Loading...
HomeMy WebLinkAboutConstruction Mitigation DescriptionProposed plat: Valley View APN: 3023059028 Requesting: Submittal for Short -plat Subdivision Construction Mitigation Description: Proposed construction dates: TBA Hours of operation: M -F 7 AM to 6 PM, Saturday 9 AM to 5 PM, Sunday no work Proposed hauling/transportation routes: On the west end of the property: when accessible Talbot Road South to Benson Drive S. Otherwise, out the access easements located along S. 32 Place to Smithers Ave S to S 32 Street to Talbot Road S to Benson Drive S. Measures to control dust: Creating a section of quarry spall rock path for trucks to clear tires, tire brushing, and water washing. Special hours of operation: Not anticipated to be needed Preliminary Traffic Control Plan: waived