Loading...
HomeMy WebLinkAboutR-391404LU f - LL! CL w I� LU 0 00�man�■�m�m I ■ 1 8" P VC TO S, I I 18" PVC TO E, IE=15. TYPE 2 B 151 .5 GRT EL=24.69 i N=175663.7 E E=1291136.9 IE IN=15.49 �o �IE 1N=15.79 EXIST IE OUT=15.49 (R jDI l / . 23.82 �I -1 . EXISTING BULDING1 MAIN FF -25.40 .......... ............. ........... AUDTORIUM F200 UDITORIU1 FF -22050 = 4 = NI 23.4 }=::= 5 S M H RIM;: --23-92' - - - - - o - :�:�:�: - - •:'�:•' ''- �''-� h SEE STD PLAN ER -3 l IE IN: 21.02 t N �. IE OUT: 20.9 +• GRADE.•: FIT .•.r.•. P 1 2 .'''''''.+:::'::::. NOTE: FEVA ELEVATION CERTIFICATE 15 REQUIRED FOR BUILDING ADDITION. :,... Y} 02;1 :.::..•::.;.. 'f- .......... j :-: `'`-� j . . -- . :' ' 1 :.. r x j Lam- �••y aap�•L'h-11 •lF R•.a�• ANN'FL JEL TOPOU sc LMH RIM=25.78' CENTER OF CHANNEL IN TO NW&OUT TOS TEROF CHANNF'- ELEVAT 28' 0 !r EXISTING DIP INA WATER MAIN EASEMENT T r �.�� .� 4 SLOPE { r' S SITIV E PROPERTY, N; 1755J5-€ E:1 2-91 3F _::' PROPOSED ■ ..,. _ :. f. - WATER MAI j �• 1 EASEMENT } •T N k. r CURB SCUP R � 20' SPACIN r ;,'!• ,y- r SEE EfC5.} { 4 J� V I CMP 117 15 0 :::�•.•:;:.::•'• :.;.;.- lx fffffj ' .] / I 2 CPP ! E - PERMEABLE r -r - ASPHALT, SEE / C TO •��� .:.T1fYl:: �• - ::7 J :'�:�:'•'•'�'�'�' �•.• SECTION A C5.4 ,.�y { f J �` L i ''•f�• - }L L f/ • � f t. r ':: �j r I .••' `i+��ii:�:.•.•. •: 'ter.. b f Y! . *'' :5 1 f TYPE 1P, SOLID LID r :: � .::::::::::::::::::::::;::::::::::::::::::::::::::::::::::::::::::;::•'�. ORT EL=22.63 tv AY 0 / a :::.:..:..:' : `::------::::: N=175425.2 I �qr i E-1291044.$ I r� I IE 11\1- 17.86 I8i' IE OUT -17. fi yr)' / � 1 8 ' CPN T TY CORN, 410.52 .. .. . E.12 1043.34 I............ ...,' B FE _ --- - - I - f xx- 19 :. 533904 S F ■�.� ■ -I , INE LAND * ' 5l + + -- it goo 1F x loop low 0 low -------� SEASON A PONDED --------- f.A &ON ND 0 %N 0 \ 't + + +++ 1 �° 0 + + 1+ + +++++++ + + + + + +++ + + + + 1 CI] SUBMITTAL TO CITY FOLLOWING PRESCREEN REVIEW = NO. REVISION n RESTORE AREA TO NATURAL CONDITION IF DISTURBED. �II 1 0 3 5 45--- no 5� ALTERNATE: PROVIDE ROCKERY OR "ALLAN WALL" TYPE TO REDUCE CLEARING, I V CLE G GRADING AND SOILS REMOVAL AL A N OVE THE ELEVATION OF 22.58 TO NOT �tPACT THE FLOOD VOLUME. WALL AS I APPROXIMATELY HOWN S APPROXI A ELY 206 LF ! J fy LINE AFTER LLA. 20 0 i9 20 ( IN FEET } 1 inch = 20 ft. su SCALE. EJG M-203 DESI�,faEO: DKS )KS 017-05-05 017-05-0r15DRAWN: DKK 2017-43-23ryry CHECKEO� ONE INCH .r FULL SCoi,E KS IF 307 ONE INCH BY DATE APPR AM1011M SCALE ACCOMNOLY WRi1CAL: NAVD 1988 HORIZONTAL NM 1993/1991 DATU M NOTES: 1. SEE DRAWING 6.0 FOR TOPO SECTIONS 'A' THROUGH 'J' 2. SEE DRAWING G1.0 FOR AREAS. 3. PORTION OF EXISTING STORMWATER PIPE AND STORMWATER ELEMENTS WILL BE RELOCATED TO ACCOMMODATE THE PROPOSED BUILDING EXPANSION PROJECT. PRIVATE STORMWATER PIPE AND PRIVATE STORMWATER FEATURES: STORMWATER FLOW CONTROL FACILITY: PERMEABLE ASPHALT PAVEMENT STORMWATER FLOW CONTROL BMP: PERMEABLE ASPHALT PAVEMENT FLOW CONTROL BMP PROVIDED = APPROX 25,0008F WATER QUALITY FEATURE. PERMEABLE ASPHALT PAVEMENT (WHERE SOIL IS TESTED ADEQUATE FOR WQ OR REPLACED WITH AMENDED SOIL) WATER QUALITY BMP PROVIDED = APPROX 25,0045F SOIL [DUAN II IIES:. CUT: 1 672 CUBIC YARDS (2257 TONS) RELOCATED FILL: 554 CUBIC YARDS (748 TONS) NET SOIL REMOVED: 1118 CUBIC YARDS (1509 TONS) SOIL: ORIGIN OF FILL: RELOCATED ON PROPERTY. DESTINATION OF SOILS REMOVED: TC BE DETERMINED BY CONTRACTOR IOTE- ALL NEW PAVEMENT SHALL BE PERVIOUS ASPHALT, ALll CITY OF - +I# REN TON 1 Planning/Building/Public Works Dept. NOVAdyne Civil Engineers Seattle 425-753-1869 Portland 971-295-6"1 Dons)@novadyne.us Established 1983 Anchorage Seattle Portland R-3914-004 P v 18347 �ojx'�� z 0 U) z IZ IN COMPLIANCE WITH CITY OF RENTON STANDARDS u1 Cn W SURFACE WATER UTILITY way DEVELOPMENT ENGINEERING 0 rstraka 0610112017 rnair 061081 017 01 - 0) Ir - LO Q LO L0 C) Q I r r .7 SEATTLE PIPE TRADES EXPANSION 595 Monster Read SW GRADING AND DRAINAGE PLAN Uj a_ a_4' R L: 3/10/17 LLI FIE1A8COK J PACE- CPA'w'1NC NO: C2.0 r SH Fes. 4 0F.17