CONSTRUCTION MITIGATION
Proposed Construction Dates (begin and end dates): Start of construction is proposed for the
Summer of 2019 with construction of the frontage improvements and installation of utilities. Completion
of construction improvements is proposed for Fall of 2019.
Hours and days of operation: 8:00 am to 5:30 pm, Monday through Friday or as otherwise allowed
by City of Renton.
Proposed Hauling/ Transportation routes: Materials and labor to the site are proposed from NE
24th Street. Transportation access will be from NE 24th Street with on-site parking and material storage
within the existing compact gravel parking area on the north side of the property.
Measures to minimize construction activities: The minimal construction activity will be necessary
to provide the required public and private improvements for this project. The proposed roadway widening
as defined within the Road Modification Request will minimize public disturbance and provide adequate
public access after development.
Special hours: No special hours are necessary to complete construction. Weekend work may be
necessary to complete the project on schedule; this will be determined by owner, contractor, and City of
Renton.
Preliminary Traffic Control Plan: Coordination with the City of Renton staff will be necessary to
minimize disruption to traffic on NE 24th Street. Once a contractor is selected, a traffic control plan will
be submitted and approved prior to the pre-construction meeting with the City of Renton. This plan will
be implemented prior to any construction activities.