HomeMy WebLinkAboutConstruction Mitigation DescriptionProposed plat: Valley View
APN: 3023059028
Requesting: Submittal for Short -plat Subdivision
Construction Mitigation Description:
Proposed construction dates: TBA
Hours of operation: M -F 7 AM to 6 PM, Saturday 9 AM to 5 PM, Sunday no work
Proposed hauling/transportation routes: On the west end of the property: when accessible
Talbot Road South to Benson Drive S. Otherwise, out the access easements located along S. 32
Place to Smithers Ave S to S 32 Street to Talbot Road S to Benson Drive S.
Measures to control dust: Creating a section of quarry spall rock path for trucks to clear tires,
tire brushing, and water washing.
Special hours of operation: Not anticipated to be needed
Preliminary Traffic Control Plan: waived