HomeMy WebLinkAboutP_Construction_Plans_ 041819_V1.pdf4
TOTAL FOOTAGE
50
0
0
0
50
Existing UG =
Riser =
SOW DETAIL VIEW
Bore/Drill New UG =
Trench New UG =
New OH =
Overlash =
COVER SHEET
ENGINEERED FOR:
Trench Path
Riser
Building Attachment
Drop Path
New Pedestal
POE
New Building Exterior =
New Building Interior =
REVISION DESCRIPTIONS
DATE:BY:REASON:
Bryant Silvia
SCREEN PRINT PASTE CROP GOOGLE STREET MAP HERE
LEGEND
Existing Pole / Pedestal
Bore Path
New Lock Box
3
ESS COMCAST
DJ Laroche (253) 358-5460
SECTIONS:SITE CONTACT
Timm Fox
COVER PAGE 1 253-313-6453
SOW DETAIL VIEW
PLAN SET COVER PAGE
283776 CONTACTS:
SCREEN PRINT PASTE CROP GOOGLE MAP
Area Manager
Lakevview Jim Buckley (206) 793-4919
1125 N 40th ST OPE
Bryant Silvia
SOW OVERVIEW DETAIL 2
Renton
DatePrepared By:Bryant Silvia
Rev
Place Large Photo Detail Here
283776 Lakevview 1125 N 40th ST Renton PLAN SET DETAIL OVERVIEW
SCOPE OF WORK Comcast to install approx 645' if 2" conduit in City of Renton ROW.
Starting on the S Side of N 40th St at the corner of N 40th St & Lake WA Blvd N, going
Eastward approx 400' to Park Ave N & then South along Park Ave N for approx 200'
before turning into private property
Date:
ENGINEERED FOR:SDU
DJ Laroche (253) 358-5460
Comcast ESS
CONTRACTOR TO INSTALL
APPROX 600' OF CONDUIT
FROM CORNER OF N 40th ST &
LAKE WA BLVD N GOING
EASTWARD TO PARK AVE AND
TURNING SOUTH FOR APPROX
200'
ALL SUBSTRUCTURE TO HAVE
36" COVER
DatePrepared By:Bryant Silvia
Rev
283776 Lakevview 1125 N 40th ST Renton Plan Set Site Detail
SCOPE OF WORK Comcast to install approx 645' if 2" conduit in City of Renton ROW.
Starting on the S Side of N 40th St at the corner of N 40th St & Lake WA Blvd N, going
Eastward approx 400' to Park Ave N & then South along Park Ave N for approx 200'
before turning into private property
Date:
ENGINEERED FOR:SDU
DJ Laroche (253) 358-5460
Comcast ESS
CONDUIT TO START HERE & BE INSTALLED
EASTWARRD APPROX 400' & TURN RIGHT
TO PARK AVE ROW