Loading...
HomeMy WebLinkAboutAdmin ReportEXECUTIVE DEPARTMENT t;`R M E M O R A N D U M DATE: November 19, 2018 TO: Ed Prince, Council President Members of Renton City Council FROM: Denis Law, Mayor Robert Harrison, Chief Administrative Officer SUBJECT: Administrative Report Inclement Weather Response Reminder: The Public Works Department would like to remind residents to help us prevent local residential street flooding by monitoring catch basins near your home and keeping them clear of leaves and other debris. Street sweepers are dispatched daily to clean up debris along major arterials. Also, snow is not far away. Please remember that during snow and ice events, the department sanders and snow plows are dispatched to keep major arterials drivable. Visit our website at rentonwa.gov/snowroutes to view our snow route maps. It is imperative that motorists do not park or abandon their vehicles within any portion of the traffic lanes. Abandoned vehicles impair snow and ice removal and impact response of emergency vehicles. An effort to rename the Eastside Rail Corridor is underway, and the city of Renton invites everyone to make suggestions through a public survey that will be available through the city's social media sites and the parks and trails division web page. The survey will be open until November 25th and your responses will help guide the decision process. For more information, contact Cailin Hunsaker, Parks and Trails Director, at chunsaker@rentonwa.gov or 425-430-6606. Information about preventative street maintenance, traffic impact projects, and road closures happening this week can be found at http://rentonwa.gov/trafficimpacts. Preventative street maintenance, traffic impact projects, and road closures will be at the following locations: ✓ Monday, November 19th through Wednesday, November 21st, 9:00 a.m. to 3:00 p.m. Intermittent northbound lane closures on Lake Washington Blvd south of Houser Way North due to roadway construction. Questions may be directed to Brad Stocco at 206-282-2373. ✓ Monday, November 19th through Wednesday, November 21st, 9:00 a.m. to 3:00 p.m. Intermittent lane closures on Lake Washington Blvd between North Ed Prince, Council President Members of Renton City Council Page 2 of 2 November 19, 2018 38th Street and North 40th Street due to roadway construction. Questions may be directed to Brad Stocco at 206-282-2373. ✓ Monday, November 19th through Wednesday, November 21st, 7:00 a.m. to 5:00 p.m. East Valley Road will be closed at the intersection of SW 19th Street for the 1-405 Direct Connector Project. One lane on East Valley Road will remain open, with flaggers directing traffic through the work site. Questions may be directed to Justin Johnson at 425-430-7291. ✓ Monday, November 19th through Wednesday, November 21st, 4:30 a.m. to 3:30 p.m. Single lane closure along southbound Talbot Road South between the northbound 1-405 on -ramp and the southbound 1-405 off -ramp for the 1-405 Direct Connector Project. Questions may be directed to Justin Johnson at 425- 430-7291. ✓ Monday, November 19th through Friday, November 23rd, 9:00 a.m. to 2:30 p.m. Expect intermittent lane closures and traffic delays along Talbot Road South (SR 515) related to the 1-405/SR 167 Interchange Direct Connector Project. In addition, northbound and southbound nighttime lane restrictions and closures along SR 167 and 1-405 are also scheduled this week related to the project. Questions may be directed to Craig Smiley, WSDOT 1-405/SR 167 Corridor Communications, at 425-456-8624 or visit the project website at http://www.wsdot.wa.gov/Pro*ects/1405/SR1671CDirectConnector. ✓ Monday, November 19th through December 2018. Road closure on South 14th Street between Smithers Avenue South and Davis Avenue South for utility construction. Questions may be directed to Patrick DeCaro at 425-207-6013. ✓ Monday, November 19th through approximately Friday, January 4th, 2019. Traffic revisions have been implemented near Talbot Hill Elementary School along Smithers Avenue South between South 21st Street and South 23rd Street to provide access to the school for buses and parents dropping off and picking up students. These revisions were needed due to the closure of the school's east parking lot which had been used by the buses. This is a temporary revision that will be in effect until repairs are made to the parking lot. ✓ Monday, November 19th through October 2019. The Renton Hill Utility Replacement Project is underway with anticipated completion in May 2019. Following completion of the utility project, an overlay of the affected surface streets will be conducted as part of the 2019 overlay project. The overlay is scheduled to be completed prior to October 31, 2019.