Loading...
HomeMy WebLinkAboutAdmin Report EXECUTIVE DEPARTMENT M E M O R A N D U M DATE: March 18, 2019 TO: Don Persson, Council President Members of Renton City Council FROM: Denis Law, Mayor Robert Harrison, Chief Administrative Officer SUBJECT: Administrative Report  King County Metro is talking with communities along the future I Line route to learn about their needs and priorities for the new RapidRide service and other mobility needs. Take their online survey before March 29 at https://publicinput.com/3757.  The Renton Downtown Partnership and participating downtown retailers are excited to present Ladies’ Night on Saturday, March 23 from 3-9 p.m., including additional after-hours cocktail specials until 10 p.m. There will be a little something for everyone, so bring your friends for a fun evening of shopping, dining, and cocktails in Downtown Renton. There will be specials and promotions at over 30 downtown retailers, restaurants, and bars. Purchase tickets at ladiesnightrenton.eventbrite.com.  Information about preventative street maintenance, traffic impact projects, and road closures happening this week can be found at http://rentonwa.gov/traffic. Preventative street maintenance, traffic impact projects, and road closures will be at the following locations:  Monday, March 18, 8:30 a.m. to 2:30 p.m. The south curb lane of North 3rd Street will be closed at Wells Avenue North while maintenance crews conduct asphalt repairs.  Monday, March 18, 8:30 a.m. to 2:30 p.m. SW Victoria Street will be closed between Hardie Avenue SW and Rainier Avenue South while maintenance crews conduct asphalt repairs.  Monday, March 18 through Friday, March 22, 9:00 a.m. to 3:00 p.m. Intermittent northbound lane closure or lane shift at the 1200 block of Lake Washington Blvd due to roadway construction. Questions may be directed to Brad Stocco at 206-282-2373. Don Persson, Council President Members of Renton City Council Page 2 of 2 March 18, 2019  Monday, March 18 through Friday, March 22, 9:00 a.m. to 3:00 p.m. Single northbound lane closure on 156th Avenue SE near 13010 156th Avenue SE due to utility construction. Questions may be directed to Brad Stocco at 206-282- 2373.  Monday, March 18 through Friday, March 22. Road closure on South 14th Street between Smithers Avenue South and Davis Avenue South for utility construction. Questions may be directed to Patrick DeCaro at 425-207-6013.  Monday, March 18 through Friday, March 22, 9:00 a.m. to 3:00 p.m. Intermittent single lane closures within the neighborhood bordered by 116th Avenue SE, 125th Avenue SE, SE 164th Street, and SE 168th Street due to water main replacement work performed by Soos Creek Water and Sewer District. Questions may be directed to Patrick DeCaro at 425-207-6013.  Monday, March 18 through Friday, March 22, 8:30 a.m. to 3:30 p.m. Single lane closure on East Valley Road between SW 19th Street and Lind Avenue SW for the I-405 Direct Connector Project. One lane of East Valley Road will remain open, with flaggers directing traffic through the work site. Questions may be directed to Justin Johnson at 425-430-7291.  Monday, March 18 through Friday, March 22, 9:00 a.m. to 5:00 p.m. Intermittent lane closures at South 132nd Street for storm water utility work. Questions may be directed to Pat Miller at 206-794-6162.  Monday, March 18 through Friday, March 22, 9:00 a.m. to 3:00 p.m. Lane closure on the eastbound lane of SW 43rd Street from west City of Renton limits to Oakesdale Avenue SW due to utility construction. Questions may be directed to Tom Main at 206-999-1833.  Wednesday, March 20 through Friday, March 22, 9:00 a.m. to 3:00 p.m. Double lane closure in the westbound lanes of Puget Drive SE at the 1500 block due to utility construction. Informational signs will be placed on Puget Drive SE on Monday, March 18. Questions may be directed to Tom Main at 206-999-1833.  Monday, March 18 through May 31. Pavement restoration related to the Renton Hill Utility Replacement Project will begin this week. The project is scheduled to be completed in May, but pavement restoration is dependent on weather conditions. Residents will receive notification via a door hangar 48 hours prior to work beginning on their respective streets. For a proposed schedule and updates on the restoration project please visit the project webpage at https://rentonwa.gov/cms/one.aspx?portalId=7922741&pageId=11366266.