Loading...
HomeMy WebLinkAbout126.2 (7/27/2022)DocuSign Envelope ID: 5D308A1A-204D-48E8-BB23-8A2834BB565E SHIM TO PLUMB SEE NOTE NOTES 1. WHERE FOUNDATION PAD IS LOCATED WITHIN A SIDEWALK, CONSTRUCT PAD TOP FLUSH WITH SIDEWALK GRADE, OMITTING CHAMFER WHERE TOP AND SIDEWALK ABUT. MOUNT TOP SHALL BE FINISHED BY A CONCRETE CONTRACTOR AND SHALL MEET THE REQUIREMENTS OF SECTION 8-14.3 IN THE WSDOT STANDARD SPECIFICATIONS. 2. PAD MOUNT DESIGN IS TYPICAL. 3. PLACE A SILICONE SEAL BETWEEN THE FOUNDATION AND CABINET. 4. ANCHOR BOLTS AND THEIR SPACING TO BE SUPPLIED BY CABINET MANUFACTURER AND SUBMITTED TO THE ENGINEER FOR APPROVAL. 5. CONDUIT SIZES/QUANTITIES FOR THE CONTROLLER AND CONTACTOR CABINETS SHALL BE INSTALLED PER THE CONTRACT PLANS, PLUS ONE 2" SPARE CAPPED OUT PAST THE FOUNDATION. 6. CONCRETE CLASS PER STD PLAN 135. 7. 2" CONDUIT SHALL BE PLACED FROM THE COMBINED BBS/CONTACTOR TO THE CONTROLLER CABINET. 8. EACH CABINET SHALL HAVE A 3/s" DIAMETER PLASTIC DRAIN PIPE. 9. LOCATE CONDUITS CENTRALLY WITHIN THE CABINETS. 10. WHEN ALL THREE CABINETS ARE TO BE INSTALLED AND SPACE ALLOWS, A COMBINED FOUNDATION SHALL BE USED. 11. WOODEN SHIMS SHALL NOT BE USED 12. GROUNDING SHALL BE PER WSDOT STANDARD PLAN J-60.05, SHEET 3. SHIM TO PLUMB SEE NOTE 3 4 HOOPS SHIM TO PLUMB EQUAL SPACES) SEE NOTE 3 NI � 2» 6" MIN 3 — #4 REINFORCING BAR (EQUAL SPACES) SEE NOTE 5 .1 1. I I \ \ Li U 1" TO 2' FRONT VIEW 3/8" DIAMETER PLASTIC DRAIN (ONE PER CABINET) SEE NOTE 7 3/8" DIAMETER PLASTIC DRAIN SEE NOTE 5 O U � w U > HORIZONTAL 0 \ ' COMBINED FOUNDATION REINF. BAR DIAGRAM 6 PIECES L#4 HOOPS BBSI CONTROLLER CONTACTOR CABINET CABINET 10" WIDTH 5„ WIDTH 10" + 1' + 2" PLAN VIEW COMBINED CONTROLLER/BBS/CONTACTOR FOUNDATION 3 — #4 REINFORCING BAR (EQUAL SPACES) CABINET FOUNDATION STD. PLAN 126.2 PUBLIC WORKS DETAILS �A6ROVED: DEPARTMENT AZ 3/13/2019 1 4 SDATE