HomeMy WebLinkAboutMFP19000840.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP19000840
IVR Number: 19000840
Permit Informaon
Permit Name:Comcast Cable Franchise Permit
Address/Locaon :02/20/2019Application Date:7231501979Parcel Number:858 S 2ND ST
Permit Type:03/04/2019Issue Date:Franchise
Permit Work Class:03/03/2020Expiration Date:Minor Utility
Job Number:311210Franchise Type:Cable
Description:Drilling underground 5' in ROW. Restoration per City of Renton standards.
Contacts
Name Address PhoneTypeBilling
Comcast Cable Communication
Management & Comcast Cable
B: (215) 665-1700Applicant
Tom Donnelly
Comcast Business Communications
1701 Jfk Blvd, 32nd Floor
Philadelphia, PA 19103
B: (215) 286-7347
C: (215) 286-7557
Contact
Scott Nall
SEFNCO Communications Inc
2904 4th Ave NE
Puyallup, WA 98372
B: (877) 385-2903
C: (253) 444-9057
Contractor
Business License Number: 41108Construction Contractor: SEFNCCI850QD
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
2-19-2019
COMCAST CABLE COMMUNICATIONS MANAGEMENT
311210
ASHLEY KIEHN
253-999-2271
AKIEHN@SEFNCO.COM
858 S 2ND ST U.S. BANK RENTON
DRILLING UNDERGROUND 5' IN ROW
5'
SEFNCO COMMUNICATIONS
SEFNCC1850QD BLO29666
MFP19000840
Scott Warlick 2/20/2019
RESTORATION PER CITY OF RENTON STANDARDS
Holly Powers 3/4/2019
MFP19000840Scott Warlick3/4/2019
MFP19000840
SCOPE OF WORK:SHEET INDEX:1- COVER SHEET2- NOTES & LEGEND SHEET3 - DESIGNBILL OF MATERIALS*:CONTACTS:U.S. BANK RENTONTHIS IS PROPRIETARY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED SEFNCO COMMUNICATIONSPROJECT VICINITY MAP:NO SCALECOVER858 S 2ND ST, RENTON, WASEFNCO:PAUL JENSEN 253-299-4961COMCAST:KYLE KINNEYCOMCASTCOMCASTJT-311210·QTY. 1-(17x30) NON-SKID VAULT·QTY. 1-(2") CONDUIT W/ RG11 CABLE·DIG AND INTERCEPT EXISTING UNDERGROUND COMCAST CONDUIT·OVER-SET NEW (17x30) NON-SKID VAULT·BORE AND PLACE 1-(2") CONDUIT W/ RG11 CABLE, APPROX - 5'·END OF DESIGN IN R.O.W., CONTINUES ON PRIVATE PROPERTY.LOCATION OF WORK"DELIVERING EXCELLENCE"SEFNCOCOMMUNICATIONSOFDATE ISSUED FOR:BY QC
DATE REVISION BY QC 858 S 2ND ST
RENTON , WA
311210
DESIGN
2/18/2019 PERMIT HBB
13DIG AND INTERCEPT EXISTING U/G CONDUIT,OVER-SET NEW (17x30) NON-SKID VAULT,BORE AND PLACE 1-(2") CONDUIT W/ RG11,END OF DESIGN IN R.O.W.,CONTINUES ON PRIVATE PROPERTY.PROJECT DESCRIPTION*TOTAL FOOTAGE5'==5'*ALL FOOTAGES AND MATERIALS ARE ESTIMATED**NOT INCLUDED IN TOTAL FOOTAGEMFP19000840
NOTES & LEGENDCOMCASTFIBER PLACEMENT NOTES:GENERAL NOTES: DISCLAIMER:1.IT IS THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR TO VERIFY ALL RIGHT OF WAYBEFORE CONSTRUCTION IS TO BEGIN. NO UNDERGROUND INSTALLATION REPRESENTED WITHIN THESE PLAN SHEETS IS PROPOSED OUTSIDE OF THE RIGHT OF WAY.2.THE UNDERGROUND ROUTE DEPICTED IS PRELIMINARY AND WILL/MAY VARY ONCE UTILITIES HAVE BEEN FIELD LOCATED.3.ANCHORING FOR THE AERIAL CONSTRUCTION IS TYPICALLY DETERMINED DURING CONSTRUCTIONAND IS COLLECTED IN THE AS-BUILT PHASE.1.CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 48 HOURS PRIOR TO CONSTRUCTION ACTIVITYSEE LOCAL DIRECTORY FOR CONTACT TELEPHONE NUMBER OF LOCAL CALL BEFORE YOU DIG AGENCY.2.CONTRACTOR SHALL RECORD SEQUENCE # OF FIBER CABLE AT EVERY WORK POLE, MANHOLE, FIBER STORAGE LOOPAND TAIL LOCATION. CONTRACTOR TO PROVIDE PROJECT MANAGER WITH SEQUENCE NUMBERS AT PROJECTCOMPLETION.3.SLACK LOOP AND SNOWSHOE STORAGE LOCATIONS SHALL BE DETERMINED ON CONSTRUCTION DRAWINGS, HOWEVER,REEL LENGTHS OF FIVE HUNDRED FEET (500') OR LESS ON LARGE COUNT FIBER OR THREE HUNDRED FEET (300') OR LESSON SMALL COUNT FIBER ARE DIFFICULT TO USE AND SHOULD BE PLACED AS FSL'S, NOT CUT AND RETURNED.4.FIBER OPTIC IDENTIFICATION TAGS SHALL BE PLACED AT EVERY WORK POLE, MANHOLE, FIBER, STORAGE LOOPS, SPLICECASES AND WHERE INDICATED BY PROJECT MANAGER. TAGS NEED TO BE PLACED SO AS TO BE READ FROM THE GROUND.5.CABLE LUBRICATION SHALL BE USED TO REDUCE PULLING TENSION. LUBRICANTS MUST NOT CONTAIN ANY PETROLEUMPRODUCTS.6.A 100 FOOT FIBER COIL MUST REMAIN IN ALL VAULTS UNLESS OTHERWISE NOTED.7.ALL BURIED INFRASTRUCTURE MUST BE ACCOMPANIED WITH WARNING TAPE AND A TRACER WIRE, AT RISER POLES THELOCATE WIRE SHALL BE ACCESSIBLE AT THE BASE OF THE RISER.8.ALL RISERS WILL BE CAPPED AT ALL TIMES.9.ALL FIBER SHALL BE MARKED AS TO DIRECTION IN EACH VAULT. RED-NORTH, GREEN-SOUTH,YELLOW-EAST, ANDBLUE-WEST. DO NOT TAPE FIBER CABLES TOGETHER IN RISER.1. ALL VAULTS / HAND-HOLES TO BE EQUIPPED WITH SECURITY LIDS WITH LOCKING BOLTS.2. GROUND RESTORATION/RIGHT-OF-WAY SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION.3. ALL 90 DEGREE BENDS IN CONDUIT CONSTRUCTION WILL BE A MINIMUM OF 36" RADIUS UNLESS SPECIFIED OTHERWISE.4. BURIED FIBER OPTIC WARNING SIGNS SHALL BE PLACED AT EACH SIDE OF ALL ROAD CROSSINGS,AT CULVERTS, DITCHES AND IN A STRAIGHT LINE OF SIGHT SPACING OF APPROXIMATELY 500 FEET.5. DEVIATIONS FROM THE ENGINEERED ROUTE REQUIRES A PROJECT MANAGER AND RIGHT-OF-WAYOWNER OR CARETAKER APPROVAL PRIOR TO CONSTRUCTION.6. WHERE PERMITS FROM STATE, COUNTY, CITY, RAILROAD OR GOVERNMENT AGENCIES AREREQUIRED, ALL WORK PERFORMED WILL COMPLY WITH THESE AGENCIES STANDARDSPECIFICATIONS.7. THE PROJECT MANAGER WILL NOTIFY BUILDING MANAGEMENT WHEN WORK WILL BEGIN ONBUILDING. CONTRACTOR TO COORDINATE ROOM ACCESS AND WORK START AND STOP TIMESWITH BUILDING MANAGEMENT.8. THE PROJECT MANAGER IS TO BE NOTIFIED BY THE CONTRACTOR 24 HOURS PRIOR TOCONSTRUCTION. SEE COMPANY CONTACT LIST FOR CONTACT NAME(s) AND TELEPHONE NUMBER(s).9. THE PROJECT MANAGER WILL RESERVE THE RIGHT TO INSPECT AT ANY TIME THE WORK BEINGPERFORMED BY THE CONTRACTOR. IF PROJECT MANAGER DETERMINES THAT THE WORK IS NOTBEING PERFORMED TO MINIMUM QUALITY STANDARDS, THEN THE CONTRACTOR SHALL PROVIDEREWORK AT HIS OWN COST.10. ANY CHANGE IN PROJECT SCOPE, INCLUDING BUT NOT LIMITED TO, CONDUIT LENGTH, CONDUITPATH, AERIAL PATH ETC., MUST BE APPROVED BY THE PROJECT MANAGER.11. ALL CORING/CONSTRUCTION THAT WILL CAUSE NOISE AND/OR VIBRATION SHALL BE DONE WITHINALLOWED (9AM-3PM) BUSINESS HOURS.12. ANY AND ALL UNDERGROUND UTILITIES ENCOUNTERED ARE THE RESPONSIBILITY OF THECONTRACTOR TO LOCATE, PROTECT, AND REPAIR, IF DAMAGED.13. ALL FOOTAGES ARE BASED ON FIELD GATHERED MEASUREMENTS, AS SUCH SOME VARIANCESHOULD BE ANTICIPATED. ADJUST AS NEEDED.14. ALL BURIED CONDUIT/CABLE WILL BE PLACED AT 36" MINIMUM COVER. SITE HAS POTENTIAL FORROCK THAT WOULD PREVENT THE ABILITY TO PROVIDE THE MINIMUM COVER. IN CASES WHERE THEMINIMUM COVER CAN NOT BE ACHIEVED, THE CONDUIT SHALL BE PLACED IN A SCH 40 EMT SLEEVEOR APPROVED EQUIVALENT.15. WATER, SEWER, STORM SEWER AND EASEMENT LOCATIONS ARE BASED OFF OF CITY MAPS,NOT FIELD VERIFIED.16. BORING OF AC PAVING IS REQUIRED AT ALL LOCATIONS AS INDICATED ON PLANS.17. AT NO TIME SHALL CURBS, GUTTERS OR HANDICAP BE DISTURBED.18.DOOR HANGERS ARE TO BE PLACED A MINIMUM OF 72 HOURS PRIOR TO START OF CONSTRUCTION.19. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL PLACE MESSAGE BOARDS STATING LANECLOSURES, AND DELAYS A WEEK IN ADVANCE. LOCATION OF THE MASSAGE BOARD SHALL BECOORDINATED WITH THE CITY INSPECTOR AT THE PRE-CONSTRUCTION MEETING.20. LANE CLOSURES CANNOT EXCEED MORE THAN 300 FT. AT A TIME. FOR SAFETY PURPOSES THERESHALL BE ONLY ONE CLOSURE AT A TIME ALONG INTERNATIONAL BLVD. MORE FLAGGERS WILL BENECESSARY TO HELP VEHICLES AND PEDESTRIANS IN THE WORK ZONES DURING THE LANECLOSURES.STORM DRAINMANHOLECOMMUNICATIONSWATERSEWERPOWERGAS6ROWRPROPOSED VAULT PROPOSED BORE PITSTREET/SIGNAL/TRAFFIC LIGHTCONSTRUCTION NOTECATCH BASINFIRE HYDRANTEXISTING POLE W/ NEW RISERBUILDING OUTLINETRAFFIC FLOWLANDSCAPING/TREEPOTHOLE LOCATIONCHANNELIZATION5+39STATIONING(xxx') OPEN TRENCHPROPOSED DIRECTIONAL DRILLEXISTING PULL THRUPROPOSED BOREPROPOSED OPEN TRENCH(xxx') EXISTING PULL THRU(xxx') BORE(xxx') DIRECTIONAL DRILLRIGHT-OF-WAYCENTERLINETRAFFIC LANEFENCEDCBSCGUARD RAILAERIAL STRANDLEGEND:VUUUUUUSWPCGDEOPEDGE OF PAVEMENT"DELIVERING EXCELLENCE"SEFNCOCOMMUNICATIONSOFDATE ISSUED FOR:BY QC
DATE REVISION BY QC 858 S 2ND ST
RENTON , WA
311210
DESIGN
2/18/2019 PERMIT HBB
23MFP19000840
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPROWROWROWROWROWROWROWEOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPROW ROW ROWROWROWEOP EOP EOP EOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOP EOP EOP EOP858EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPROWROWROWROWROWROWROWROWROWROWROWROWEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPCONTINUES ONPRIVATE PROPERTYROW ROW ROWROWROWROWROWS 2nd STWELLS AVE SWILLIAMS AVE SONE WAY ROADONE WAY ROADONE WAY ROADONE WAY ROADONE WAY ROADONE WAY ROAD
COMCAST"DELIVERING EXCELLENCE"SEFNCOCOMMUNICATIONSOFDATE ISSUED FOR:BY QC
DATE REVISION BY QC 858 S 2ND ST
RENTON , WA
311210
DESIGN
2/18/2019 PERMIT HBB
33EXISTING UNDERGROUND CONDUIT TOBE VERIFIED ALONG WITH UTILITYLOCATES PRIOR TO CONSTRUCTIONR&R CONCRETE SIDEWALK PANELS ASNEEDED FOR CONSTRUCTION, CONCRETEPANELS TO BE LIKE NEW OR EQUALDIG & INTERCEPT EXISTING U/G CONDUIT,OVER-SET NEW (17x 30) NON-SKID VAULTBORE AND PLACE 1-(2") CONDUITW/ RG11 DROP CABLE, APPROX -5' IN R.O.W., END OF DESIGNNOTE: TYP. - ALL UTILITY PIPING DEPTHS TBDBY POT-HOLE/S IN R.O.W. WHERE CROSSINGWITH BORING CONDUIT OCCURS, AS TO AVOIDANY CONTACT WITH SAID PIPING BORE DEPTHWILL BE ADJUSTED ACCORDINGLY.MFP19000840