HomeMy WebLinkAboutRS_Traffic_Study_3-14-19 TENW Transportation Engineering NorthWest Transportation Planning | Design | Traffic Impact & Operations 11400 SE 8th Street, Suite 200, Bellevue, WA 98004 | Office (425) 889-6747 MEMORANDUM DATE: November 1, 2017 TO: City of Renton FROM: Jeff Schramm SUBJECT: Submittal for the proposed East Valley Road-Donovan Brothers Development TENW Project No. 5429 This memo transmits the draft TIA for the proposed East Valley Road-Donovan Brothers project, and also summarizes the updated trip generation calculation for the purpose of documenting a comparison of the current project proposal to what was analyzed in the draft TIA dated May 12, 2017. The current project proposal includes a 32,500 square foot (SF) lumber store, consistent with what was analyzed in the draft TIA dated May 12, 2017. The prior project proposal assumed the existing Skyway Towing and MiltÊs Trucking & Excavating would be removed, while the existing Lumber Market would remain with the proposed project. Based on the latest site plan, the existing Lumber Market will be removed with the proposed project. By removing the existing Lumber Market, the existing trip generation credit will increase, therefore reducing the net new trip generation associated with the proposed East Valley Road-Donovan Brothers project. Shown below in Table 1 is a comparison of the trip generation estimates based on the latest site plan compared to what was analyzed in the draft TIA dated May 12, 2017. Table 1 East Valley Road-Donovan Brothers – Trip Generation Comparison May 2017 Draft TIA Current Proposal Time Period In Out Total In Out Total Weekday Daily 563 563 1,126 538 538 1,076 Weekday AM Peak Hour 45 20 65 40 16 56 Weekday PM Peak Hour 61 66 127 61 61 122 As shown in Table 1, the trip generation associated with the current project proposal is less than what was assumed in the May 2017 draft TIA. Based on this information, the findings and conclusions in the May 2017 draft TIA remain valid and can be considered conservative since the net new trip generation is less. Transportation impact fees will be based on the size of the building and type of tenant(s) at the time of building permit issuance. If you have any questions regarding the information presented in this memo, please contact me at (425) 250- 0581 or schramm@tenw.com DRAFT FOR REVIEW East Valley Road – Donovan Brothers Renton, WA Transportation Impact Analysis May 12, 2017 Prepared for: Latitude Development, LLC PO Box 817 Auburn, WA 98071 Prepared by: TENW Transportation Engineering NorthWest 11400 SE 8th Street, Suite 200 Bellevue, WA 98004 Office: (425) 889-6747 Fax: (425) 889-8369 DRAFT Transportation Impact Analysis East Valley Road – Donovan Brothers TENW May 12, 2017 Page i Table of Contents FINDINGS/CONCLUSIONS .................................................................................................. 1 INTRODUCTION ................................................................................................................. 2 Project Description ................................................................................................................ 2 Project Approach ................................................................................................................. 2 Primary Data and Information Sources ...................................................................................... 2 EXISTING CONDITIONS ....................................................................................................... 5 Roadway Network ............................................................................................................... 5 Existing Traffic Volumes .......................................................................................................... 5 Public Transportation Services ................................................................................................. 5 Level of Service .................................................................................................................... 7 Collision History ................................................................................................................... 8 FUTURE TRAFFIC CONDITIONS ............................................................................................. 9 Planned Transportation Improvements ....................................................................................... 9 Project Trip Generation ........................................................................................................ 10 Project Trip Distribution and Assignment .................................................................................. 11 Future Traffic Volumes .......................................................................................................... 11 Future Level of Service ......................................................................................................... 15 Site Access Assessment ........................................................................................................ 16 MITIGATION .................................................................................................................... 17 Appendices Appendix A – Peak Hour Turning Movement Counts Appendix B – Level of Service (LOS) Calculations Appendix C – Trip Generation Calculations Appendix D – Site Access Level of Service (LOS) and Queue Calculations DRAFT Transportation Impact Analysis East Valley Road – Donovan Brothers TENW May 12, 2017 Page ii List of Figures and Tables Figure 1 Project Site Vicinity ....................................................................................................... 3 Figure 2 Preliminary Site Plan ..................................................................................................... 4 Figure 3 Year 2017 Existing Peak Hour Traffic Volumes .................................................................. 6 Figure 4 Project T rip Distribution & Assignment ............................................................................ 12 Figure 5 2019 No Action Peak Hour Traffic Volumes ................................................................... 13 Figure 6 2019 With-Project Peak Hour Traffic Volumes ................................................................. 14 Table 1 Existing Roadway Network Summary – Project Site Vicinity .................................................. 5 Table 2 LOS Criteria for Signalized and Stop-Controlled Intersections1 .............................................. 7 Table 3 2017 Existing Peak Hour LOS Summary .......................................................................... 8 Table 4 Collision Data Summary, January 1, 2014 to December 31, 2016 ...................................... 8 Table 5 Trip Generation Summary ............................................................................................ 10 Table 6 Project Trip Distribution................................................................................................ 11 Table 7 Year 2019 Peak Hour Level of Service Summary ............................................................. 15 Table 8 Site Access Peak Hour Level of Service Summary ............................................................. 16 DRAFT Transportation Impact Analysis East Valley Road – Donovan Brothers TENW May 12, 2017 Page 1 FINDINGS/CONCLUSIONS This traffic impact analysis (TIA) has been prepared for the proposed East Valley Road-Donovan Brothers project located on the east side of East Valley Road south of SW 27th Street in Renton. Project Proposal. The proposed East Valley Road-Donovan Brothers project includes the development of a 32,500 square foot (SF) lumber store. The existing site includes Lumber Market, Skyway Towing, and MiltÊs Trucking & Excavating. Lumber Market will remain with the proposed development; Skyway Towing and MiltÊs Trucking & Excavating will be removed. Vehicular access to the site would be provided via three existing driveways on East Valley Road. Note that the two existing driveways to Lumber Market would be consolidated into one. Full buildout of the project is estimated to occur in 2019. Trip Generation. The proposed project is estimated to generate 1,126 net new weekday daily trips with 65 net new trips occurring during the weekday AM peak hour (45 in, 20 out) and 127 net new trips occurring during the weekday PM peak hour (61 in, 66 out). The trip generation reflects credit for the existing uses that will be removed. Future Year LOS. LOS analyses were conducted for future year 2019 AM and PM peak hour conditions at the East Valley Road / SW 27th Street intersection. Based on the analysis results, all controlled movements are expected to operate at LOS B or better in 2019 with the proposed East Valley Road-Donovan Brothers project. Site Access Analysis. The controlled movements at the three site access driveways on East Valley Road are expected to operate at LOS B or better in 2019 with 95th percentile queues anticipated to be less than 25 feet during both the AM and PM peak hours. Mitigation. Based on the results of the analysis, the existing transportation facilities are anticipated to accommodate the additional traffic generated by the proposed project. Payment of the CityÊs traffic impact fees will mitigate project impacts. No additional mitigation has been identified for the proposed East Valley Road-Donovan Brothers project. DRAFT Transportation Impact Analysis East Valley Road – Donovan Brothers TENW May 12, 2017 Page 2 INTRODUCTION This traffic impact analysis (TIA) has been prepared for the proposed East Valley Road-Donovan Brothers project located on the east side of East Valley Road south of SW 27th Street as shown in the Figure 1 Vicinity Map. Project Description The proposed East Valley Road-Donovan Brothers project would include the development of a 32,500 square foot (SF) lumber store. The existing site includes Lumber Market, Skyway Towing, and MiltÊs Trucking & Excavating. Lumber Market will remain with the proposed development; Skyway Towing and MiltÊs Trucking & Excavating will be removed. Vehicular access to the site would be provided via three existing driveways on East Valley Road. Note the two existing driveways to Lumber Market will be consolidated into a single driveway. Full buildout of the project is expected by 2019. A preliminary site plan is provided in Figure 2. Project Approach To analyze the traffic impacts from the project, the following tasks were undertaken: · Assessed existing conditions through field reconnaissance and reviewed existing planning documents; · Described and assessed existing transportation conditions in the area; · Documented collision histories at study intersections; · Documented planned transportation improvements in the site vicinity; · Documented existing traffic volumes and intersection levels of service (LOS) at the East Valley Road / SW 27th Street study intersection during the weekday AM and PM peak hours; · Estimated trip generation and documented trip distribution and assignment of AM and PM peak hour project-generated traffic; · Documented traffic forecasts and assumptions for year 2019 conditions at the off- site study intersection without and with the proposed development; · Analyzed weekday AM and PM peak hour LOS for year 2019 conditions at the off- site study intersection without and with the proposed development; · Assessed operations at the proposed site access locations, including LOS and queuing during weekday AM and PM peak hour conditions; · Identified transportation mitigation to the City of Renton. Primary Data and Information Sources · City of Renton Comprehensive Plan Transportation Element, June 22, 2015. · City of Renton 2017 - 2022 Transportation Improvement Program. · ITE Trip Generation Manual, 9th edition, 2012. · AM and PM Peak Hour traffic counts by All Traffic Data, April and May 2017. · Highway Capacity Manual (HCM 6th Edition), 2016. · Washington State Department of Transportation (WSDOT) Collision Data, 2014- 2016. DRAFT Transportation Impact Analysis East Valley Road – Donovan Brothers TENW May 12, 2017 Page 3 Figure 1 Project Site Vicinity DRAFT Transportation Impact Analysis East Valley Road – Donovan Brothers TENW May 12, 2017 Page 4 Figure 2 Preliminary Site Plan DRAFT Transportation Impact Analysis East Valley Road – Donovan Brothers TENW May 12, 2017 Page 5 EXISTING CONDITIONS Roadway Network The primary anticipated travel routes to and from the site in the City of Renton include East Valley Road and SW 27th Street. Descriptions of these roadways are included in Table 1 below. Table 1 Existing Roadway Network Summary – Project Site Vicinity Roadway Orientation Classification Speed Limit Number of Lanes Street Parking Sidewalks East Valley Road N-S Collector Arterial 35 3 None Both Sides SW 27th Street E-W Minor Arterial 35 3 None Both Sides Existing Traffic Volumes Existing weekday AM and PM peak hour traffic volumes at the East Valley Road / SW 27th Street off-site study intersection were based on counts conducted by All Traffic Data in April and May 2017. Figure 3 illustrates the 2017 existing AM and PM peak hour traffic volumes at the study intersection. The detailed peak hour turning movement count sheets are provided in Appendix A. Public Transportation Services Public transportation in the immediate project vicinity is served by King County Metro Transit. The closet transit stop is located at the Lind Avenue SW / SW 27th Street intersection, approximately a quarter of a mile west of the site. This stop provide access to King County Metro Transit routes 153 which provides service between the Renton Transit Center and the Kent Sounder Station. DRAFT Transportation Impact Analysis East Valley Road – Donovan Brothers TENW May 12, 2017 Page 6 Figure 3 Year 2017 Existing Peak Hour Traffic Volumes DRAFT Transportation Impact Analysis East Valley Road – Donovan Brothers TENW May 12, 2017 Page 7 Level of Service Level of service (LOS) analyses were conducted at the East Valley Road / SW 27th Street off-site study intersection. LOS generally refers to the degree of congestion on a roadway or intersection. It is a measure of vehicle operating speed, travel time, travel delays, and driving comfort. A letter scale from A to F generally describes intersection LOS. At signalized intersections, LOS A represents free-flow conditions (motorists experience little or no delays), and LOS F represents forced-flow conditions where motorists experience an average delay in excess of 80 seconds per vehicle. The LOS reported at stop-controlled intersections is based on the average control delay and can be reported for each controlled minor approach, controlled minor lane group, and controlled major- street movement (and for the overall intersection at all-way stop controlled intersections. Additional v/c ratio criteria apply to lane group or movement LOS only). Table 2 outlines the current HCM 6th Edition LOS criteria for signalized and stop-controlled intersections based on these methodologies. Table 2 LOS Criteria for Signalized and Stop-Controlled Intersections1 SIGNALIZED INTERSECTIONS STOP-CONTROLLED INTERSECTIONS LOS by Volume-to Capacity (V/C) Ratio2 LOS by Volume-to Capacity (V/C) Ratio3 Control Delay (sec/veh) £ 1.0 > 1.0 Control Delay (sec/veh) £ 1.0 > 1.0 £ 10 A F £ 10 A F > 10 to £ 20 B F > 10 to £ 15 B F > 20 to £ 35 C F > 15 to £ 25 C F > 35 to £ 55 D F > 25 to £ 35 D F > 55 to £ 80 E F > 35 to £ 50 E F > 80 F F > 50 F F 1 Source: Highway Capacity Manual (6th Edition), Transportation Research Board, 2016. 2 For approach-based and intersection-wide assessments at signals, LOS is defined solely by control delay. 3 For two-way stop controlled intersections, the LOS criteria apply to each lane on a given approach and to each approach on the minor street. LOS is not calculated for major-street approaches or for the intersection as a whole at two-way stop controlled intersections. For approach-based and intersection-wide assessments at all-way stop controlled intersections, LOS is solely defined by control delay. Level of service calculations for intersections were based on methodology and procedures outlined in the latest Highway Capacity Manual (6th Edition) using Synchro 10 traffic analysis software. The 2017 existing AM and PM peak hour LOS analysis results for the East Valley Road / SW 27th Street study intersection are summarized in Table 3. The 2017 existing LOS worksheets are included in Appendix B. DRAFT Transportation Impact Analysis East Valley Road – Donovan Brothers TENW May 12, 2017 Page 8 Table 3 2017 Existing Peak Hour LOS Summary Time Period / Study Intersection LOS Delay (sec) AM Peak Hour 1. East Valley Road / SW 27th Street Northbound Left-Turn A 7.6 Eastbound Left-Turn B 14.6 Eastbound Right-Turn A 9.1 Westbound Shared Left-Thru-Right C 18.2 Southbound Left-Turn A 8.4 PM Peak Hour 1. East Valley Road / SW 27th Street Northbound Left-Turn A 7.9 Eastbound Left-Turn B 12.4 Eastbound Right-Turn B 10.5 Westbound Shared Left-Thru-Right B 11.9 Southbound Left-Turn A 0.0 As shown in Table 3, the controlled movements at the study intersection currently operate at LOS C or better. Collision History Historic collisions at the study intersections were analyzed for the three-year period from 2014 to 2016. Collision data was provided by WSDOT. Summaries of the total and yearly average collisions during this period are provided in Table 4. Table 4 Collision Data Summary, January 1, 2014 to December 31, 2016 Location 2014 2015 2016 Three-Year Total Collisions Average Annual Collisions Intersection East Valley Rd / SW 27th St 0 0 0 0 0.00 Segment East Valley Rd between SW 27th St and SW 34th St 0 0 1 1 0.33 Source: WSDOT Collision Records. DRAFT Transportation Impact Analysis East Valley Road – Donovan Brothers TENW May 12, 2017 Page 9 FUTURE TRAFFIC CONDITIONS Planned Transportation Improvements This section documents the known planned transportation improvements in the study area. There are two planned transportation improvement projects identified in the City of RentonÊs adopted 2017- 2022 Transportation Improvement Program (TIP) in the project vicinity. DRAFT Transportation Impact Analysis East Valley Road – Donovan Brothers TENW May 12, 2017 Page 10 · TIP #4 SW 27th Street/Strander Boulevard Connection Description: This project provides a critical four/five-lane arterial that will serve as a connector to West Valley Highway (SR 181) and East Valley Road, as well as an arterial connector to SR 167 from the south. The project will provide a grade-separated crossing at the Union Pacific Railroad (UPRR) and Burlington Northern Santa Fe (BNSF) railroad tracks. Bicycle and pedestrian connections will be provided to the Tukwila Station and the Interurban Trail. A new east-west arterial roadway will connect the cities of Renton and Tukwila and provide significant congestion relief to existing arterials. The new road will provide access to the new Tukwila Station, a multi-modal center being developed by Sound Transit immediately north of the new alignment. By undercrossing the UPRR and BNSF railroads, the new arterial will provide significant benefits to both freight mobility and general motorists. The total project cost is $31,116,857. · TIP #34 Lind Avenue SW (SW 16th Street to SW 43rd Street) Description: Widen existing roadway to five lanes where required. Includes new roadway, curbs, sidewalks, drainage, signals, lighting, signing and channelization. Increasing traffic demands in the Valley due in part to development will create the need for increasing the capacity of this major north/south arterial. A potential project is a signal installation at the intersection at Lind Ave SW and SW 34th St (currently unsignalized). Additionally, improvements may result from future WSDOT I-405 plans which include an interchange at Lind Ave SW (currently unfunded). The total project cost is $4,400,000. Project Trip Generation The trip generation estimate for the proposed East Valley Road-Donovan Brothers development was based on the methodology included in the Institute of Transportation Engineers (ITE) Trip Generation Manual, 9th edition for Land Use Code (LUC) 812 (Building Materials & Lumber Store). The credit for the existing uses that will be removed was based on existing counts collected during the AM and PM peak periods at the existing site driveways. The resulting net new weekday daily, AM, and PM peak hour trip generation associated with the proposed project is summarized in Table 5. Table 5 Trip Generation Summary Net New Trips Generated Weekday Time Period In Out Total Weekday Daily 563 563 1,126 Weekday AM Peak Hour 45 20 65 Weekday PM Peak Hour 61 66 127 As shown in Table 5, the proposed project is estimated to generate 1,126 net new weekday daily trips, with 65 net new trips occurring during the weekday AM peak hour (45 entering, 20 exiting), and 127 net new trips occurring during the weekday PM peak hour (61 entering, 66 exiting). Detailed trip generation calculations are included in Attachment C. DRAFT Transportation Impact Analysis East Valley Road – Donovan Brothers TENW May 12, 2017 Page 11 Project Trip Distribution and Assignment The distribution and assignment of the net new AM and PM peak hour project trips were estimated based existing travel patterns, and confirmed by City of Renton staff as part of the Traffic Scoping for the project. The following Table 6 summarizes the resulting general trip distribution patterns. Table 6 Project Trip Distribution Route (Direction) Trip Distribution East Valley Road (north) 40% East Valley Road (south) 40% SW 27th Street (west) 20% TOTAL 100% The project trip distribution and assignment through the site driveways and the study intersection is shown in Figure 4. It should be noted that the trips shown at the site driveways are gross project trips and also includes trips from the existing Lumber Market that will remain. Future Traffic Volumes Year 2019 No Action (without project) peak hour traffic volumes were estimated by applying a 2 percent annual background growth rate to the existing volumes (confirmed by City as part of Traffic Scoping). In addition to the 2 percent annual background growth rate, trips from the Carmax Renton pipeline project (39 net new AM peak hour trips) were included in the future traffic volume estimates. The Carmax Renton project would result in a net reduction in weekday PM peak hour trips (-124 trips). As a conservative measure, no adjustments to the PM peak hour trips were made as a result of the Carmax Renton pipeline project. The resulting future 2019 No Action AM and PM peak hour traffic volumes are shown in Figure 5. The 2019 With-Project traffic volumes were determined by adding the trip assignment from the proposed development (shown in Figure 4) to the future 2019 No Action traffic volumes. The resulting 2019 With-Project AM and PM peak hour traffic volumes at the study intersections are shown in Figure 6. It should be noted that east leg of the intersection of East Valley Road/SW 27th Street (existing north driveway to Lumber Market) would be removed as part of the proposed project. DRAFT Transportation Impact Analysis East Valley Road – Donovan Brothers TENW May 12, 2017 Page 12 Figure 4 Project Trip Distribution & Assignment DRAFT Transportation Impact Analysis East Valley Road – Donovan Brothers TENW May 12, 2017 Page 13 Figure 5 2019 No Action Peak Hour Traffic Volumes DRAFT Transportation Impact Analysis East Valley Road – Donovan Brothers TENW May 12, 2017 Page 14 Figure 6 2019 With-Project Peak Hour Traffic Volumes DRAFT Transportation Impact Analysis East Valley Road – Donovan Brothers TENW May 12, 2017 Page 15 Future Level of Service Future year 2019 Level of Service (LOS) analyses were conducted at the East Valley Road / SW 27th Street off-site study intersection for year 2019 weekday AM and PM peak hour No Action (without project) conditions and for year 2019 With-Project conditions. Existing intersection geometry was assumed at the study intersection as there are no planned improvements at this intersection. The 2019 weekday AM and PM peak hour LOS results at the study intersections without and with the proposed project are summarized in Table 7. The LOS worksheets are included in Appendix C. Table 7 Year 2019 Peak Hour Level of Service Summary 2019 No Action 2019 With-Project Time Period / Study Intersection (movement)LOS Delay (sec) LOS Delay (sec) AM Peak Hour 1. East Valley Road / SW 27th Street Northbound Left-Turn A 7.6 A 7.6 Eastbound Left-Turn C 15.0 B 14.9 Eastbound Right-Turn A 9.1 A 9.3 Westbound Shared Left-Thru-Right C 18.8 - - Southbound Left-Turn A 8.5 - - PM Peak Hour 1. East Valley Road / SW 27th Street Northbound Left-Turn A 7.9 A 8.0 Eastbound Left-Turn B 12.5 B 12.5 Eastbound Right-Turn B 10.7 B 11.0 Westbound Shared Left-Thru-Right B 12.1 - - Southbound Left-Turn A 0.0 - - 1. Results based on HCM Methodologies (6th Edition). As shown in Table 7, the controlled movements at the study intersection are expected to operate at acceptable levels (LOS B or better) in the future with the East Valley Road-Donovan Brothers project during the weekday AM and PM peak hours. DRAFT Transportation Impact Analysis East Valley Road – Donovan Brothers TENW May 12, 2017 Page 16 Site Access Assessment Vehicle access to the site will be provided by three existing driveways on East Valley Road. Note the two existing driveways to Lumber Market will be consolidated into a single access. All site access driveways are assumed to be full-access driveways. To assess operations of the proposed site access locations, level of service (LOS) and queuing were analyzed. LOS and Queue Analysis The LOS and queue calculations were conducted using Synchro 10 software based on methodology outlined in the latest edition of the Highway Capacity Manual (6th Edition). The reported queues are estimated 95th percentile queues that are exceeded only 5 percent of the time. Table 8 summarizes the results of the 2019 with-project LOS and queue analyses. The LOS and queue calculation sheets are included in Appendix D. Table 8 Site Access Peak Hour LOS & Queue Summary AM Peak Hour PM Peak Hour Study Intersection LOS Delay (sec) 95th % Queue LOS Delay (sec) 95th % Queue A. East Valley Rd / North Driveway Westbound Shared Left-Right B 12.1 0’ B 10.2 0’ Southbound Left-Turn A 8.8 0’ A 0.0 0’ B. East Valley Rd / Middle Driveway Westbound Shared Left-Right B 11.9 0’ B 11.2 0’ Southbound Left-Turn A 8.8 0’ A 8.0 0’ C. East Valley Rd / South Driveway Westbound Shared Left-Right B 12.4 < 25’ B 12.1 < 25’ Southbound Left-Turn A 8.9 < 25’ A 8.1 < 25’ 1. Results based on HCM Methodologies (6th Edition). As shown in Table 8, all turn movements entering and exiting the proposed site access driveways are expected to operate at acceptable levels (LOS B or better) during the weekday AM and PM peak hours in 2019. Vehicle queues are all estimated to be statistically 1 vehicle or less. DRAFT Transportation Impact Analysis East Valley Road – Donovan Brothers TENW May 12, 2017 Page 17 MITIGATION Based on the results of the analysis, the existing transportation facilities are anticipated to accommodate the additional traffic generated by the proposed project. Payment of the CityÊs traffic impact fees will mitigate project impacts. No additional mitigation has been identified for the proposed East Valley Road-Donovan Brothers project DRAFT Transportation Impact Analysis East Valley Road – Donovan Brothers Appendix A Peak Hour Turning Movement Counts Peak Hour:07:15 AM - 08:15 AM E VALEY RD.E VALLEY RD.DWY 1SW 27TH ST (303) 216-2439 www.alltrafficdata.net Location:1 E VALEY RD. & DWY 1 AM Tuesday, April 25, 2017Date and Start Time: All Vehicles Pedestrians/Bicycles in Crosswalk Traffic Counts - All Vehicles Heavy Vehicles Peak Hour Traffic Counts - Heavy Vehicles and Pedestrians/Bicycles in Crosswalk3100 1 0 16 1 8 75 413 1 2 45888 25 56 N S EW 0 0 715240411SW 27TH ST DWY 1E VALEY RD.E VALLEY RD.559 0 000N S EW 0000 0 0 00Interval Start Time RightLeftThru Total Eastbound Westbound Northbound Southbound U-Turn Rolling HourRightLeftThruU-Turn RightLeftThruU-Turn RightLeftThruU-Turn 7:00 AM 5570000000218500141264002 7:15 AM 55901000011511200141462001 7:30 AM 52204000101411000211565001 7:45 AM 4800110000128810181296011 8:00 AM 5030200000119400181283000 8:15 AM 0 0 0 0 1 0 0 9 82 0 0 14 1093000 8:30 AM 0 0 0 0 0 0 0 14 74 0 0 20 1143021 8:45 AM 0 1 0 0 1 0 0 14 107 0 0 21 1524022 Count Total 0 9 1 0 2 1 1 110 752 1 0 140 1,06030058 Peak Hour 0 8 1 0 0 1 1 52 404 1 0 71 55916013 HV%PHF 0.69 0.25 0.89 0.85 32.0% 100.0% 10.3% 14.7% 12.0%0.90 EB WB NB SB All 2000 1 0 7 0 1 11 41 1 0 4716 8 10 N S EW 0 0 974000Heavy VehiclesInterval Start Time EB NB TotalWBSB 7:00 AM 2 8 0 3 13 7:15 AM 2 6 0 2 10 7:30 AM 2 15 1 4 22 7:45 AM 4 11 0 3 18 8:00 AM 0 15 0 2 17 8:15 AM 0 13 1 2 16 8:30 AM 0 10 0 3 13 8:45 AM 3 17 0 5 25 Count Total 13 95 2 24 134 Peak Hour 8 47 1 11 67 Pedestrians/Bicycles on CrosswalkInterval Start Time EB NB TotalWBSB 7:00 AM 0 0 0 0 0 7:15 AM 0 0 0 0 0 7:30 AM 0 0 0 0 0 7:45 AM 0 0 0 0 0 8:00 AM 0 0 0 0 0 8:15 AM 0 0 0 0 0 8:30 AM 0 0 0 0 0 8:45 AM 0 0 0 0 0 Count Total 0 0 0 0 0 Peak Hour 0 0 0 0 0 Peak Hour:07:15 AM - 08:15 AM E VALLEY RD.E VALLEY RD.DWY 2 (303) 216-2439 www.alltrafficdata.net Location:2 E VALLEY RD. & DWY 2 AM Tuesday, April 25, 2017Date and Start Time: All Vehicles Pedestrians/Bicycles in Crosswalk Traffic Counts - All Vehicles Heavy Vehicles Peak Hour Traffic Counts - Heavy Vehicles and Pedestrians/Bicycles in Crosswalk0000 0 3 91 459 3 3 46294 N S EW 091 045930 DWY 2E VALLEY RD.E VALLEY RD.556 0 00 N S EW 0000 0 0 Interval Start Time RightLeftThru Total Eastbound Westbound Northbound Southbound U-Turn Rolling HourRightLeftThruU-Turn RightLeftThruU-Turn RightLeftThruU-Turn 7:00 AM 549000001060016123010 7:15 AM 556000001270017145010 7:30 AM 521010001230027151000 7:45 AM 484000001070023130000 8:00 AM 504020001020024130020 8:15 AM 0 0 0 0 0 94 0 0 15 110010 8:30 AM 0 0 0 0 0 92 0 0 21 114100 8:45 AM 0 1 0 0 0 120 0 0 28 150010 Count Total 0 4 0 0 0 871 0 0 171 1,053160 Peak Hour 0 3 0 0 0 459 0 0 91 556030 HV%PHF 0.38 0.90 0.84 33.3% 8.7% 17.6% 10.3%0.92 EB WB NB SB All 0000 0 1 16 38 1 2 4017 N S EW 016 03820Heavy VehiclesInterval Start Time EB NB TotalWBSB 7:00 AM 8 0 5 13 7:15 AM 5 0 3 8 7:30 AM 11 0 4 15 7:45 AM 11 0 8 19 8:00 AM 13 1 1 15 8:15 AM 19 0 3 22 8:30 AM 12 0 3 15 8:45 AM 14 0 6 20 Count Total 93 1 33 127 Peak Hour 40 1 16 57 Pedestrians/Bicycles on CrosswalkInterval Start Time EB NB TotalWBSB 7:00 AM 0 0 0 0 7:15 AM 0 0 0 0 7:30 AM 0 0 0 0 7:45 AM 0 0 0 0 8:00 AM 0 0 0 0 8:15 AM 0 1 0 1 8:30 AM 0 0 0 0 8:45 AM 0 0 0 0 Count Total 0 1 0 1 Peak Hour 0 0 0 0 Peak Hour:07:15 AM - 08:15 AM E VALLEY RD.E VALLEY RD.DWY 3 WBDWY 1 EB (303) 216-2439 www.alltrafficdata.net Location:3 E VALLEY RD. & DWY 3 WB AM Tuesday, April 25, 2017Date and Start Time: All Vehicles Pedestrians/Bicycles in Crosswalk Traffic Counts - All Vehicles Heavy Vehicles Peak Hour Traffic Counts - Heavy Vehicles and Pedestrians/Bicycles in Crosswalk1011 0 0 0 0 2 95 463 1 1 46493 2 5 N S EW 0 0 93446000DWY 1 EB DWY 3 WBE VALLEY RD.E VALLEY RD.562 0 000N S EW 0000 0 0 00Interval Start Time RightLeftThru Total Eastbound Westbound Northbound Southbound U-Turn Rolling HourRightLeftThruU-Turn RightLeftThruU-Turn RightLeftThruU-Turn 7:00 AM 5550100000110300161220010 7:15 AM 5620000000212700171470100 7:30 AM 5300100000212200281530000 7:45 AM 4930000000010701241330001 8:00 AM 5100100000010400241290000 8:15 AM 0 1 0 0 0 0 0 1 95 0 0 17 1151000 8:30 AM 0 0 0 0 0 0 0 0 94 0 0 22 1160000 8:45 AM 0 0 0 0 0 0 0 0 119 0 0 29 1501100 Count Total 0 4 0 0 0 0 0 6 871 0 1 177 1,0652211 Peak Hour 0 2 0 0 0 0 0 4 460 0 1 93 5620101 HV%PHF 0.50 0.25 0.90 0.85 50.0% 0.0% 10.1% 21.1% 12.1%0.92 EB WB NB SB All 1000 0 0 0 0 1 20 48 0 0 4719 1 1 N S EW 0 0 1904700Heavy VehiclesInterval Start Time EB NB TotalWBSB 7:00 AM 0 7 0 5 12 7:15 AM 0 6 0 3 9 7:30 AM 0 15 0 5 20 7:45 AM 0 11 0 9 20 8:00 AM 1 15 0 3 19 8:15 AM 2 18 0 3 23 8:30 AM 0 12 0 3 15 8:45 AM 0 17 1 8 26 Count Total 3 101 1 39 144 Peak Hour 1 47 0 20 68 Pedestrians/Bicycles on CrosswalkInterval Start Time EB NB TotalWBSB 7:00 AM 0 0 0 0 0 7:15 AM 0 0 0 0 0 7:30 AM 0 0 0 0 0 7:45 AM 0 0 0 0 0 8:00 AM 0 0 0 0 0 8:15 AM 0 0 0 0 0 8:30 AM 0 0 0 0 0 8:45 AM 0 0 0 0 0 Count Total 0 0 0 0 0 Peak Hour 0 0 0 0 0 Peak Hour:07:00 AM - 08:00 AM E VALLEY RD.E VALLEY RD.DWY 4 WBDWY 2 EB (303) 216-2439 www.alltrafficdata.net Location:4 E VALLEY RD. & DWY 4 WB AM Tuesday, April 25, 2017Date and Start Time: All Vehicles Pedestrians/Bicycles in Crosswalk Traffic Counts - All Vehicles Heavy Vehicles Peak Hour Traffic Counts - Heavy Vehicles and Pedestrians/Bicycles in Crosswalk1001 0 3 1 0 0 88 466 4 9 47491 1 1 N S EW 0 0 87046590DWY 2 EB DWY 4 WBE VALLEY RD.E VALLEY RD.567 0 000N S EW 0000 0 0 00Interval Start Time RightLeftThru Total Eastbound Westbound Northbound Southbound U-Turn Rolling HourRightLeftThruU-Turn RightLeftThruU-Turn RightLeftThruU-Turn 7:00 AM 5670000000011000181290001 7:15 AM 5670000200012700201510110 7:30 AM 5310000100012600251590070 7:45 AM 4820000000010200241281010 8:00 AM 5090000000010200241290210 8:15 AM 0 0 0 0 1 0 0 0 95 0 0 18 1150001 8:30 AM 0 0 0 0 1 0 0 0 86 0 1 21 1100010 8:45 AM 0 0 0 0 0 0 0 2 121 0 0 29 1551110 Count Total 0 0 0 0 5 0 0 2 869 0 1 179 1,07624122 Peak Hour 0 0 0 0 3 0 0 0 465 0 0 87 5671191 HV%PHF 0.25 0.50 0.89 0.93 0.0% 0.0% 7.6% 23.9% 10.1%0.89 EB WB NB SB All 1000 0 0 0 0 0 21 36 0 0 3620 0 1 N S EW 0 0 2003600Heavy VehiclesInterval Start Time EB NB TotalWBSB 7:00 AM 0 8 0 6 14 7:15 AM 0 6 0 5 11 7:30 AM 0 11 0 4 15 7:45 AM 0 11 0 6 17 8:00 AM 0 13 2 4 19 8:15 AM 0 15 0 4 19 8:30 AM 0 10 1 3 14 8:45 AM 1 18 0 6 25 Count Total 1 92 3 38 134 Peak Hour 0 36 0 21 57 Pedestrians/Bicycles on CrosswalkInterval Start Time EB NB TotalWBSB 7:00 AM 0 0 0 0 0 7:15 AM 0 0 0 0 0 7:30 AM 0 0 0 0 0 7:45 AM 0 0 0 0 0 8:00 AM 0 0 0 0 0 8:15 AM 0 0 0 0 0 8:30 AM 0 0 0 0 0 8:45 AM 0 0 0 0 0 Count Total 0 0 0 0 0 Peak Hour 0 0 0 0 0 Peak Hour:07:00 AM - 08:00 AM E VALLEY RD.E VALLEY RD.DWY 5 (303) 216-2439 www.alltrafficdata.net Location:5 E VALLEY RD. & DWY 5 AM Tuesday, April 25, 2017Date and Start Time: All Vehicles Pedestrians/Bicycles in Crosswalk Traffic Counts - All Vehicles Heavy Vehicles Peak Hour Traffic Counts - Heavy Vehicles and Pedestrians/Bicycles in Crosswalk0000 0 0 85 469 0 0 46985 N S EW 085 046900 DWY 5E VALLEY RD.E VALLEY RD.554 0 00 N S EW 0000 0 0 Interval Start Time RightLeftThru Total Eastbound Westbound Northbound Southbound U-Turn Rolling HourRightLeftThruU-Turn RightLeftThruU-Turn RightLeftThruU-Turn 7:00 AM 554000001100018128000 7:15 AM 554000001270016143000 7:30 AM 524000001300027157000 7:45 AM 478000001020024126000 8:00 AM 503000001040024128000 8:15 AM 0 0 0 0 0 95 0 0 18 113000 8:30 AM 0 0 0 0 0 90 0 0 21 111000 8:45 AM 0 0 0 0 0 124 0 0 27 151000 Count Total 0 0 0 0 0 882 0 0 175 1,057000 Peak Hour 0 0 0 0 0 469 0 0 85 554000 HV%PHF 0.00 0.90 0.84 0.0% 7.0% 24.7% 9.7%0.88 EB WB NB SB All 0000 0 0 21 33 0 0 3321 N S EW 021 03300Heavy VehiclesInterval Start Time EB NB TotalWBSB 7:00 AM 6 0 4 10 7:15 AM 6 0 3 9 7:30 AM 11 0 6 17 7:45 AM 10 0 8 18 8:00 AM 15 0 4 19 8:15 AM 14 0 3 17 8:30 AM 10 0 4 14 8:45 AM 20 0 7 27 Count Total 92 0 39 131 Peak Hour 33 0 21 54 Pedestrians/Bicycles on CrosswalkInterval Start Time EB NB TotalWBSB 7:00 AM 0 0 0 0 7:15 AM 0 0 0 0 7:30 AM 0 0 0 0 7:45 AM 0 0 0 0 8:00 AM 0 0 0 0 8:15 AM 0 0 0 0 8:30 AM 0 0 0 0 8:45 AM 0 0 0 0 Count Total 0 0 0 0 Peak Hour 0 0 0 0 Peak Hour:07:15 AM - 08:15 AM E VALLEY RD.E VALLEY RD.DWY 6 (303) 216-2439 www.alltrafficdata.net Location:6 E VALLEY RD. & DWY 6 AM Tuesday, April 25, 2017Date and Start Time: All Vehicles Pedestrians/Bicycles in Crosswalk Traffic Counts - All Vehicles Heavy Vehicles Peak Hour Traffic Counts - Heavy Vehicles and Pedestrians/Bicycles in Crosswalk0011 0 0 91 473 1 1 47290 N S EW 090 047200 DWY 6E VALLEY RD.E VALLEY RD.564 0 00 N S EW 0000 0 0 Interval Start Time RightLeftThru Total Eastbound Westbound Northbound Southbound U-Turn Rolling HourRightLeftThruU-Turn RightLeftThruU-Turn RightLeftThruU-Turn 7:00 AM 562000001100020130000 7:15 AM 564000001260022148000 7:30 AM 532000001320022154000 7:45 AM 495000001050123130100 8:00 AM 509000001090023132000 8:15 AM 0 0 0 0 0 96 0 0 20 116000 8:30 AM 0 0 0 0 0 93 0 0 24 117000 8:45 AM 0 0 0 0 0 117 0 0 27 144000 Count Total 0 0 0 0 0 888 0 1 181 1,071100 Peak Hour 0 0 0 0 0 472 0 1 90 564100 HV%PHF 0.25 0.89 0.95 100.0% 9.7% 15.4% 10.8%0.92 EB WB NB SB All 0001 0 0 14 47 1 0 4614 N S EW 014 04600Heavy VehiclesInterval Start Time EB NB TotalWBSB 7:00 AM 7 0 5 12 7:15 AM 6 0 3 9 7:30 AM 14 0 3 17 7:45 AM 11 1 6 18 8:00 AM 15 0 2 17 8:15 AM 16 0 3 19 8:30 AM 12 0 4 16 8:45 AM 16 0 8 24 Count Total 97 1 34 132 Peak Hour 46 1 14 61 Pedestrians/Bicycles on CrosswalkInterval Start Time EB NB TotalWBSB 7:00 AM 0 0 0 0 7:15 AM 0 0 0 0 7:30 AM 0 0 0 0 7:45 AM 0 0 0 0 8:00 AM 0 0 0 0 8:15 AM 0 0 0 0 8:30 AM 0 0 0 0 8:45 AM 0 0 0 0 Count Total 0 0 0 0 Peak Hour 0 0 0 0 Peak Hour:04:00 PM - 05:00 PM E VALLEY RD.E VALLEY RD.LUMBER MARKET DWY 1SW 27TH ST. (303) 216-2439 www.alltrafficdata.net Location:1 E VALLEY RD. & LUMBER MARKET DWY 1 PM Thursday, March 9, 2017Date and Start Time: All Vehicles Pedestrians/Bicycles in Crosswalk Traffic Counts - All Vehicles Heavy Vehicles Peak Hour Traffic Counts - Heavy Vehicles and Pedestrians/Bicycles in Crosswalk6001 1 0 86 0 4 260 264 2 1 276340 90 23 N S EW 0 0 2541625910SW 27TH ST. LUMBER MARKET DWY 1E VALLEY RD.E VALLEY RD.628 0 300N S EW 0300 0 0 00Interval Start Time RightLeftThru Total Eastbound Westbound Northbound Southbound U-Turn Rolling HourRightLeftThruU-Turn RightLeftThruU-Turn RightLeftThruU-Turn 4:00 PM 6280200000661006916928012 4:15 PM 6190100010266005513813000 4:30 PM 6270100000573006617426003 4:45 PM 5810000000359006414719101 5:00 PM 5470000110164006716022004 5:15 PM 0 2 0 0 0 1 0 4 58 0 0 58 14623000 5:30 PM 0 0 0 0 0 0 0 4 44 0 0 64 12815001 5:45 PM 0 0 0 0 0 0 0 3 48 0 0 49 11312001 Count Total 0 6 0 0 1 3 0 28 473 0 0 492 1,1751581112 Peak Hour 0 4 0 0 0 1 0 16 259 0 0 254 62886116 HV%PHF 0.75 0.50 0.88 0.92 3.3% 0.0% 4.3% 3.1% 3.7%0.90 EB WB NB SB All 0000 0 0 3 0 0 8 10 0 0 1211 3 2 N S EW 0 0 821000Heavy VehiclesInterval Start Time EB NB TotalWBSB 4:00 PM 2 4 0 4 10 4:15 PM 1 2 0 0 3 4:30 PM 0 4 0 2 6 4:45 PM 0 2 0 2 4 5:00 PM 1 2 0 4 7 5:15 PM 1 3 0 2 6 5:30 PM 1 0 0 2 3 5:45 PM 1 4 0 4 9 Count Total 7 21 0 20 48 Peak Hour 3 12 0 8 23 Pedestrians/Bicycles on CrosswalkInterval Start Time EB NB TotalWBSB 4:00 PM 0 0 2 0 2 4:15 PM 0 0 1 0 1 4:30 PM 0 0 0 0 0 4:45 PM 0 0 0 0 0 5:00 PM 0 0 0 0 0 5:15 PM 0 0 0 0 0 5:30 PM 0 0 0 0 0 5:45 PM 0 0 0 0 0 Count Total 0 0 3 0 3 Peak Hour 0 0 3 0 3 Peak Hour:04:00 PM - 05:00 PM E VALLEY RD.E VALLEY RD.LUMBER MARKET DWY 2 (303) 216-2439 www.alltrafficdata.net Location:2 E VALLEY RD. & LUMBER MARKET DWY 2 PM Thursday, March 9, 2017Date and Start Time: All Vehicles Pedestrians/Bicycles in Crosswalk Traffic Counts - All Vehicles Heavy Vehicles Peak Hour Traffic Counts - Heavy Vehicles and Pedestrians/Bicycles in Crosswalk0001 0 0 348 270 1 1 270348 N S EW 0348 026910 LUMBER MARKET DWY 2E VALLEY RD.E VALLEY RD.619 0 00 N S EW 0000 0 0 Interval Start Time RightLeftThru Total Eastbound Westbound Northbound Southbound U-Turn Rolling HourRightLeftThruU-Turn RightLeftThruU-Turn RightLeftThruU-Turn 4:00 PM 619000006200101163000 4:15 PM 60900000730068141000 4:30 PM 60600000760094171010 4:45 PM 56500000580085144100 5:00 PM 53200000660087153000 5:15 PM 0 0 0 0 0 61 0 0 77 138000 5:30 PM 0 0 0 0 0 49 0 0 81 130000 5:45 PM 0 0 0 0 0 50 0 0 61 111000 Count Total 0 0 0 0 0 495 0 0 654 1,151110 Peak Hour 0 0 0 0 0 269 0 0 348 619110 HV%PHF 0.25 0.88 0.86 0.0% 4.8% 3.2% 3.9%0.90 EB WB NB SB All 0000 0 0 11 13 0 0 1311 N S EW 011 01300Heavy VehiclesInterval Start Time EB NB TotalWBSB 4:00 PM 5 0 5 10 4:15 PM 2 0 1 3 4:30 PM 4 0 3 7 4:45 PM 2 0 2 4 5:00 PM 2 0 4 6 5:15 PM 3 0 4 7 5:30 PM 0 0 2 2 5:45 PM 5 0 4 9 Count Total 23 0 25 48 Peak Hour 13 0 11 24 Pedestrians/Bicycles on CrosswalkInterval Start Time EB NB TotalWBSB 4:00 PM 0 0 0 0 4:15 PM 0 0 0 0 4:30 PM 0 0 0 0 4:45 PM 0 0 0 0 5:00 PM 0 0 0 0 5:15 PM 0 0 0 0 5:30 PM 0 0 0 0 5:45 PM 0 0 0 0 Count Total 0 0 0 0 Peak Hour 0 0 0 0 Peak Hour:04:00 PM - 05:00 PM E VALLEY RD.E VALLEY RD.SOUND BUILDING DWY 1SKYWAY DWY 1 (303) 216-2439 www.alltrafficdata.net Location:3 E VALLEY RD. & SOUND BUILDING DWY 1 PM Thursday, March 9, 2017Date and Start Time: All Vehicles Pedestrians/Bicycles in Crosswalk Traffic Counts - All Vehicles Heavy Vehicles Peak Hour Traffic Counts - Heavy Vehicles and Pedestrians/Bicycles in Crosswalk2020 0 2 3 0 6 344 273 2 4 269345 9 2 N S EW 0 0 340026720SKYWAY DWY 1 SOUND BUILDING DWY 1E VALLEY RD.E VALLEY RD.624 0 001N S EW 0000 0 0 10Interval Start Time RightLeftThru Total Eastbound Westbound Northbound Southbound U-Turn Rolling HourRightLeftThruU-Turn RightLeftThruU-Turn RightLeftThruU-Turn 4:00 PM 624030010006301981702011 4:15 PM 615010010006600661350001 4:30 PM 621000000008200931761000 4:45 PM 572020000005601831430010 5:00 PM 541000010006700911612000 5:15 PM 0 0 0 0 1 0 0 0 62 0 0 78 1410000 5:30 PM 0 0 0 0 0 0 0 0 48 0 1 78 1270000 5:45 PM 0 0 0 0 0 0 0 0 49 0 0 63 1120000 Count Total 0 6 0 0 4 0 0 0 493 0 3 650 1,1655022 Peak Hour 0 6 0 0 2 0 0 0 267 0 2 340 6243022 HV%PHF 0.45 0.50 0.82 0.86 11.1% 0.0% 4.5% 3.8% 4.2%0.89 EB WB NB SB All 1010 0 0 0 0 1 13 12 0 2 1211 1 1 N S EW 0 0 1101110Heavy VehiclesInterval Start Time EB NB TotalWBSB 4:00 PM 1 5 0 6 12 4:15 PM 0 1 0 1 2 4:30 PM 0 4 0 2 6 4:45 PM 0 2 0 4 6 5:00 PM 0 2 0 4 6 5:15 PM 0 3 0 3 6 5:30 PM 0 0 0 3 3 5:45 PM 0 5 0 4 9 Count Total 1 22 0 27 50 Peak Hour 1 12 0 13 26 Pedestrians/Bicycles on CrosswalkInterval Start Time EB NB TotalWBSB 4:00 PM 1 0 0 0 1 4:15 PM 0 0 0 0 0 4:30 PM 0 0 0 0 0 4:45 PM 0 0 0 0 0 5:00 PM 0 0 1 0 1 5:15 PM 0 0 1 0 1 5:30 PM 0 0 0 0 0 5:45 PM 0 0 0 0 0 Count Total 1 0 2 0 3 Peak Hour 1 0 0 0 1 Peak Hour:04:30 PM - 05:30 PM E VALLEY RD.E VALLEY RD.SKYWAY DWY 2TRUCK DEPOT DWY 1 (303) 216-2439 www.alltrafficdata.net Location:4 E VALLEY RD. & SKYWAY DWY 2 PM Thursday, March 9, 2017Date and Start Time: All Vehicles Pedestrians/Bicycles in Crosswalk Traffic Counts - All Vehicles Heavy Vehicles Peak Hour Traffic Counts - Heavy Vehicles and Pedestrians/Bicycles in Crosswalk0021 0 5 0 0 0 349 265 6 4 267352 0 1 N S EW 0 0 347126420TRUCK DEPOT DWY 1 SKYWAY DWY 2E VALLEY RD.E VALLEY RD.622 0 300N S EW 3000 0 0 00Interval Start Time RightLeftThru Total Eastbound Westbound Northbound Southbound U-Turn Rolling HourRightLeftThruU-Turn RightLeftThruU-Turn RightLeftThruU-Turn 4:00 PM 6190000100063011011670010 4:15 PM 615000010006800661350000 4:30 PM 622000000008000931730000 4:45 PM 579000000015701841440010 5:00 PM 545000030006701911630010 5:15 PM 0 0 0 0 2 0 0 0 60 0 0 79 1420100 5:30 PM 0 0 0 0 1 0 0 0 48 0 0 80 1300010 5:45 PM 0 0 0 0 0 0 0 0 49 0 0 60 1100001 Count Total 0 0 0 0 8 0 0 1 492 0 3 654 1,1640141 Peak Hour 0 0 0 0 5 0 0 1 264 0 2 347 6220120 HV%PHF 0.00 0.50 0.83 0.94 0.0% 0.0% 4.5% 3.4% 3.9%0.90 EB WB NB SB All 0010 0 0 0 0 0 12 11 0 1 1211 0 1 N S EW 0 0 1111100Heavy VehiclesInterval Start Time EB NB TotalWBSB 4:00 PM 0 5 0 5 10 4:15 PM 0 2 0 1 3 4:30 PM 0 4 0 2 6 4:45 PM 0 3 0 3 6 5:00 PM 0 2 0 4 6 5:15 PM 0 3 0 3 6 5:30 PM 0 0 0 3 3 5:45 PM 0 4 0 4 8 Count Total 0 23 0 25 48 Peak Hour 0 12 0 12 24 Pedestrians/Bicycles on CrosswalkInterval Start Time EB NB TotalWBSB 4:00 PM 1 0 0 0 1 4:15 PM 0 0 0 0 0 4:30 PM 0 0 0 0 0 4:45 PM 0 0 0 0 0 5:00 PM 0 0 1 0 1 5:15 PM 0 0 2 0 2 5:30 PM 0 0 0 0 0 5:45 PM 0 0 0 0 0 Count Total 1 0 3 0 4 Peak Hour 0 0 3 0 3 Peak Hour:04:30 PM - 05:30 PM E VALLEY RD.E VALLEY RD.SKYWAY DWY 3 (303) 216-2439 www.alltrafficdata.net Location:5 E VALLEY RD. & SKYWAY DWY 3 PM Thursday, March 9, 2017Date and Start Time: All Vehicles Pedestrians/Bicycles in Crosswalk Traffic Counts - All Vehicles Heavy Vehicles Peak Hour Traffic Counts - Heavy Vehicles and Pedestrians/Bicycles in Crosswalk0000 0 0 354 268 0 0 268354 N S EW 0354 026800 SKYWAY DWY 3E VALLEY RD.E VALLEY RD.622 0 00 N S EW 0000 0 0 Interval Start Time RightLeftThru Total Eastbound Westbound Northbound Southbound U-Turn Rolling HourRightLeftThruU-Turn RightLeftThruU-Turn RightLeftThruU-Turn 4:00 PM 61600000660097163000 4:15 PM 61200000700071141000 4:30 PM 62200000770087164000 4:45 PM 58500000620086148000 5:00 PM 55100000640095159000 5:15 PM 0 0 0 0 0 65 0 0 86 151000 5:30 PM 0 1 0 0 0 49 0 0 77 127000 5:45 PM 0 0 0 0 0 51 0 0 63 114000 Count Total 0 1 0 0 0 504 0 0 662 1,167000 Peak Hour 0 0 0 0 0 268 0 0 354 622000 HV%PHF 0.00 0.87 0.93 0.0% 4.5% 3.4% 3.9%0.95 EB WB NB SB All 0000 0 0 12 12 0 0 1212 N S EW 012 01200Heavy VehiclesInterval Start Time EB NB TotalWBSB 4:00 PM 4 0 5 9 4:15 PM 2 0 1 3 4:30 PM 4 0 2 6 4:45 PM 3 0 1 4 5:00 PM 2 0 5 7 5:15 PM 3 0 4 7 5:30 PM 0 0 2 2 5:45 PM 3 0 4 7 Count Total 21 0 24 45 Peak Hour 12 0 12 24 Pedestrians/Bicycles on CrosswalkInterval Start Time EB NB TotalWBSB 4:00 PM 0 0 0 0 4:15 PM 0 0 0 0 4:30 PM 0 0 0 0 4:45 PM 0 0 0 0 5:00 PM 0 0 0 0 5:15 PM 0 0 0 0 5:30 PM 0 0 0 0 5:45 PM 0 0 0 0 Count Total 0 0 0 0 Peak Hour 0 0 0 0 Peak Hour:04:30 PM - 05:30 PM E VALLEY RD.E VALLEY RD.MILTS TRUCKING DWY 1 (303) 216-2439 www.alltrafficdata.net Location:6 E VALLEY RD. & MILTS TRUCKING DWY 1 PM Thursday, March 9, 2017Date and Start Time: All Vehicles Pedestrians/Bicycles in Crosswalk Traffic Counts - All Vehicles Heavy Vehicles Peak Hour Traffic Counts - Heavy Vehicles and Pedestrians/Bicycles in Crosswalk0000 0 1 355 266 1 0 266356 N S EW 0355 026600 MILTS TRUCKING DWY 1E VALLEY RD.E VALLEY RD.622 0 00 N S EW 0000 0 0 Interval Start Time RightLeftThru Total Eastbound Westbound Northbound Southbound U-Turn Rolling HourRightLeftThruU-Turn RightLeftThruU-Turn RightLeftThruU-Turn 4:00 PM 614010006400100165000 4:15 PM 61600000690066135000 4:30 PM 62200000790095174000 4:45 PM 57900000590081140000 5:00 PM 55100000680099167000 5:15 PM 0 1 0 0 0 60 0 0 80 141000 5:30 PM 0 0 0 0 0 50 0 0 81 131000 5:45 PM 0 1 0 0 0 49 0 0 62 112000 Count Total 0 3 0 0 0 498 0 0 664 1,165000 Peak Hour 0 1 0 0 0 266 0 0 355 622000 HV%PHF 0.25 0.84 0.90 0.0% 4.1% 3.1% 3.5%0.89 EB WB NB SB All 0000 0 0 11 11 0 0 1111 N S EW 011 01100Heavy VehiclesInterval Start Time EB NB TotalWBSB 4:00 PM 5 0 5 10 4:15 PM 2 0 1 3 4:30 PM 3 0 2 5 4:45 PM 3 0 2 5 5:00 PM 2 0 4 6 5:15 PM 3 0 3 6 5:30 PM 0 0 3 3 5:45 PM 4 0 3 7 Count Total 22 0 23 45 Peak Hour 11 0 11 22 Pedestrians/Bicycles on CrosswalkInterval Start Time EB NB TotalWBSB 4:00 PM 1 0 0 1 4:15 PM 0 0 0 0 4:30 PM 0 0 0 0 4:45 PM 0 0 0 0 5:00 PM 0 0 0 0 5:15 PM 0 0 0 0 5:30 PM 0 0 0 0 5:45 PM 0 0 0 0 Count Total 1 0 0 1 Peak Hour 0 0 0 0 DRAFT Transportation Impact Analysis East Valley Road – Donovan Brothers Appendix B Level of Service (LOS) Calculations DRAFT Transportation Impact Analysis East Valley Road – Donovan Brothers 2017 Existing Lanes, Volumes, Timings 1: E Valley Rd & SW 27th St 05/08/2017 Latitude East Valley Road Synchro 10 Report 2017 Existing - AM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 8 1 16 0 1 0 53 404 1 1 71 3 Future Volume (vph) 8 1 16 0 1 0 53 404 1 1 71 3 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 100 0 0 0 100 0 50 0 Storage Lanes 1 1 0 0 1 0 1 0 Taper Length (ft) 25 25 25 25 Link Speed (mph) 35 25 35 35 Link Distance (ft) 304 171 280 316 Travel Time (s) 5.9 4.7 5.5 6.2 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Heavy Vehicles (%) 32% 32% 32% 100% 100% 100% 10% 10% 10% 15% 15% 15% Shared Lane Traffic (%) Sign Control Stop Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized HCM 6th TWSC 1: E Valley Rd & SW 27th St 05/08/2017 Latitude East Valley Road Synchro 10 Report 2017 Existing - AM Peak Hour Intersection Int Delay, s/veh 1.3 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 8 1 16 0 1 0 53 404 1 1 71 3 Future Vol, veh/h 8 1 16 0 1 0 53 404 1 1 71 3 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length 100 - 0 - - - 100 - - 50 - - Veh in Median Storage, # - 1 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 32 32 32 100 100 100 10 10 10 15 15 15 Mvmt Flow 9 1 18 0 1 0 59 449 1 1 79 3 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 651 651 81 660 652 450 82 0 0 450 0 0 Stage 1 83 83 - 568 568 - - - - - - - Stage 2 568 568 - 92 84 - - - - - - - Critical Hdwy 7.42 6.82 6.52 8.1 7.5 7.2 4.2 - - 4.25 - - Critical Hdwy Stg 1 6.42 5.82 - 7.1 6.5 - - - - - - - Critical Hdwy Stg 2 6.42 5.82 - 7.1 6.5 - - - - - - - Follow-up Hdwy 3.788 4.288 3.588 4.4 4.9 4.2 2.29 - - 2.335 - - Pot Cap-1 Maneuver 343 352 902 270 285 448 1466 - - 1045 - - Stage 1 856 771 - 370 378 - - - - - - - Stage 2 458 461 - 722 668 - - - - - - - Platoon blocked, %- - - - Mov Cap-1 Maneuver 331 338 902 256 273 448 1466 - - 1045 - - Mov Cap-2 Maneuver 382 385 - 256 273 - - - - - - - Stage 1 822 770 - 355 363 - - - - - - - Stage 2 438 443 - 706 667 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 10.9 18.2 0.9 0.1 HCM LOS B C Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR Capacity (veh/h) 1466 - - 382 902 273 1045 - - HCM Lane V/C Ratio 0.04 - - 0.023 0.02 0.004 0.001 - - HCM Control Delay (s) 7.6 - - 14.6 9.1 18.2 8.4 - - HCM Lane LOS A - - B A C A - - HCM 95th %tile Q(veh) 0.1 - - 0.1 0.1 0 0 - - Lanes, Volumes, Timings 1: E Valley Rd & SW 27th St 05/08/2017 Latitude East Valley Road Synchro 10 Report 2017 Existing - PM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 4 0 86 0 1 1 16 259 1 0 254 6 Future Volume (vph) 4 0 86 0 1 1 16 259 1 0 254 6 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 100 0 0 0 100 0 50 0 Storage Lanes 1 1 0 0 1 0 1 0 Taper Length (ft) 25 25 25 25 Link Speed (mph) 35 25 35 35 Link Distance (ft) 304 171 280 316 Travel Time (s) 5.9 4.7 5.5 6.2 Confl. Peds. (#/hr)3 3 3 3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Heavy Vehicles (%) 3% 3% 3% 0% 0% 0% 4% 4% 4% 3% 3% 3% Shared Lane Traffic (%) Sign Control Stop Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized HCM 6th TWSC 1: E Valley Rd & SW 27th St 05/08/2017 Latitude East Valley Road Synchro 10 Report 2017 Existing - PM Peak Hour Intersection Int Delay, s/veh 1.8 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 4 0 86 0 1 1 16 259 1 0 254 6 Future Vol, veh/h 4 0 86 0 1 1 16 259 1 0 254 6 Conflicting Peds, #/hr 0 0 0 3 0 3 0 0 3 3 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length 100 - 0 - - - 100 - - 50 - - Veh in Median Storage, # - 1 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 3 3 3 0 0 0 4 4 4 3 3 3 Mvmt Flow 4 0 96 0 1 1 18 288 1 0 282 7 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 615 - 289 665 617 295 289 0 0 292 0 0 Stage 1 286 - - 328 328 - - - - - - - Stage 2 329 - - 337 289 - - - - - - - Critical Hdwy 7.13 - 6.23 7.1 6.5 6.2 4.14 - - 4.13 - - Critical Hdwy Stg 1 6.13 - - 6.1 5.5 - - - - - - - Critical Hdwy Stg 2 6.13 - - 6.1 5.5 - - - - - - - Follow-up Hdwy 3.527 - 3.327 3.5 4 3.3 2.236 - - 2.227 - - Pot Cap-1 Maneuver 402 0 748 376 408 749 1262 - - 1264 - - Stage 1 719 0 - 689 651 - - - - - - - Stage 2 682 0 - 681 677 - - - - - - - Platoon blocked, %- - - - Mov Cap-1 Maneuver 395 - 746 323 401 745 1262 - - 1260 - - Mov Cap-2 Maneuver 494 - - 323 401 - - - - - - - Stage 1 709 - - 677 640 - - - - - - - Stage 2 668 - - 592 677 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 10.6 11.9 0.5 0 HCM LOS B B Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR Capacity (veh/h) 1262 - - 494 746 521 1260 - - HCM Lane V/C Ratio 0.014 - - 0.009 0.128 0.004 - - - HCM Control Delay (s) 7.9 - - 12.4 10.5 11.9 0 - - HCM Lane LOS A - - B B B A - - HCM 95th %tile Q(veh) 0 - - 0 0.4 0 0 - - DRAFT Transportation Impact Analysis East Valley Road – Donovan Brothers 2019 No Action Lanes, Volumes, Timings 1: E Valley Rd & SW 27th St 05/08/2017 Latitude East Valley Road Synchro 10 Report 2019 Baseline - AM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 8 1 17 0 1 0 55 421 1 1 75 3 Future Volume (vph) 8 1 17 0 1 0 55 421 1 1 75 3 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 100 0 0 0 100 0 50 0 Storage Lanes 1 1 0 0 1 0 1 0 Taper Length (ft) 25 25 25 25 Link Speed (mph) 35 25 35 35 Link Distance (ft) 304 171 280 316 Travel Time (s) 5.9 4.7 5.5 6.2 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Heavy Vehicles (%) 32% 32% 32% 100% 100% 100% 10% 10% 10% 15% 15% 15% Shared Lane Traffic (%) Sign Control Stop Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized HCM 6th TWSC 1: E Valley Rd & SW 27th St 05/08/2017 Latitude East Valley Road Synchro 10 Report 2019 Baseline - AM Peak Hour Intersection Int Delay, s/veh 1.3 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 8 1 17 0 1 0 55 421 1 1 75 3 Future Vol, veh/h 8 1 17 0 1 0 55 421 1 1 75 3 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length 100 - 0 - - - 100 - - 50 - - Veh in Median Storage, # - 1 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 32 32 32 100 100 100 10 10 10 15 15 15 Mvmt Flow 9 1 19 0 1 0 61 468 1 1 83 3 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 678 678 85 688 679 469 86 0 0 469 0 0 Stage 1 87 87 - 591 591 - - - - - - - Stage 2 591 591 - 97 88 - - - - - - - Critical Hdwy 7.42 6.82 6.52 8.1 7.5 7.2 4.2 - - 4.25 - - Critical Hdwy Stg 1 6.42 5.82 - 7.1 6.5 - - - - - - - Critical Hdwy Stg 2 6.42 5.82 - 7.1 6.5 - - - - - - - Follow-up Hdwy 3.788 4.288 3.588 4.4 4.9 4.2 2.29 - - 2.335 - - Pot Cap-1 Maneuver 329 339 897 257 274 436 1461 - - 1028 - - Stage 1 852 768 - 358 368 - - - - - - - Stage 2 445 450 - 717 665 - - - - - - - Platoon blocked, %- - - - Mov Cap-1 Maneuver 317 324 897 243 262 436 1461 - - 1028 - - Mov Cap-2 Maneuver 370 374 - 243 262 - - - - - - - Stage 1 816 767 - 343 353 - - - - - - - Stage 2 425 431 - 700 664 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 11 18.8 0.9 0.1 HCM LOS B C Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR Capacity (veh/h) 1461 - - 370 897 262 1028 - - HCM Lane V/C Ratio 0.042 - - 0.024 0.021 0.004 0.001 - - HCM Control Delay (s) 7.6 - - 15 9.1 18.8 8.5 - - HCM Lane LOS A - - C A C A - - HCM 95th %tile Q(veh) 0.1 - - 0.1 0.1 0 0 - - Lanes, Volumes, Timings 1: E Valley Rd & SW 27th St 05/08/2017 Latitude East Valley Road Synchro 10 Report 2019 Baseline - PM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 4 0 89 0 1 1 17 269 1 0 264 6 Future Volume (vph) 4 0 89 0 1 1 17 269 1 0 264 6 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 100 0 0 0 100 0 50 0 Storage Lanes 1 1 0 0 1 0 1 0 Taper Length (ft) 25 25 25 25 Link Speed (mph) 35 25 35 35 Link Distance (ft) 304 171 280 316 Travel Time (s) 5.9 4.7 5.5 6.2 Confl. Peds. (#/hr)3 3 3 3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Heavy Vehicles (%) 3% 3% 3% 0% 0% 0% 4% 4% 4% 3% 3% 3% Shared Lane Traffic (%) Sign Control Stop Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized HCM 6th TWSC 1: E Valley Rd & SW 27th St 05/08/2017 Latitude East Valley Road Synchro 10 Report 2019 Baseline - PM Peak Hour Intersection Int Delay, s/veh 1.8 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 4 0 89 0 1 1 17 269 1 0 264 6 Future Vol, veh/h 4 0 89 0 1 1 17 269 1 0 264 6 Conflicting Peds, #/hr 0 0 0 3 0 3 0 0 3 3 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length 100 - 0 - - - 100 - - 50 - - Veh in Median Storage, # - 1 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 3 3 3 0 0 0 4 4 4 3 3 3 Mvmt Flow 4 0 99 0 1 1 19 299 1 0 293 7 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 639 - 300 690 641 306 300 0 0 303 0 0 Stage 1 297 - - 341 341 - - - - - - - Stage 2 342 - - 349 300 - - - - - - - Critical Hdwy 7.13 - 6.23 7.1 6.5 6.2 4.14 - - 4.13 - - Critical Hdwy Stg 1 6.13 - - 6.1 5.5 - - - - - - - Critical Hdwy Stg 2 6.13 - - 6.1 5.5 - - - - - - - Follow-up Hdwy 3.527 - 3.327 3.5 4 3.3 2.236 - - 2.227 - - Pot Cap-1 Maneuver 387 0 737 362 395 739 1250 - - 1252 - - Stage 1 709 0 - 678 642 - - - - - - - Stage 2 671 0 - 671 669 - - - - - - - Platoon blocked, %- - - - Mov Cap-1 Maneuver 380 - 735 308 388 735 1250 - - 1248 - - Mov Cap-2 Maneuver 482 - - 308 388 - - - - - - - Stage 1 698 - - 666 630 - - - - - - - Stage 2 657 - - 579 669 - - - - - - - Approach EB WB NB SB HCM Control Delay, s 10.8 12.1 0.5 0 HCM LOS B B Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR Capacity (veh/h) 1250 - - 482 735 508 1248 - - HCM Lane V/C Ratio 0.015 - - 0.009 0.135 0.004 - - - HCM Control Delay (s) 7.9 - - 12.5 10.7 12.1 0 - - HCM Lane LOS A - - B B B A - - HCM 95th %tile Q(veh) 0 - - 0 0.5 0 0 - - DRAFT Transportation Impact Analysis East Valley Road – Donovan Brothers 2019 With-Project Lanes, Volumes, Timings 1: E Valley Rd & SW 27th St 05/10/2017 Latitude East Valley Road Synchro 10 Report 2019 With-Project - AM Peak Hour Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 8 27 60 429 93 3 Future Volume (vph) 8 27 60 429 93 3 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 100 0 100 0 Storage Lanes 1 1 1 0 Taper Length (ft) 25 25 Link Speed (mph) 35 35 35 Link Distance (ft) 304 280 316 Travel Time (s) 5.9 5.5 6.2 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Heavy Vehicles (%) 32% 32% 10% 10% 15% 15% Shared Lane Traffic (%) Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized HCM 6th TWSC 1: E Valley Rd & SW 27th St 05/10/2017 Latitude East Valley Road Synchro 10 Report 2019 With-Project - AM Peak Hour Intersection Int Delay, s/veh 1.3 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 8 27 60 429 93 3 Future Vol, veh/h 8 27 60 429 93 3 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 100 0 100 - - - Veh in Median Storage, # 1 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 32 32 10 10 15 15 Mvmt Flow 9 30 67 477 103 3 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 716 105 106 0 - 0 Stage 1 105 - - - - - Stage 2 611 - - - - - Critical Hdwy 6.72 6.52 4.2 - - - Critical Hdwy Stg 1 5.72 - - - - - Critical Hdwy Stg 2 5.72 - - - - - Follow-up Hdwy 3.788 3.588 2.29 - - - Pot Cap-1 Maneuver 355 874 1437 - - - Stage 1 850 - - - - - Stage 2 488 - - - - - Platoon blocked, %- - - Mov Cap-1 Maneuver 338 874 1437 - - - Mov Cap-2 Maneuver 373 - - - - - Stage 1 810 - - - - - Stage 2 488 - - - - - Approach EB NB SB HCM Control Delay, s 10.6 0.9 0 HCM LOS B Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR Capacity (veh/h) 1437 - 373 874 - - HCM Lane V/C Ratio 0.046 - 0.024 0.034 - - HCM Control Delay (s) 7.6 - 14.9 9.3 - - HCM Lane LOS A - B A - - HCM 95th %tile Q(veh) 0.1 - 0.1 0.1 - - Lanes, Volumes, Timings 1: E Valley Rd & SW 27th St 05/10/2017 Latitude East Valley Road Synchro 10 Report 2019 With-Project - PM Peak Hour Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 4 101 31 296 288 6 Future Volume (vph) 4 101 31 296 288 6 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 100 0 100 0 Storage Lanes 1 1 1 0 Taper Length (ft) 25 25 Link Speed (mph) 35 35 35 Link Distance (ft) 304 280 316 Travel Time (s) 5.9 5.5 6.2 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Heavy Vehicles (%) 3% 3% 4% 4% 3% 3% Shared Lane Traffic (%) Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized HCM 6th TWSC 1: E Valley Rd & SW 27th St 05/10/2017 Latitude East Valley Road Synchro 10 Report 2019 With-Project - PM Peak Hour Intersection Int Delay, s/veh 2 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 4 101 31 296 288 6 Future Vol, veh/h 4 101 31 296 288 6 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 100 0 100 - - - Veh in Median Storage, # 1 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 3 3 4 4 3 3 Mvmt Flow 4 112 34 329 320 7 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 721 324 327 0 - 0 Stage 1 324 - - - - - Stage 2 397 - - - - - Critical Hdwy 6.43 6.23 4.14 - - - Critical Hdwy Stg 1 5.43 - - - - - Critical Hdwy Stg 2 5.43 - - - - - Follow-up Hdwy 3.527 3.327 2.236 - - - Pot Cap-1 Maneuver 393 715 1221 - - - Stage 1 731 - - - - - Stage 2 677 - - - - - Platoon blocked, %- - - Mov Cap-1 Maneuver 382 715 1221 - - - Mov Cap-2 Maneuver 482 - - - - - Stage 1 711 - - - - - Stage 2 677 - - - - - Approach EB NB SB HCM Control Delay, s 11.1 0.8 0 HCM LOS B Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR Capacity (veh/h) 1221 - 482 715 - - HCM Lane V/C Ratio 0.028 - 0.009 0.157 - - HCM Control Delay (s) 8 - 12.5 11 - - HCM Lane LOS A - B B - - HCM 95th %tile Q(veh) 0.1 - 0 0.6 - - DRAFT Transportation Impact Analysis East Valley Road – Donovan Brothers Appendix C Trip Generation Calculations Land Use Size 1 ITE LUC 2 Trip Rate 2 Enter Exit Enter Exit Total Daily Proposed Use: Building Materials & Lumber Store 32,500 GFA 812 Equation 50%50%658 658 1,316 Less Existing Use: Based on existing counts 3 -95 -95 -190 Net New Weekday Daily Trips =563 563 1,126 AM PEAK HOUR Proposed Use: Building Materials & Lumber Store 32,500 GFA 812 2.60 67%33%57 28 85 Less Existing Use: Based on existing counts -12 -8 -20 Net New Weekday AM Peak Hour Trips =45 20 65 PM PEAK HOUR Proposed Use: Building Materials & Lumber Store 32,500 GFA 812 4.49 47%53%69 77 146 Less Existing Use: Based on existing counts -8 -11 -19 Net New Weekday PM Peak Hour Trips =61 66 127 Notes: 1. GFA = Gross Floor Area. 2. Institute of Transportation Engineers, Trip Generation Manual, 9th Edition. 3. PM Peak Hour assumed to be 10% of daily. East Valley Road - Donovan Brothers Trip Generation Estimate Directional Split 2 Vehicle Trip Generation 5/12/2017 DRAFT Transportation Impact Analysis East Valley Road – Donovan Brothers Appendix D Site Access LOS and Queue Calculations Lanes, Volumes, Timings 2: E Valley Rd & North Dwy 05/10/2017 Latitude East Valley Road Synchro 10 Report 2019 With-Project - AM Peak Hour Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 3 1 488 4 1 120 Future Volume (vph) 3 1 488 4 1 120 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 50 Storage Lanes 1 0 0 1 Taper Length (ft) 25 25 Link Speed (mph) 25 35 35 Link Distance (ft) 171 130 280 Travel Time (s) 4.7 2.5 5.5 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Heavy Vehicles (%) 2% 2% 10% 10% 18% 18% Shared Lane Traffic (%) Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized HCM 6th TWSC 2: E Valley Rd & North Dwy 05/10/2017 Latitude East Valley Road Synchro 10 Report 2019 With-Project - AM Peak Hour Intersection Int Delay, s/veh 0.1 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 3 1 488 4 1 120 Future Vol, veh/h 3 1 488 4 1 120 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - 50 - Veh in Median Storage, # 1 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 10 10 18 18 Mvmt Flow 3 1 530 4 1 130 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 664 532 0 0 534 0 Stage 1 532 - - - - - Stage 2 132 - - - - - Critical Hdwy 6.42 6.22 - - 4.28 - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 - - 2.362 - Pot Cap-1 Maneuver 426 547 - - 958 - Stage 1 589 - - - - - Stage 2 894 - - - - - Platoon blocked, %- - - Mov Cap-1 Maneuver 426 547 - - 958 - Mov Cap-2 Maneuver 499 - - - - - Stage 1 588 - - - - - Stage 2 894 - - - - - Approach WB NB SB HCM Control Delay, s 12.1 0 0.1 HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) - - 510 958 - HCM Lane V/C Ratio - - 0.009 0.001 - HCM Control Delay (s) - - 12.1 8.8 - HCM Lane LOS - - B A - HCM 95th %tile Q(veh) - - 0 0 - Lanes, Volumes, Timings 3: E Valley Rd & Middle Dwy 05/10/2017 Latitude East Valley Road Synchro 10 Report 2019 With-Project - AM Peak Hour Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 1 2 490 2 3 120 Future Volume (vph) 1 2 490 2 3 120 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 50 Storage Lanes 1 0 0 1 Taper Length (ft) 25 25 Link Speed (mph) 25 35 35 Link Distance (ft) 171 120 130 Travel Time (s) 4.7 2.3 2.5 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Heavy Vehicles (%) 2% 2% 10% 10% 18% 18% Shared Lane Traffic (%) Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized HCM 6th TWSC 3: E Valley Rd & Middle Dwy 05/10/2017 Latitude East Valley Road Synchro 10 Report 2019 With-Project - AM Peak Hour Intersection Int Delay, s/veh 0.1 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 1 2 490 2 3 120 Future Vol, veh/h 1 2 490 2 3 120 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - 50 - Veh in Median Storage, # 1 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 10 10 18 18 Mvmt Flow 1 2 533 2 3 130 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 670 534 0 0 535 0 Stage 1 534 - - - - - Stage 2 136 - - - - - Critical Hdwy 6.42 6.22 - - 4.28 - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 - - 2.362 - Pot Cap-1 Maneuver 422 546 - - 957 - Stage 1 588 - - - - - Stage 2 890 - - - - - Platoon blocked, %- - - Mov Cap-1 Maneuver 421 546 - - 957 - Mov Cap-2 Maneuver 496 - - - - - Stage 1 586 - - - - - Stage 2 890 - - - - - Approach WB NB SB HCM Control Delay, s 11.9 0 0.2 HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) - - 528 957 - HCM Lane V/C Ratio - - 0.006 0.003 - HCM Control Delay (s) - - 11.9 8.8 - HCM Lane LOS - - B A - HCM 95th %tile Q(veh) - - 0 0 - Lanes, Volumes, Timings 4: E Valley Rd & South Dwy 05/10/2017 Latitude East Valley Road Synchro 10 Report 2019 With-Project - AM Peak Hour Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 10 15 477 21 31 90 Future Volume (vph) 10 15 477 21 31 90 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 50 Storage Lanes 1 0 0 1 Taper Length (ft) 25 25 Link Speed (mph) 25 35 35 Link Distance (ft) 171 347 120 Travel Time (s) 4.7 6.8 2.3 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Heavy Vehicles (%) 2% 2% 10% 10% 18% 18% Shared Lane Traffic (%) Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized HCM 6th TWSC 4: E Valley Rd & South Dwy 05/10/2017 Latitude East Valley Road Synchro 10 Report 2019 With-Project - AM Peak Hour Intersection Int Delay, s/veh 0.9 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 10 15 477 21 31 90 Future Vol, veh/h 10 15 477 21 31 90 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - 50 - Veh in Median Storage, # 1 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 10 10 18 18 Mvmt Flow 11 16 518 23 34 98 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 696 530 0 0 541 0 Stage 1 530 - - - - - Stage 2 166 - - - - - Critical Hdwy 6.42 6.22 - - 4.28 - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 - - 2.362 - Pot Cap-1 Maneuver 408 549 - - 952 - Stage 1 590 - - - - - Stage 2 863 - - - - - Platoon blocked, %- - - Mov Cap-1 Maneuver 393 549 - - 952 - Mov Cap-2 Maneuver 473 - - - - - Stage 1 569 - - - - - Stage 2 863 - - - - - Approach WB NB SB HCM Control Delay, s 12.4 0 2.3 HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) - - 516 952 - HCM Lane V/C Ratio - - 0.053 0.035 - HCM Control Delay (s) - - 12.4 8.9 - HCM Lane LOS - - B A - HCM 95th %tile Q(veh) - - 0.2 0.1 - Lanes, Volumes, Timings 2: E Valley Rd & North Dwy 05/10/2017 Latitude East Valley Road Synchro 10 Report 2019 With-Project - PM Peak Hour Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 0 3 324 2 0 389 Future Volume (vph) 0 3 324 2 0 389 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 50 Storage Lanes 1 0 0 1 Taper Length (ft) 25 25 Link Speed (mph) 25 35 35 Link Distance (ft) 171 130 280 Travel Time (s) 4.7 2.5 5.5 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Heavy Vehicles (%) 2% 2% 4% 4% 3% 3% Shared Lane Traffic (%) Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized HCM 6th TWSC 2: E Valley Rd & North Dwy 05/10/2017 Latitude East Valley Road Synchro 10 Report 2019 With-Project - PM Peak Hour Intersection Int Delay, s/veh 0 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 0 3 324 2 0 389 Future Vol, veh/h 0 3 324 2 0 389 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - 50 - Veh in Median Storage, # 1 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 4 4 3 3 Mvmt Flow 0 3 352 2 0 423 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 776 353 0 0 354 0 Stage 1 353 - - - - - Stage 2 423 - - - - - Critical Hdwy 6.42 6.22 - - 4.13 - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 - - 2.227 - Pot Cap-1 Maneuver 366 691 - - 1199 - Stage 1 711 - - - - - Stage 2 661 - - - - - Platoon blocked, %- - - Mov Cap-1 Maneuver 366 691 - - 1199 - Mov Cap-2 Maneuver 479 - - - - - Stage 1 711 - - - - - Stage 2 661 - - - - - Approach WB NB SB HCM Control Delay, s 10.2 0 0 HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) - - 691 1199 - HCM Lane V/C Ratio - - 0.005 - - HCM Control Delay (s) - - 10.2 0 - HCM Lane LOS - - B A - HCM 95th %tile Q(veh) - - 0 0 - Lanes, Volumes, Timings 3: E Valley Rd & Middle Dwy 05/10/2017 Latitude East Valley Road Synchro 10 Report 2019 With-Project - PM Peak Hour Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 3 5 321 3 4 385 Future Volume (vph) 3 5 321 3 4 385 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 50 Storage Lanes 1 0 0 1 Taper Length (ft) 25 25 Link Speed (mph) 25 35 35 Link Distance (ft) 171 120 130 Travel Time (s) 4.7 2.3 2.5 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Heavy Vehicles (%) 2% 2% 4% 4% 3% 3% Shared Lane Traffic (%) Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized HCM 6th TWSC 3: E Valley Rd & Middle Dwy 05/10/2017 Latitude East Valley Road Synchro 10 Report 2019 With-Project - PM Peak Hour Intersection Int Delay, s/veh 0.2 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 3 5 321 3 4 385 Future Vol, veh/h 3 5 321 3 4 385 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - 50 - Veh in Median Storage, # 1 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 4 4 3 3 Mvmt Flow 3 5 349 3 4 418 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 777 351 0 0 352 0 Stage 1 351 - - - - - Stage 2 426 - - - - - Critical Hdwy 6.42 6.22 - - 4.13 - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 - - 2.227 - Pot Cap-1 Maneuver 365 692 - - 1201 - Stage 1 713 - - - - - Stage 2 659 - - - - - Platoon blocked, %- - - Mov Cap-1 Maneuver 364 692 - - 1201 - Mov Cap-2 Maneuver 477 - - - - - Stage 1 711 - - - - - Stage 2 659 - - - - - Approach WB NB SB HCM Control Delay, s 11.2 0 0.1 HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) - - 592 1201 - HCM Lane V/C Ratio - - 0.015 0.004 - HCM Control Delay (s) - - 11.2 8 - HCM Lane LOS - - B A - HCM 95th %tile Q(veh) - - 0 0 - Lanes, Volumes, Timings 4: E Valley Rd & South Dwy 05/10/2017 Latitude East Valley Road Synchro 10 Report 2019 With-Project - PM Peak Hour Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (vph) 27 42 282 25 37 351 Future Volume (vph) 27 42 282 25 37 351 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 50 Storage Lanes 1 0 0 1 Taper Length (ft) 25 25 Link Speed (mph) 25 35 35 Link Distance (ft) 171 347 120 Travel Time (s) 4.7 6.8 2.3 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Heavy Vehicles (%) 2% 2% 4% 4% 3% 3% Shared Lane Traffic (%) Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized HCM 6th TWSC 4: E Valley Rd & South Dwy 05/10/2017 Latitude East Valley Road Synchro 10 Report 2019 With-Project - PM Peak Hour Intersection Int Delay, s/veh 1.5 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 27 42 282 25 37 351 Future Vol, veh/h 27 42 282 25 37 351 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - 50 - Veh in Median Storage, # 1 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 4 4 3 3 Mvmt Flow 29 46 307 27 40 382 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 783 321 0 0 334 0 Stage 1 321 - - - - - Stage 2 462 - - - - - Critical Hdwy 6.42 6.22 - - 4.13 - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 - - 2.227 - Pot Cap-1 Maneuver 362 720 - - 1220 - Stage 1 735 - - - - - Stage 2 634 - - - - - Platoon blocked, %- - - Mov Cap-1 Maneuver 350 720 - - 1220 - Mov Cap-2 Maneuver 452 - - - - - Stage 1 711 - - - - - Stage 2 634 - - - - - Approach WB NB SB HCM Control Delay, s 12.1 0 0.8 HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) - - 584 1220 - HCM Lane V/C Ratio - - 0.128 0.033 - HCM Control Delay (s) - - 12.1 8.1 - HCM Lane LOS - - B A - HCM 95th %tile Q(veh) - - 0.4 0.1 -