murphy, Partner
CRAWFORD ARCHITECTS LLC
1901 Main Street — Suite 200
Kansas City, MO 64108
Planning/Building/PublieWorks Department
Gregg Zimmerman P.E., Administrator
Re: Seattle Seahawks Headquarters & Practice Facility, PSA-H, SA-M,
SM, ECF — Request for Minor Adjustment to the Site Plan
Dear Mr. Murphy
I am in receipt of your letter dated April 9, 2007, wherein you request approval of a
revision to the approved site plan for the Seahawks Headquarters and Training Facility.
As your letter states, a minor adjustment to the approved site plan is proposed, as
follows:
Maximum Building Height — 115'-0" feet in lieu of 110'-6" feet as noted on Figure
10.6 (Sheet A401) of the Land Use, Shoreline & Master Plan Permit Application —
Volume 1.
Our understanding is that the requested adjustment is based on refinements to the final
structural design and would accommodate a clear inside height dimension of 95 feet as
noted in the application. Furthermore, the referenced height is measured to the highest
point of the roof deck from the finished floor slab. The City of Renton Hearing Examiner
approved the Practice Facility at a. height of 111 feet above grade.
Renton Municipal Code Section 4-9-2001, allows minor adjustments to an approved site
plan, provided:
1. The adjustment does not involve more than a fen percent (10%) increase in area
or scale of the development in the approved site plan; or
2. The adjustment does not have a significantly greater impact on the environment
and facilities than the approved plan; or
3. The adjustment does not change the boundaries of the originally approved plan.
Analysis of Request
The site plan modification requested has been compared to the site plan as approved by
the City of Renton Hearing Examiner on December 7, 2006.
The proposed change in building height from 111 feet, as stated in the "Findings,
Conclusions, and Recommendations" section of the Hearing Examiner's decision
(numbers 19 and 22) to the proposed modified height of 115 feet would result in an
additional 4 feet of building height and approximately 350,064 square feet of building
area.
1055 South Grady Way - Renton, Washington 98057 RE N T O N
.4HEAn Or THE l][i RVP
This papercontairts5o%recycledmateria1.30%post consumer
David M. Murphy
April 25, 2007
Page 2
The proposed increase in area would not result in more than a 10 percent increase in
area or scale of the development.
Although the increased height could impact views from nearby properties, the
modification would not have a substantial impact on the environment or facilities.
The requested modification would not change the boundaries of the originally approved
site plan.
The project site is zoned Commercial ! Office 1 Residential. All applicable setback, lot
coverage, and landscaping standards would be achieved. The requested modification
would not impact the building facades or other architectural features as proposed.
Decision
Based on the analysis and recommendation of staff, l have determined the proposed
revision is within the parameters defined by the Renton Municipal Code.
Therefore, the proposed modification of the site plan. is deemed to be "minor" and
therefore, is approved subject to the following condition:
1. Prior to the issuance of the final building permit for the Seahawks Headquarters
and Training Facility, three full size prints and one 8 % x.11 inch contact print of
revised building elevations shall be submitted to the Development Services
Division project manager.
This.determination will be final unless a written appeal of this administrative
determination, accompanied by the required $75.00 filing fee, is fled with the City's
Hearing Examiner within 14 days of the date of this decision.
If you have any questions regarding this determination or the requirements discussed in
this letter, please contact Elizabeth Higgins, Senior Planner, at (425) 430-7382,
Sincere ,
50le wad
Neil Watts, Director
Development Services Division
cc: Parties of Record
Jim Levin
Lance Lopes
Ray Colliver
Tom Chiado
Elaine Wine
Roger Pearce
Brian Dickson
Jennifer Henning
Elizabeth Higgins
File
STATE OF WASHINGTON
DEPARTMENT OF ECOLOGY
Northwest Regional Office • 3190 1601h Avenue SE • Bellevue, Washington 98008-5452 • (425) 649-7000
December 8, 2006
Port Quendall Company
Attn: Ray Colliver
505 Fifth Ave South, Suite 900
Seattle, WA 98104
Dear Mr. Colliver:
Subject: City of Renton Permit # LUAU— Approved
Port Quendall Company (Seattle Seahawks Training Facility) - Applicant
Shoreline Substantial Development Permit 9 2006-NW-10029
'Purpose of this letter:
This letter is to inform you that on December 6, 2006, the Department of Ecology received
notice that the City of Renton approved your application for a substantial development permit.
Your permit is for construction of the Seattle Seahawks training facility and headquarters
including four outdoor fields, an office building and indoor training facility within shoreline
jurisdiction of Lake Washington. (Chapter 90.58 Revised Code of Washington).
What happens next?
The law requires that you must wait at least twenty-one (21) days from the date that we received
this decision from City before you begin the specific activities authorized by this permit.
Therefore, you cannot lawfully begin those activities until after December 27, 2006. This .
waiting period is to allow anyone disagreeing with any aspect of your permit to appeal to the
state Shorelines Hearings Board.
If aiiyoiie does appeal your permit, you must wait until the appeal is over before you start work.
The Shorelines Hearings Board will notify you by letter if they receive an appeal. To be sure
that the Shorelines Hearings Board has not received an appeal, we advise you to contact them at
(360) 459-6327 or http://www.eho.wa.gov/Boards/SHB.asp before you begin work.
If you want to appeal this decision, you can find appeal instructions (Chapter 46108 WAC) at
the Shoreline Hearings Board website above. They are also posted on the website of the
Washington State legislature at: http://apps.leg.wa.gov/wac.
Other federal, state and local permits may be required in addition to this shoreline. permit.
Port Quendall
December S, 2006
Page 2 of 2
If you have any questions about this letter, please contact Joe Burcar at 425-649-7145
jobu461@Acy.wa.gov.
Sincerely,
Joe Burcar, orelands Specialist
Shorelands and Environmental Assistance Program
JGB:cja
cc: Elizabeth Higgins, City of Renton
Few STAP o
a m
� w x
STATE OF WASHINGTON
DEPARTMENT OF ECOLOGY
Northwest Regional Office • 3190 160th Avenue SE • Bellevue, Washington 98008-5452 • (4?) 649-7000
REV �C�',p ft
lAk-s
January 17, 2007
Ms. Elaine Wine
Vulcan
505 Fifth Ave S Suite 900
Seattle, WA 98104
r Elaine,
N 19 4?001
11$c$/
Ecology hereby appr ves the Engi•zeeting Design Reps: (EOR) dated December 29,
2006. The construction activities may stars according to the requirements specified in the
EDR. By approving the EDR, Ecology is agreeing that the proposed cleanup actions are
consistent with the requirements of the J.H. Baxter (North) and (South) Consent Decrees.
However, by approving the EDR, Ecology is not warranting the success of the proposed
remedial actions.
City of Renton and Fish and Wildlife Department also reviewed the EDR and provided
the requirements specified in the letters (see attachments). Ecology's approval of the
EDR is contingent upon your full compliance with the requirements listed in these
attachments.
If you have any questions, please call me at (425) 649 -7187.
Sincerely,
Sunny Lin &je--�
SBecker, P.E.
Toxics Cleanup Program
Department of Ecology
Cc: Ecology Ching -Pi Wang
Fish and Wildlife: Stewart Reinbold
City of Renton: Elizabeth Higgins
Ecology AG's Office. Melissa Rourke
ate:. i«1