HomeMy WebLinkAbout126.2 (7/27/2022)DocuSign Envelope ID: 5D308A1A-204D-48E8-BB23-8A2834BB565E
SHIM TO PLUMB
SEE NOTE
NOTES
1. WHERE FOUNDATION PAD IS LOCATED WITHIN A SIDEWALK, CONSTRUCT
PAD TOP FLUSH WITH SIDEWALK GRADE, OMITTING CHAMFER WHERE
TOP AND SIDEWALK ABUT. MOUNT TOP SHALL BE FINISHED BY A
CONCRETE CONTRACTOR AND SHALL MEET THE REQUIREMENTS OF
SECTION 8-14.3 IN THE WSDOT STANDARD SPECIFICATIONS.
2. PAD MOUNT DESIGN IS TYPICAL.
3. PLACE A SILICONE SEAL BETWEEN THE FOUNDATION AND CABINET.
4. ANCHOR BOLTS AND THEIR SPACING TO BE SUPPLIED BY CABINET
MANUFACTURER AND SUBMITTED TO THE ENGINEER FOR APPROVAL.
5. CONDUIT SIZES/QUANTITIES FOR THE CONTROLLER AND CONTACTOR
CABINETS SHALL BE INSTALLED PER THE CONTRACT PLANS, PLUS ONE
2" SPARE CAPPED OUT PAST THE FOUNDATION.
6. CONCRETE CLASS PER STD PLAN 135.
7. 2" CONDUIT SHALL BE PLACED FROM THE COMBINED BBS/CONTACTOR
TO THE CONTROLLER CABINET.
8. EACH CABINET SHALL HAVE A 3/s" DIAMETER PLASTIC DRAIN PIPE.
9. LOCATE CONDUITS CENTRALLY WITHIN THE CABINETS.
10. WHEN ALL THREE CABINETS ARE TO BE INSTALLED AND SPACE
ALLOWS, A COMBINED FOUNDATION SHALL BE USED.
11. WOODEN SHIMS SHALL NOT BE USED
12. GROUNDING SHALL BE PER WSDOT STANDARD PLAN J-60.05, SHEET 3.
SHIM TO PLUMB
SEE NOTE 3
4 HOOPS SHIM TO PLUMB
EQUAL SPACES)
SEE NOTE 3
NI � 2»
6" MIN
3 — #4 REINFORCING BAR (EQUAL SPACES)
SEE NOTE 5
.1 1.
I I \ \
Li
U
1" TO 2'
FRONT VIEW
3/8" DIAMETER PLASTIC DRAIN (ONE PER CABINET)
SEE NOTE 7
3/8" DIAMETER PLASTIC DRAIN
SEE NOTE 5
O U � w
U >
HORIZONTAL
0
\ ' COMBINED FOUNDATION
REINF. BAR DIAGRAM
6 PIECES
L#4 HOOPS
BBSI
CONTROLLER CONTACTOR
CABINET CABINET
10" WIDTH 5„ WIDTH 10"
+ 1' + 2"
PLAN VIEW
COMBINED CONTROLLER/BBS/CONTACTOR FOUNDATION
3 — #4 REINFORCING BAR
(EQUAL SPACES)
CABINET FOUNDATION STD. PLAN 126.2
PUBLIC WORKS DETAILS �A6ROVED:
DEPARTMENT AZ 3/13/2019 1 4
SDATE