SURFACE WATER STANDARD PLAN NOTES:
THE FOLLOWING IS A LISTING OF GENERAL NOTES THAT SHALL BE INCORPORATED IN THE DRAINAGE PLAN SET ALL THE NOTES ON THE LIST MAY NOT PERTAIN TO EVERY
PROJECT THE APPLICMI OR OWNER HEREBY REFERRED TO AS APPLICANT. MAY STRIKE OUT IRRELEVANT NOTES F NOT APPLICABLE TO THE PROJECT HOWEVER THE
APPLICANT SHALL HOT RENUMBE R NOR EDIT THE REMAINING NOTES. IF ADDITIONAL NOTES ARE NEEDED FOR SPECIFIC ASPECTS THEY SHALL BE ADDED AFTER THE
SURFACE WATER STANDARD PLAN NOTES.
1 BEFO RE ANY CONSTRUCTION OR OEV ELOPM ENT ACTIVITY OCCURS A PRE -CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF RENTON, HEREBY
REF ERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANT'S CONTRACTOR.
2 THE APPLICANT SH ALL BE RESPONSIBLE FOR SECURING ALL NECESSARY CITY, STATE. AND FEDERAL PERMITS PRIOR TO CONSTRUCTION
3. ALL STORM DRAINAGE IMPROVEMENTS SHALL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH THE LATEST EDIT ION OF THE CITY OF RENTON SURFACE
WATER DESIGN MANUAL (RENTON SWOMy, RENTON MUNICIPAL CODE (WhC) AND THE STANDARD SPECIFICATIONS FOR ROAD BRIDGE AND MUNICIPAL
CON STRVCTIUN PREPARED BY WSOUT AND THE AME RICAN PUBLIC WORKS ASSOCIATION ULFWA). IT SHALL BE THE IDLE RE SPUN 9QILFTY OF THE APPLICANT TO
CORRECT ANY ERROR. OMISSION OR VARLA710M FROM THE ABOVE REQUIREMENTS FOUND IN THE PLANS ALL CORRECTIONS SHALL BE AT NO ADDITIONAL COST TO
THE CITY
A APPROVAL OF THE ROAD, GRADING. PARKING, BUILDING, AND DRAINAGE FLAN DOES NOT CONSTITUTE AS APPROVAL Of ANY OTHER CONSTRUCTION I G WATER,
SEWER, GAS, ELECTRICAL ETC.). PLANS FOR STRUCTURES SUCH AS 6910GES. VAULTS. AND RETAINING WALLS PLOUIRE A SEPARATE REVIEW AND APPROVAL BY
THE CITY PRIOR TO CONSTRUCTION THE SURFACE WATER DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED PLANS- ANY OEVUITION
FROM THE APPROVED PLANS AlU REQUIRE COORDINATION FOLLOWED BY WRITTEN APPROVAL FROM THE CITY,
5 A COPY OF THE APPROVED PLANS SHALL BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
0- THE LOCATIONS OF ALL EXISTING UTILITIES SHOWN HEREON HAVE BEEN ESTABUSHED BY FIELD SURVEY OR OBTAINED FROM AVA&ABL E RECORDS AND SHALL
THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECE SSAFRILY COMPLETE. IT 15 THE SOLE RESPONSI BOJTY OF THE APPLICANT AND THE APPLICANTS
CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN- AND TO FUR THEFT DI SCOVER AND AVOID ANY OTHER UTILITIES NOT
SHOWN HEREON THAT MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN THE APPLICANT SHALL RECORD ON THE AS -BUILT DRAWINGS ALL
VNOOCUMENTED UTILITIES DISCOVERED AND ANY CHANGES TO THE APPROVED PLANS THE APPLICANT SHALL IMMEDIATELY NOTIFY THE ENGINEER OF RECORD IF A
CON LICT EXISTS
7, VERTICAL DATUM SHALL BE NAV D 58 AND HORIZONTAL DATUM SHALL BE NAD 831WA STATE PLANE- NORTH)- UNLESS OTHERWISE APPROVED BY THE CITY
REFERENCE BENCHMARK- DAY UM. AND ELEVATIONS SHALL BE NOTED ON THE PLANS
8 ALL UTILITY TRENCH BACK FILL AND ROADWAY SUBGRADE SHALL BE COM PAGTED TO 95%MAX IMUM DRY OE NS ITY PER SECTION 2.03 3114)D • COMPACTION AND
MOISTURE CONTROL TESTS OF THE W5007 STANDARD SIP ECAFICATIONS IH PERMEABLE PAVEMENT AND 01HER INFILTRATION AREAS, ALL TRENCH BACKFILL SHALL
BE FIRM AND UNYIELD04G BUT IN NO CASE SHALL BE COMPACTED TO MORE THAN 92%OF MAXIMUM DRY DENSITY
9 OPEN CUTTING OF EXISTING ROADWAYS FOR STORM DRAINAGE WORK 19 NOT ALLOWED UNLESS SPECIFICALLY APPROVED BY THE CITY AND NOTED ON THESE
APPROVED PLANS ANY OPEN CUT SHALL BE RESTORED IN ACCORDANCE WITH THE CITY TRENCH RESTORATION STANDA ROS
10 ALL PIPE AND STRUCTURES SHALL BE STAKED FOR SURVEY LINE AND GRADE PRIOR TO THE START OF CONSTRUCTION WHERE SHOWN ON THE PLANS OR WHERE
DIRECTED BY THE CITY. THE EXISTING MANHOLES. CATCH BASINS- OR INLETS SHALL BE ADJUSTED TO THE GRADE AS STAKED.
11. ALL FLOW CONTROL FACILITIES SHALL BE INSTALLED AND IN OPERATION PRIOR TO, OR IN CONJUNCTION WITH, ANY CONSTRUCTION ACTNfTY UNLESS OTHERWISE
APPROVED BY THE CITY
12 ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WI TH THE CURRENT $TATE Of WAS MINGION STANDARD
SPEC FICATiON FOR ROAD AND BRIDGE CONSTRUCTION THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNOATION
MATERIAL. AS WELL AS PLACEMENT AND COMPACTION OF REGUIRED BEDDING MATERIAL TD UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE
SUPPORTED ON A UNIFORMLY DENSE. UNYIELDING BASE ALL PIPE BEGIN NG AND SA.CKF ILL SHALL BE AS SHOWN ON THE CITY STANDARD PLAN 220.00. 220 10 AND
220 20
13 STEEL PIPE SHALL BE ALUMINIZED. OR GALVANIZED WITH ASPHALT TREATMENT 1, 2. OR S INSIDE AND OUTSIDE
14. ALL. DRAINAGE STRUCTURES SUCH AS CATCH BASINS AND MANHOLES SHALL BE FITTED WITH DUCTILE IRON- BOLT -LOCKING LIDS PER THE CITY STANDARD PLALN
20d.10. 20420. 204.30. ANO 204 50 STRUCTURES SHALL HAVE
• RECTANGULAR OR ROUND. SOLID LIDS WHEN HOT COLLECTING RUNOFF, AND OUTSIDE OF THE ROADWAY.
• ROUND, SOLID LIDS WHEN NDT COLLECTING RUNOFF. AND LOCATED WITHIN THE ROADWAY, BUT OUTSIDE OF THE CUR&GIJTTER LINE
• ROUND- SOLID LIDS DISPLAYING THE CITY LOGO WHEN W1IHIN THE PUBLIC RIGHT 4OF-WAY OR IN AN EASEMENT TO THE CITY PRIVATE STRUCTURE LIDS OUTSIDE
PUBLIC RIGHT-OF-WAY AND EASEMENTS TO THE CITY SHALL NOT DISPLAY THE CITY LOGO.
15 BUILDINGS AND OTHER STRUCTURES SMALL BE PLACED IN ACCORDANCE WITH TABLE 4 1 EASEMENT WIDTHS AND BUILDING SETBACKS LINES OF THE RENTON SWDM
16 LIDS OF MANHOLE&CATCH BASINS WITHIN PUBLIC RIGHT-OF-WAY SHALL NOT BE ADJUSTED TO FINAL GRACE UNTIL AFTER PAVING ALL NANHOLEIGATCH BASIN RIMS
SHALL BE ADJUSTED TO BE FLUSH WITH FINAL FINISHED GRADES. UNLESS OTHERWISE SHOWN
17. ALL DRIVEWAY CULVERTS LOCATED WITHIN CITY RIGHT-OF-WAY SHALL BE OF SUFFICIENT LENGTH TO PROVIDE A MINIMUM 3.1 SLOPE FROM THE EDGE OF THE
DRIVEWAY TO THE BOTTOM OF THE DITCH.
UMM OTH[ItW1S[ NOTL 0, DRAWING Iy NOT TO SCAiLI IN TS'
STD. PLAN - 267.00
: PUBLIC WORKS SURFACE WATER STANDARD PLAN OR fl
DEPARTMENT NOTES (1 OF 2) +GAZ 9/281zQ1a I
Dart
SURFACE WATER STANDARD PLAN NOTES:
THE FOLLOWING IS A LISTING OF GENERAL NOTES THAT SHALL BE INCORPORATED IN THE DRAINAGE PLAN SET ALL THE NOTES ON THE LIST MAY NOT PERTAIN TO EVERY
PROJECT THE APPLICANT OR OWNER- HERESY REFERRED TO AS APPLICANT. MAY STRIKE OUT IRRELEVANT NOTES F NOT APPLICABLE TO THE PROJECT HOWEVER, THE
APPLICANT SMALL NOT RENUMBER NOR EDIT THE REMAINING NOTES IF ADDITIONAL NOTES ARE NEEDED FOR SPECIFIC ASPECTS. THEY SHALL BE ADDED AFTER THE
SURFACE WATER STANDARD PLAN NOTES
16 ROCK FOR ERG SION PROTECTION OF ROADSIOE DITCHES. WHERE REOUMD. SHALL BE OF SOLI NO OUARRY ROCK PLACED TO A MINIMUM DEPTH OF ONE (1) FOOT
AND SHALL MEET THE FDLLOWING SPECIFICATIONS
. 4 - B ININCH ROCK I40 - 70% PASSING,
. 2 • CH ROCK 130 .40% PASSING; AND
. LESS THAN 2 INCH ROCK 110 - 2D% PASSING
19 FOOTING DRAWAGE SYSTEMS AND ROOF DOWNSPOUT SYSTEMS SHALL NOT BE WTERCOHNECTED AND SHALL SEPARATELY CONVEY COLLECTED FLOWS TO THE
CONVEYANCE SYSTEM OR FLOW CONTROL FACILITY ON THE SITE, UNLESS APPROVED BY THE CITY. FOOTING DRAINS SHALL NOT BE CONNECTED TO ON -SITE BMPS
20, THE END OF EACH STORM DRAIN STUB SHALL BE CAPPED A CLEANOUT TOPPED WITH A BOLTAOCKING LID MARK ED 'STORM' SHALL BE LOCATED AT THE PROPERTY
LINE OR AT THE POINT OF CONNECTION OF A PRIVATE STORM DRAINAGE CONVEYANCE SYSTEM PER THE CITY STANDARD PUN 227.00
21 ALL STORM SYSTEM EXTENSIONS SHALL BE STAKED FOR LINE AND GRADE BY A SURVEYOR LICENSED IN WASIIING70N STATE. AND CUT SHEETS SHALL BE PROVIDED
TO THE CITY PRIOR TO CONSTRUCTION
72. ALL NEWLY 4NSTALLED AND NE WLY.R EHABI LTTATED (PUBLIC ANO PRIVATE)STORM CONVEYANCE SYSTEMS SHALL BE INSPECTED BY MEANS OF REMOTE CCTV
ACCORDING TO THE CITY STANDARD PLAN 266.00. CCTV 1NSPEC7 ONS AND REPORTS SHALL BE SUBMITTED TO THE CITY PRIOR TO RECEIVING APPROVAL TO INSTALL
PROJECT CURBS, GUTTERS ANDoOR PAVEMENT.
25. ALL STORM SYS TENS AND CONNECTIONS TO EXI5T IN M.AI NS SHALL BE TE STEC IN ACCORDANCE WITH SECTION 7-0I-3(1) OF THE WSDOT STIR CARD SPEC IF IC ATKXJS
AND IN THE PRESENCE OF A REPRESENTATIVE OF THE CITY STORM DRAW STUBS SHALL BE TESTED FOR ACCEPTANCE AT THE SAME TIME THE MAIN STORM IS
TESTED
24. FOR ALL DISTURBED PERVIOUS AREAS (COMPACTED. GRADED, LANDSCAPED, ETC. OF THE DEVELOPMENT SITE, TO MAINTAIN THE MOISTURE CAPACITY OF THE SOIL
EITHER STOC►(PI LE AND REDISTRIBUTE THE EXISTING DUFF LAYER AND NATIVE TOPSOIL OR AMEND THE SOIL WITH COMPOST IN ACCORDANCE WITH 5TAJNDA RD PLAN
264.00.
25. ISSUANCE OF THE BUILDING OR CON 5TRUCTION PERMITS BY THE CITY DOES NOT RELIEVE THE APPLICANT OF THE CONTINUING LEGAL OBLIGATION AND.'OR LIABILITY
CONNECTOO WITH STORMWATER DISPOSAL THE CITY DOE NOT ACCEPT ANY OBLIGATION FOR THE PROPER FUNCTIONING AND MAINTENANCE OF THE STORM
SYSTEM PROVIDED DURING CONSTRUCTION.
2B- ADEOUATE SAFEGUARDS, SAFETY DEVICES, PROTECTIVE EQUIPMENT. FLAGGERS. AND ANY OTHER ACTIONS NEEDED TO PROTECT THE Life. HEALTH, AND SAFETY OF
THE PUBLIC. AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK SHALL BE PROVIDED, ANY WORK WITHIN THE TRAVELED
RIGHT-OF-WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE A TRAFFIC CONTROL PLAN APPROVED BY THE CITY. ALL SECTION5 OF THE WSDOT
STANDARD SPECIFICATIONS I.10 TEMPORARY TRAFFIC CONTROL SHALL APPLY
27 PROJECTS LOCATED WITHIN THE CITYS AOUIFER PROTECTION AREA (APA)SHALL COMPLY WITH SPECIAL REQUIREMENT X6 OF THE RENTON SWOM AND AQUIFER
PROTECTION REGULATIONS IRMC 4.3450).
28- PLACEMFNT OF SURFACE AAPPURTENAINCE$ (CATCH BA45IN7MANHOLL: LID$, CLEANM15, INLETS, ETC.) IN THE 5TREET TRAVEL LANE WHEEL PATH, IHTERSEC TIONS OF
STREET TRAVEL LANES, BIKE LAW ES- SIDEWALKS, AND CROSSWALKS SHALL BE AVOIDED WHENEVER POSSIBLE. ANY SURFACE APPURTENANCE PLACED IN A
SIDEWALK OR CROSSWALK SHALL BE FRIED WITH A NON -SLIP OR NON-SKID LID PER ADA REOUIREMENTS
29. CLEARLY LABFL PUBLIC AND PRIVATE SYSTEMS ON THE PLMS. PRIVATE SYSTEMS SHALL BE MAINTAINED BY THE APPLICANT.
3D. MINIMUM COVER OVER STORM DRAINAGE PIPE SHALL CONFORM TO TABLE 4.2 1 A2 OF THE RENT ON SWOM
31. CONSTRUCTED PERMEABLE PAVEMENT SHALL BE PERMEABLE ENOUGH TO ABSORB WATER AT A M W IMUM RATE OF 70 INCHES PER HOUR IMMEDIATELY AFTER THE
PAVEMENT SURFACE HAS BEEN WETTED CONTINUOUSLY FOR AT LEAST 10 MINUTES COMPLIANCE WITH THIS MINIMUM RATE SHALL BE CHECKED PRIOR TO
GON$TRUCIION APPROVAL OF THE PAVEMENT. COMPLIANCE MAY BE CHECJKED USING A $AMPLE RUCKET TEST 1N WHICH 5 GALLON$ OF WATER IS POURED ONTO THE
PAVEMENT SURFACE ALL AT ONCE. IF ONLY A MINOR AMOUNT OF WATER PONDS OR RUNS OFF THE SURFACE. THEN THE PAVEMENT IS CONSIDERED TO MEET THE
MINIMUM RAZE Or, AB50RPT iON AT LEAST GIVE TEST SHALL BE CONDUCTED PER 1.000 SQUARE FEET OF PERMEABLE PAVEMENT IP THIS TEST IS NOT CONCLUSIVE
THEN ANOTHER TEST PER ASTM C1701 SHALL BE CONDUCTED FOR LARGE AREAS (E G. PARKING AREAS). TESTING OBSERIIATI ON MAY BE ACCOMPLISHED WHILE
WALK] NG BEHIND A SLOWLY MOVING WATER TRUCK DISC HAAG ING WRYER AT A BATE SIMILAR TD THE BUCKET TEST. PS RIVE ABLE PAVERS SHALL BE TESTED USING
ASTM C1761
UNL[55 (MIRWISF. Nona, DRAWING 15 NOT TO SCAB [NISI
sro. PLAN - 267.10
PUBLIC WORKS SURFACE WATER STANDARD PLAN PPS D.
DEPARTMENT NOTES (2 OF 2) GAZ 9/28/2018
nAll
• Call 811
• ® two business days
before you dig
CATCH BASIN NOTES
GRADING AND DRAINAGE NOTES
1. TYPE 1 CATCH BASINS SHALL COMPLY WITH WSDOT STANDARD PLAN B-5.20-01.
1.
PROVIDE 12" MINIMUM VERTICAL AND 7' (10' FROM WATER) MINIMUM HORIZONTAL CLEARANCE
(OUTSIDE SURFACES) BETWEEN STORM DRAIN PIPES AND OTHER UTILITY PIPES AND
2. TYPE 1 CATCH BASINS SHALL BE EQUIPPED WITH RECTANGULAR FRAMES PER WSDOT
CONDUITS. FOR VERTICAL SEPARATION SMALLER THAN 12" AT ANY CROSSINGS, ETHOFOAM
STANDARD PLAN B-30.10-01. TYPE 1 CATCH BASINS SHALL BE COVERED WITH
PAD SHALL BE PROVIDED.
BOLT -DOWN CAST IRON SOLID LID PER PER WSDOT STANDARD PLANS OR OTHER NOTED
ON PLANS.
2.
CONTRACTOR AND/OR SURVEYOR SHALL CALCULATE PIPE SLOPES BASED ON THE INVERT
ELEVATIONS SHOWN ON THE PLANS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL
3. STORM STRUCTURES SHALL BE INSTALLED PER WSDOT STANDARD SPECIFICATION 7-05 AND
NOTIFY THE ENGINEER OF ANY DISCREPANCIES PRIOR TO FIELD STAKING AND CONSTRUCTION.
DETAIL 04/C3.4.
O
3.
CONTRACTOR TO FIELD VERIFY HORIZONTAL LOCATION OF CATCH BASIN STRUCTURES WITH
Liz
0)
STORM PIPE NOTES
RESPECT TO CURBING/CONCRETE PADS PRIOR TO CATCH BASIN PLACEMENT. PARTIAL
I-
STAKING OF CURBS/PADS AT TIME OF CATCH BASIN STAKING MAY BE NECESSARY.
C)
STORM DRAIN (SD) GRAVITY SYSTEM SHALL BE CONSTRUCTED OF THE FOLLOWING MATERIALS AND
4.
ALL STORM DRAINAGE PIPING SHALL BE GASKETED AND WATERTIGHT.
0
GD
AS NOTED ON PLANS:
5.
PIPE COVER FOR LINED POLYETHYLENE PIPE (CPEP) SHALL BE 2' MINIMUM.
T
V
1. CORRUGATED POLYETHYLENE PIPE (CPEP) AND FITTINGS: SHALL BE DUAL WALL AND COMPLY
WITH WSDOT 9-05.20 REQUIREMENTS.
6.
PIPE COVER FOR POLYVINYL CHLORIDE PIPE (PVC) SHALL BE 3' MINIMUM.
2. STORM DRAINS SHALL BE INSTALLED PER CITY OF RENTON STD PLAN 220.10 AND STD PLAN
220.20 (DETAILS 03/C3.3 AND 04/C3.3, RESPECTIVELY).
3. GRAVITY STORMWATER SYSTEM SHALL BE LOW PRESSURE AIR TESTED IN ACCORDANCE WITH
WSDOT STANDARD SPECIFICATION 7-04.3(1)F. AT THE OWNER'S DISCRETION, PIT DRAINS,
MANHOLES, VAULTS OR OTHER ANCILLARY PIPE SYSTEMS MAY BE HYDROSTATICALLY TESTING
TO THE OWNER'S SATISFACTION (E.G. PLUG PIPES, FILL STRUCTURE TO SET ELEVATION WITH
WATER, AND OBSERVE WATER LEVEL DEVIATION OVER A SET PERIOD OF TIME).
EXCAVATION NOTES
1. EXCAVATE TO ELEVATIONS, LINES AND GRADES INDICATED TO NOT MORE THAN 1/2-INCH ABOVE
OR BELOW THAT REQUIRED.
2. SLOPE SIDES OF EXCAVATION AS INDICATED OR COMPLY WITH LOCAL CODES AND ORDINANCES
HAVING JURISDICTION, WHICHEVER IS MORE STRINGENT. SHORE AND BRACE WHERE SLOPING IS
NOT POSSIBLE BECAUSE OF SPACE RESTRICTIONS OR STABILITY OF MATERIAL EXCAVATED.
3. STOCKPILE SATISFACTORY EXCAVATED MATERIALS WHERE DIRECTED UNTIL REQUIRED FOR
BACKFILL OR FILL. PLACE, GRADE AND SHAPE STOCKPILES FOR PROPER DRAINAGE. LOCATE AND
RETAIN SOIL MATERIALS AWAY FROM EDGE OF EXCAVATIONS.
4. DISPOSE OF EXCESS SOIL AND UNSUITABLE SOIL MATERIAL OFF -SITE AS DIRECTED.
SUBGRADE PREPARATION NOTES
SUBGRADE BELOW PAVEMENT:
SUBGRADE PREPARATION: ALL SOIL SUBGRADES SHOULD BE THOROUGHLY COMPACTED, THEN
PROOF -ROLLED WITH A LOADED DUMP TRUCK OR HEAVY COMPACTOR. ANY LOCALIZED ZONES OF
YIELDING SUBGRADE DISCLOSED DURING THIS PROOF -ROLLING OPERATION SHOULD BE OVER
EXCAVATED TO A MAXIMUM DEPTH OF 12 INCHES AND REPLACED WITH A SUITABLE STRUCTURAL FILL
MATERIAL. ALL STRUCTURAL FILL SHOULD BE COMPACTED ACCORDING TO THE GEOTECHNICAL
ENGINEERING REPORT RECOMMENDATIONS GIVEN IN THE STRUCTURAL FILL SECTION. SPECIFICALLY,
THE UPPER 2 FEET OF SOILS UNDERLYING PAVEMENT SECTION SHOULD BE COMPACTED TO AT LEAST
95 PERCENT MAXIMUM DRY DENSITY (BASED ON ASTM D-1557), AND ALL SOILS BELOW 2 FEET
SHOULD BE COMPACTED TO AT LEAST 90 PERCENT.
COMPACTION NOTES
1. CONTROL SOIL COMPACTION DURING CONSTRUCTION PROVIDING MINIMUM PERCENTAGE
OF DENSITY SPECIFIED FOR EACH AREA CLASSIFICATION. PERCENTAGES ARE RELATED
TO MAXIMUM DRY DENSITY AS MEASURED IN CONFORMANCE WITH ASTM D 1557.
2. COMPACT TOP 12-INCHES OF SUBGRADE (24-INCHES UNDER PROPOSED DRIVING
SURFACES) TO 95-PERCENT OF MAXIMUM DRY DENSITY UNDER PAVEMENTS AND
GRAVEL SURFACING.
3. WHERE SUBGRADE OR LAYER OF SOIL MATERIAL MUST BE MOISTURE CONDITIONED
BEFORE COMPACTION, UNIFORMLY APPLY WATER TO SURFACE OF SUBGRADE OR LAYER
OF SOIL MATERIAL TO PREVENT FREE WATER APPEARING ON SURFACE DURING OR
SUBSEQUENT TO COMPACTION OPERATIONS. REMOVE AND REPLACE, OR SCARIFY AND
AIR DRY, SOIL MATERIAL THAT IS TOO WET TO PERMIT COMPACTION TO SPECIFIED
DENSITY. SOIL MATERIAL THAT HAS BEEN REMOVED BECAUSE IT IS TOO WET TO PERMIT
COMPACTION MAY BE STOCKPILED OR SPREAD AND ALLOWED TO DRY. ASSIST DRYING
BY DISKING, HARROWING OR PULVERIZING UNTIL MOISTURE CONTENT IS REDUCED TO
SATISFACTORY VALUE.
SITTS & HILL
ENGINEERS, INC.
CIVIL ■ STRUCTURAL ■ SURVEYING
4815 CENTER STREET TACOMA, WA. 98409
PHONE: (253) 474-9449 FAX: (253) 474-0153
hftp://www.sittshill.com/
Project No.: 17668 Project Mgr.: KH
Proj. Engineer: MBK Proj. Drafter: JMW
R-402716
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
DEVELOPMENT ENGINEERING SURFACE WATER UTILITY �j>}
bbannwarth 11 /13/2018 rstraka 11 /13/2018
SURVEYED:
SCALE:
AS NOTED
VERTICAL:NAVD 1988
HORIZONTAL: NAD 193/1991
83/1
DATU M
•
CITY 0E
RENTON
Nuiv
Planning/Building/Public works Dept.
WSADA PARKING LOT
GRADING AND STORM DRAINAGE NOTES
(PRIVATE & PUBLIC)
DATE:
DESIGNED:
K H
flELDB00K:
PAGE:
DRAWN:
JMW
ONE INCH
DRAWING NO:
C3.2
CHECKED:
MBK
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
NO.
REVISION
BY
DATE
APPR
APPROVED:
KH
SHEET: 16 OF:
i
W
O
O
O
ao
o�
O
J
0
Z
o�
LL
a
0
a
U)