I
132ND AVE STA. 11+09.75, 9'RT. `
EX 12`x B" Dl. TEE (MJxFL),
EX e" Dl. G471VALVE EAST (FLrW)
EX 12" DL GATEVALVE SOUTH (MJ)
NEW 12"x e" REDUCER
REMOVE EX CONCRETE BLOCKING
AND EX 721CAP PER STD 300.5(SHT 2 OF 3)
W. CONC. BLOCKING
INSTALL NEW 8 GATE VALVE (MJxMJ)
W-2847
h_
I N
I
I I
II
I I
II
I I
1
i
MAINTAIN 5.0' HORIZONTAL
SEPARATION BETWEEN NEW
TOP WATERLINE WATERLINE PND EXISTING
EL = 379.20' CITY OF RENTON STORM
LINE
132ND AV STA. 11+22, 9"RT.
1- 450 BEND (MJxFL)
W/CONCRETE BLOCKING
132ND AV. STA ll+30, 2'RT.
g 1- 450 BEND (MJxFL)
W/CONCRETE BLOCKING TOP WATERLINEBLF8" D! EL = 368.22"
T (
UNION AVENUE NE
132nd AVENUE SE)
CITY OF RENTON ROW
PAVEMENTIMPROVMENT
Y
CONTRACTOR TO CONTACT
CITY OF SEATTLE WATER
SPU) AND MAINTAIN A
MINIMUM OF 10.0'
HORIZONTAL SEPAP477ON
BETWEFN NEW WATERLINE
AND EXISBNG 36"
WATERLINE
W2
bioU
NOTES.
1. THE PAVEMENT RESTORATION WITHIN THE CITY
OF RENTON SHALL BE AS PER THE CITY OF
RENTON STANDARD TRENCH AND PAVEMENT
RESTORATION STANDARDS.
2. ANY PAVEMENT AND/OR ROW RESTORATION /N
KING COUNTY ROW SHALL BE AS PER KING
COUNTY ROW PERMIT CONDITIONS.
3. ALL THRUST BLOCKS ARE TO BE INSTALLED IN
FIELD AND PRESSURE TESTED BEFORE 77E /N
4. MAINTAIN MINIMUM J.0 FEET BURY
132ND AV. STA. 12+92, 2'RT
8"0 VERTICAL CROSS (MJxFL)
W2-8" BLIND FLANGES,
1 W. 27AP & 2PLUG
1-80PLUG(M))
KING COUNTY ROW
RESTORE GRAVEL
DITCH
A KING COUNTY RIGHT OF WAY
PERMIT IS REQUIRED
FOR THIS PORTION OF WORK
EX 12 it 8" DI. TEEi (MJxFL),
EX i"" Dl. GATE ALVE SO M (MJ)
q NEW 12 i B" EDUCER _
BLIdOrq132NDAV. A 12+92 O; 2 RL , 1
JeA' a AND EX /2 CAP PER STD 300.5(SHT 2 OF 3) B"0 VER CROSS (MJxFL) ,
W. GONG. LOCKING
INSTA NEW E GATE VAL (MJxM)) —. -- . 27AP & 2PLUG
9+00
STA
48"0
1- 45 BEND (MJxFL)
1 ILF 8 DI W/CDN ETE BLOCKING
A 13+38
1- BEND (MJxFL)
W/CO CRETE BLOCKING
8LF
1 —30' RIM ELV. 387.7 ti
11VV. ELV. 372.35 m 000n uerr
TOP OF C TY OF SEATTLE
36" WATER LINE
CGNIR0 --TBR-TO- VGVR
MAINTAIN 12" SEPARATION
CONT91CTOR TO PLACE
SAND JN6E7WEEN PROPOSED
8" DI PIPE AND EX 36" SPU
SEE DETAIL SHEET 1 OF 3
10+00 11+00
NO.
STA.
4
12+00
REVISION
420
EXISTING 36" SPU WATER
30" MIN
410
CROSSING DETAIL
400
390
j
132nd AVE STA 72+91, 2"RT
380
INSTALL FIRE HYDRANT A MIN
10.0' NORM AF EXISTING DRIVE
U U
5'x 6" Dl. TEE (MJxFL)
6" GATE VALVE (FLxMJ)
FIRE HYDRANT ASSMBY.
IVf
SEE FH. DETAIL
W. CONC. BLOCK.
U Y
INSTALL 1 INCH
I I WATERMETER
PER STD# 320.1
111` INSTALL I" LINE UNDER
EXISTING DTfCH
QkER
SEWER PUMP STATION
EX 12 it 8" DI. TEEi (MJxFL),
EX i"" Dl. GATE ALVE SO M (MJ)
q NEW 12 i B" EDUCER _
BLIdOrq132NDAV. A 12+92 O; 2 RL , 1
JeA' a AND EX /2 CAP PER STD 300.5(SHT 2 OF 3) B"0 VER CROSS (MJxFL) ,
W. GONG. LOCKING
INSTA NEW E GATE VAL (MJxM)) —. -- . 27AP & 2PLUG
9+00
STA
48"0
1- 45 BEND (MJxFL)
1 ILF 8 DI W/CDN ETE BLOCKING
A 13+38
1- BEND (MJxFL)
W/CO CRETE BLOCKING
8LF
1 —30' RIM ELV. 387.7 ti
11VV. ELV. 372.35 m 000n uerr
TOP OF C TY OF SEATTLE
36" WATER LINE
CGNIR0 --TBR-TO- VGVR
MAINTAIN 12" SEPARATION
CONT91CTOR TO PLACE
SAND JN6E7WEEN PROPOSED
8" DI PIPE AND EX 36" SPU
SEE DETAIL SHEET 1 OF 3
10+00 11+00
NO.
STA.
4
12+00
REVISION
420
EXISTING 36" SPU WATER
30" MIN
410
CROSSING DETAIL
400
390
13+00
BY I DATE i APPR
THAT PORTION OF THE NW 1/4 OF NW 1/4 OF
SECTION 3, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
CITY OF RENTON. STATE OF WASHINGTON
GRAPHIC SCALE II
A 0 15 A BO lA
t inert = 30 tt
SURVEY NOTES:
INSTRUMENT.' FOCUS 35
METHOD USED: FIELD TRAVERSE WITH ACTUAL
FIELD MEASUREMENTS AND ANGLES
WAC 332-130-070
DATE OF SURVEY: JUNE 2016
BASIS OF BEARING: WEST LINE OF THE NW 1/4
SEC 3-23-5 (N 01'5559" E)
DEVELOPER: APPLICANT:
RUSLAN KOVAL RUSLAN KOVAL
PSH DEVELOPMENT, LLC PSH DEVELOPMENT, LLC
206-580-5885 206-580-5885
ENGINEER / LAND SURVEYOR
MOUNIR 'TOM" TOUMA, PE & PLS DAN TOUMA, PLS
TOUMA ENGINEERS & LAND SURVEYORS TOUMA ENGINEERS & LAND SURVEYORS
255 SW 41st STREET 255 SW 41st STREET
RENTON, WA 98057 RENTON, WA 98057
PHONE (425)251-0665 PHONE (206)304-3567
CITY OF SEATTLE NOTES
Contact SPU Crew Chief Kathi lllmon at 206-402-2187 a minimum 72 hours prior to
any construction in proximity to SPL• water mains.
The locations of the SPU waterline were asbuilted during the construction of logs plat in
2001 Contractor potholed the SPU line to confirm vertical elevation and ,horizontal
1 locations. see profile view for the notaton of the top of the 36" pipe. contractor to verify
utility and top elev. of the deeper utility and adhere to SPU vertical separation
requirements or refereto crossing detail on sheet 7 of 3
POSED DI PIPE City of Seattle SPU contact information
Paj Hwang, P.E.
Senior Civil Engineer / Cathodic Protection Program
1' MIN. Engineering & Technical Services Division
Project Delivery & Engineering Branch l Seattle Public Utilities
PO Box 34018 / Seattle, WA 98 124-40 18
Tel (206) 386-4198 / Email- Polf.Hwang®seattle.gov
acn cRSSFTF SxxO I
WA TER NOTES
V Utility covers in the restoration area are to be flush with the final paved surface. This
i may require adjustment of the covers following the paving,
2. Any parallel trench restoration in o lane requires grinding and overlay for the entire
lone width. For residential streets, or other streets not marked with channelization, the
street is to be considered two lanes, divided in the middle of the pavement. Any work in
the pavement area requires grind and overlay from the edge of pavement to the
centerline of the pavement for the portionn ofof street effected by the restoration. if the
trench is down the middle of the street, then full street oveNoy will be required. For any
street with lanes marked with channelization stripes and/or buttons (typically arterial
streets), the /ones ore determined by the chonnelizotion. in the case of an outside lune,
the lone extends from the marked lane edge outward to the fog line, or if there is no
fog line, then to the curb or edge of pavement. Any work in this area would require
grind and overlay for the entire area defined as a Ione, in some case exceeding the
typical 10 to 12 footlone width. If the trench is in a marked parking area, between a
fog line or marked lane edge and the curb line, then the area which requires grind and
overlay is limited to this defined parking lane.
W=392501
rause w'•iii liw, 1•=20'
DT
nT_.___.
I DATUM
MHT y1`q
A-NNNNNNN
APPROVED FOR CONSTRUCTION
SUBJECT TO ERRORS AND OMISSIONS
J 1R was? BY A*04 LA7F. 11/15116
x Au BY.' 047E'
9470 jj0` ' BY. DA 7E.
F-
IONAL ETf' BY 04TE' XLLJ
CITY OF KOVAL WA EXTENTSION 9/`9/2016 I`__
RENTON PLAN AND PROFILE q
132nd AVE SE «.
g/Public Works Dept. , I
773 j
4
1 3 >
O
Y
j 380
U U
12NEW 34LF 8-0 DI. WA, 3' MIN. COVER
IVf U Y 132nd AVE STA 12+91, 2'RT.
r— 370 INSTALL FIRE HYRANT A A41NQkER10.0' NORM AF EXISTING DRIVE
1'8-x 6" DL TEE (MJxFL)
6" GATE VALVE (FLxW)
FIRE HYDRANT ASSMBY.
360 SEE FH DETAIL
W CONC. BLOCK. 0
13+00
BY I DATE i APPR
THAT PORTION OF THE NW 1/4 OF NW 1/4 OF
SECTION 3, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
CITY OF RENTON. STATE OF WASHINGTON
GRAPHIC SCALE II
A 0 15 A BO lA
t inert = 30 tt
SURVEY NOTES:
INSTRUMENT.' FOCUS 35
METHOD USED: FIELD TRAVERSE WITH ACTUAL
FIELD MEASUREMENTS AND ANGLES
WAC 332-130-070
DATE OF SURVEY: JUNE 2016
BASIS OF BEARING: WEST LINE OF THE NW 1/4
SEC 3-23-5 (N 01'5559" E)
DEVELOPER: APPLICANT:
RUSLAN KOVAL RUSLAN KOVAL
PSH DEVELOPMENT, LLC PSH DEVELOPMENT, LLC
206-580-5885 206-580-5885
ENGINEER / LAND SURVEYOR
MOUNIR 'TOM" TOUMA, PE & PLS DAN TOUMA, PLS
TOUMA ENGINEERS & LAND SURVEYORS TOUMA ENGINEERS & LAND SURVEYORS
255 SW 41st STREET 255 SW 41st STREET
RENTON, WA 98057 RENTON, WA 98057
PHONE (425)251-0665 PHONE (206)304-3567
CITY OF SEATTLE NOTES
Contact SPU Crew Chief Kathi lllmon at 206-402-2187 a minimum 72 hours prior to
any construction in proximity to SPL• water mains.
The locations of the SPU waterline were asbuilted during the construction of logs plat in
2001 Contractor potholed the SPU line to confirm vertical elevation and ,horizontal
1 locations. see profile view for the notaton of the top of the 36" pipe. contractor to verify
utility and top elev. of the deeper utility and adhere to SPU vertical separation
requirements or refereto crossing detail on sheet 7 of 3
POSED DI PIPE City of Seattle SPU contact information
Paj Hwang, P.E.
Senior Civil Engineer / Cathodic Protection Program
1' MIN. Engineering & Technical Services Division
Project Delivery & Engineering Branch l Seattle Public Utilities
PO Box 34018 / Seattle, WA 98 124-40 18
Tel (206) 386-4198 / Email- Polf.Hwang®seattle.gov
acn cRSSFTF SxxO I
WA TER NOTES
V Utility covers in the restoration area are to be flush with the final paved surface. This
i may require adjustment of the covers following the paving,
2. Any parallel trench restoration in o lane requires grinding and overlay for the entire
lone width. For residential streets, or other streets not marked with channelization, the
street is to be considered two lanes, divided in the middle of the pavement. Any work in
the pavement area requires grind and overlay from the edge of pavement to the
centerline of the pavement for the portionn ofof street effected by the restoration. if the
trench is down the middle of the street, then full street oveNoy will be required. For any
street with lanes marked with channelization stripes and/or buttons (typically arterial
streets), the /ones ore determined by the chonnelizotion. in the case of an outside lune,
the lone extends from the marked lane edge outward to the fog line, or if there is no
fog line, then to the curb or edge of pavement. Any work in this area would require
grind and overlay for the entire area defined as a Ione, in some case exceeding the
typical 10 to 12 footlone width. If the trench is in a marked parking area, between a
fog line or marked lane edge and the curb line, then the area which requires grind and
overlay is limited to this defined parking lane.
W=392501
rause w'•iii liw, 1•=20'
DT
nT_.___.
I DATUM
MHT y1`q
A-NNNNNNN
APPROVED FOR CONSTRUCTION
SUBJECT TO ERRORS AND OMISSIONS
J 1R was? BY A*04 LA7F. 11/15116
x Au BY.' 047E'
9470 jj0` ' BY. DA 7E.
F-
IONAL ETf' BY 04TE' XLLJ
CITY OF KOVAL WA EXTENTSION 9/`9/2016 I`__
RENTON PLAN AND PROFILE q
132nd AVE SE «.
g/Public Works Dept. , I
773 j
4
1 3 >
O
Y
WATER PLW GFNFRPl N0i6 SdImIN Phn Nw 3W
1. ALL WORK AND MATER ULS SHALL BE IN ACCORDANCE WITH THE LATEST EOMM OF ME On OF RENTOR PUBUC WORKS
SILANDARO SPECIFICATIONS AND SPECIAL "OPTIONS AND WSDOT / APWA STAMOMOSPEOFIUTICNS, PULSE EDITION AS
WENDED BYTHE ONCE RENON. ASSTOFCRYAPPROVEDPVJSSHALLBEX ATTNEIMWEWMNEVFRCONSTRUCTtlN
SINPROGRESS. A PIE -CONSTRUCTION CONFERENCE SHALL BE NERD" FOR TO THE START OFCONs1RLIC ,THE CONTOACfOR
AND ON DEVELOPER SHALL BE RESPONSIBLE FOR SECURING ALL NECESSMY PERMITS R TO CGl51AUCIgN.
2, ALL EXISTING UTIUTIFS SHALL REMAIN IN SERVICE DURING COLEGUMIG KEN INR EVES OTHERWISE NOTED. THE CONMX CTOR SHALL
CALL 1AW4245555 TO VERIFY UTILITY LOOATUMS BEFORE BEG WEXCINATION.
3, ALL MATERIALS USED FOR INE CONSTRUCTION OF WATER SYSTEM IMPROVEMENTS SMALL BE NEW AI87 UTOAMAGED, ANO
CATALOG LVW DUKNA MAftRM SHALL BE APPROVED IN WAITING AT THE CRYW RENTOR ERROR TO KNWiM My
MATERIALS OFMIIF.
4. ALL WATER MORE! INE MATERIALS SHALL BE CEMENT LINED WCTRE IRON PR THgWE55 CLASS 52 PERAW WA C 151 AMC
LM. PIPE HHNR SHALL BE PUSH -ON OR MECHANICAL IqM. CAST MON OR DUCTILE1RIX! PRE FfT11MS SHFILL BE C1AS52W AS
PFA AN51/AW WA CIWA21.:6K. All DUCTILE IRON PIPE AM FEELINGS SHAUN WIWPEO WTI11 B#RLBWO( NBE TYPE,
POLYETHYLENE PLASTIC PER AW WACU 55TWAAC5.
5. MIMMUM COVER FROM TOP OF WATER MAINSTO FINISHED GRADE SHALL M 351NCMES FOR PIBE ONMFIHLOF lOIN]I OR IFSS
MLDUACMESPo PIPEDIAMETEROF12JNCHANDURGER MAXDAUMCOGENFORµLWATERMANSSMN KWNOTES ANYDEVIATIONSMUSTSEAPPROVEDWTHECT'
OFREWONPMORTOCONSTh VN.WHERELIMNCONFIlCr5000UR THEMOFKEOFTHEWATERMANSHALLBEMJUSTEOMNKFSSRIVTODIEMCgiUR
MPIWIDEMNMUMC flE PIPE
OEFUECRON SHALL NOI EXCEED ONE-HALF OF PIPE MANUFACTURER'S SPECNIGI FOR 512E OF PIPE USED. MATE BACKFNISMUMCOMPAUECT095PERCEMMAXIMWMVOENSRYASOEIEN.
E MSYTHEWOSWPRCCTORTFSr M,
METHOD MADE) IN ROAOWAYN ROADWAY SHOULDERS, ROADWAY PRISM AM DRNFWAYO AND 85 KRUW MOO N UNPAVED AREAS.
ALLPPEZONECOMPACIIMSNALLBE%MW a
CONCRETE BLOCKING FOR WATER MAINS SHALL RE DESCRIBE, INSTALLED AND POURED N PUCE IN ACCORDAMQ WRN Ott OF RENTON
STANDARD DETAILS AM SPFCIFKAl10NS AND SHALL BE RdTAIIEO ATALL VERTICAL ANDHORQOMTMBENDS TETHERS ANDBASEOFNYDMNR.
MEGA -DEALS JOB SIMILAR PROWLED MAY BE REQUIRED THAM ME . MN'l1l MATO MTO CONCRETE
BLOIXIM. T.
ALL NEW WATER MAIN PIPES AND FITTINGS SHALL HAVE A FOAM PIPE PIG RUN THROUGH THEM PRIOR W BEING FLUSHED, DISINFECTED,
AM TESTED. CIEANNG, PRESSURE AND PURITY TESTING SHALL BE DOHS IN ME PRESENCE OF AND UNDER TNN SUPERVISOM
OF A OW Oi RENTOR Un1 INSPECTOR. THE COITMCTg1 SNYI STRAY, B6TY1 AM REMOWE RAGS, CORPCRAnON
STOPS, BLOW-0FFASSEMBLES, AM MRIAT RESTMIM/ MOQNG fCR 1ES11NG ANOFVRm ACCEPTANCE. NO CIXLMC
MSHAELBEMMEBETWEENTHENEWMNNORBEEWEEHTHENEW WUTMVALVETOAMFMS WMMXUNIT TME
NEW PIPING HAS BEEN FOAM-0gGED, DMWFMD, FLUSHED, AND PASSED BOTH PRESSURE AND "Un TEinM. S.
MEW WATER MAINS INCLUDING SERVICE UTERMS SHALL BE TESTED ATA STATIC PRESSURE OF 151 PM ABOVE WORKING PRESSURE
WITH A MINIMUM OF 225 P.SwITEST PRESSURE FOR 110 MINUTES WITH A MAI'JMUM OF 5 W PRESSURE DROP WRING ME
Em ETEST PERIOD. UPON SATISFACTORY COMPUEDON OF THE PRESSURE TEST, THE LINE SHAD. BE MWEC ,FLUSHED, AND
MEN WATER SAMPLES SHALL Y TAKEN AOR PURITY TFSTIM BY THE PUBLIC WORKS INSPECTOR, 9.
ME CDR UC SMALL NOTIFY THE CITY OF RENTON WATER UTILITY AM MAINLEMWE DEPARTMENTS AT WAST lO WORKING DAYS
PRIOR TO MAKING CONNECTIONS TO ME EXISTING WATER SYSTEM. THE CONTRACTOR SHALL EXPOSE ME EXISTING WATER MAIN
AND FIRINGS AT ME CONNECTION ROOT BEFORE ORDERING ME NECESSARY ADAPTORS AM FITTINGS REQUIRED FOR MEFNMCONNERgN.
THE COM MSHALL UUGVATE, REMOVE ALL SURFACE MATEIIALS,AM PMVIDE$HMNG AND ALL
MATERIALS REQUIRED FOR THE OTY OF REN TO PERFORM THE CONNECTION TOME EXISTING WAWA SYSTEM ME CONTRACTOR
SHALL PROVIDE AND INSTALL BACKFILL, COMREM, NOCONG,ANO CLMRFN MORFACE RFSTOMTILN. M.
PLAN - 800.0 M
M PUBLIC WORKS YYA7ER PLMF OENER/IL NOTES 8__..___._- DEPARTMENT' MARCH 2oIC1 Utility
Specifications Water
Utility Notes and Specifications THESE
NOTES SHALL APPEAR ON PROJECTS FOR THE WATER. UTILITY. 1.
All work material shall be in Conformance with the standards and specifications of the City
Of Renton Planning/Building/Public Works Department and the lamst edition of Me WSDOT/
APWA Standards and Specifications, as approved and modified by Me City of Renton
in the Renton Standard Plans & Specifications. A set of approved plans shall be kept
on site at all times during construction. 2.
The hours of work in the street Eight of way shall be limited to 8:30 AM to 3:30 PM on weekdays
unless otherwise approved in writing by the Public Works Department at 425)
430-7301. The Police Department, Fire Department, and 911 shall be notified 24 hours
in advance of any WORK in Co right of way. 3.
All locations of existing utilities shown are approximate and it shall be the contractor's responsibility
to verify the true and correct location M as to avoid damage or disturbance.
For 1ltildy locates call 48-hour locators 800-424-5555. 4.
An approved Traffic Control Plan is required to be submitted at the Pre Construction meeting.
S.
Datum for Vertical Control shall be North American Vertical Datum 1988 Meters, and for Horizontal
Control shall be North American Datum 1983/1991 Meters unless otherwise approved
by the City of Renton Public Works Department. Reference benchmark and elevations
are noted on the plans. 6.
All watermain pipe is to be cement lined ductile iron pipe conforming to AW WAC110 and
C111 or latest revision, thickness Das 52. Cement mortar lining and seal coating shall
conform Eo AVIWA C104 cur latest revision. Pipe yomis to be push -on or me131anical joint.
Bedding to be Class C. All ductile iron pipe and fittings shall be polyethylene wrapped
per ANSI/AW WAC1051A21.5-93 Standards. 7.
Cast iron and ductile iron fittings shall be cement lined, pressure rated as noted on plans,
and in accordance with ANSI/AW WAC11O/A21.10-87. Cement lining shall be in accordance
with ANSI/AW WA C104/421/4-90. if fittings are 3 to 12 inches in diameter and
have mechanical joints, the fittings shall in accordance with either ANSI/AW WA C110 -
A21.10-87 or ANSgAW WAC153/A21.53-94. Three (3) inch W 12 inch diameter fittings,
which have mechanical joints and/or flanged joints, shall be in accordance with ANSI/
AWWA CIIO/A21.10.87 or a Combination of ANSIJAWWA C110/A21.10.87 and ANSIJAWWA
C153/A21.53-94 such that the portion of the fitting with a mechanical joints)
maybe with ANSUAW WA C153/A21.53-94 and that portion of the fitting with flanged
jolnt(s) shall be in accridance with AW WACllo/A21.10-87. Acceptance testing in
accordance with section 53.53 of ANSI/AWM'Asection 10-4.3 of ANSI/AW WAC110/
A21.10-87 shall be obtained by the Contractor and transmitted to the owner. 8.
Gate valves shall be iron body, bronzed-rtrounted, double disc with bronze wedging device
and O-ring stuffing box (AW WA0500) or of resilient seated type (AW WAC509). WATER
MAIN - -IF ADDITIONAL A9ASTMENI IS REQUIRED,
INSTALL 2-2CLOSE NIPPLE
AND 2-2- g0' BEND, ECREWEO 2'
CLOY NIPPLE AI' THIS POINT FIELD LOCATE PLASTIC METER BOX IN PLANTER
CR` CA 1' IRON BOX IN PAVED F- CR f,ONCREiE AREAS. 2-
CLOSE NIPPLE 2'
90' ELBOW- -2 GALVAN2E0 F PE AS REWIRED CONCRETE
BLOCKING PI
AN TWO
PIECE CAST IRON VALVE _ EQUAL
TO OLYMPIC FOUNDRY CO. STANDARD
B- 10P SECTION, WITI
REGULAR BASE YC ON LENGTH
TO FIT. BEEN
2'
RESILIENT SEATED Will GAZE
VALVE. SCREAGE - 2-
GALVANIZED PIPE
12' LONG 2'
OUSE NIPPLE - AND2BETWEEN
CAP
OR PLUL AND
z" GC ELBOW INS1A
L 4 MIL POLYETHYLENE GRAVEL
COVER OVER WASTE GRAVELNTHOLEFORPIPEVALVE
NOT Ex PASON As BLOODED YE
DNC: BRAG / PAGE 9090) GROUNDJ
fi" MAX I
l MAX
UNE
r CONCRETE SIDEWALK I 2
1/2" NSI' (HOSE) AND
2 1/2' FEST CAP
NTH GASKET 2-+
2",2- TEE AND 2" CAP 2'
CLOSE NIPPLE BEWTEEN LEE AND
g0' EI BOW. 2-
90" ELBOW 10
ON FT. WASHED GRAVEL PASSING 1-
1/2- AND RETAINED ON $/A MEAT FEW
ORAJN h
LLVATI N PUBLIC
WORKS 2" BLOW -OFF M. PLAN -1 DEPAR'
T'MENT PERMANENT ASSEMBLY 1 -_-- MARCH 2010 Utility
Specifications Valves
shall be designed for a minimum water operating pressure of 200 psi. Gate valves
shall be Clow List 14, Mueller Company NO. A2380 or M & H. 9.
fire hydrants shall be Corey type (opening with the pressure) or Compression type opening
against pressure) conforming to AW WAC-502-85 With a 6 inch mechanical joint
inlet and a main valve opening (M.V.O.) of 5-1/4 inch, two 2-1/2 inch hose nozzles with
National Standard Threads 7-112 threads per inch and one 4 inch pumper nozzle with
the new Seattle Pattern 6 threads per inch, 60 degrees V. Threads' outside diameter
of male thread 4.875 and root diameter 4.6263. Hydrants shall have a 1-1/4 inch
pentagon operating nut opened by Coming counter clockwise (left). 10.
The two 2-1/2 inch hose nozzles shall be fitted with cast iron threaded caps with operating
nut of the same design and proportions as the hydrant stem not. Caps shall be
fitted with suitable neoprene gaskets for positive water tightness under test pressures.
1
I. The 4 inch pumper nozzle shall be fitted with a Storz adapter, 4 inch Seattle Thread x 5 inch
Storz. Storz adapter shall be forged and/or extruded 6061-T6 aluminum alloy, hardcoat
alDdized. Threaded end portion shall have NOT lugs and two set screws 180 degrees
apart. SI face to be metal, no gasket to weather. Storz cap to have synthetic
molded rubber gasket, and shall be attached to hydrant adapter with 1/8 inch, mated,
stainless steel, aircraft cable. 12.
Fre hydrants shall be painted with two mats of paint. Preservative paint number 43- 655
safety yellow or approved equal. 13.
Pumper connection Eo face roadway assembly. 14.
Fre hydrants shall be installed per City of Renton Standard Detail for fire hydrants, latest
revision. 15.
All watermains 10 inches and smaller Eo maintain a minimum cover of 36 inches below finish
grade. All watermain 12 inches and larger shall be at a minimum Of 48 inches Ilelow
finish grade. Where utillty Conflicts occur, waternams are to be lowered Eo clear. 16.
All watermains 6 inches and larger in diameter shall be cleaned with pipe cleaning PIGS"
prior to disinfection. The "Poly pigs" shall be Girard Industries Aqua Swab -AS or approved
equal, 2 Ib/cu. R. density foam with all duroRleter urethane rubber coating on
the rear of"P1G" only. 17. "
PIGS" shall be cylinder shaped with bullet nose or square end. The contractor will perform
the cleaning operation. NO.
I REVIS)ON 11',
21' PLASTIC METER BOX EQUAL r0 MO-SIMES RnSIIC, ME
S EYRIES MSBCF 1124-I8 WIN 175' THICK `CIDE a" MITI NOR
WO LER EUTAL o0 M -57AMS LASICS. NC
VXUa-1324 a ALLRENTOR a ANO 2' TRADED NOT FOR
TWCILBAD Of TOP REE Or FAIL A -A) -- slIN
W MPRWD RICHT IT I P % STAu PE:TETR BOX AT PROPERTY
UK TE LORD
COPPER TAXPECC 51,
YMx
H)
9EWAIK
H) r
ISA GRADE 1 "^'
zl
i
3 TER TO EIDEE A 01A
STFPLOO
BY THE 1e"
MIN ou£R ^ Ci r, TYPE "
x' SEAT CawEATVNBIG ^'
A" 22-
y2 AVE
DUCTILE FUNWAINNSEEXEC LIKE TO TOO E is 3/4 OR 1 1x '
0ATINSTALLEDINS a GALVANIZED ns
FALL mRD CL PLUG COMDR
5v9x CdMTNC -- LOOP
00'M, To PER AT OF
Nn2A MAN TO PRO
sn CWPER TERFORD iFRNCL
JMEOTO METER VwP2-15W- I-JaC, (M MININAl0 3RP55. 21-215W00033, OR MIT'
LEFT a/a E 2470-2 Mm W2E BALL VALVE ON INLET SAO W, 9NECNEp LVE ON WMT L.
CORPCRAnM STOP MIX PALL VALVE. PULP I -{,WP R rRR FOR 1 yETDI ipt0 WHN2-15w-4a-na:., OF TAPERED
THREM (CC) CN U) BRAS4 2L SWCO(IH, UELIFP: 1-B-2470-2 i3/
E RECORD OR AYCMCDONALD 471 90TNRINLEr AND ELECT NUT WICK KART. PX0.MM WNGS ON 1-
21Mp_'_a) OR AN KFUNA-0 47DIS MET ANPUr SABXSLVALAE
L
BE OIL SACLEICK fICRECK
VALVE
CN WTLEEALL : NTNOTE'.
R Boxes wsrulsD N LxeEU OR FARM DRIVEWAYS HNL OR CASTMETER
EQUAL
TO C fpMT ARY EXPANSION JOINTS MUSH OF ESTALLED ON NOTE
SIDES OF METER RoxP
ANP-
ACDUCh[RDEALTERNATE rnnCTREAD) MREV L _
ZµDI
P -
OW FROM f MEARIESTM, EDNEGADTRrSTrFICAI.
ANI I
NOTE
UECENTERA TRUE HaE MEET BE AT LEAST 1- FROM UNKRN.
API Res ONE55 THE PC SPACING ALLOWS USE ST
To TIGHTEN AGAINST me SEEM aDE A MORE WAN HE
RB B4"
ANTD D1" WATER SERVICE S. PLAN - 920"1 4
W PUBLIC WORKS L_- -_--- DEPARTMENTNOVEMBER 2009 18.
All watermains and services shall be pressure tested ED a minimum of 200 psi or 150 psi over
operating pressure, in accordance with the specifications of the City of Renton and the
Washington State Health Department. All pressure testing shall be done in the presence
of a representative of the City of Renton. The quantity of water lost from the main
shall not exceed the number of gallons per Mur as listed in City of Renton Standard
Plans & Specifications 7-11.3(11). The loss m pressure shall not exceed 5 ps during
the 2 hour test period. 19,
All watermams and services shall be disinfected by the in)Eztion of a 50 ppm (minimum concentration) chlonne/waier solution. Dry Calcium Hypochlorite shall NOT be placed in the
pipe as laid. Chlorine shall be metered/Injected in accordance with Section 7- 11.
3(12)E or 7-11.3(12)F of the Standard Specifications referenced above. 20.
A pe -construction Conference is required prior to any construction. A minimum of five 5)
working days notice is required for scheduling. 21,
Twenty-four (24) Mors notice will be required prior to starting new construction. 22.
It shall be the contractor's responsibility M secure all necessary permits prior to starting construction.
23.
Installation of corporate stops, water services, lines and meters shall not he done until all
service agreements, meter applications, construction permits, and payment of fees have
been made W the City of Renton. 24.
All connection to existing mains is to be accomplished by the City of Renton, except wet taps,
which may be made by approved wet Cap contractors with pior approval from the Public
Warks Department. AA necessary excavation and materials are Eo be supplied by the
contractor and be onsite prior to City notifications. 25.
Inspection will be accomplished by a representative of the City of Renton, ft shall be the
contracphs responsibility M notify Development Services twenty four (24) hours in advance
of backfilling all constnBction. The contractor, as wall as Me engineers, shall keep
as -built drawings. 26.
Contactor to provide plugs and temporary blow -off assemblies for beshng and county acceptance
prior to final tie-in. Li'
LTJi 27.
All pint restraint systems (shackle rods, nuts, bolts, etc.) shall be as manufactured by the
Star Manufacturing Company of Columbus Ohio, or equal, approved in writing by the Public
Works Department. 28.
Asphalt and concrete street paving shall be sawcut to a minimum depth of two (2) inches.
Oil mat sbeets may be spade Cut All surface corEretg pavement, sidewalks, curb,
gutters, and driveway approaches shall be sawcut to a minimum depth of two (2) inches
or removed Eo an existing expansion joint. 29.
A temporary cold mix asphalt patch shall be placed on the day of initial excavation with a
permanent, sealed patch to be placed, to City of Renton policy, within 10 days. Call for
subgmde inspection prior to placement of final patch. W 30.
For City projects such as telemetry conduit, the PVC pipe used shall be All chemical process
lines shall be schedule 80 PVC pipe. Schedule 40 in unimproved areas and schedule
80 PVC pipe under improved areas. BAJA_.. _
CITY
OF RENTON
g/
Public Works Dept. BY,
BY
BY,
BY.
uueb.
s" W=
392502 A."
NNNNNNN APPROVED
FOR CONSTRUCTION SUBJECT
TO ERRORS AND OMISSIONS KOVAL
WA EXTENTSION WATER
DETAILS & NOTES 132nd
AVE SE LATE:
DA7F.
LATE
LATF.
9/
9/2016 N7;
3 2
E3
TESTING DETAIL
EXISTING WATER LINE
EII IMG TEE. DEAD END LINE, CAP OR PLUG
00 NOT DISTURB BLOCKING
NEW WATER LINE
r: -It-
VERTICAL CROSS (MJvfL) FOR POLYPIGGING
1 -BAND RANGE ON TOP WITH 2'TAP BE 2•PLUG
1. - BLIND RANGE ON BOTTOM
1--PLUG(MJ) W/2'TAP BE 2" BLOW -OFF
TEMP. BLOCK
FINAL CQNNECTION DETAIL
NEW WATER
IL r._I_ ..'N.
AFTER ALL TESTING. CLEANING BY POLYPIG AND DISINFECTION,
REMOVE TEMP. BLOCK & BLOW -OFF & CONNECT
TO EXISTING WATER LINE WITH SLEEVE (MJ)
AND G.I. SPOOLS
FINAL CONNECTION BY CITY FORCES
8i0. PLAN -900.6PUBWCNORMSCONNECTIONTOWATERMAIN
DEPARTMENT EXISTING TEE OR ENO LINE CAP
MARCH 2010
MAI
11-1/a' BEND 22-1/2' BEND as BEND
Z -
CTAP
TEE. 90REND
NOCK f AREA w SWAB. ( ) FRO RDN1.5DEFENSE9
COMPACT GAND A GRAVEL
ALEX NESTLE WE UNIT ISUCK BE 05 A SPUR ALL REPLACE
M. NEWNT BY MW51 F.MN GTE 00 PIPE r IAB
A, THAN EARNED
ELB BE MELA BENEFIT
IDEA „A R NAME POT
ENIFIRI N K
z. ML MOwxc TURATEC n M GROUND
a BTALL LESS AFTER CLASSES .Az FLATTED NOWL AL COMMEASTA SL res'Twc
uL uaxmc CLUE A CdETCR a s O-vA'i
ALBERT MYAWAREAGAINSTBEARNEuTHE AM1NNT I u'z Lv XMIDSREASONABLENITTONOTERAMBARINGSMALLr- RONALD.
Y CONCRETE BLOCKING FOR BLD. PIAN - M.2
PUBWTCWORKSHORIZONTAL AND DOWNWARD -- -- --
IP7C DEPARTMENT VERTICAL BENDS MARCH LOIU
APPR
RRC FIEN3RANt SNML BE COREY—TYPE EQUAL TO IOWA F-5110 OR
COMPRESSION TYPE SUCH OW MEDALL", U At X 9A MUELLER
WENDY CENTURION 200, AMID WAREFFOUS PACER NET N MECHANICAL
JONI INLETMT I. / N VALVE CEPTERING, TWO 2-1/D'
VSE "NODDED NATIONAL STANDARD THREADS 1 RIMPER
CONNECTION CITY OP SEATTLE UNEASY WM A S ORZ ADAPTOR.
875' SEATTLE THREAD X 5 SECRET. ATTACHED FELL 1/8- STARLETS,
STEEL CA&L. 1-1/0' PENTAGON OPERATING NUT. FIRE NY9RANT TO
BE PAINTED MEN TWO COATS OF PAIN. KELLY-MOORE/PRE SERVATVE
PENT No. SPI DUN ACRYLIC CLOSE, SAFETY YELLOW di
APPROVED EWAI_ PAMPER CORRECTION TO FACE THAIOF AS
DIRECTED BY MERCER FIRE DEPARTMENT FIRE DEFENDANT IDI FNSOM TO
BE USED IF RGWIRED.
MIN. IB' 10 PO" BEHIND BACK 01
CURB OR 12 SETTLED BACK OF
l3 -
9DEwNJ( THAT IS MODULE TO
VRB411 . 5' 5TORZ
TURA, 5INTERiHIH CONCRETEiHIIXCMGNEIE PA(IAAROUND
INTERNET THEMEUST T>
WU
SIDEWALK
EXPANSIONOpN T AT
Z DAN CN DENAtl
COxCRETE SiOC
TWER-PIETCE CAST IRM VALVE BOX W UT WG
ME COMP EWAL t0 d'RW C TOMMY CO
STANDARD B TDP MERCER WEEK REGULAR BASE
SECTION LENGTH t0 FIT I NGT EXTENSION
AS RFOIRED
RAISED PAVEYENC MARKER TYPE M -A
SlIMSON17C. TWO-WAY BLUE RERCCTIK
MCREIE XUYCNINC
TNROST RECUR` `MRN LRE TEF. WTH B' FLANGE SEE OUTSET,
fi GTE TWELVE (FL X MB AW EA C-51:9, RESLLKNT SER
G' DUCTILE ROM RPE, CLASS 52 CEMENT LINED, EDGED TO PIT
2-]/C CORI EASES BE NWS.
16 F 9' a f MINIMUM -+ 1/2 URD 01 1-1/4 WPSREC' DRAM ROCK
CONCRETE DEARNGABOVE BOOT FLANGE PLACE B MEBEDANUNDERHYDRANTPOLYETHYLENEFILMARGUINGTOPAMO SIDES DE
GRAVEL
FIRE HYDRANT ASSEMBLY
r LcvEL ALL GROUND
MINEL
AA GROUND
INN s RADIUS
W B' aunln
V _ }
ME MAN ROLK
li O /I
E" CONCRETE PAC /- S CMCNETL PAD
CI,T FILL
HYDRANT LOCATION IN CUT OR FIDE
A PUBLIC WORKS EIRE HYDRANT ASSEMBLY 879 _PIAN _910_1_
DEPARTMENT
MARCH 2010
W=392503