HomeMy WebLinkAboutzS-3914Set- CB 151 FLIM 24.69' 1 I
24" rPP TO IF 15.49' I
- 1
r� I
[l 8" PVC TO S, - 1
IIS 18" PVC TO E, ]E=15. SSMH 5 16 I
SSM IM=14T55 12x6 REDUCING TEE
C� CEN�TE OF $ ChANN L (MJxFL), s GATE VALVE
x TO 8G ISE I (FLXMJ) WITH CONC.
* j CEJE OF HA NEL BLOCKING
foo ELE AT ON=�0.6 N: 175624.84
� E:1291186.98
- U01491 SSMH 5017
❑ / (R,j D{
NEW HYDRANT PER
i CITY OF RENTON STD
`
PLAN 310.1
N. 25.0
Lu ` I £:1291 93.44
-EXSS.
4 /
`` SEE NATE A. BELOW AND IF NEEDED:
ULj um I NEW SS LINE TO AVOID NEN FH. 55LF 8" SS @ 1.4%
1
SANITARY SEWER4,� CAP EXIST TEE 4
CONNECTION WITH N:175595.69 ti
< EKSTflG B U I LQ IS CLEANOUT, APPROX ,4, E: 1291185.35 -�
PROPERTY CORNER
Lu Cf)M A (� F F= 2 5.4 0 N:175571.92 . REBAR SET
E: 1291103.52, N:175&133.92
AUDITORUM FF=22.50 ON I s E: 1291205.88
SSMH 5018
SSMH RIM=25.78'
- - N88' 1 D5.01 "E m `,. CENTER OF CHANNEL
Cn
00 REMOVE SSMH AND REPLACE WITH 7.26' IN TO NW & OUT TO S
4" DDCVA TO BE INSTALLED IN CLEANOUT, EXIST IE OUT = 20.97 _ I I ` 1 CENTER OF CHANNEL
mmmmmmm FIRE SPRINKLER BOOM PER COR SEE MECHANICAL DRAWINGS - 1 7 LF ELEVATION= 21.28'
STD PLAN 360.5mommommommommom MJXMJ WITH CONC. 10" DI
} BLOCKING
„ _ N:175541.46 :1 {{ ,r
4 FIRE WATER SUPPLY SSMH RIM -23.92 1 00 12 X10 REDUCING TAPPING
E:1291182.41 � i „
4 - -
:.. :::•:...............
_
CONNECTION, 10x TE£ >��........ TEE, 10" TAPPING VALVE
.........................:...
SEE STD PLAN BR�3 - �;�
4,r � �
MJXFL , 4 GATE VALVE ............. MJ?{FL PER CITY OF
IF IN: 21.02
FLXMJ WITH CONC. BLOCKING �I RENTON STD PLAN 300.1
IF OUT: 20.7
- N:175541.69
PER COR STI) PLAN 310.1 r� ,
I P N
E: 1291189.67
30 D PIPE TO BUILQI G + :22'
::::::::::::: ::�::<::-::::::/ DIP elf A
N:175432.91 ..j�:D
E. 1291010.25 r .: ... I: `�... f 11 LF
:;
:m
,:
�:: f
mmmmmf
10 DI
:F:1: :
} �.. ::,:
4 PIV2,r ,4 I:N:
:::.:;;;:::PE::GOR: T#?::•::: % PROPERTY CORNER
10" 45' BEND ::350::x: :f N, 175515.86
::'' .•: i _m f E:1291207.87
MJXMJ WITH CONC. �.............:•.:.........
.
: ............ :....., .....
BLOCKING �:: �.. D99K Tf� .:A��#� ' TE
N:175443.69 .... f' }R ST P, A 2 M
::
I
£:1290982.42 /
'r
......
- _ M
Y 1:"::::,�`:`•. LVE
% 10 45' BEND MJXMJ
:.. .:::::: FOR 'I
P COR o WITH IDONC.
...... ....................
......... .............:........... :.
..
::::::STEP :: N: 40. �'1 BLOCI4ING
j
} � N:175532.24
"CONNECTION o,'1 f
10 ..:: ti
::. .. 3:f WATER, E:1291182.46
Z PER CITY OF $ f
�ET P OR STD PLAN
... ... .....
... :..,
``:'`..
- RENTON STD �• �� '� ,
PLAN 300.5 � .
N:175442.88 ' YDRANT PER ¢
1=:1290979.93 % OF RENTON STD
PLAN 310.1
N: fi 75447.25 % '��`� � �� .
E:1291040.73 1 WATER EASEMENT
P IE=15 4, -_
CB PI 4M 21.
l
'PP
IE = ;
25 LF.29 LF
DP TO N , I - 8.61 r S62' 53,66"E `10 DI I0 DI f
22.61' ' f
10" 22.5' BEND !
(MJXMJ) WITH S87' 44' 53.66"E
CONC. BLOCKIN 66.55;
N: 175433.20 i
r E: 1291002.46
--- � 10" 45' BEND
2" WATEF2 SERVICE MJXMJ WITH PROPERTY COR R
36
LU M CONNECTION TEE CONC. BLOCKING N. E:1291911 0020
1 .
(MJXMJ) WITH r N: 175430.59 5
CONC. BLOCKING E: 1291058.95
IN:175432.71
£:1291015.12 r PP Tr) PROPERTY CORNER }
I, {� f x OX6 REDUCING ' N:175410,52
RV
65- T (MJxFL), 6" E: 1291048, 34
R GA VALVE J
6 (FLXMJ�- WITH �
CONC. BL'5CKING
f N: 175431.72 l
--- -- - MID POINT OF E:1291040.12
- - PROPERTY LINE ARC 1
- - - -` N: 175357.55 /
E:1290940.57 f
WATER PLAN GENERAL NOTES Standard Plan No. 300
1. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE CRY OF RENTON PUBLIC WORKS
STANDARD SPECIFICATIONS AND SPECIAL PROVISIONS AND WSIDOT f APWA STANDARD SPECIFICATIONS, LATEST EDITION AS
AMENDED BY THE CITY OF RENTON, A SET OF CITY APPROVED PLANS SHALL BE KEPT ATTHE JOB SITE WHENEVER CONSTRUCTION
IS IN PROGRESS. A PRE -CONSTRUCTION CONFERENCE SHALL BE HELD PRIOR TO THE START OF CONSTRUCTION. THE CONTRACTOR
AND OR DEVELOPER SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY PERMITS PRIOR TO CONSTRUCTION.
2. ALL EXISTING UTILITIES SHALL REMAIN IN SERVICE DURING CONSTRUCTION UNLESS OTHERWISE NOTED. THE CONTRACTOR SHALL
CALL 1-800-4245555 TO VERIFY UTILITY LOCATIONS BEFORE BEGINNING EXCAVATION.
3. ALL MATERIALS USED FOR THE CONSTRUCTION OF WATER SYSTEM IMPROVEMENTS SHALL BE NEIN AND UNDAMAGED, AND
'CATALOG CUTS" FOR ALL MATERIALS SHALL BE APPROVED IN W RITING BY THE CITY OF RENTON PRIOR TO BRINGING ANY
MATERIALS ON-SITE.
4. ALL WATER MAIN PIPE MATERIALS SHALL BE CEMENT LINE DUCTILE IRON PIPE, THICKNESS CLASS 52 PER AWWA C 151 AND C
104, PIPE JOINTS SHALL BE PUSH -ON OR MECHANICAL JOINT. CAST IRON OR DUCTILE IRON PIPE FITTINGS SHALL BE CLASS 250 AS
PER ANSI{AWWA 0110{A21AGM. ALL DUCTILE IRON PIPE AND FITTINGS SHALL BE WRAPPED WITH 8 -MIL BLACK, TUBE TYPE,
POLYETHYLENE PLASTIC PER AWWAC105 STANDARDS.
5. MINIMUM COVER FROM TOP OF WATER MAINS TO FINISHED GRADE SHALL BE 36 INCHES FOR PIPE DIAMETER OF 10 -INCH OR LESS
AND 48 INCHES FOR PIPE DIAMETER OF 12 -INCH AND LARGER. MAXIMUM COVER FOR ALL WATER MAINS SHALL BE 60 INCHES.
ANY DEVIATIONS MUST BE APPROVED BY THE CITY OF RENTON PRIOR TO CONSTRUCTION. WHERE UTILITY CONFLICTS OCCUR,
THE PROFILE OF THE WATER MAIN SHALL BE ADJUSTED AS NECESSARY TO CLEAR CONFLICTS AND TO PROVIDE MINIMUM COVER.
PIPE DEFLECTION SHALL NOT EXCEED ONE-HALF OF PIPE MANUFACTURER'S SPECIFICATION FOR SIZE OF PIPE USED. ALL TRENCH
BACKFILL SHALL BE COMPACTED TO 95 PERCENT MAXIMUM DRY DENSITY AS DETERMINED BY THE MODIFIED PROCTOR TEST
METHOD (MDD) IN ROADWAYS, ROADWAY SHOULDERS, ROADWAY PRISM AND DRIVEWAYS, AND 85 PERCENT MDD IN UNPAVED
AREAS. ALL PIPE ZONE COMPACTION SHALL BE 95 MDD.
6. CONCRETE BLOCKING FOR WATER MAINS SHALL BE DESIGNED, INSTALLED AND POURED IN PLACE IN ACCORDANCE WITH CITY OF
RENTON STANDARD DETAILS AND SPECIFICATIONS AND SHALL BE INSTALLED AT ALL VERTICAL AND HORIZONTAL BENDS, FITTINGS
AND BASE OF HYDRANTS. MEGA -LUGS (OR SIMILAR PRODUCT) MAY BE REQUIRED ON ALL MECHANICAL JOINTS IN ADDITION TO
CONCRETE BLOCKING.
7. ALL NEW WATER MAIN PIPES AND FITTINGS SHALL HAVE A FOAM PIPE PIG RUN THROUGH THEM PRIOR TO BEING FLUSHED,
DISINFECTED, ANO TESTED. CLEANING, PRESSURE AND PURITY TESTING SHALL BE DONE IN THE PRESENCE OF AND UNDER THE
SUPERVISION OF A CRY OF RENTON UTILITY INSPECTOR. THE CONTRACTOR SHALL SUPPLY, INSTALL AND REMOVE PLUGS,
CORPORATION STOPS, BLOWOFF ASSEMBLIES, AND THRUST RESTRAINT f BLOCKING FOR TESTING AND PURITY ACCEPTANCE. NO
CONNECTION SHALL BE MADE BETWEEN THE NEW MAIN OR BETWEEN THE NEW INET -TAP VALVE TO AN EXISTING MAIN UNTIL
THE NEW PIPING HAS BEEN FOAM -PIGGED, DISINFECTED, FLUSHED, AND PASSED BOTH PRESSURE AND PURITY TESTING.
8. NEW WATER MAINS INCLUDING, SERVICE LATERALS SHALL BE TESTED AT A STATIC PRESSURE OF 150 PSI ABOVE WORKING
PRESSURE WITH A MINIMUM OF 225 PSI TEST PRESSURE FOR 120 MINUTES WITH A MAXIMUM OF 5 PSI PRESSURE DROP DURING
THE ENTIRE TEST PERIOD. UPON SATISFACTORY COMPLETION OF THE PRESSURE TEST, THE LINE SHALL BE DISINFECTED, FLUSHED,
AND THEN WATER SAMPLES SHALL BE TAKEN FOR PURITY TESTING BYTHE PUBLIC WORKS INSPECTOR.
9. THE CONTRACTOR SHALL NOTIFY THE CITY OF RENTON WATER UTILITY AND MAINTENANCE DEPARTMENTS AT LEAST 10 WORKING
DAYS PRIOR TO MAKING CONNECTIONS TO THE EXWING WATER SYSTEM. THE CONTRACTOR SHALL EXPOSE THE EXISTING WATER
MAIN AND FITTINGS AT THE CONNECTION POINT BEFORE ORDERING THE NECESSARY ADAPTORS AND FITTINGS REQUIRED FOR
THE FINAL CONNECTION. THE CONTRACTOR SHALL EXCAVATE, REMOVE ALL SURFACE MATERIALS, AND PROVIDE SHORING AND
ALL MATERIALS REQUIRED FOR THE CITY OF RENTON TO PERFORM THE CONNECTION TO THE EXISTING WATER SYSTEM. THE
CONTRACTOR SHALL PROVIDE AND INSTALL BACKFILL, CONCRETE BLOCKING, AND COMPLETE SURFACE RESTORATION.
STD. PLAN - 300.0
+ + * PUBLIC WORKS WATER PLAN GENERAL NOTES
DEPARTMENT
MARCH 2010
NOTE A. CONTRACTOR SHALL LOCATE, Horizontally and vertically per City Note;
Please show the existing sewer manholes and sewer mains in the plan. Add
note on the plan.
* "Pothole the existing sewer line GM04919 from SSMH5016 to SSMH5017
prior to installation of the new fire hydrant. If there if field conflict between
the new fire hydrant and the existing sewer main and/or the sewer manhole,
then a new sewer main is required to be provided from SSMH5018 to
SSMH5016. Prior to the new sewer main from SSMH5018 to SSMH5016,
ccty-ing of the existing sewer main between SSMH5016 and SSMH5017 and
the existing sewer main between SSMH5017 and SSMH5018 is required to
confirm that there are no existing utility service connections in these lines that
will be impacted by the abandonment of these sewer lines."
VERTICAL: NAVD 1986 '
HORIZONTAL NAR] 1483/1991�II + CITY E
RENTON
DATUM�T
Planning/Building/Public Works Dept
Lf)
iI
LO
r
H
`LS
7 -
cc cc
OL
NOVAdyne
Civil Engineers CD
Seatde 425--753-18139
Portland 971-295-6441
oonsgnovadyne.usA��a�+�9
Eslablished 1983 Anchorage Seattle Porgand �'����
S-3914-001 1 °
C/)Z
0-
X
IN COMPLIANCE WITH CITY OF RENTON STANDARDS W
Lu
WASTEWATER UTILITY 0 WATER UTILITYt.:� C)
dchriten 06/01/2017 Abdoul Gafour 0610612017 � ' <
I -
DEVELOPMENT ENGINEERING 0
rnair 06108/2017
lfA l L.
SEATTLE PIPE TRADES EXPANSION '3/10/17 w
FIELDODOK: J
595 Monster Road SUV PAGE: �
SANITARY SEWER AND WATER MAIN DRAMnNGC3,0
Lu
RELOCATION PLAN SHEET: 8 "17 0
SURWYM
EwI }
SCAxE: r}
1 "-G0t
OUIG,N
DKS
2
CD SUBMITTAL TO CITY FOLLOWING POSTSCREEN REVIEW
DKS
017-05-05
ORA'HN'. FCS
ONE INCH
1
CD SUBMITTAL TO CITY FOLLOWING PRESCREEN REVIEW
DKS
2017-03-23
CHECKM
DKS
Ai FULL 5CPLE
F NOT ONE INCH
SCALE ACCORDINGLY
NO.
REVISION
BY
DATE
APPR
.6fiPROvE0:
WATER PLAN GENERAL NOTES Standard Plan No. 300
1. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE CRY OF RENTON PUBLIC WORKS
STANDARD SPECIFICATIONS AND SPECIAL PROVISIONS AND WSIDOT f APWA STANDARD SPECIFICATIONS, LATEST EDITION AS
AMENDED BY THE CITY OF RENTON, A SET OF CITY APPROVED PLANS SHALL BE KEPT ATTHE JOB SITE WHENEVER CONSTRUCTION
IS IN PROGRESS. A PRE -CONSTRUCTION CONFERENCE SHALL BE HELD PRIOR TO THE START OF CONSTRUCTION. THE CONTRACTOR
AND OR DEVELOPER SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY PERMITS PRIOR TO CONSTRUCTION.
2. ALL EXISTING UTILITIES SHALL REMAIN IN SERVICE DURING CONSTRUCTION UNLESS OTHERWISE NOTED. THE CONTRACTOR SHALL
CALL 1-800-4245555 TO VERIFY UTILITY LOCATIONS BEFORE BEGINNING EXCAVATION.
3. ALL MATERIALS USED FOR THE CONSTRUCTION OF WATER SYSTEM IMPROVEMENTS SHALL BE NEIN AND UNDAMAGED, AND
'CATALOG CUTS" FOR ALL MATERIALS SHALL BE APPROVED IN W RITING BY THE CITY OF RENTON PRIOR TO BRINGING ANY
MATERIALS ON-SITE.
4. ALL WATER MAIN PIPE MATERIALS SHALL BE CEMENT LINE DUCTILE IRON PIPE, THICKNESS CLASS 52 PER AWWA C 151 AND C
104, PIPE JOINTS SHALL BE PUSH -ON OR MECHANICAL JOINT. CAST IRON OR DUCTILE IRON PIPE FITTINGS SHALL BE CLASS 250 AS
PER ANSI{AWWA 0110{A21AGM. ALL DUCTILE IRON PIPE AND FITTINGS SHALL BE WRAPPED WITH 8 -MIL BLACK, TUBE TYPE,
POLYETHYLENE PLASTIC PER AWWAC105 STANDARDS.
5. MINIMUM COVER FROM TOP OF WATER MAINS TO FINISHED GRADE SHALL BE 36 INCHES FOR PIPE DIAMETER OF 10 -INCH OR LESS
AND 48 INCHES FOR PIPE DIAMETER OF 12 -INCH AND LARGER. MAXIMUM COVER FOR ALL WATER MAINS SHALL BE 60 INCHES.
ANY DEVIATIONS MUST BE APPROVED BY THE CITY OF RENTON PRIOR TO CONSTRUCTION. WHERE UTILITY CONFLICTS OCCUR,
THE PROFILE OF THE WATER MAIN SHALL BE ADJUSTED AS NECESSARY TO CLEAR CONFLICTS AND TO PROVIDE MINIMUM COVER.
PIPE DEFLECTION SHALL NOT EXCEED ONE-HALF OF PIPE MANUFACTURER'S SPECIFICATION FOR SIZE OF PIPE USED. ALL TRENCH
BACKFILL SHALL BE COMPACTED TO 95 PERCENT MAXIMUM DRY DENSITY AS DETERMINED BY THE MODIFIED PROCTOR TEST
METHOD (MDD) IN ROADWAYS, ROADWAY SHOULDERS, ROADWAY PRISM AND DRIVEWAYS, AND 85 PERCENT MDD IN UNPAVED
AREAS. ALL PIPE ZONE COMPACTION SHALL BE 95 MDD.
6. CONCRETE BLOCKING FOR WATER MAINS SHALL BE DESIGNED, INSTALLED AND POURED IN PLACE IN ACCORDANCE WITH CITY OF
RENTON STANDARD DETAILS AND SPECIFICATIONS AND SHALL BE INSTALLED AT ALL VERTICAL AND HORIZONTAL BENDS, FITTINGS
AND BASE OF HYDRANTS. MEGA -LUGS (OR SIMILAR PRODUCT) MAY BE REQUIRED ON ALL MECHANICAL JOINTS IN ADDITION TO
CONCRETE BLOCKING.
7. ALL NEW WATER MAIN PIPES AND FITTINGS SHALL HAVE A FOAM PIPE PIG RUN THROUGH THEM PRIOR TO BEING FLUSHED,
DISINFECTED, ANO TESTED. CLEANING, PRESSURE AND PURITY TESTING SHALL BE DONE IN THE PRESENCE OF AND UNDER THE
SUPERVISION OF A CRY OF RENTON UTILITY INSPECTOR. THE CONTRACTOR SHALL SUPPLY, INSTALL AND REMOVE PLUGS,
CORPORATION STOPS, BLOWOFF ASSEMBLIES, AND THRUST RESTRAINT f BLOCKING FOR TESTING AND PURITY ACCEPTANCE. NO
CONNECTION SHALL BE MADE BETWEEN THE NEW MAIN OR BETWEEN THE NEW INET -TAP VALVE TO AN EXISTING MAIN UNTIL
THE NEW PIPING HAS BEEN FOAM -PIGGED, DISINFECTED, FLUSHED, AND PASSED BOTH PRESSURE AND PURITY TESTING.
8. NEW WATER MAINS INCLUDING, SERVICE LATERALS SHALL BE TESTED AT A STATIC PRESSURE OF 150 PSI ABOVE WORKING
PRESSURE WITH A MINIMUM OF 225 PSI TEST PRESSURE FOR 120 MINUTES WITH A MAXIMUM OF 5 PSI PRESSURE DROP DURING
THE ENTIRE TEST PERIOD. UPON SATISFACTORY COMPLETION OF THE PRESSURE TEST, THE LINE SHALL BE DISINFECTED, FLUSHED,
AND THEN WATER SAMPLES SHALL BE TAKEN FOR PURITY TESTING BYTHE PUBLIC WORKS INSPECTOR.
9. THE CONTRACTOR SHALL NOTIFY THE CITY OF RENTON WATER UTILITY AND MAINTENANCE DEPARTMENTS AT LEAST 10 WORKING
DAYS PRIOR TO MAKING CONNECTIONS TO THE EXWING WATER SYSTEM. THE CONTRACTOR SHALL EXPOSE THE EXISTING WATER
MAIN AND FITTINGS AT THE CONNECTION POINT BEFORE ORDERING THE NECESSARY ADAPTORS AND FITTINGS REQUIRED FOR
THE FINAL CONNECTION. THE CONTRACTOR SHALL EXCAVATE, REMOVE ALL SURFACE MATERIALS, AND PROVIDE SHORING AND
ALL MATERIALS REQUIRED FOR THE CITY OF RENTON TO PERFORM THE CONNECTION TO THE EXISTING WATER SYSTEM. THE
CONTRACTOR SHALL PROVIDE AND INSTALL BACKFILL, CONCRETE BLOCKING, AND COMPLETE SURFACE RESTORATION.
STD. PLAN - 300.0
+ + * PUBLIC WORKS WATER PLAN GENERAL NOTES
DEPARTMENT
MARCH 2010
NOTE A. CONTRACTOR SHALL LOCATE, Horizontally and vertically per City Note;
Please show the existing sewer manholes and sewer mains in the plan. Add
note on the plan.
* "Pothole the existing sewer line GM04919 from SSMH5016 to SSMH5017
prior to installation of the new fire hydrant. If there if field conflict between
the new fire hydrant and the existing sewer main and/or the sewer manhole,
then a new sewer main is required to be provided from SSMH5018 to
SSMH5016. Prior to the new sewer main from SSMH5018 to SSMH5016,
ccty-ing of the existing sewer main between SSMH5016 and SSMH5017 and
the existing sewer main between SSMH5017 and SSMH5018 is required to
confirm that there are no existing utility service connections in these lines that
will be impacted by the abandonment of these sewer lines."
VERTICAL: NAVD 1986 '
HORIZONTAL NAR] 1483/1991�II + CITY E
RENTON
DATUM�T
Planning/Building/Public Works Dept
Lf)
iI
LO
r
H
`LS
7 -
cc cc
OL
NOVAdyne
Civil Engineers CD
Seatde 425--753-18139
Portland 971-295-6441
oonsgnovadyne.usA��a�+�9
Eslablished 1983 Anchorage Seattle Porgand �'����
S-3914-001 1 °
C/)Z
0-
X
IN COMPLIANCE WITH CITY OF RENTON STANDARDS W
Lu
WASTEWATER UTILITY 0 WATER UTILITYt.:� C)
dchriten 06/01/2017 Abdoul Gafour 0610612017 � ' <
I -
DEVELOPMENT ENGINEERING 0
rnair 06108/2017
lfA l L.
SEATTLE PIPE TRADES EXPANSION '3/10/17 w
FIELDODOK: J
595 Monster Road SUV PAGE: �
SANITARY SEWER AND WATER MAIN DRAMnNGC3,0
Lu
RELOCATION PLAN SHEET: 8 "17 0
C/)
LU
T_
I—
LLI
OL
n
LUJ
Li
0
L l EXIST. 10" Dl WA
10" W.
10" WAS
10" WA
0+150
0+'751
1+00
Utility Specifications
Sanitary Sewer Notes and Specifications
THESE NOTES SHALL APPEAR ON PROJECTS FOR THE WASTEWATER UTILITY.
1. All work and work material shall be in Conformance with the standards and specifKations
of the City of Renton Pianning/Suilding}Publrc Works Deparbnent and the latest edrtion
of the WSDOT/APWA Standards and Specifications, as approved and modified by the
City of Renton in the Renton Standard Plans 8L Specifications. A set of approved plans
shall be kept on site at all Mmes during construction.
2. The hours of work in the street right of way shall be per City specifications on weekdays
unless otherwise approved in writing by the Planning}Building{Public Works Department.
An approved traffic control plan must be obtained prior to beginning any work within
public right of way.
3. All kacattons of existing tibirties shown are approximate and it shall be the Contractor's
responsibility to verify the true and correct location so as to avoid damage or
drsturbanCe.
4. A pre-crostruction conference and a 24 hour nonce shall be required prior to Starting
new construction. It shall be the contractor's responsibility to Secure all necessary
permits prior to sung constrtion. (Inspection will be accomplished by a
representative of the City of Renton.) It shall be the contractor's responsibility to notify
the Public Works inspector 24 hours in advance of backfilling all construction.
S. Contractor is solely responsible for the means, methods and sequences of construction
and for the safety of workers and others on the construction site.
6. It shall be the responsibility of the contractor to obtain street use and any other related
permits prior to any construction.
7. Planes approved by the City of Renton* Public Works Department shall take precedence
over all other plans.
8. A copy of these approved plans must be on they lob site whenever construction is in
progress.
9. The contractor shall provide the City of Renton with an as -built drawing of the sanitary
Sewer system, which has been Stamped and signed by a IiC sed profesSkimil "ireer
or licensed professional surveyor -
110. Backfill shall be placed equally on both sides of the pipe in layers with a loose average
depot of 6 inches, maximum depth of 8 incttes, thoroughly tamping each layer to 95
percent of maximum density. These compacted layers must extend for one pipe
diameter on each side of the pipe or to the side of the trench. Materials to complete the
fill over pipe shall be the same as described.
11. Open cut fogad crossings for utility trenches on existing traveled roadway shall be
backfilled with crushed rack and mechanically compacted unless otherwise approved by
1 +'25
4
3
1
0+'0D
0
2
rti
N L'
Z
J
�d
x
0-
O
J
LL.
-BUILDING ADDITION
2
Z 1-11
LO
X
rn
,-
w
Q w
L--�
nr
CL
Ln
J
W
W
...r=rr
�
jfr
C3 �.o
�11
r -j Q
z
Ld¢
$ It—
LdH
Cr)
0
� Ctil (A
C#i O
I
�_
ZLj
Ci
te)
CL
C
coLL
Z
XUL_a-
>
W ci
K
0�
Ora .4.
LO
t4]
—
n
N
�C
r—Z4
C)��
-tM
40
r]O
�cli
LIJrk�r'}p
Ld 'tom
n0
LLJ ��—
30
N
in�
Ln M
Z !
[rl
C'4r•
04
N
II II
_
II II
_
II II
c pw II ll
II II
81
Z W
Zw
- a.Zw
NZ W
L l EXIST. 10" Dl WA
10" W.
10" WAS
10" WA
0+150
0+'751
1+00
Utility Specifications
Sanitary Sewer Notes and Specifications
THESE NOTES SHALL APPEAR ON PROJECTS FOR THE WASTEWATER UTILITY.
1. All work and work material shall be in Conformance with the standards and specifKations
of the City of Renton Pianning/Suilding}Publrc Works Deparbnent and the latest edrtion
of the WSDOT/APWA Standards and Specifications, as approved and modified by the
City of Renton in the Renton Standard Plans 8L Specifications. A set of approved plans
shall be kept on site at all Mmes during construction.
2. The hours of work in the street right of way shall be per City specifications on weekdays
unless otherwise approved in writing by the Planning}Building{Public Works Department.
An approved traffic control plan must be obtained prior to beginning any work within
public right of way.
3. All kacattons of existing tibirties shown are approximate and it shall be the Contractor's
responsibility to verify the true and correct location so as to avoid damage or
drsturbanCe.
4. A pre-crostruction conference and a 24 hour nonce shall be required prior to Starting
new construction. It shall be the contractor's responsibility to Secure all necessary
permits prior to sung constrtion. (Inspection will be accomplished by a
representative of the City of Renton.) It shall be the contractor's responsibility to notify
the Public Works inspector 24 hours in advance of backfilling all construction.
S. Contractor is solely responsible for the means, methods and sequences of construction
and for the safety of workers and others on the construction site.
6. It shall be the responsibility of the contractor to obtain street use and any other related
permits prior to any construction.
7. Planes approved by the City of Renton* Public Works Department shall take precedence
over all other plans.
8. A copy of these approved plans must be on they lob site whenever construction is in
progress.
9. The contractor shall provide the City of Renton with an as -built drawing of the sanitary
Sewer system, which has been Stamped and signed by a IiC sed profesSkimil "ireer
or licensed professional surveyor -
110. Backfill shall be placed equally on both sides of the pipe in layers with a loose average
depot of 6 inches, maximum depth of 8 incttes, thoroughly tamping each layer to 95
percent of maximum density. These compacted layers must extend for one pipe
diameter on each side of the pipe or to the side of the trench. Materials to complete the
fill over pipe shall be the same as described.
11. Open cut fogad crossings for utility trenches on existing traveled roadway shall be
backfilled with crushed rack and mechanically compacted unless otherwise approved by
1 +'25
4
3
1
0+'0D
10" WA
10" WA
FINISHED GRADE
E}{1511NG GRADE
1+'50 1 +'75 2+00
WATER PROFILE
HORIZ SCALE: I";:=10'
VERT SCALE: I"=10'
J
CJ
0
2
~
W
N L'
Z
J
�d
x
0-
O
-BUILDING ADDITION
2
Lr7
Ld
X
rn
,-
w
� W
J
C
CL
Ln
CD
W
...r=rr
jfr
C3 �.o
�11
r -j Q
co3:ZW
Ld¢
$ It—
Cr)
0
� Ctil (A
r- [til
I
C EZW
ZLj
10" WA
10" WA
FINISHED GRADE
E}{1511NG GRADE
1+'50 1 +'75 2+00
WATER PROFILE
HORIZ SCALE: I";:=10'
VERT SCALE: I"=10'
J
CJ
0
2
~
W
N L'
00
nl{t
Z
LiJ
Q
O
-BUILDING ADDITION
ULo
Cr
Lr7
Cr
M Ld
r >_WT
rn
,-
w
4 0 �
J
C
_
LOen
Ln
...r=rr
�11
ZLLJ
co3:ZW
38 LF 8" SSWR 0 0.317.
EXIST
XISTING 8" SSWR
0+25
0+50
z CD SUBMITTAL TO CITY FOLLOWING POSTSCREEN REViB
1 CD SUBMITTAL TO CITY FOLLOWING PRESCREEN REVIEW
NO. REVISION
2-'
FINISHED GRAE
EXISTING GRAE
-79 LF 8°' SSWR 0 4.33`Pe
FXIST
0+75
SANITARY SEWER PROFILE
HORIZ SCALE: I"=10'
VERT SCALE: 1"=10'
SURVEYM:
DESK',NED
DKS
DKS 017-05-05 oRnwN:
KW
DKK 2017-03-2 3 CHECKED
DKS
BY DATE APPR ZPROvEO:
10" WA
2+50
1+'00
SCALE:
1+25
1 >f_ 1 0" H0R DNTAL W 19W/19,01
ONE INCH DATUM
Ai FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
2+'75
34
EXISTING 8" SSWR
0
1 +'45
C I TY O F
I+ R E N TT N
�
Planning/Building/Public Warks De;)t
3400
W
NN
Uf N
M
N L'
00
nl{t
—
rZw
�I �I
II II
Zw
3- '
10" WA, 1.0" W.
Z
0
H
W
Lt
r CO
in M
f��
d Z W
0)
T
C)
C)
Lr)
T
30 CD
i
LS7
T
20 J
14
3450
C)
NOTE: USE 0900 OR DI PIPE FOR SEWER IN LOCATIONS WHERE COVER LESS WTHAN 5 FEET. C)
SEWER PIPING INSIDE BUILDING FOOTPRINT SHALL BE AS PER PLUMBING CODE L
REPLACE AS REQUIRED BY CONDITION OR CODE.
Ir
OL
0v IIIANOVAdyne
Civil Engineers o71
Seattle 425-753-1869 'C
Portland 971-295-6441
Dons@novadyne.us _1s IST
s�+� �
EstabOstrecl1983 Anchorage Seattle Portland
S-3914-002 W-3914-002 0
C/)z
n
x
IN COMPLIANCE WITH CITY OF RENTON STANDARDS LU
—_WASTEiNATER UTILITY DL<L]
WATER UTILITY ,. ❑
dChriten 01112017 AbdoL�I Gafaur Qljflljl2p17 "
EDEVELOPMENT ENGINEERING Ll.l
ir 06/08/2017 a-
Rlt;
SEATTLE PIPE TRADES EXPANSION 3/9/" Ljj
1aLaD4K: J
595 Monster Road SUV -AGE. �
SANITARYEWER AND 1 ATER MAIN 7RAIMNGC .1
LU
PROFILES 5HEEL � aF;�