Loading...
HomeMy WebLinkAboutCM_Construction_Mitigation_Statement_3-14-1914900 INTERURBAN AVE. SOUTH, #138, TUKWILA, WA 98168 PH.(206) 859-5500 FAX (206) 859-5501 Stacey Holdings LLC Compton Lumber Renton 2940, 2960, 2980, and 2990 East Valley Road Renton, WA 98057 Construction Mitigation Description March 11, 2019 TRA Project No. 2018.60 The Compton project site is a proposed commercial development project located at 2940, 2960, 2980, and 2990 East Valley Road in the city of Renton, King County, Washington. The project site comprises Parcels 3023059091, 3023059096, 3023059098, and 3023059099, with a combined size of 5.85 acres. Construction is scheduled to begin in Summer of 2019 and end in Spring of 2020. Construction activities will take place on weekdays from 7 am to 6 pm, or as otherwise permitted by Renton Municipal Code. These restricted construction hours will help minimize noise impacts from construction activities. Construction vehicles will access the site via East Valley Road. Construction vehicles traveling to the site from northbound State Route 167 will take the South 18th Street/SW 43rd Street exit, turn left onto South 180th Street, turn right onto East Valley Road, and travel north until reaching the project site. Construction vehicles traveling to the site from southbound State Route 167 will take the SW 43rd Street/ East Valley Road exit, turn right onto East Valley Road, and travel north until reaching the project site. The source of fill material or the destination of construction waste material is not known at this point. Erosion control measures expected to be implemented include watering to control dust, a construction entrance to reduce transport of sediment, silt fence and inlet protection devices to prevent sediment from leaving the project site, and street sweeping to prevent tracking of sediment onto adjacent surfaces. A preliminary traffic control plan is not required for the project because construction will be predominantly limited to the project site; no construction will occur in the East Valley Road right-of-way, other than utility connections. Lane closures and traffic flagging will be provided, as necessary. The contractor will provide the necessary, simple, traffic control measures necessary for the utility connections.