Inclement Weather Response Reminder: The Public Works Department would like
to remind residents to help us prevent local residential street flooding by monitoring
catch basins near your home and keeping them clear of leaves and other debris.
Street sweepers are dispatched daily to clean up debris along major arterials. Also,
snow is not far away. Please remember that during snow and ice events, the
department sanders and snow plows are dispatched to keep major arterials drivable.
Visit our website at rentonwa.gov/snow routes to view our snow route maps. It is
imperative that motorists do not park or abandon their vehicles within any portion
of the traffic lanes. Abandoned vehicles impair snow and ice removal and impact
response of emergency vehicles.
Be sure to include the spectacular Clam Lights holiday lights display on your holiday
list of "must dos" this season. Clam Lights runs nightly from 5:00 to 9:00 p.m.
through January 1st. This year's Clam Lights display features 200,000 lights, turning
Gene Coulon Memorial Beach Park into a winter wonderland, perfect for holiday
photos or leisurely strolls along the shores of Lake Washington.
• Information about preventative street maintenance, traffic impact projects, and
road closures happening this week can be found at http://rentonwa.gov/traffic.
Preventative street maintenance, traffic impact projects, and road closures will be at
the following locations:
✓ Monday, December 3rd through Friday, December 7th, 4:30 a.m. to 3:30 p.m.
Single lane closure along southbound Talbot Road South between the
northbound 1-405 on -ramp and the southbound 1-405 off -ramp for the 1-405
Direct Connector Project. Questions may be directed to Justin Johnson at 425-
430-7291.
✓ Monday, December 3rd through Friday, December 7th, 7:00 a.m. to 5:00 p.m.
East Valley Road will be closed at the intersection of SW 19th Street and Taylor
Avenue SW for the 1-405 Direct Connector Project. One lane on East Valley Road
Ed Prince, Council President
Members of Renton City Council
Page 2 of 2
December 3, 2018
will remain open, with flaggers directing traffic through the work site. Questions
may be directed to Justin Johnson at 425-430-7291.
✓ Monday, December 3rd through Friday, December 7th, 9:00 a.m. to 3:00 p.m.
Intermittent northbound lane closures on Lake Washington Blvd south of Houser
Way North due to roadway construction. Questions may be directed to Brad
Stocco at 206-282-2373.
✓ Monday, December 3rd through Friday, December 7th, 9:00 a.m. to 3:00 p.m.
Intermittent lane closures on Lake Washington Blvd between North 38th Street
and North 40th Street due to roadway construction. Questions may be directed
to Brad Stocco at 206-282-2373.
✓ Monday, December 3rd through Friday, December 7th, 9:00 a.m. to 3:00 p.m.
Possible lane closures at the intersection of South Puget Drive and 116th Avenue
SE due to utility and roadway construction. Questions may be directed to Tom
Main at 206-999-1833.
✓ Monday, December 3rd through Friday, December 7th, 9:00 a.m. to 2:30 p.m.
Expect intermittent lane closures and traffic delays along Talbot Road South (SR
515) related to the I-405/SR 167 Interchange Direct Connector Project.
In addition, northbound and southbound nighttime lane restrictions and closures
along SR 167 and 1-405 are also scheduled this week related to the project.
Questions may be directed to Craig Smiley, WSDOT 1-405/SR 167 Corridor
Communications, at 425-456-8624 or visit the project website at
http://www.wsdot.wa.gov/Pro*ects/1405/SR1671CDirectConnector.
✓ Monday, December 3rd through December 2018. Road closure on South 14th
Street between Smithers Avenue South and Davis Avenue South for utility
construction. Questions may be directed to Patrick DeCaro at 425-207-6013.
✓ Monday, December 3rd through approximately Friday, January 4th, 2019.
Traffic revisions have been implemented near Talbot Hill Elementary School
along Smithers Avenue South between South 21st Street and South 23rd Street
to provide access to the school for buses and parents dropping off and picking up
students. These revisions were needed due to the closure of the school's east
parking lot which had been used by the buses. This is a temporary revision that
will be in effect until repairs are made to the parking lot.
✓ Monday, December 3rd through October 2019. The Renton Hill Utility
Replacement Project is underway with anticipated completion in May 2019.
Following completion of the utility project, an overlay of the affected surface
streets will be conducted as part of the 2019 overlay project. The overlay is
scheduled to be completed prior to October 31, 2019.