Loading...
HomeMy WebLinkAboutAdmin ReportEXECUTIVE DEPARTMENT M E M O R A N D U M DATE: January 14, 2019 TO: Don Persson, Council President Members of Renton City Council FROM: Denis Law, Mayor Robert Harrison, Chief Administrative Officer SUBJECT: Administrative Report The mayor's annual State of the City address is January 30 at 8:00 a.m. at Renton Pavilion Event Center. Tickets are $25 each or $200 for a table of 8 and can be purchased by calling 425-430-6616. • Gene Coulon Memorial Beach Park is currently undergoing repairs that will close the south deck and day moorage until early spring. Ivar's restaurant will also close during this time for a remodel. Signage will be provided around the construction site regarding closure and redirection for pedestrian access. More information is available at rentonwa.gov/coulon. The public is invited to review and comment on proposed updates to the Airport Master Plan, including the Airside Alternatives, during an open house scheduled for Tuesday, January 15 from 5:30 to 7:30 p.m. at the Renton Community Center, located at 1715 Maple Valley Hwy in Renton. The Airport Airside Alternatives may be viewed on our website at rentonwa.gov/airport. • Information about preventative street maintenance, traffic impact projects, and road closures happening this week can be found at http://rentonwa.gov/traffic. Preventative street maintenance, traffic impact projects, and road closures will be at the following locations: ✓ Monday, January 14 through Friday, January 18, 9:00 a.m. to 3:00 p.m. Single lane closures on the north and southbound lanes of 108th Avenue SE (SR 515) at SE Petrovitsky Road due to utility construction. Questions may be directed to Tom Main at 206-999-1833. ✓ Monday, January 14 through Friday, January 18, 9:00 a.m. to 3:00 p.m. Intermittent single lane closures within the neighborhood bordered by 116th Avenue SE, 125th Avenue SE, SE 164th Street, and SE 168th Street due to water main replacement work performed by Soos Creek Water and Sewer District. Questions may be directed to Patrick DeCaro at 425-207-6013. Don Persson, Council President Members of Renton City Council Page 2 of 2 January 14, 2019 ✓ Monday, January 14 through Friday, January 18, 9:00 a.m. to 3:00 p.m. Intermittent lane closures on Lake Washington Blvd between North 39th Street and North 40th Street due to roadway construction. Questions may be directed to Brad Stocco at 206-282-2373. ✓ Monday, January 14 through Friday, January 18, 9:00 a.m. to 3:00 p.m. Possible lane closure of the outer westbound lane of Puget Drive SE east of Benson Road South due to utility construction. Questions may be directed to Tom Main at 206-999-1833. ✓ Monday, January 14 through Friday, January 18, 4:30 a.m. to 3:30 p.m. Single lane closure along southbound Talbot Road South between the northbound I- 405 on -ramp and the southbound 1-405 off -ramp for the 1-405 Direct Connector Project. Questions may be directed to Justin Johnson at 425-430-7291. ✓ Monday, January 14 through Friday, January 18, 9:00 a.m. to 5:00 p.m. Intermittent lane closures at South 132nd Street for storm water utility work. Questions may be directed to Pat Miller at 206-794-6162. ✓ Monday, January 14 through Friday, January 18, 9:00 a.m. to 3:00 p.m. Lane closures between South 4th Street and South 7th Street due to work on the Renton Hill Utility Replacement Project. Questions may be directed to Todd Freih at 206-999-1832. ✓ Monday, January 14 through Friday, January 18, 9:00 a.m. to 2:30 p.m. Expect intermittent lane closures and traffic delays along Talbot Road South (SR 515) related to the 1-405/SR 167 Interchange Direct Connector Project. In addition, northbound and southbound nighttime lane restrictions and closures along SR 167 and 1-405 are also scheduled this week related to the project. Questions may be directed to Craig Smiley, WSDOT 1-405/SR 167 Corridor Communications, at 425-456-8624 or visit the project website at http://www.wsdot.wa.gov/Projects/1405/SR1671CDirectConnector. ✓ Monday, January 14 through October 2019. The Renton Hill Utility Replacement Project is underway with anticipated completion in May 2019. Following completion of the utility project, an overlay of the affected surface streets will be conducted as part of the 2019 overlay project. The overlay is scheduled to be completed prior to October 31, 2019. ✓ Monday, January 14 through January 2019. Road closure on South 14th Street between Smithers Avenue South and Davis Avenue South for utility construction. Questions may be directed to Patrick DeCaro at 425-207-6013.