Loading...
HomeMy WebLinkAboutR-390202H H Nei D W W Z N W z LO X X X X a 0 1 XO"POPLAR D �20"POPLAR 8"POPLAR —x X I PAID�'CEL TAX # 0423059325 18,538 SQ. ET, 0.43 ACRES REMOVE TREE (TYP.) _ r 454 _ 8"POPLAR Y 95.00' 11,100- EQ.- FT. 0.25 ACRFS'� I PORTION OF THE SE 1/4 NE 1/4 SECTION 4, TWP. 23 N, RGE. 5 E., W.M. , EROSION CONTROL NOTES 6. The erosion and sedimentation control systems 12. The ESC facilities on inactive sites shall be inspected depicted on this drawing are intended to be minimum and maintained a minimum of once a month or within 24 1. These notes shall appear for all projects — site requirements to meet anticipated site conditions. As hours following a storm event. improvements, surface water utility, wastewater utility, construction progresses and unexpected or seasonal conditions dictate, the permitee shall anticipate that more 13. At no time shall more than one (1) foot of sediment water utility, and transportation plans: erosion and sedimentation control facilities will be be allowed to accumulate within a catch basin. All catch 2. Before any construction or development activity occurs, necessary to ensure complete siltation control on the basins and conveyance lines shall be cleaned prior to a pre —construction meeting must be held with the City of proposed site. During the course of construction, it shall paving. The cleaning operation shall not flush Renton, public works design engineer. be the obligation and responsibility of the permitee to ediment—laden water into the downstream 3. The Boundaries of the clearing limits and areas of address any new conditions that may be created by the 14. During the time period of October 1st through March g p g vegetation preservation as prescribed on the plan(s) shall activities and to provide additional facilities, over and 30th, all project distributed soil areas greater, that are be clearly flagged by survey tape or fencing in the field above minimum requirements, as may be needed, to protect adjacent properties and water quality of the to be left un—worked for more than 12 hours, shall be prior to construction in accordance with Appendix D of receiving drainage system. covered by mulch, sodding or plastic covering. the Surface Water Design Manual and observed during 15. Any permanent retention/detention facility used as a construction. During the construction period, no 7. Approval of this plan is for erosion/sedimentation temporary settling basin shall be modified with the disturbance beyond the clearing limits shall be permitted. control only. It does not constitute an approval of storm necessary erosion control measures and shall provide The clearing limits shall be maintained by the drainage design, size nor location of pipes, restrictors, adequate storage capacity. If the permanent facility is to applicant/ESC supervisor for the duration of construction. channels, or retention facilities. function ultimately as an infiltration system, the 4. Stabilized construction entrances shall be installed at 8. Any areas of exposed soils, including roadway temporary facility must be rough graded so that the the beginning of construction and maintained for the embankments, that will not be disturbed for two days bottom and sides duration of the project. Additional measures, such as during the wet season (October 1st trough March 30th) are at least three feet above the final grade of the constructed wheel wash systems or wash pads, may be or seven days during the dry season (April 1st tough permanent facility. required to ensure that all paved areas are kept clean September 30) shall be immediately stabilized with the 16. Prior to the beginning of the wet season (Oct. 1), all and track out to road right of way does not occur for approved ESC cover methods (e.g., seeding, mulching, disturbed areas shall be reviewed to identify which ones the duration of the project. plastic covering, etc.). can be seeded in preparation for the winter rains. 5. All required sedimentation erosion control facilities q / 9. Wet season seasonal erosion and sediment control Disturbed areas shall be seeded within one week of the beginning of the wet season. A sketch map of those must be constructed and in operation prior to land requirements apply to all construction sites clearing areas to be seeded and those areas to remain uncovered clearing and/or construction to prevent transportation of between October 1 and March 30 inclusive, unless shall be submitted to the City of Renton for review. sediment to surface water, drainage systems and adjacent otherwise approved by the City through an adjustment properties. All erosion and sediment facilities shall be process. maintained in a satisfactory condition until such time that clearing and/or construction is complete and potential for 10. Cover measures will be applied in conformance with on —site erosion has passed. The implementation, Appendix D of the Surface Water Design Manual. maintenance, replacement and additions to 11. Any area needing ESC measures, not requiring erosion/sedimentation control systems shall be the immediate attention, shall be addressed within seven responsibility of the permitee. (7) days. HYDROSEED DISTURBED cc -REPLACE DISTURBED GRAVEL OFF -SITE LANDSCAPED [DRIVEWAY WITH 4 INCHES OF W� EU M I NARY AREAS DUE TO DETENTION CONSTRUCTION, (TYP.) 1-1/4 INCH MINUS CRUSHED Ln SURFACING BASE COURSE GRAVEL 1+ I v 0 U 4 U V'';' /� , 50"EIRv`�2UMA� LOT -X9 HONEY CICE�EX CST -1 ITEM 16�,,12' QUEST ESMT REC# 200804 1 0000610 48" UNDERGROUND POWER & TELL INSTALL SILT FENCE ON +48 X5 ALL DOWNSLOPES PER CITY OF RENTON STANDARD PLAN 214.00 NO RUNOFF TO ADJACENT PROPERTY DURING AND/OR AFTER CONSTRUCTION TJ- r� T� T ■ NE 23RD STREET Green Lake Engineering, LLC 6045 4th Ave. NE, Seattle, WA 98115 Phone: 206-525-5332 email: bob.kehrli@greenlakeengineering.com Contact : Bob Kehrli, PE S6 6 HARKEN, Ow LC O�6FM. WA 11 1 PER CITY REVIEW COMMENTS 2 PER CITY REVIEW COMMENTS z - O Boa 48089 F �FG/STE'�° Ln n I NO. REVISION X X X X A X STABILIZED CONSTRUCTION ENTRANCE PER CITY OF RENTON STANDARD PLAN 215.10 M UI�IDLI<GI<GUl�li POWER 8� N — TEL V4 WM MAILBOX - I / w LC -)CO V-) N PESS GRAVEL o� -- � - 8' 0RM x CE i YPE / RIM=457.25' INV— 454.35' (8"E) INV452.45'(18"N) RMK 10 30 15 RMK SURVEYED: HANSEN SURVEYING SCALE: SCALE RMK 2 15 16 RMK DESIGNED: R. KEHRLI, P.E. DRAWN: R. KEHRLI, P.E. ONE INCH CHECKED: C. WILLIAMS, P.E. AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY BY DATE APPR APPROVED: 0.00 _ Q T SIGN �D \—CATCH BASIN PROTECTION __ (TYP.) Q w � f— LD w 0 L (-D l 1 GUTTER ,I CAFE 811 VERTICAL: NAVD 1988 309 NE 24TH STREET Ec INV45: BEFORE YOU HORIZONTAL: NAD 1983/1991 CITY OF RENTON DATU M Planning/Building/Public Works Dept. NOTE: EXISTING UTILITY LOCATIONS SHOWN HEREON ARE APPROXIMATE ONLY. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE EXACT VERTICAL AND HORIZONTAL LOCATION OF ALL EXISTING UNDERGROUND UTILIITES PRIOR TO COMMENCING CONSTRUCTION. NO REPRESENTATION IS MADE THAT ALL EXISTING UTILITIES ARE SHOWN HEREON. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR UTILITIES NOT SHOWN OR UTILITIES NOT SHOWN IN THEIR PROPER LOCATION. CALL BEFORE YOU DIG: 1-800-424-5555 20 0 20 40 horizontal scale feet RECOMMENDED FOR APPROVAL BY: DATE: BY: DATE: BY: DATE: BY: DATE: WATER MAIN EXTENSION & STORM DRAIN 8/10/2016 FIELDBOOK: TU SCAN Y CONSTRUCTION, LLC PAGE: EROSION CONTROL & TREE RETENTION PLAN DRAWING NO: 3956 NE 24TH STREET I SHEET: 2 OF: 8 R-390202 LN07 07