HomeMy WebLinkAboutAdmin ReportEXECUTIVE DEPARTMENT
M E M O R A N D U M
DATE: March 4, 2019
TO: Don Persson, Council President
Members of Renton City Council
FROM: Denis Law, Mayor
Robert Harrison, Chief Administrative Officer
SUBJECT: Administrative Report
• An online map -based survey is available (http://bit.ly/rentoninteractiveparksmap)
for residents to provide input on the update to the Parks, Recreation and Natural
Areas Plan. The map -based survey is available in English, Spanish, and Vietnamese
and will be taking input through March 28. Share which Renton parks you use, what
you like about them, and what you would like to see changed or improved. This is
one of several ways that the City will collect ideas and issues from the community
during the planning process.
• Swap plants and seeds and learn about gardening, beekeeping, backyard chickens,
and more at the SubUrban Farm and Garden Expo on Saturday, March 9 from 10:00
a.m. to 2:00 p.m. at the North Highlands Neighborhood Center, 3000 NE 16th Street.
• Information about preventative street maintenance, traffic impact projects, and
road closures happening this week can be found at http://rentonwa.gov/traffic.
Preventative street maintenance, traffic impact projects, and road closures will be at
the following locations:
✓ Monday, March 4 through Thursday, March 7, 5:00 p.m. Emergency road
closure on South 132nd Street at Renton Avenue South. Questions may be
directed to Pat Miller at 206-794-6162.
✓ Monday, March 4 through Friday, March 8, 9:00 a.m. to 5:00 p.m. Intermittent
lane closures at South 132nd Street for storm water utility work. Questions may
be directed to Pat Miller at 206-794-6162.
✓ Monday, March 4 through Friday, March 8, 9:00 a.m. to 3:00 p.m. Intermittent
lane closures on Lake Washington Blvd between North 39th Street and North
40th Street due to roadway construction. Questions may be directed to Brad
Stocco at 206-282-2373.
Don Persson, Council President
Members of Renton City Council
Page 2 of 2
March 4, 2019
✓ Monday, March 4 through Friday, March 8, 9:00 a.m. to 3:00 p.m. Single lane
closure on 156th Avenue SE near 13010 156th Avenue SE due to utility
construction. Questions may be directed to Brad Stocco at 206-282-2373.
✓ Monday, March 4 through Friday, March 8. Road closure on South 14th Street
between Smithers Avenue South and Davis Avenue South for utility construction.
Questions may be directed to Patrick DeCaro at 425-207-6013.
✓ Monday, March 4 through Friday, March 8. Specific date/time unknown.
Eastbound curbside single lane closures at 6210 NE 4th Street due to concrete
roadway construction. Questions may be directed to Brad Stocco at 206-282-
2373.
✓ Monday, March 4 through October 2019. The Renton Hill Utility Replacement
Project is underway with anticipated completion in May 2019. Following
completion of the utility project, an overlay of the affected surface streets will be
conducted as part of the 2019 overlay project. The overlay is scheduled to be
completed prior to October 31, 2019.