Loading...
HomeMy WebLinkAboutS-391402C/) LU T_ I— LLI OL n LUJ Li 0 L l EXIST. 10" Dl WA 10" W. 10" WAS 10" WA 0+150 0+'751 1+00 Utility Specifications Sanitary Sewer Notes and Specifications THESE NOTES SHALL APPEAR ON PROJECTS FOR THE WASTEWATER UTILITY. 1. All work and work material shall be in Conformance with the standards and specifKations of the City of Renton Pianning/Suilding}Publrc Works Deparbnent and the latest edrtion of the WSDOT/APWA Standards and Specifications, as approved and modified by the City of Renton in the Renton Standard Plans 8L Specifications. A set of approved plans shall be kept on site at all Mmes during construction. 2. The hours of work in the street right of way shall be per City specifications on weekdays unless otherwise approved in writing by the Planning}Building{Public Works Department. An approved traffic control plan must be obtained prior to beginning any work within public right of way. 3. All kacattons of existing tibirties shown are approximate and it shall be the Contractor's responsibility to verify the true and correct location so as to avoid damage or drsturbanCe. 4. A pre-crostruction conference and a 24 hour nonce shall be required prior to Starting new construction. It shall be the contractor's responsibility to Secure all necessary permits prior to sung constrtion. (Inspection will be accomplished by a representative of the City of Renton.) It shall be the contractor's responsibility to notify the Public Works inspector 24 hours in advance of backfilling all construction. S. Contractor is solely responsible for the means, methods and sequences of construction and for the safety of workers and others on the construction site. 6. It shall be the responsibility of the contractor to obtain street use and any other related permits prior to any construction. 7. Planes approved by the City of Renton* Public Works Department shall take precedence over all other plans. 8. A copy of these approved plans must be on they lob site whenever construction is in progress. 9. The contractor shall provide the City of Renton with an as -built drawing of the sanitary Sewer system, which has been Stamped and signed by a IiC sed profesSkimil "ireer or licensed professional surveyor - 110. Backfill shall be placed equally on both sides of the pipe in layers with a loose average depot of 6 inches, maximum depth of 8 incttes, thoroughly tamping each layer to 95 percent of maximum density. These compacted layers must extend for one pipe diameter on each side of the pipe or to the side of the trench. Materials to complete the fill over pipe shall be the same as described. 11. Open cut fogad crossings for utility trenches on existing traveled roadway shall be backfilled with crushed rack and mechanically compacted unless otherwise approved by 1 +'25 4 3 1 0+'0D 0 2 rti N L' Z J �d x 0- O J LL. -BUILDING ADDITION 2 Z 1-11 LO X rn ,- w Q w L--� nr CL Ln J W W ...r=rr � jfr C3 �.o �11 r -j Q z Ld¢ $ It— LdH Cr) 0 � Ctil (A C#i O I �_ ZLj Ci te) CL C coLL Z XUL_a- > W ci K 0� Ora .4. LO t4] — n N �C r—Z4 C)�� -tM 40 r]O �cli LIJrk�r'}p Ld 'tom n0 LLJ ��— 30 N in� Ln M Z ! [rl C'4r• 04 N II II _ II II _ II II c pw II ll II II 81 Z W Zw - a.Zw NZ W L l EXIST. 10" Dl WA 10" W. 10" WAS 10" WA 0+150 0+'751 1+00 Utility Specifications Sanitary Sewer Notes and Specifications THESE NOTES SHALL APPEAR ON PROJECTS FOR THE WASTEWATER UTILITY. 1. All work and work material shall be in Conformance with the standards and specifKations of the City of Renton Pianning/Suilding}Publrc Works Deparbnent and the latest edrtion of the WSDOT/APWA Standards and Specifications, as approved and modified by the City of Renton in the Renton Standard Plans 8L Specifications. A set of approved plans shall be kept on site at all Mmes during construction. 2. The hours of work in the street right of way shall be per City specifications on weekdays unless otherwise approved in writing by the Planning}Building{Public Works Department. An approved traffic control plan must be obtained prior to beginning any work within public right of way. 3. All kacattons of existing tibirties shown are approximate and it shall be the Contractor's responsibility to verify the true and correct location so as to avoid damage or drsturbanCe. 4. A pre-crostruction conference and a 24 hour nonce shall be required prior to Starting new construction. It shall be the contractor's responsibility to Secure all necessary permits prior to sung constrtion. (Inspection will be accomplished by a representative of the City of Renton.) It shall be the contractor's responsibility to notify the Public Works inspector 24 hours in advance of backfilling all construction. S. Contractor is solely responsible for the means, methods and sequences of construction and for the safety of workers and others on the construction site. 6. It shall be the responsibility of the contractor to obtain street use and any other related permits prior to any construction. 7. Planes approved by the City of Renton* Public Works Department shall take precedence over all other plans. 8. A copy of these approved plans must be on they lob site whenever construction is in progress. 9. The contractor shall provide the City of Renton with an as -built drawing of the sanitary Sewer system, which has been Stamped and signed by a IiC sed profesSkimil "ireer or licensed professional surveyor - 110. Backfill shall be placed equally on both sides of the pipe in layers with a loose average depot of 6 inches, maximum depth of 8 incttes, thoroughly tamping each layer to 95 percent of maximum density. These compacted layers must extend for one pipe diameter on each side of the pipe or to the side of the trench. Materials to complete the fill over pipe shall be the same as described. 11. Open cut fogad crossings for utility trenches on existing traveled roadway shall be backfilled with crushed rack and mechanically compacted unless otherwise approved by 1 +'25 4 3 1 0+'0D 10" WA 10" WA FINISHED GRADE E}{1511NG GRADE 1+'50 1 +'75 2+00 WATER PROFILE HORIZ SCALE: I";:=10' VERT SCALE: I"=10' J CJ 0 2 ~ W N L' Z J �d x 0- O -BUILDING ADDITION 2 Lr7 Ld X rn ,- w � W J C CL Ln CD W ...r=rr jfr C3 �.o �11 r -j Q co3:ZW Ld¢ $ It— Cr) 0 � Ctil (A r- [til I C EZW ZLj 10" WA 10" WA FINISHED GRADE E}{1511NG GRADE 1+'50 1 +'75 2+00 WATER PROFILE HORIZ SCALE: I";:=10' VERT SCALE: I"=10' J CJ 0 2 ~ W N L' 00 nl{t Z LiJ Q O -BUILDING ADDITION ULo Cr Lr7 Cr M Ld r >_WT rn ,- w 4 0 � J C _ LOen Ln ...r=rr �11 ZLLJ co3:ZW 38 LF 8" SSWR 0 0.317. EXIST XISTING 8" SSWR 0+25 0+50 z CD SUBMITTAL TO CITY FOLLOWING POSTSCREEN REViB 1 CD SUBMITTAL TO CITY FOLLOWING PRESCREEN REVIEW NO. REVISION 2-' FINISHED GRAE EXISTING GRAE -79 LF 8°' SSWR 0 4.33`Pe FXIST 0+75 SANITARY SEWER PROFILE HORIZ SCALE: I"=10' VERT SCALE: 1"=10' SURVEYM: DESK',NED DKS DKS 017-05-05 oRnwN: KW DKK 2017-03-2 3 CHECKED DKS BY DATE APPR ZPROvEO: 10" WA 2+50 1+'00 SCALE: 1+25 1 >f_ 1 0" H0R DNTAL W 19W/19,01 ONE INCH DATUM Ai FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY 2+'75 34 EXISTING 8" SSWR 0 1 +'45 C I TY O F I+ R E N TT N � Planning/Building/Public Warks De;)t 3400 W NN Uf N M N L' 00 nl{t — rZw �I �I II II Zw 3- ' 10" WA, 1.0" W. Z 0 H W Lt r CO in M f�� d Z W 0) T C) C) Lr) T 30 CD i LS7 T 20 J 14 3450 C) NOTE: USE 0900 OR DI PIPE FOR SEWER IN LOCATIONS WHERE COVER LESS WTHAN 5 FEET. C) SEWER PIPING INSIDE BUILDING FOOTPRINT SHALL BE AS PER PLUMBING CODE L REPLACE AS REQUIRED BY CONDITION OR CODE. Ir OL 0v IIIANOVAdyne Civil Engineers o71 Seattle 425-753-1869 'C Portland 971-295-6441 Dons@novadyne.us _1s IST s�+� � EstabOstrecl1983 Anchorage Seattle Portland S-3914-002 W-3914-002 0 C/)z n x IN COMPLIANCE WITH CITY OF RENTON STANDARDS LU —_WASTEiNATER UTILITY DL<L] WATER UTILITY ,. ❑ dChriten 01112017 AbdoL�I Gafaur Qljflljl2p17 " EDEVELOPMENT ENGINEERING Ll.l ir 06/08/2017 a- Rlt; SEATTLE PIPE TRADES EXPANSION 3/9/" Ljj 1aLaD4K: J 595 Monster Road SUV -AGE. � SANITARYEWER AND 1 ATER MAIN 7RAIMNGC .1 LU PROFILES 5HEEL � aF;�