CONSTRUCTION SEQUENCE
N
O
I
O
1
0
W
I-
��
z
EROSION AND SEDIMENT CONTROL (ESC) STANDARD PLAN NOTESs
THE FOLLOWING IS A N, ISTING OF GENERAL NOTES THAT SHALL BE INCORPORATED IN THE EROSION AND SEDIMENT CONTROL IESC)PLAN SF ALL THE NOTES ON THE
LIST MAY NOT PERTAIN TO EVERY PROJECT THE APPLICANT OR OWNER. HEREBY REFERRED TO AS APPLICANT MAY STRKE OUT IRRELEVANT NOTE 5IF NOT
APPLICABLE TO THE PROJECT HOWEVER. THE APPLICANT SHALL NOT RENUMBER NOR EDIT THE REMAINING NOTES. IF ADDITIONAL NOT ES ARE NEEDED FOR SPECIFIC
ASPECTS. THEY SHALL BE AWED AFTER THE ESC STANDARD PLAN NOIES.
1 BEFORE ANY Cow RUCIION
OR DEVELOPMENT ACTIVITY OCCURS. A PRE -CONSTRUCTION MEETING SMALL BE HELD AMONG THE CITY OF RENTON. HEREBY
REFERRED TO AS THE CITY. THE APPLICANT AND THE APPLICANT'SCDNTRACTOR-
2. THE APPLICANT IS RESPONSIBLE FOR OBTAINING THE WASH IN01ON STATE DEPARTMENT OF ECOLOGY(ECOLOGY) CONSTRUCTION STORMWATER GENERAL
PERMIT, IF IT IS RE 0LII RED FOR THE PROJECT THE APPLICANT SHALL PROVIDE THE CITY COPIES OF ALL MONITORING REPORTS PROVI DE13 TO ECOLOGY
ASSOCIATED WITH THE CONSTRUCTION STORMWATER GENERAL PERMIT
3. THE ESC PLAN SET SHALL INCLUDE AN ESC CONSTitUCTION SEQUENCE DETAILING THE ORDERED STEPS THAT SHALL BE FOLLOWED FROM CONSTRUCTION
COMMENCEMENT TO POST- PROJECI CLEANUP IN ORDER TO FULFILL PROJECT ESC REQUIREMENTS
4 THE BOUNDARIES OF THE CLEARING LIMITS- SENSITIVE AREAS AND THEIR BUT FERS• AND AREAS OF VEGETATION PRESERVATION AND TREE RE TENTIQN AS
PRESCRIBED ON THE PLANTS) SHALL 9E CLEARLY DELINEATED BY FENCING AND PROTECTED IN THE FIELD IN ACCORDANCE WITH APPENDIX D OF THE CITY OF
RENTON SURFACE WATER DESIGN MANUAL (RENT ON SWDMJ PR OR TO THE START OF CONSTRUCTION. DURING THE CONSTRUCTION PERIOD. NO DISTURBANCE
BEYOND THE CLEARING LIMITS SHALL HE PERMITTED THE CLEARING LIMITS SHALL WE MAINTAINED BY TINE APPLICANItE SC SUPS RVISOR FOR THE DORA VON of
CONSTRUCTION
S. STABILiZE0 CONSTRUCTION ENTRANCE SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT
ADDITIONAL MEASURES. SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS. MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT
CLEAN AND TRACK, OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT IF SEDIMENT IS TRACKED OFFSITE, PUBLIC ROADS SHALL
BE CLEANED THOROWHLY AT THE END OF EACH DAY- OR MORE FREQUENTLY DURING WET WEATHER. AS NECESSARY TO PREVENT SEDIMENT FROM ENTERING
WATERS OF THE STATE
6 WASHOUT FROM CONCRETE TRUCKS SHALL BE PERFORMED OFF.SI TE OR IN O ESIGNATE D CONCRE TE WASHOUT AREAS ONLY. DO NOT WASH OUT CONCRETE
TRUCKS ONTO THE GROUND. OR TO STORM DRAINS OR OPEN DITCHES ON -SITE DUMPING OF EXCESS CONCRETE SHALL ONLY OCCUR IN DESIGNATED CONCRETE
WASHOUTAREAS
1. ALL REQUIRED ESC BMPS SHALL BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND+OR CONSTRUCTION TO PREVENT TRANSPORTATION OF
SEOIME.NI TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL ESC BMPS SHALL 9E MAINTAINED IN A SATIS FAG TORY CONDITKON UNTIL
SUCH TIME THAT CLEARING ANNOR CONSTRUCTION IS COMPLETE AND POT ENT PAL FOR ON -SITE EROSION HAS PASSED. ALL ESC BMPS SHALL BE REMOVED AFTER
CONSTRUCTION IS OOMPLE TED AND THE 91 TE HAS BEEN STABILIZED TO ENSURE POTENTIAL FOR ON -SITE EROSION DOES NOT ENLIST THE VAPL E MEN TATION,
MAINTENANCE. REPLACEMENT. ENHANCEMENT. AND REMOVAL OF ESC BMPS SHALL BE THE RESPONSIBILITY OF THE APPLICANT
8. ANY HAZARDOUS MATERIALS OR LIOUD PRODUCTS THAT HAVE THE POTENTIAL TO POLLUTE RUNOFF SHALL BE DISPOSED OF PROPERLY
9 THE ESC BMPS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE COND IVONS AS CONSTRUCTION
PROGRESSES AND ONEXPECTE❑ OR SEASONAL CONDITIONS DICTATE, THE APPLICANT SWILL ANTtCPAT E THAT MORE ESC BMPS WILL BE NECESSARY TO ENSURE
COMPLETE SILTATION CONTROL ON THE PROPOSED SITE DURING THE COURSE OF CONSTRUCTION- IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE
APPLICANT TOADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL ESC EIMPS OVER AND ABOVE MINIMUM
REOUIREMENTS, AS MAY BE NEEDED TO PROTECT ADJACENT PROPERTIES ANO WATER OUALI TY OF THE RECEIVING ORAI WAGE SYSTEM
10 APPROVAL OF THIS PLAN IS FOR ESC ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF 5TORM DRAIRAGE DESIGN, SIZE NOR LOCATION OF PIPETS. REST RICTOR$..
CHANNELS. OR S70RMWATER FACILTIES
11 ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF STDRMWATER FACIUTFES SHALL BE SUBMTTE0 TO THE CITY FOR REVIEW ANO APPROVAL.
12 ANY AREAS OF Ex POSED SOILS- INCLUDING ROADWAY EMBANKMENTS. THAT WILL NOT BE DISTURBED FOR TWO DAYS OUR ING THE WET SEASON (OCTOSER 1ST
THROUGH APR IL 30THy OR SEVEN DAYS DURING THE DRY SEASON (MAY IST THROUGH SE PT EMBER 30TH) SWILL BE IMMEDIATELY STABILIZED WITH THE APPROVED
ESC COVER METHODS (E G . SEEDING, MULCHING, PLASTIC COVERING, ETC.) IN CONFORMANGE WITH APPENDIX O OF THE RENTON SWDM
13 WET SEASON ESC REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES BETWEEN OCTCBER 1ST AND APRIL 30TH, UNLESS OTHERWISE APPROVED BY THE CITY
14 ANY AREA NEEDING ADDITIONAL ESC MEASURES NOT REQUIRING IMMEDIATE ATTENTION. SHALL SE ADORESSE 0 WITHIN SEVEN (7)DAYS
15 THE ESC BMPS ON INACTIVE SITES SHALL BE INSPECTEO AND MAINTAINED AT A MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWINGA STORM EVENT
INSPECTION AND µAINTENANCE SHALL OCCUR MDRE FREOUENTLY AS REDO IRED BY THE CITY
16 BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, CATCH BASIN INSERTS PER THE CITY STANDARD PLAN 216.30 SHALL BE PROVIDED FOR ALL STORM
DRAIN INLETS DOWHSLOPE AND WITHIN 500 FEEI OF A DISTTIRBE0 OR CONSTRUCTION AREA, UNLESS THE RUNOFF THAT ENTERS THE INLET WILL BE CONVEYED
TO A SEDIMENT POND OR TRAP. ALL CATCH BASIN INSERTS SHALL BE PERIODICALLY INSPECTED AND REPLACED AS NECESSARY TO ENSURE FULLY FUNCTKJNNG
CONDITION
17 AT NO TIME SHALL SEDIMENT ACCUMULATION E%GEED 2n OF THE CAPACITY OF THE CATCH BASIN SUMP ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE
CLEANED PRIOR TO PAVING THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT-LAOEN WATER INTO THE DOWNSTREAM SYSTEM
18 ANY PERMAN1ENT STORMWATER FACILITY LOCATION USED AS A TIE MPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY ESC SMPSAND SHALL
PROVIDE AIDE OUATE STORAGE CAPACITY IF THE TEMPORARY FACILITY IS TO ULTIMATELY FUNCTION AS AN INFILTRATION SYSTEM IN ITS PERAIAUNENT STATE, THE
TEMPORARY FACILITY SHALL BE ROUGH GRADED SO THAT THE SOTT OM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT
FACILITY
IS- AREAS DESIGNATED ON THE PLAN(S) CONITAIMING EXISTING STORMWATER FACILITIES OR ONSTTE BMPS (AMENDED SOILS. 0 1 OR ETE NTION. PERMEABLE PAVEMENT.
ETC.) SHALL BE CLEARLY FEN CEDAND PROTECTED USING ESC BMPS TO AVOID SEDIMENTATION AND COMPACTION DURING CONSTRUCTION.
20, PRIOR TO THE BEG INNING OF THE WET SEASON (OCTOBER 13T)• ALL DISTURBED AREAS SHALL BE INSPECTED TO IDENTIFY WHII?1 ONES SHALL BE SODDED OR
SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SODDED OR SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON
AN EXHIBIT OF THOSE AREAS TO BE SODDED OR SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY FOR REVIEW
21. PRIOR TO FINALCONS 7RUC TION ACCEPTANCE. THE PROJECT SITE SHALL BE STABILIZED TO PREVENT SEDIMENT -LADEN WATER FROM LEAVING THE PROJECT SITE,
ALL ESC BMPS SHALL BE REMOVED- AND STORMWATER CONVEYANCE SYSTEMS, FACILITIES. AND ON -SITE BMPS SHALL BE RESTORED TO THEIR FULLY
FLNCTION INGCON DITION. ALL DISTURBED AREAS OF THE PROJECT SITE SHALL BE VEGETATED OR OTHERWISE PEPMA NENTLY STA91LIZ£D. AT A MINIMUM,
DISTURBED AREAS SHALL BE SODDED OR SEEDED AND MULCHED TO ENSURE THAT BUFF (CENT COVER WALL DEVELOP SHORTLY AFTER FINAL APPROVAL MULCH
WITHOUT SEEDING IS ADEQUATE FOR AREAS TO BE LANDSCAPED BEFORE OCTOBER 1ST
22, ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND EROSION CONTROL ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS
RETAINING WALLS- ALL ROCKERIES IN CITY ROAD RIGHTS -OF -WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH CITY STANDARDS. ROCKERIES OUTSIDE OF
ROAD RIGNTS•OF•WAY SHALL BE OONSTRUCTED IN ACCORDANCE WI TH THE INTERNATION,4L BUIL04NG CODE
URLTSS 01,-1 RIV-V NOT r r."Yli I`J;: MNOT T-,, sCtilF INTsl
sro. PLAN - 268.00
URIPUBLIC WORKS EROSION AND SEDIMENT CONTROL DEPARTMENT STANDARD PLAN NOTES GAZ 972$72018
w... a..... DATE
1. CATCH BASIN INSERTS SHALL BE PROVIDED IN THE CATCH BASINS NOTED ON THE PLANS.
2. CATCH BASIN INSERT SHALL BE STREAMGUARD SEDIMENT CATCH BASIN INSERT #3003,
ULTRA -DRAIN GUARD #9217, OR APPROVED EQUAL.
3. CATCH BASIN INSERTS SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S
RECOMMENDATIONS, AND MAINTAINED TO OPERATE PROPERLY.
4. CATCH BASIN INSERTS SHALL BE REMOVED FOLLOWING COMPLETION OF CONSTRUCTION AND
STABILIZATION OF ALL CLEARED AREAS.
STOCKPILE NOTES
1. STOCKPILES SHALL BE STABILIZED (WITH PLASTIC COVERING OR OTHER APPROVED DEVICE) DAILY
BETWEEN NOVEMBER 1 AND MARCH 31.
2. IN ANY SEASON, SEDIMENT LEACHING FROM STOCK PILES MUST BE PREVENTED.
3. TOPSOIL SHALL NOT BE PLACED WHILE IN A FROZEN OR MUDDY CONDITION, WHEN THE SUBGRADE IS
EXCESSIVELY WET OR WHEN CONDITIONS EXIST THAT MAY OTHERWISE BE DETRIMENTAL TO PROPER
GRADING OR PROPOSED SODDING OR SEEDING.
4. PREVIOUSLY ESTABLISHED GRADES ON THE AREAS TO BE TOPSOILED SHALL BE MAINTAINED ACCORDING
TO THE APPROVED PLAN.
POLLUTION PREVENTION NOTES
1. OBTAIN SITE DEVELOPMENT PERMIT FROM CITY OF RENTON PLANNING & LAND SERVICES. SCHEDULE
PRE -CONSTRUCTION MEETINGS WITH CITY INSPECTOR, OWNER, CONTRACTOR AND DESIGN TEAM.
SUBMIT ALL SUBMITTALS.
2. PROVIDE TESC MEASURES (EROSION CONTROL PLANS AND DETAIL SHEETS). COORDINATE WITH PROJECT
WORK TIME PERIODS AND PROJECT MILESTONE COMPLETION DATES.
3. PERFORM REQUIRED SITE DEMOLITION WORK.
4. PERFORM SITE EARTHWORK MASS EXCAVATION & GRADING WORK. REMOVE EXCESS SOIL FROM SITE
WHILE BEGINNING SOIL IMPORT.
5. INSTALL WATER QUALITY UNIT AND TO CONNECT TO THE EXISTING MAIN WITHIN THE ALLEY BETWEEN SW
GRADY WAY AND SW 12TH STREET RIGHT-OF-WAY PER PLAN SPECIFICATIONS.
6. PAINT PARKING LOT STRIPING. INSTALL SIGNAGE.
7. CLEAN SEDIMENTS FROM EXISTING STORM DRAINAGE STRUCTURES AND PIPING IF AFFECTED. PROVIDE
DOCUMENTATION CLEANING WAS PERFORMED BY A LICENSED/BONDED COMPANY.
10. SUBMIT PROJECT AS-BUILTS PER CITY OF RENTON SPECIFICATION.
DEMOLITION NOTES
1. EQUIPMENT LUBRICATION AND FUELING OPERATIONS SHALL OCCUR AT EXISTING PAVED AREAS. 2
2. PREVENT OILS AND FUELS FROM ENTERING THE STORM DRAINAGE SYSTEM WITH PROPER CONTAINMENT
DEVICES.
3. ACCESS TO CONSTRUCTION IS VIA ADJACENT EXISTING PAVED STREETS. SWEEP DIRT FROM PAVING 3'
DAILY OR AS NEEDED. THE INTENT IS TO PREVENT DIRT AND DEBRIS FROM VEHICLES AND EQUIPMENT
FROM BEING DEPOSITED ON CITY STREET PAVEMENT.
4. THE CONTRACTOR SHALL PREVENT ALL MATERIAL USED OR GENERATED ON -SITE FROM ENTERING THE 4'
STORM DRAINAGE SYSTEM. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ADEQUATE
CONTAINMENT/SEPARATION AT ALL TIMES.
INSPECTION, MONITORING, DOCUMENTATION AND 5.
REPORTING SCHEDULE
1. EROSION AND SEDIMENT CONTROL (ESC) FACILITIES SHALL NOT BE ALLOWED TO FALL INTO DISREPAIR.
THE PROPONENT OR DESIGNATED ESC LEAD SHALL INSPECT ALL PROJECT FACILITIES IN ACCORDANCE
WITH CITY OF RENTON CONSTRUCTION STORMWATER POLLUTION REQUIREMENTS.
2. THE ESC LEAD SHALL IMPLEMENT THE ESC PLAN. IMPLEMENTATION SHALL INCLUDE BUT IS NOT LIMITED
TO: INSTALLING, MAINTAINING, INSPECTING MONITORING, DOCUMENTING, REPORTING AND REPAIRING ALL
TEMPORARY EROSION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICES INCLUDED IN THE PLAN.
SEDIMENT CONTROL MEASURES SHALL BE INSPECTED AT LEAST ONCE EVERY FIVE WORKING DAYS, EACH
WORKING DAY DURING A RUNOFF PRODUCING RAIN EVENT, AND WITHIN 24 HOURS AFTER A RUNOFF
PRODUCING RAIN EVENT. ALL PROJECT CONSTRUCTION STORMWATER DISCHARGES SHALL COMPLY WITH
CITY OF RENTON DISCHARGE REQUIREMENTS.
PLASTIC COVERING NOTES
1. PLASTIC SHEETING SHALL HAVE A MINIMUM THICKNESS OF 6 MILS AND SHALL MEET THE
REQUIREMENTS OF THE STATE STANDARD SPECIFICATIONS SECTION 9-14.5(3).
2. COVERING SHALL BE INSTALLED AND MAINTAINED TIGHTLY IN PLACE BY USING SANDBAGS OR TIRES
ON ROPES WITH A MAXIMUM 10-FOOT GRID SPACING IN ALL DIRECTIONS. ALL SEAMS SHALL BE
TAPED OR WEIGHTED DOWN FULL LENGTH AND THERE SHALL BE AT LEAST A 12-INCH OVERLAP OF
ALL SEAMS.
3. CLEAR PLASTIC COVERING SHALL BE INSTALLED IMMEDIATELY ON AREAS SEEDED BETWEEN
NOVEMBER 1 AND MARCH 31 AND REMAIN UNTIL VEGETATION IS FIRMLY ESTABLISHED.
4. WHEN THE COVERING IS USED ON UN -SEEDED SLOPES, IT SHALL BE KEPT IN PLACE UNTIL THE
NEXT SEEDING PERIOD.
5. PLASTIC COVERING SHEETS SHALL BE BURIED TWO FEET AT THE TOP OF SLOPES IN ORDER TO
PREVENT SURFACE WATER FLOW BENEATH SHEETS.
6. PROPER MAINTENANCE INCLUDES REGULAR CHECKS FOR RIPS AND DISLODGED ENDS.
• Call 811
• ® two business days
before you dig
REMOVE ALL DELETERIOUS MATERIAL FOUND ON -SITE INCLUDING VEGETATION, SCRAP
WOOD, TRASH, ETC. AND DISPOSE OF AT AN APPROVED OFF -SITE LOCATION.
AT ALL TIMES THE CONTRACTOR SHALL MAINTAIN SIGNS, BARRICADES, FENCING, OR OTHER
MEASURES TO ENSURE CONTINUOUS PROTECTION OF THE PUBLIC AND TO PREVENT
UNAUTHORIZED ENTRY TO THE CONSTRUCTION AREA.
DAMAGE TO ANY PROPERTY, INCLUDING BUT NOT LIMITED TO, BUILDINGS, UTILITIES,
VEHICLES, FENCING, OR LANDSCAPING AS A RESULT OF CONTRACTORS ACTIVITIES WILL BE
REPAIRED OR REPLACED AT THE CONTRACTORS EXPENSE.
THE CONTRACTOR IS FINANCIALLY RESPONSIBLE FOR THE MAINTENANCE AND REPAIR OF
OFF -SITE AND ON -SITE PAVED SURFACES WHERE DAMAGE HAS BEEN SUSTAINED BECAUSE
OF CONSTRUCTION TRAFFIC.
DEMOLISHED CONCRETE MAY BE RUBBLIZED AND USED AS STRUCTURAL FILL FOR SITE
IMPROVEMENTS. RUBBLIZED MATERIAL SHALL MEET WSDOT STANDARDS FOR GRAVEL
BORROW PER WSDOT SPECIFICATION 9-03.14(1). CONTRACTOR SHALL STOCKPILE AND
COVER RUBBLIZED MATERIAL TO PREVENT STORMWATER CONTACT IN INTERIM CONDITION.
SEEDING NOTES
1. SEED MIXTURES SHALL BE PER THE "SEED MIXTURE FOR EROSION CONTROL" TABLE BELOW, AND SHALL
BE APPLIED AT THE RATE OF 80 LB. PER ACRE.
2. SEED BEDS PLANTED BETWEEN MAY 1 AND OCTOBER 31 WILL REQUIRE IRRIGATION AND OTHER
MAINTENANCE AS NECESSARY TO FOSTER AND PROTECT THE ROOT STRUCTURE.
3. FOR SEED BEDS PLANTED BETWEEN OCTOBER 31 AND APRIL 30, ARMORING OF THE SEED BED WILL BE
NECESSARY (E.G. GEOTEXTILES, JUTE MAT, CLEAR PLASTIC COVERING).
4. BEFORE SEEDING, INSTALL NEEDED SURFACE RUNOFF CONTROL MEASURES SUCH AS GRADIENT
TERRACES, INTERCEPTOR DIKES, SWALES, LEVEL SPREADERS, AND SEDIMENT BASINS.
5. THE SEED BED SHALL BE FIRM WITH A FAIRLY FINE SURFACE, FOLLOWING SURFACE ROUGHENING.
PERFORM ALL OPERATIONS ACROSS OR AT RIGHT ANGLES TO THE SLOPE.
6. FERTILIZERS ARE TO BE USED ACCORDING TO SUPPLIERS RECOMMENDATIONS. AMOUNTS USED SHOULD
BE MINIMIZED, ESPECIALLY ADJACENT TO WATER BODIES AND WETLANDS.
7. SEED SHALL NOT BE USED IN AREAS SUBJECT TO WEAR BY CONSTRUCTION TRAFFIC.
8. APPLICABLE IN AREAS OF 10% OR LESS SLOPE FOR A MAXIMUM HORIZONTAL DISTANCE OF 100 FEET.
IN STEEPER AREAS (>10% SLOPE), USE MULCH, NETTING, OR OTHER TREATMENTS SPECIFICALLY
DESIGNED FOR STEEPER AND LONGER SLOPES.
SEED MIXTURE FOR EROSION CONTROL
NAME PROPORTIONS PERCENT PERCENT
BY WEIGHT
PURITY
GERMINATION
REDTOP (AGROSTIS ALBA)
10%
92%
85%
ANNUAL RYE (LOLIUM
40%
98%
90%
MULTIFLORUM)
CHEWING FESCUE (FESTUCA
40%
98%
90%
RUBRA COMMUTATA)
WHITE DUTCH CLOVER
10%
98%
90%
(TRIFOLIUM REPENS)
SITTS & HILL
ENGINEERS, INC.
CIVIL III STRUCTURAL III SURVEYING
4815 CENTER STREET TACOMA, WA. 98409
PHONE: (253) 474-9449 FAX: (253) 474-0153
http://www.sittshill.com/
Project No.: 17668 Project Mgr.: KH
Proj. Engineer: MBK Proj. Drafter: JMW
R-402706
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
EbbanLnwalrth
ENT ENGINEERING SURFACE WATER UTILITY + +
11 /13/2018 rstraka 11 /13/2018
SURVEYED: SCALE: DATE:
VERTICAL:NAND
1988
AS NOTED HORIZONTAL: NAD 193/183/1 991 • CITY 0E WSADA PARKING LOT
DESIGNED: KH t%Rj
RENTON FIELDBOOK:
DRAWN: PAGE:
JMW ONE INCH DATUM 7 DRAWING NO:
CHECKED: AT FULL SCALE Planning Buildinfl Public works Dept. TEMPORARY EROSION AND SEDIMENT CONTROL NOTES C1.2
MBK IF NOT ONE INCH !1/ fl/ ~
NO. REVISION BY DATE APPR �APPROVED:H
SCALE ACCORDINGLY (PRIVATE & PUBLIC) SHEET: c OF:
C/O
L
C�
�o
W
T
L J
W
CM
O
O
O
I
CD
T
Ir
n