Loading...
HomeMy WebLinkAboutAdden 03 CAG-15-089 , Adden #3-19 Washington Stat Department of 7'Meansportation Supplemental Agreement Organization and Address Number 3 KPG,P.S. Original Agreement Number 3131 Elliot Ave,Suite 400 Seattle,WA 98121 CAG-15-089 Phone: (253)627-0720 Project Number Execution Date Completion Date TED4003813 10/23/2015 12/31/2021 Project Title New Maximum Amount Payable Rainier Ave South-Phase 4(S 3rd St to NW 3rd PI) $2,740,712 Description of Work Provide engineering services for Rainier Ave South-Phase 4 including 60%,90%, 100%and Bid design plans,specifications and estimates; perform corridor-wide screening for hazardous substances;geotechnical infiltration testing/report with finding, conclusions and recommendations;public outreach;private and public utility coordination;environmental permitting support; develop WSDOT channelization plan,basis of design,and project analysis;and right of way support. The Local Agency of City of Renton desires to supplement the agreement entered in to with KPG,P.S. and executed on 10/23/2015 and identified as Agreement No. CAG-15-089 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, is hereby changed to read: The General Scope of Work of the Original Agreement and Supplemental Agreements No. I and 2 are supplementaed to include the attached Exhibit 4. I I Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: Change contract completion date from December 31,2019 to December 31,2021. III Section V, PAYMENT, shall be amended as follows: See attached Exhibits"A", 1,D and E. as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated abov please sign in e Appropriate spaces below and return to this office for final action. By. Jason E:ritzler,KPG By. Denis Law,Mayor Con ant ignature . ,,,,yaks\ � � ��� � A. eth, C= ty Clerk DOT Form 140-063 S _ - a t e Revised 09/2005 * � 3 A �fa l Exhibit"A" Summary of Payments Basic Agreement Supplement#1 Supplement#2 Supplement#3 Total Direct Salary Cost $36,016 $91,598 $196,613 $446,156 $770,383 Overhead (Including Payroll Additives) $47,358 $120,442 $258,526 $654,511 $1,080,837 Direct Non-Salary Costs $407 $140,104 $145,643 $214,564 $500,718 Fixed Fee $10,805 $27,479 $58,984 $133,847 $231,115 Total $94,586 $379,623 $659,765 $1,449,078 $2,583,052 Exhibit"1" Maximum Amount Payable Summary A/E Professional Services Contract with KPG, P.S.,CAG-15-089,Supplement No. 3 Rainier Ave S-S 3rd St to NW 3rd PI(aka Rainier Ave Phase 4) Original Supplement#1 Supplement#2 Supplement#3 Total Agreement Total Amount Authorized $94,586 $379,623 $659,765 $1,449,078 $2,583,052 Management Reserve Fund $4,000 $43,421 $52,579 $57,660 $157,660 Maximum Amount Payable $98,586 $423,044 $712,344 $1,506,738 $2,740,712 Management Reserve(MR)Fund Summary Original Agreement $4,000.00 Supplement#1 $43,420.92 Supplement#2 $52,579.08 Supplement#3 $57,660.00 Total= $157,660.00 EXHIBIT 4 MODIFIES EXHIBIT A OF THE ORIGINAL AGREEMENT AND EXHIBIT 3 OF SUPPLEMENT 2 SCOPE OF WORK SUPPLEMENT 3 AGENCY: CITY OF RENTON CONSULTANT: KPG, P.S. CONTRACT: CAG-15-089 PROJECT: RAINIER AVE S-S 3rd St to NW 3rd PI A. PROJECT DESCRIPTION The City of Renton is planning to continue infrastructure improvements to the Rainier Ave S corridor with a new Phase 4.The approximate project limits of the new phase are between S 3rd St and NW 3rd PI. Similar to Phase 3, this new phase includes infrastructure improvements for enhanced transit mobility, traffic safety and pedestrian safety. Construction of Rainier Avenue S - Phase 4 will be divided into two phases due to limited available construction funding. Phase 4A (S 3rd St to S Tobin St)will be constructed first and followed by Phase 4B (S Tobin St to NW 3rd PI) once funding becomes available. Design and right of way acquisition services will be performed over the entire project length. The goals of Phase 4 are to enhance traffic flow, improve safety, eliminate sub-standard conditions and provide an enhanced pedestrian environment. B. PURPOSE The City of Renton (AGENCY) is requesting A&E Professional Services from KPG, P.S. (CONSULTANT) for the design of the Rainier Ave S — S 3rd Street to NE 3rd Place Project (PROJECT). The design of this project is being conducted in multiple phases. Design Phase 1 of this project was completed in January 2016. Design Phase 2 of this project was substantially complete in March 2017. Design Phase 3 was substantially complete in August 2018. This supplemental agreement covers the Scope of Work (SCOPE) required to complete Design Phase 4(PHASE 4). PHASE 4 includes the following: 1. develop 60%, 90%, 100%, and Bid design plans, specifications, and estimates, 2. perform a corridor-wide screening for hazardous substances, 3.geotechnical infiltration testing/report with findings, conclusions and recommendations, 4. public outreach, 5. private and public utility coordination, 6. environmental permitting support, 7. develop WSDOT channelization plan, basis of design, and project analysis, 8. right of way support City of Renton Page 1 of 17 KPG Rainier Ave S—S 3'd St to NW 3'd PI Supplement 3 1/25/2019 The AGENCY anticipates a future design phase will include engineering support during construction. The AGENCY anticipates that this future design phase will be initiated through a supplement agreement to this contract. C. DESIGN CRITERIA The design of this PROJECT shall be in accordance with the following: • WSDOT Local Agency Guidelines (LAG), M 36-63,April 2017 • WSDOT Design Manual, M 22-01,July 2017 • WSDOT Pavement Policy, June 2015 • WSDOT Geotechnical Design Manual, M 46-03, May 2015 • WSDOT Highway Runoff Manual, M 31-16, February 2016 • WSDOT Hydraulics Manual, M 23-03,January 2015 • WSDOT Right of Way Manual, M 26-01, November 2016 • WSDOT Roadside Manual, M-25-30, February 2016 • WSDOT Traffic Manual, M 51-02,July 2015 • FHWA Manual on Uniform Traffic Control Devices (MUTCD), 2009 Edition • AASHTO A Policy on Geometric Design of Highways and Streets, 2011 Edition • AASHTO Roadside Design Guide, 2011 Edition • AASHTO LRFD Specifications for Structural Supports for Highway Signs, Luminaires, and Traffic Signals, 2015 Edition • City of Renton Standard Details • City of Renton Surface Water Design Manual, 2017 • Manual (SWDM City of Renton Amendments to the 2016 King County Surface Water Design Manual • Washington State Dept.of Health Water System Design Manual, DOH 331-123, December 2009 • City of Renton Watery System Plan, 2012, Appendix J • Washington State Dept. of Ecology, Criteria for Sewage Works Design, 98-37 WQ,August 2008 The project construction specifications shall be based on the WSDOT Standard Specifications. The edition to be utilized for the construction contract provisions will be determined by the year in which the Bid Documents are sent to Local Programs for review and approval to advertise the project. D. GENERAL ASSUMPTIONS The following SCOPE and associated costs are based on the assumptions outlined below: • FHWA Surface Transportation Program (STP) funds are being utilized for design and right of way services included in this contract.Therefore,this contract is subject to all rules and regulations associated with this funding source. City of Renton Page 2 of 17 KPG Rainier Ave 5—5 3rd St to NW 3rd PI Supplement 3 1/25/2019 • Any task or deliverable requested by the AGENCY that is not specifically defined in this SCOPE will not be performed by the CONSULTANT unless one of the following occur: ✓ The CONSULTANT provides a written request to the AGENCY to use Management Reserve funds. This request shall summarize the scope of additional work, estimated hours and associated direct salary costs by task and adjustment in total fee. Once received, the AGENCY will evaluate the request. If approved, the AGENCY will issue a Notice to Proceed in writing. Once received,the CONSULTANT may proceed with the additional work. ✓ The CONSULTANT provides a draft supplemental agreement to the AGENCY for review and negotiation.The supplemental agreement shall be complete, including the scope of additional work, estimated hours and associated direct salary costs by task, adjustment in total fee and total amount authorized for the contract.The AGENCY will review the supplement agreement. Once complete, further negotiations may occur between the parties. Once a scope of work and budget is agreed to, two (2) complete signed originals will be delivered to the AGENCY, by the CONSULTANT,for execution by the AGENCY. Once executed, the AGENCY will issue a Notice to Proceed in writing. Once received, the CONSULTANT may proceed with the additional work. • The AGENCY is responsible for the following, as necessary: ✓ Reserve and arrange conference room(s) as necessary, for meetings held at Renton City Hall. ✓ Reserve and arrange facilities for public open houses and community meetings. ✓ Prepare and mail project notices, as required. ✓ Prepare and publish all public notices, newsletters and news releases. ✓ Host and update a project website. ✓ All coordination with franchise and public utilities except where identified in the scope. ✓ Provide CONSULTANT (via AGENCY's GIS) with existing record drawings (as-built plans) of street and public utilities (water, sanitary sewer, storm), right-of-way(ROW) plans, horizontal and vertical monument information, GIS maps and other applicable information, as may be available. ✓ Provide CONSULTANT with a list of WSDOT approved Public Interest Findings (PIF) materials to be incorporated into the project. ✓ Provide CONSULTANT with City Standard details to be incorporated into the project. ✓ Provide CONSULTANT with all AGENCY standard contract documents, GSP's, and AGENCY bid forms in Microsoft Word, Microsoft Excel and Adobe pdf formats, as applicable. ✓ Provide CONSULTANT with pdf copies of the final NEPA and SEPA checklists and associated determinations. ✓ Review all submittals from CONSULTANT and provide written comments back to CONSULTANT within 20 working days. ✓ Provide CONSULTANT right of way documents templates. City of Renton Page 3 of 17 KPG Rainier Ave S—S 3rd St to NW 3rd PI Supplement 3 1/25/2019 E.TASK ASSUMPTIONS All assumptions are listed below, at the beginning of each task. F. DELIVERABLES All deliverables to be prepared and produced by the CONSULTANT, as part of this SCOPE, are identified at the end of each task listed below. G. SCOPE DESIGN PHASE NO. 1 PHASE 1 is complete therefore no more hours can be charged to the tasks listed below as complete. • Task 1- Project Management for Design Phase 1 -Complete • Task 2 -Surveying-Complete DESIGN PHASE NO. 2 PHASE 2 is substantially complete. No more hours can be charged to the tasks listed below as complete.Tasks 8 will remain open during Design Phase 4. • Task 3- Project Management for Design Phase 2- Complete • Task 4-Additional Field Survey- Complete • Task 5 - Utility Mapping and Inspection -Complete • Task 6-Traffic Analysis Report-Complete • Task 7- Pavement Assessment Report-Complete • Task 8- Community and Agency Coordination -Open • Task 9- Preliminary Right of Way Investigation - Complete • Task 10- Preliminary Roadway Alternatives-Complete • Task 11 -Traffic Counts and Speed Studies—Complete DESIGN PHASE NO. 3 PHASE 3 is substantially complete. No more hours can be charged to the tasks listed below as complete. Tasks 13, 16, 18, 20, and 21 will remain open during Design Phase 4. • Task 12 - Project Management for Design Phase 3 -Complete • Task 13- Utility Coordination - Open • Task 14-Storm, Water, Wastewater-Complete City of Renton Page 4 of 17 KPG Rainier Ave S—S 3'd St to NW 3'd PI Supplement 3 1/25/2019 • Task 15- Right of Way True Cost Estimate -Complete • Task 16- Linear Corridor Haz Mat Report- Open • Task 17- Preliminary Geotechnical Engineering Report- Open • Task 18- Environmental Permitting Support-Open • Task 19-S 2nd St Extension TA and 10% Design - Complete • Task 20-WSDOT Coordination -Open • Task 21 - Illustrative Design and Urban Design Package-Open • Task 22 -30% Design -Complete • Task 23- QA/QC-Complete TASK 24—PROJECT MANAGEMENT FOR DESIGN PHASE NO.4 The following items are to be performed by the CONSULTANT, under this task. Assumptions for Task 24: • The budget shown in Exhibit D assumes this task is twenty four (24) months in duration. Provide project management of CONSULTANT services, coordination with the AGENCY, monthly progress reports and invoicing. This effort will include the following elements: 24.1 Administration, Coordination and Supervision • Initiate project set-up including establishment of timesheets (charge codes), creation of project files (electronic and physical) and scheduling of CONSULTANT personnel work activities. • Supervision of CONSULTANT personnel and activities to ensure compliance with contract scope and schedule and proper charging of time against the contract. • Oversite of sub-consultant activities for compliance with contract scope, schedule and budget. • Prepare and update a design schedule for the PROJECT in MS Projects format. 24.2 Invoicing • Preparation of monthly invoices with progress reports that include the following: ✓ Spreadsheet summary of budget, expenses to date, expenses for work period, estimate to complete and estimate at completion, for each task. ✓ Summary of work accomplished for the work period. ✓ Summary of outstanding issues to be resolved by the AGENCY. ✓ Estimate of percent of work complete for the work period, to justify fee earned. ✓ Graph showing monthly budgeted expenses and actual expense, for the time period of the contract. ✓ Backup detail that includes the name, direct salary rate and hours charged by date, for each individual charging time to this contract,for the work period. ✓ Backup detail of all direct non-salary costs included in the invoice for the work period. City of Renton Page 5 of 17 KPG Rainier Ave S—5 3rd St to NW 3rd PI Supplement 3 1/25/2019 24.3 Project Meetings • Project Kickoff Meeting—After receiving a Notice to Proceed (NTP) from the Agency, set up a project kickoff meeting with key Agency and CONSULTANT design team personnel. The purpose of the meeting is to discuss key elements of the SCOPE, project schedule timelines and critical path elements.This meeting is to be held at Renton City Hall. • For any face-to-face project meetings with the AGENCY, the CONSULTANT shall prepare an agenda, sign-in sheet, record of meeting including a list of action items, if any. • Monthly design coordination meetings with AGENCY staff.These meetings are to be held at Renton City Hall. It is estimated that 24 meetings will be held during Design Phase 4. • Internal design coordination meetings—The CONSULTANT project manager will conduct regular internal design coordination meetings with key design team members including sub-consultants. DELIVERABLES The following deliverables and delivery times are included in Task 24. • Meeting agenda(s)in Microsoft Word format—Delivered to the AGENCY one(1)business day before scheduled meeting. • Sign-in sheet(s) in Microsoft Word format— Delivered to the AGENCY at the scheduled meeting. • Draft record of meeting in Microsoft Word format— Delivered to the AGENCY three (3) - business days after scheduled meeting. • Final record of meeting in Microsoft Word format — Delivered to the AGENCY three (3) business days after comments received from AGENCY. • Monthly invoices with progress reports—Delivered to the AGENCY monthly. • Project Schedule in Microsoft Projects format—Delivered to the AGENCY upon request. TASK 25—FINAL DESIGN UTILITY COORDINATION The following items are to be performed by the CONSULTANT, under this task. Assumptions for Task 25: • The budget shown in Exhibit D assumes this task is twenty(24) months in duration. 25.1 CONSULTANT shall continue coordination efforts with each of the private utilities through emails and phone calls. Updated plans will be sent to each utility at the 60%, 90%, and 100% design submittal phases. A Utility Contact Matrix will be updated throughout the duration of the project. 25.2 CONSULTANT shall update the Utility Conflict Plan with the most recent information and will provide to all purveyors with utilities in the project limits. Utilities thought to be in conflict with the proposed improvements will be potholed as identified in Task 25.4. City of Renton Page 6 of 17 KPG Rainier Ave 5—5 3rd St to NW 3rd PI Supplement 3 1/25/2019 25.3 CONSULTANT shall prepare for and attend meetings (8 assumed) with public and franchise utilities to discuss utility conflicts, relocations, system limitations, system termini, and requirements. 25.4 APS will provide potholing services to identify potential utility conflicts (160 estimated). The locations of the potholes will be surveyed and added to the base map. DELIVERABLES The following deliverables and delivery times are included in Task 25. • Updated Utility Conflict Plans — Delivered to the AGENCY one (1) week before the franchise utility coordination meeting • Excel spreadsheet(delivered via e-mail)of the Utility Contact Matrix—Delivered to the AGENCY upon request. • Pothole Data Sheets-Delivered to the AGENCY once potholing operations are complete. • Updated Basemap with Pothole Data — Delivered to the AGENCY once potholing operations are complete. TASK 26—STORMWATER,WATER, WASTEWATER FINAL DESIGN AND COORDINATION The following items are to be performed by the CONSULTANT, under this task. Assumptions for Task 26: • The budget shown in Exhibit D assumes this task is twenty(20) months in duration. • Information on infiltration feasibility and design will be obtained from geotechnical engineer in Task 29 for evaluation of On-Site BMPs. • All analyses and designs required for water, sewer, and storm systems upgrades associated with the 2nd and 3rd Street Utility Replacement Project are not included in this scope of work. This task includes the effort required to update the analysis, design and documentation of the project's stormwater management requirements in accordance with the 2017 City of Renton Surface Water Design Manual and to address the comments received from the AGENCY during design PHASE 3. This task also includes the final engineering and coordination required of the water main and wastewater conveyance infrastructure improvements. 26.1 The On-Site BMP design and analysis will be advanced to include the infiltration testing information obtained from the geotechnical subconsultant. 26.2 Perform final design calculations and sizing of stormwater facilities for inclusion in the Final Technical Information Report(TIR) submittal. City of Renton Page 7 of 17 KPG Rainier Ave S—5 3rd St to NW 3rd PI Supplement 3 1/25/2019 26.3 Prepare a 60%TIR documenting the technical information and analysis of the stormwater facilities. The 60%TIR will be in accordance with AGENCY requirements and will address the comments received from the AGENCY during design PHASE 3. 26.4 Prepare a Final TIR documenting the technical information and analysis of the stormwater facilities. The Final TIR will be in accordance with AGENCY requirements and will address the comments received from the AGENCY on the 60% review submittal.The Final TIR will be submitted with the 90% review submittal. 26.5 CONSULTANT will continue to coordinate with AGENCY water utility staff and MSA to confirm design criteria, determine replacements needed, connection points, valves, and pipe alignments. 26.6 CONSULTANT will continue to coordinate with AGENCY wastewater utility staff and MSA to confirm design criteria, determine replacements needed, existing and future side sewer locations, and preferred pipe alignments. DELIVERABLES The following deliverables and delivery times are included in Task 26. • Two (2) CD's with electronic copies of the 60% Technical Information Report—Delivered to the AGENCY along with the 60%Submittal in Task 30. • Two(2)CD's with electronic copies of the Final Technical Information Report—Delivered to the AGENCY along with the 100%Submittal in Task 30. TASK 27—RIGHT OF WAY ACQUISITION SUPPORT The following items are to be performed by the CONSULTANT, under this task. Assumptions for Task 27: • The budget shown in Exhibit D assumes this task is twenty four (24) months in duration. • Title report updates will be obtained by the CONSULTANT and provided to the AGENCY and Epic Land Solutions on a CD. • Final ROW Plans will be prepared in Task 30 and included in the Bid Documents. • ROW acquisition will be supported for both Phase 4A and Phase 4B. This task covers the effort required to support the right of way acquisition/appraisal processes and the WSDOT right of way obligation effort. 27.1 The CONSULTANT will prepare up to 40 property owner exhibits to be utilized during appraisal/AGNECY meetings and negotiations with the property owners. The purpose of City of Renton Page 8 of 17 KPG Rainier Ave 5—S 3rd St to NW 3rd PI Supplement 3 1/25/2019 these exhibits is to give each property owner a clear understanding of ROW and parking impacts along their frontage. The exhibits will contain the following information: ❑ Scale, north arrow, and legend (in color) ❑ Parcel name and number ❑ Existing parcel features, ROW lines, and Parcel Lines ❑ Proposed Frontage Improvements and dimensions where necessary ❑ Proposed Parking Revisions ❑ Proposed ROW lines ❑ Proposed permanent easement lines ❑ Proposed temporary easement lines 27.2 The CONSULTANT will prepare up to 65 legal descriptions (25 fee, 40 permanent easement) and 105 exhibits (25 fee, 40 permanent easement, 40 temporary easement) to be utilized in the acquisition process. Legal descriptions will be stamped and signed by a licensed surveyor. Updates to titles reports will be order upon request and forty (40) title report updates are assumed. 27.3 The CONSULTANT shall prepare preliminary ROW plans to be submitted with the Project Funding Estimate (PFE) for WSDOT approval. The ROW plans will be updated as the design progresses and these updates will be addressed in Task 29. 27.4 The CONSULTANT shall mark in the field ROW and easement boundaries for up to 40 parcels/frontages. DELIVERABLES The following deliverables and delivery times are included in Task 27. • Property Owner Exhibits—Delivered to the AGENCY and Epic Land Solutions upon request. • Stamped Legal Descriptions and Exhibits — Delivered to the AGENCY and Epic Land Solutions upon request. • Preliminary ROW Plans—Delivered to the AGENCY and Epic Land Solutions upon request • Updated Title Reports-Delivered to the AGENCY and Epic Land Solutions upon request. TASK 28—GEOTECHNICAL ENGINEERING (INFILTRATION)AND REPORT The following items are to be performed by the sub-consultant, Wood Environment & Infrastructure Solutions (formerly Amec Foster Wheeler), under this task. Assumptions for Task 28: • The budget shown in Exhibit G1 assumes this task is four(4) months in duration. City of Renton Page 9 of 17 KPG Rainier Ave S—S 3rd St to NW 3rd PI Supplement 3 1/25/2019 • Base maps showing topography and existing structures and utilities will be provided to Wood prior to the field exploration; and design plans will be provided displaying the proposed improvements. • AGENCY will provide ROW Use Permit(s) based on traffic control plans provided by Wood. Any fees or deposits related to ROW Use Permits will be waived by the AGENCY. • Field exploration within the driving lanes of Rainier Avenue might have restricted hours of 9am to 3pm. Field exploration in other locations, such as sidewalks can be conducted Monday through Friday, 7 am -7 pm. • Borehole holes within pavement will be patched with ready-mix concrete. • Engineering will be based on WSDOT, AASHTO, and City of Renton design methods to the extent practical. Wood will conduct a field investigation and engineering analyses in order to provide design infiltration recommendations for improvements within the project limits. 28.1 Administration, Coordination and Supervision • Initiate project set-up including establishment of timesheets (charge codes), creation of project files (electronic and physical), scheduling of Wood personnel work activities, setting up subcontracts, and scheduling subcontractor activities. • Coordinate tasks with CONSULTANT and project schedule. • Supervise Wood personnel and activities to ensure compliance with contract scope and schedule and proper charging of time against the contract. • Over-see activities of sub-consultants and service companies for compliance with contract scope, schedule and budget. • Prepare monthly invoices with progress reports that include the following: ✓ Spreadsheet summary of budget, expenses to date, expenses for invoice period, estimate to complete and estimate at completion,for each task assigned to Wood. ✓ Summary of work accomplished for the invoice period. ✓ Estimate of percent of work complete for the invoice period,to justify fee earned. ✓ Summary of outstanding issues to be resolved by the AGENCY and/or CONSULTANT. ✓ Backup detail that include the name, direct salary rate and hours charged by date, for each individual charging time to this contract, for the work period. ✓ Backup detail of all direct non-salary costs included in the invoice for the work period. 28.2 Field Exploration Preparation: The following activities will be performed in preparation of the subsurface investigation: • Prepare traffic control plans. • Apply for a ROW Use permit from the AGENCY. • Review the proposed infiltration locations, visit the site, and mark potential City of Renton Page 10 of 17 KPG Rainier Ave S—5 3rd St to NW 3rd PI Supplement 3 1/25/2019 infiltration testing locations. • Notify the Underground Utility Location Center of the proposed drilling locations and allow time for the utilities in the vicinity to be located with paint. • Schedule subcontracted private utility locater,traffic control, and drilling/infiltration testing crew. • Prepare job safety assessment for the field activities. 28.3 Infiltration Evaluation and Engineering: City of Renton adopted King County 2016 storm water design manual which recommends performing small and large pilot infiltration tests (PITs) at the locations of proposed infiltration facilities.The size of these facilities is generally 12 to 36 square feet(sf)for small PIT and 100 sf for large PIT.The constraints of the project site, traffic closure and underground utilities will not allow for PITs in accordance with storm water design manual. Therefore, we propose to perform infiltration testing with smaller scale testing that will have less impact to traffic. In general, field exploration will consist of drilling soil borings at proposed infiltration facilities and conducting infiltration testing using the USBR borehole method. The following activities will be performed during subsurface investigation: • Subcontract the services of a traffic control company to place signs, cones, and flaggers to route traffic around the work area in accordance with AGENCY approved traffic control plans. • Subcontract the services of a drilling company to drill up to 10 soil borings and conducting up to 10 borehole infiltration tests.A trailer mounted drill rig will be used to drill 5 to 10 feet below the ground surface. • Collect soil samples from the borings. • Observe and log the hydrogeologic properties of the subsurface conditions. • Perform infiltration tests by the USBR borehole method in up to 10 borings. • The borings will be backfilled with bentonite chips and quick-set concrete. • Submit selected soil samples to a subcontracted laboratory for measuring the index and engineering properties of the soil. The following tests have been assumed for budgeting but may be modified based on the conditions encountered. o 10 moisture contents; and o 10 grain size distributions (sieve and wash). • Prepare soil boring logs that summarize the conditions encountered. • Update site exploration plans to display the locations of the explorations. • Update the geologic profile with the additional boring logs. • Calculate in-situ infiltration rates from field testing. Review and compare infiltration rates from laboratory testing. Correlate infiltration rates from laboratory grain size testing, and visual classification of soils based on methods described in the stormwater design manual. • Estimate long-term design rates for stormwater infiltration using the correction factors discussed in the stormwater design manual. 28.4 Wood will update the Geotechnical Engineering Report to include the findings, City of Renton Page 11 of 17 KPG Rainier Ave S—5 3rd St to NW 3rd PI Supplement 3 1/25/2019 conclusions and recommendations of the infiltration study. A draft preliminary report will be provided to the CONSULTANT for review by the CONSULTANT and AGENCY. Once review comments are received, a final report will be submitted to the CONSULTANT to deliver to the AGENCY. 28.5 Meetings: Up to four meetings have been budgeted. • Design coordination meetings with AGENCY and CONSULTANT staff. These meetings are to be held at Renton City Hall. It is estimated that Wood will attend up to 2 meetings. • Internal design coordination meetings — Wood will conduct regular internal design coordination meetings with key design team members and as applicable Wood sub- consultants. It is estimated that Wood will attend up to 2 meetings. DELIVERABLES: The following deliverables and delivery times are included in Task 28. • Completed ROW Use Permit application and associated traffic control plan for drilling —Delivered to the AGENCY'S permit counter within eight(8) weeks after receiving written notice to proceed. • Updated Geotechnical Engineering Report including storm water infiltration recommendations—Delivered to the Agency within four(4)months after the fully executed contract. TASK 29—FINAL DESIGN The following items are to be performed by the CONSULTANT, under this task. Assumptions for Task 29: • The budget shown in Exhibit D assumes this task is twenty(20) months in duration. • All drafting will be done in accordance with standards listed in Exhibit C. Design Phases 4A and 4B will remain consolidated for the 60%, 90%, and 100% Plan submittals. The CONSULTANT shall prepare 60%, 90%, 100% Plans, Specifications and Estimates for review and approval by the AGENCY. City Standard Details and WSDOT standard plans will be supplemented with project specific details as required. All design plans and documents will be signed by a licensed professional engineer in the State of Washington. City of Renton Page 12 of 17 KPG Rainier Ave S—5 3rd St to NW 3rd PI Supplement 3 1/25/2019 29.1 The CONSULTANT shall prepare 60% plans for review and approval by the City. The 60% Plans will incorporate comments from the 30% Design submittal, geotechnical findings, and utility coordination process as applicable. 29.2 The CONSULTANT shall prepare 90% plans for review and approval by the City. The 90% submittal will include all comments received from the 60% review. 29.3 The CONSULTANT shall prepare 100%plans for review and approval by the City. The 100%submittal will include all comments received from the 90%review. It is anticipated that the design drawings will include the following sheets: Cover sheet (1 Sheet) Legend and Abbreviations (1 Sheet) Survey Control (1 Sheet) Sheet Index (1 Sheet) Roadway Typical Sections (3 Sheets) Construction Channelization Plan (5 Sheets) Temporary Signalization Plans (3 Sheets) Existing Conditions Plans (10 Sheets) Site Preparation Plans and TESC Plans (10 Sheets) Site Preparation Plans and TESC Details (2 Sheets) Roadway Plans (10 Sheets) Roadway Profiles (11 Sheets) Concrete Panel Plans (2 Sheets) Drainage Plans (10 Sheets) Drainage Profiles (8 Sheets) Drainage Details (2 Sheets) Sewer Plans (9 Sheets) Sewer Profiles (8 Sheets) Sewer Details (2 Sheets) Water Plans (10 Sheets) Water Profiles (8 Sheets) Water Details (2 Sheets) Water Bypass Plans (4 Sheets) JUT Plans (8 Sheets) JUT Profiles (8 Sheets) JUT Sections (4 Sheets) JUT Details (2 Sheets) Ramp Details (12 Sheets) Island and Median Details (2 Sheets) Property Restoration Plans (10 Sheets) Property Restoration Details (2 Sheets) Driveway Plans and Profiles (9 Sheets) City of Renton Page 13 of 17 KPG Rainier Ave S—5 3rd St to NW 3rd PI Supplement 3 1/25/2019 Driveway Schedule and Details (1 Sheet) Illumination and Interconnect Plans (10 Sheets) Illumination Details (2 Sheets) One Line Plans (2 Sheets) Signal Plans (8 Sheets) Signal Pole Specifications (2 Sheets) Fiber Optic Splice Details (2 Sheets) Channelization and Signing Plans (10 Sheets) Landscape Plans (10 Sheets) Landscape Schedule and Details (2 Sheets) Urban Design Details (2 Sheets) Irrigation Plans (10 Sheets) Irrigation Details (2 Sheets) Right of Way Plans (12 Sheets) TOTAL= 255 sheets 29.4 The CONSULTANT will calculate quantities and prepare construction cost estimates in support of the 60%, 90%, and 100%submittals. 29.5 The CONSULTANT will prepare specifications based on 2020 WSDOT Standard Specifications, using contract boilerplate, federal funding requirements, and general special provisions provided by the City for the 90%and 100%submittals. DELIVERABLES: • The following deliverables and delivery times are included in Task 29. • DVD with electronic and five(5)%-size bound copies of the 60%Design Plans and Cost Estimate—Delivered to the AGENCY within six(8)months after the Notice to Proceed date. • DVD with electronic and five(5)34-size bound copies of the 90%Design Plans, Specifications, and Cost Estimate—Delivered to the AGENCY within eight(10)months after the 60%review comments are received. • DVD with electronic and five(5)%-size bound copies of the 100%Design Plans, Specifications, and Cost Estimate—Delivered to the AGENCY within two(2)months after the 90%review comments are received. • TASK 30—WSDOT REVIEW AND BID DOCUMENTS The following items are to be performed by the CONSULTANT, under this task. Assumptions for Task 30: • The budget shown in Exhibit D assumes this task is two (2) months in duration. City of Renton Page 14 of 17 KPG Rainier Ave s—S 3rd St to NW 3rd PI Supplement 3 1/25/2019 • All drafting will be done in accordance with standards listed in Exhibit C. • Phase 4A will be separated as a standalone plan set before the WSDOT and Bid Documents submittals. Phase 4A PS&E will be the only submittal to WSDOT and the AGENCY under this task. The CONSULTANT shall provide WSDOT Review Plans, Specifications and Estimates for review and approval by WSDOT. Bid Document Plans, Specifications and Estimates will be developed after addressing WSDOT review comments. WSDOT Review documents and Bid Documents will be stamped, signed and dated by a licensed professional engineer in the State of Washington. 30.1 The CONSULTANT shall prepare a set of WSDOT concurrence submittal documents(Plans, Specifications and Cost Estimate) for WSDOT Northwest Region for review. The WSDOT review submittal will include all comments received from the City's 100% Design review and include the WSDOT Checklist. 30.2 Prepare and submit a Public Interest Finding(PIF)for all agency supplied and sole sourced materials and Maximum Extent Feasible (MEF) documentation in accordance with WSDOT requirements. 30.2 The CONSULTANT shall prepare Bid Documents (Plans, Specifications and Cost Estimate) for advertisement by the City. The Bid Documents will include all comments received from the WSDOT review submittal. DELIVERABLES: The following deliverables and delivery times are included in Task 30. • DVD with electronic and two(2)M-size bound copies of the WSDOT Design Plans, Specifications, Cost Estimate, PIF and MEF—Delivered to the AGENCY and WSDOT within one(1)months after the 100%review comments are received. • DVD with electronic and five(5)%-size bound copies of the Bid Design Plans, Specifications, and Cost Estimate—Delivered to the AGENCY within one(1)months after the WSDOT review comments are received. TASK 31—PUBLIC INVOLVEMENT FINAL DESIGN The following items are to be performed by the CONSULTANT, under this task. Assumptions for Task 31: • The budget shown in Exhibit D assumes this task is one (1) month in duration. This Task covers the effort required to continue the public involvement process outlined in Design Phase 2(Task 8). This Task will support one(1)additional Open House and supporting documents to be held at the completion of the 100% Design Phase. City of Renton Page 15 of 17 KPG Rainier Ave S—5 3rd St to NW 3rd PI Supplement 3 1/25/2019 31.1 The CONSULTANT shall prepare for and attend one (1) Open House after the 100%Design Phase is complete. It is anticipated that the following items will be updated by the CONSULTANT for the open house: open house flyer, sign in sheet, comment form, roll- plots, photos of existing conditions, before/after photo simulations, project schedule exhibit and other informational exhibits conveying general project information (i.e. project goals, project budget, etc.). 31.2 The CONSULTANT will assist in the preparation of website graphics and up to two (2) project fliers to be distributed to the public. DELIVERABLES: The following deliverables and delivery times are included in Task 31. • Draft Open House Materials—Delivered to the AGENCY one(1) week before the open house. • Final Open House Materials—Delivered to the AGENCY at the open house. • Two(2)compact disks with electronic copies of Final Open House Materials—Delivered to the AGENCY one week after the open house. TASK 32—QUALITY ASSURANCE AND QUALITY CONTROL(QA/QC) FOR DESIGN PHASE NO.4 This task shall involve CONSULTANT staff to review and control the outgoing documents through a process of Quality Assurance and Quality Control (QA/QC). The following items are to be performed by the CONSULTANT, under this task. Assumptions for Task 32: • The budget shown in Exhibit D assumes this task is twenty four(24) months in duration. 32.1 QA/QC Plan - The CONSULTANT shall prepare and submit to the AGENCY, a QA/QC Plan for deliverables identified in Tasks 25 thru 33. The QA/QC Plan shall include the names, titles and roles of those individuals designated to review the deliverables prior to formal submission to the AGENCY. The QA/QC Plan shall include checklist(s) to be completed by the reviewer(s) upon completion the review(s). 32.2 QA/QC Reviews - The CONSULTANT shall schedule technical discipline review, lead designer review, and principle review of the deliverables. Technical discipline reviews shall be performed while the detailed technical work is in progress(e.g. computations are completed, development of plan sheets, etc.). Lead designers shall review specific products such as drawing sets,reports,specifications,technical memorandums and other documents requiring the seal of a licensed professional engineer prior to submission to the AGENCY per WAC 196-23-020. Principle reviews shall be performed for an overall task when and as defined in the QA/QC plan. Such reviews shall be performed after project City of Renton Page 16 of 17 KPG Rainier Ave S—5 3rd St to NW 3'd PI Supplement 3 1/25/2019 packages are assembled and before they are submitted for review to the AGENCY.QA/QC efforts and reviews shall include the work performed by the CONSULTANT and their subconsultants. 32.3 QA/QC Audits - The AGENCY reserves the right to perform periodic audits of QA/QC comments and responses generated from technical discipline reviews, lead design reviews and/or principle reviews. The audit(s) will occur at the CONSULTANT's office(s). The AGENCY will notify the Consultant of audit(s), up to one week in advance. The AGENCY will coordinate with the CONSULTANT to schedule the date, time and office location of the audit(s). DELIVERABLES The following deliverables and delivery times are included in Task 32. • QA/QC Plan in pdf format—Delivered to the AGENCY via e-mail within two(2) weeks after the Notice to Proceed date. • QA/QC Checklist in pdf format-Delivered to the AGENCY with each submittal at 60%, 90%, 100%, WSDOT, and Bid Documents. ADDITIONAL SERVICES The AGENCY may require additional services from the CONSULTANT. The scope of work for additional services will be determined based on anticipated or unanticipated project needs or other considerations at the sole discretion of the AGENCY. This work may include items identified in the current task authorizations as well other items,which may include, but are not necessarily limited to the following: • Additional Surveying Services • Additional Traffic Analysis • Assistance During Bidding • Additional Hazardous Material Reporting and Support • Engineering Support During Construction • Construction Management Services • Other services not specifically referenced in this scope of work These services will be authorized under a future contract supplement if necessary. At the time these services are required, the CONSULTANT shall provide a detailed scope of work and an estimate of costs. The CONSULTANT shall not proceed with the work until the AGENCY has authorized the work and issued a notice to proceed. City of Renton Page 17 of 17 KPG Rainier Ave S—S 3rd St to NW 3rd PI Supplement 3 1/25/2019 EXHIBIT D FEE SUMMARY K p G • Architecture • Landscape Architecture ♦ Civil Engineering Project: City of Renton Rainier Avenue S - S 3rd St to NW 3rd PI - Supplement 3 1/25/2019 Description Estimated Fee Task 24-Project Management for Design Phase 4 $91,649 Task 25-Final Design Utility Coordination $190,772 Task 26 -Stormwater,Water,Wastewater Final Design Coord. $69,125 Task 27-Right of Way Acquisition Support $129,927 Task 28 -Geotechnical Engineering(Infiltration)and Report $66,639 Task 29 -Final Design $754,809 Task 30 -WSDOT Review and Bid Documents $48,639 Task 31 -Public Involvement Final Design $25,871 Task 32-QA/QC $71,647 Total Estimated Fee $1,449,078 City of Renton Rainier Avenue S-S3rd St to NW 3rd PI Page 1 of 5 KPG Supplement 3 1/25/2019 _ o al N M Y p o N Y,.o Ni n 0 Q V nO OO p Q mN:a 0 Un O_ •ri • 0 �GLL y2 Q E y w wr0 1 ' 0 W 74 ! n C NN NYFaFU I :I W 1 N h o- ig. ..k i co N c a r ♦.1♦ l l 1 }_I 2 rn N M OY7 N mOromWQ o) n b tri N40 N us Wa O n N m l 1 Il I I I '1 Oi 00 N m.N m N N ,i; 4 " t0 -M N <Y - - OS - Cl N �p li N N U U rN'' N N N 1^ ^ D7 th N O a NI 1 " r' 1. o 11 Q �n (0 NN m 1 I " c C " Y O V,,, O O O O o o Y O 00 !o o 0 0 o O o o.o o e u O N N ::: ::: O : ::: Q : : : : : OFh' 1 ^ oI1 a 0� � O O W .0,‘",,.-; 1 I Y N . O b O ' IE.-h' oo co 1.. - ,, two 0 0 O 1 O O N O o 0 O d N w 11101. O110 m11 1 N OI O ini I , 1 z o ° m Oa 000000f Oo oN ., lit NI' Y N m Y CO N CO m0 OOt { O Y Y Y ` m 1, 101,1 0 0 0 0 0 0 0 o O o'0 0 M O o 0 0 N 111 W o O O o E 1 1 a 1 8 i I h c a ' I E v a t" % 0 o - CQ Iw I I3 ❑ orn ° o o c I .- 0 aa d G ° o A W d O0i . ac.0 f I', C '• - x ° 1 Y• ° O.^I m F0 c o. I.6 ❑ ❑ o Y 1 E'1 : y m m y 0 9 11 " E y o1 N o y z m - 0 In ` d N w o � d . a 5 d ; au a O8� • ; Woc c um c ' oNg d " uo mr n g -° � c _ o y t fo - O ,c - Tau o ;1wa t o E W U w a ❑ 2 < § W w ° p !r. ° A s ¢ � nLL 0 t 1u'0 °'oa C -oFF❑ 3 ' Et. EEa m - w • ui " z LL_ o ?,E y m c g " E Koo:ddE CE w a g m Q o¢ 553'a � opILv � . ct3LS� av vo ¢ �Q mC .0 QN N N 1 Y Y 46yO y Y M Y MV. Y 7V M Q N 7 N:M Y ° O e A O N N'N O N N N O N N NN 2b NNnN N C C = 0. I- : 12 I , F.- I- I- ) U�h 00 m n M E",- M m n < w w 1-1 a 0 ..a • • �u H � $ w w o w,w m H. !LL --aw ~ N suw . I r0.� a > O'- O N I N u- c N,V 'I N a` � ♦o. �... m o - r O O N ,, N N m r u U m O J 1 ill F'• 7,1'. `'''' Ft,NN I L.)H III A NM1111 O VI D V m 0 w !I :: i:ii o o O'1. O l I m 1;1] 1111 o 0 IL Edto w` �o - 11 o x x a" illi a •< m w `o n m A N a J 8 Li II I Qill Zvo 0 o 0 i - 0 0 11 0 0 a N w N Z A O O " i w I m N m O N O m m IF-2 w W w o I o I Tn. a 0 ur 1 9 M Z H r m o 2 Io_ m I � o I' n II AI E I I I-a y N E y o 1 u y 0 Wm. H O I m F N O c v 1 0 1a h H c 4, u v g m = d 15 m c c v E. C � m 0 C N O ~O c ; 01'w `o W dw ' a 4 9'Iroa > � v N v� W Y N .„ o a' n 10 E W U CC .- O O1 C c i 0 3 ~ N a I'm 6 0 C G LL a m y 0 0 N'1 a W Q re :tgai t e e i E 3 N `,,i a E o c i re t; 1N b m'K 3'13 m K t¢ I 0 O 1I m N PIN N N N N N x a H F 1... `" �'m U K 0 .�vo ♦ F 4.5 wn m wwi q 0W i E2 i ^ N eN' oaO Y atCv u w QW Ws4aub7 N I 5u N ill W•,..,• a` H 1 o i I E d "10 N m 0...l 2 N o o n I Nb pN 3 .. I a '''' �'In O 2 1 A 5 n o 0 0 I N N O 0 w co m o o O C F O I pp pp Qa F- n y N m o 2 o b'.. W3 m 't.a a „p N3 N,a g 2 ml N E w p W c m o� o ,.. m o = 0 WX ho ' l ' N cOdN N i , d 1 2 F 0'. Il N g IN ,_ w all a R N OI v a3m f . c Iw w 0 . o 1111 I m N W W d I. W 61 W 7 I �y V1 o F. 1 tu a el ,E F F - o` I o o0. c € c.5 ro f o 3 p n` m a NI F Cm 1� C LL d M C j C L a k cu O d N d 0 N o y W N ' C m _ E W UK � ` da _ Z Nd Qa ' G U. a 1 tt ao C m 6 c na o E Ill Q a, ` aaa a Nc ` N a I Y c c d Y Y - N CA aNO O N N N N M x a O mI U g EXHIBIT D HOUR AND FEE ESTIMATE Project: City of Renton Rainier Avenue S-S 3rd St to NW 3rd PI-Supplement 3 1/25/2019 • Architecture • Landscape Architecture ♦ Civil Engineering ♦ Reimbursable Breakdown Task 24-Project Management for Design Phase 4 Mileage(est.2400 miles x 0.58 cents/mile) $1,392 Reproduction $0 Task 24-Total $1,392 Task 25-Final Design Utility Coordination Mileage(est.800 miles x 0.58 cents/mile) $464 APS Potholing(est.160 Potholes x$800/ea) Reproduction $128,000 $0 Task 25-Total $128,464 Task 26-Stormwater,Water,Wastewater Final Design Coord. Mileage(est.300 miles x 0.58 cents/mile) $174 Reproduction $0 Task 26-Total $174 Task 27-Right of Way Acquisition Support Mileage $0 Reproduction Title Report Updates(40 Title Reports X$600/ea) $0 Task 27-Total $24,000 $24,000 Task 28-Geotechnical Engineering(Infiltration)and Report Mileage $0 Reproduction Wood _ $0 $60,418 Task 28-Total $60,418 Task 29-Final Design Mileage Reproduction $0 $0 $0 Task 29-Total $0 Task 30-WSDOT Review and Bid Documents Mileage $0 Reproduction $0 $0 Task 30-Total $0 Task 31-Public Involvement Final Design Mileage(est.200 miles x 0.58 cents/mile) $116 Reproduction $0 $0 Task 31-Total $116 Task 32-QA/QC Mileage $0 Reproduction $0 $0 Task 32-Total $0 TOTAL REIMBURSABLES $214,564 City of Renton Rainier Avenue S-S3rd St to NW 3rd PI Page 5 of 5 KPG Supplement 3 1/25/2019 KPG Exhibit D CONSULTANT FEE DETERMINATION SUMMARY OF COST City of Renton Rainier Avenue S - S 3rd St to NW 3rd PI Supplement 3 Direct Salary Direct Salary Classification Cost Total Hours Total Cost Senior Engineer $89.86 60 $5,392 Project Manager $67.69 497 $33,642 Survey Manager $76.52 16 $1,224 Project Surveyor $50.57 244 $12,339 Sr. Proj Engineer/LA $65.04 2446 $159,088 Dsn Engineer/LA/Sury $43.77 2984 $130,610 Design Engr/LA Tech $32.50 1744 $56,680 Technician $42.47 1016 $43,150 Clerical $36.00 112 $4,032 DSC Subtotal 9,119 $446,156 ICR Cost (Include Salary Additives) ICR x DSC of 146.70% $446,155.97 $654,511 Fixed Fee (FF) FF Rate 30.00% $446,155.97 $133,847 DSC Total $1,234,514 Direct Reimbursables Mileage $2,146 Wood APS $60,418 $128,000 Title Reports $24,000 Reproduction $0 Reimbursable Total $214,564 I(1)Total Agreement Amount $1,449,0781 MR Allowed $100,000 IMR Remaining Supplement 2 $42,3401 (2) MR Supplement 3 $57,660 1(1+2)Max Amount Payable $1,506,7381 City of Renton Date: 1/25/18 Exhibit E Level of Effort Hours Estimate Personnel and Maximum Hourly Rotes Per Category wood y � do ff � s a 'ti` o p$ Q Q ., 'f q ; e 4by ,i `qyc aa ,a � db Qb �a '.8O ayri' f4il i Q 4. ,1 4" `., totals 4. by task Task SUMMARY OF COSTS : $73.90 $66.65 S45,00 539,57 $32,10 $35,82 $27.10 hours 18.1 Contract Administration Contract and subcontract setup 1 2 4 2 9 Invoicinr9 6 4 10 Project management 1 12 12 4 29 18.2 Field Preparation Traffic Control Plans.Apply for Street Use Permit,Safety 4 8 4 4 20 • Mark infiltration locations for utility locate 8 W 4 4 16 0 18.3 Infiltration Evaluation and Engineering Setup,monitor and krg up to 10 infiltration boreholes 6 10 50 66 Laboratory testing of samples 2 4 6 Prepare geologic logs and update profile 4 4 6 14 Determine infiltration rates and corelate with GSA 8 16 24 18.4 Reporting Craft report 2 8 12 4 8 34 Respond to review comments 2 3 5 - Final report. 4 4 4 12 18.5 Meetings Meetings with KPG and City(41 16 16 total hours per category 4 68 83 58 8 18 22 261 DSC(Direct Salary Cost) $ 296 $ 4,546 $ 3,735 $ 2,295 $ 257 $ 645 $. 596 $ 12,369 OH=DSC X 1.39 $ 411 $ 6,319 $ 5,192 $ 3,190 $ 357 $ 896 $ 829 $ 17,193 FF=0,31 X(DSC) $ 92 $ 1,409 $ 1,158 $ 711 $ 80 $ 200 $ 185 $ 3,834 Total burdened labor $ 798 $ 12,274 $ 10,085 $ 6,197 $ 693 $ 1,741 $ 1,610 $ 33,397 Subtotal AMEC Expenses $ 470 Subtotal Subcontract Expenses $ 26,551 0%markup $ TOTAL ODCs $ 27 021 TOTAL ESTIMATED FEE $ 60,418 Exhibit E Other Direct Costs VVoocJ SUMMARY OF COSTS Breakdown of Expenses AmecFW Expenses Expense Item Quantity Unit Unit Cost Total Mileage 500 Miles $0.540 $270 Field Supplies 1 Each $200.00 $200 Subtotal AMEC Expenses $470 Subcontract Laboratory Expenses Expens0 dens Quantity Un4 U11it Cost tout Sieve 10 Each $100 $1,000.00 200 Wash 0 Each $55 $0,00 Moisture 10 Each $20 $200.00 Subtotal Ldboeatury Evenses $1,200 Subcontract Private Utility Locate(APS) Expense Item Quantity Unit Unit Cost Total Labor 8 hours $80 8640.00 Subtotal Private Locate Expenses $640 Subcontract Traffic Control Plans(Kenny's Traffic Control Plans) Expense Item Quantity Unit Unit Cost Total Labor 12 hours $100 $1,200 Subtotal Traffic Control Plan Expenses $7,200 Subcontract Traffic Control Services(Emerald City Flagging) Expense Item Quantity Unit Unit Cost Total Mobilization 5 day $25 $125 Barrier Truck 2 days, $500 $1,000 Signage 9 each $4 $36 Cones 100 each $0.75 $75 2Arrowboards 5 day $200 $1,000 Equipment Truck 5 day $75 $375 { Flaggers 80 hour $55 $4,400 Subtotal Traffic Control Service Expenses $7,011 Subcontract to Drill and Test 10 locations(Geologic Drill) Expense Item Quantity Unit Unit Cost Total Drilling and Borehole Infiltration 1 each $16,500 $16,500 Subtotal Drilling and Borehole Infiltration Expenses $16,500 Subtotal AmecFW Expenses $470 Subtotal Subcontract Expenses $26,551 0%mark-up on subcontract expenses $0 'Total Other Direct Costs $27,0211 Exhibit E SUMMARY OF COSTS Infiltration Study wood. Rainier Avenue South Phase 4 Renton, Washington Wood Environment & Infrastructure Solutions, Inc. DIRECT SALARY COST(DSC): Task Classification(AMEC Class Code) Hours x Hourly Rate = Cost Task Total Principal Geotechnical Engineer(624 to 625) 4 $73.90 $295.60 Associate Engineer(620 to 623) 68 $66.85 $4,545.80 Senior Geologist/Engineer(616 to 619) 83 $45.00 $3,735.00 Project Geologist/Engineer(614 to 615) 58 $39.57 $2,295.06 Staff Geologist/Engineer(611 to 613) 8 $32.10 $256.80 CAD Drafter(517) 18 $35.82 $644.76 Clerical/Word Processor(808 to 809) 22 $27.10 $596.20 TOTAL DSC 261 $12,369.22 OVERHEAD COST(OH COST-including salary additives): OH Rate of 1.39 x DSC 1.39 x $12,369.22 = $17,193.22 FIXED FEE(FF): FF Rate of 0.31 x(DSC) 0.31 x $12,369.22 = $3,834.46 REIMBURSABLES: Field Expenses(mileage,equipment,etc.) $470.00 Subcontract Expenses(0%mark-up) $26,551.00 TOTAL REIMBURSABLES = $27,021.00 TOTAL $60,418 41111111. Washington State Transportation Building �' Department of Transportation 310 Maple Park Avenue S.E. P.O.Box 47300 Olympia,WA 98504-7300 360-705-7000 TTY:1-800-833-6388 www.wsdot.wa.gov June 27, 2018 Wood Environmental & Infrastructure 600 University Street, Suite 600 Seattle, WA 98101 Subject: Acceptance FYE 2017 ICR—Cognizant Review Dear Mr. Eddie Goyne: We have accepted your firms FYE 2017 Indirect Cost Rate (ICR) of 138.99% of direct labor(Home Office)and 121.42%of direct labor(Field Office)based on the"Cognizant Review" from The Georgia Department of Transportation (GDOT). This rate will be applicable for WSDOT Agreements and Local Agency Contracts in Washington only. This rate may be subject to additional review if considered necessary by WSDOT. Your ICR must be updated on an annual basis. Costs billed to agreements/contracts will still be subject to audit of actual costs, based on the terms and conditions of the respective agreement/contract. Any other entity contracting with your firm is responsible for determining the acceptability of the ICR. If you have any questions, feel free to contact our office at(360) 705-7019 or via email consultantratesAwsdot.wa.gov. Regards; Jonson,Erik Jun 29 2018 8:56 AM cosign ERIK K. JONSON Manager, Consultant Services Office EKJ:rck Acceptance ICR Cognizant Review 4111 Washington State Transportation Building VA. Department of Transportation 310 Maple Park Avenue S.E. P.O.Box 47300 Olympia,WA 98504-7300 360-705-7000 TTY:1-800-833-6388 www.wsdot.wa.gov April 19,2018 KPG,P.S. 3131 Elliott Avenue, Suite 400 Seattle,WA 98121 Subject: Acceptance FYE 2017 ICR—Risk Assessment Review Dear Ms. Suzy Rowe: Based on Washington State Department of Transportation's (WSDOT) Risk Assessment review of your Indirect Cost Rate (ICR), we have accepted your proposed FYE 2017 ICR of 146.70%. These rates are applicable to Washington Local Agency Contracts only.These rates may be subject to additional review if considered necessary by WSDOT.Your ICR must be updated on an annual basis. Costs billed to agreements/contracts will still be subject to audit of actual costs, based on the terms and conditions of the respective agreement/contract. This was not a cognizant review. Any other entity contracting with your firm is responsible for determining the acceptability of the ICR. If you have any questions,feel free to contact our office at(360)705-7019 or via email consultantrates@wsdoiwa.gov. Regards; (g.tAklie—, Jonson, Erik Apr Apr 20 2018 8:02 AM cosign ERIK K. JONSON Manager,Consultant Services Office EKJ:kms Acceptance 1CR Audit Office Review KPG,P.S. STATEMENT OF DIRECT LABOR, FRINGE BENEFITS,AND GENERAL OVERHEAD FOR THE YEAR ENDED DECEMBER 31,2017 Financial Stmt Unallowable Total Description Expense Costs FAR Ref Proposed Direct Labor $ 4,980,661 $ $ 4,980,661 INDIRECT COSTS Fringe Benefits: Vacation, sick, and holiday $ 936,891 $ - $ 936,891 Incentive compensation 24,560 - 24,560 401(k)plan 180,610 - 180,610 Employee group insurance 604,878 (16,599) (1) 588,279 Payroll taxes 697,174 (417) (2) 696,757 Workers compensation 31,865 - 31,865 Other employee benefits 71,306 (52,474) (3)(4)(5) 18,832 Total Fringe Benefits $ 2,547,284 $ (69,490) $ 2,477,794 General Overhead: Indirect labor $ 2,239,532 $ (5,449) (3) $ 2,234,083 Advertising 8,199 (8,101) (6)(7) 98 Automobile 54,894 - 54,894 Bank fees and processing charges 3,054 - 3,054 Computer supplies 321,140 - 321,140 Contributions 137 (137) (8) - Depreciation and amortization 321,959 - 321,959 Dues and professional licenses 20,261 - 20,261 Entertainment 9,515 (9,515) (4) - Fines and penalties 792 (792) (9) - Insurance 122,267 (21,485) (10) 100,782 Interest 288,329 (288,329) (11) - Leased equipment 1,483 - 1,483 Meals expense 8,272 (298) (4)(5) 7,974 Office supplies and postage 87,729 (457) (3)(4) 87,272 Professional services 105,063 (8,115) (12) 96,948 Recruitment 1,049 - 1,049 Rent 901,692 (59,877) ' (13) 841,815 Repairs and maintenance 51,607 - 51,607 Seminars and professional education 33,080 33,080 Supplies 34,906 - 34,906 Taxes and licenses 283,074 - 283,074 Telecommunications 129,188 - 129,188 Travel 191,144 (7,754) (14)(15) 183,390 Recovery (26,016) - (26,016) Total General Overhead $ 5,192,350 $ (410,309) $ 4,782,041 Total Indirect Costs $ 7,739,634 $ (479,799) $ 7,259,835 Percent of Direct Labor 145.76% Facilities Capital Cost of Money(FCCM) $ 46,757 Percent of Direct Labor 0.94% Total Indirect Costs and FCCM Percent of Direct Labor 146.70% See accompanying auditors' report and notes. 3 KPG,P.S. DESCRIPTION OF FAR REFERENCES AND AUDIT ADJUSTMENTS FOR THE YEAR ENDED DECEMBER 31,2017 (1) 31.205-19(e)(2)(v) Insurance and indemnification-Costs of insurance on the lives of officers that does not represent additional compensation and the company is the beneficiary of the policy is unallowable. (2) 31.201-6(a)Accounting for unallowable costs-When an unallowable cost is incurred, its directly associated costs are also unallowable. (3) 31.205-13(b)Employee morale, health,welfare, food service, and dormitory costs and credits-Costs of gifts are unallowable. (4) 31.205-14 Entertainment costs-Costs of amusement, diversions, social activities, and any directly associated costs such as tickets to shows or sports events, meals, lodging, rentals, transportation, and gratuities are unallowable. (5) 31.205-51 -Costs of alcoholic beverages-Costs of alcoholic beverages are unallowable. (6) 31.205-1 (f)Public relations and advertising costs-Public relations and advertising costs designed to call favorable attention to the contractor and its activities is unallowable. (7) 31.205-22(a)(1)Lobbying and political activity costs-Costs associated with attempts to influence the outcomes of any Federal, State, or local election, referendum, initiative, or similar procedure, through in kind or cash contributions, endorsements, publicity, or similar activities are unallowable. (8) 31.205-8 Contributions or donations-Contributions or donations are unallowable. (9) 31.205-15 Fines, penalties, and mischarging costs-Fine, penalties, and late fees are unallowable. (10) 31.201-2(c)Determining allowability-When contractor accounting practices are inconsistent with this Subpart 31.2, costs resulting from such inconsistent practices in excess of the amount that would have resulted from using practices consistent with this subpart are unallowable. (11) 31.205-20 Interest and other financial costs-Interest on borrowings(however represented)are unallowable. (12) 31.201-3(b)(1)-Determining reasonableness-Costs generally not recognized as ordinary and necessary for the conduct of business are unallowable. (13) 31.205-36(3)Rental costs-Charges in the nature of rent for property between organizations under common control that exceed the normal costs of ownership are unallowable. (14) 31.205-46(a)2 Travel costs-Costs that exceed, on a daily basis,the maximum per diem rates in effect at the time of travel as set forth in the Federal Travel Regulations are unallowable. (15) 31.202-Direct costs of the contract shall be charged directly to the contract. See accompanying auditors' report and notes. 4