Franchise Permit: MFP19001595
IVR Number: 19001595
Permit Informaon
Permit Name:Comcast Cable Franchise Permit
Address/Locaon :03/28/2019Application Date:0418000305Parcel Number:3304 NE 6TH ST
Permit Type:04/23/2019Issue Date:Franchise
Permit Work Class:04/22/2020Expiration Date:Major Utility
Job Number:310850Franchise Type:Cable
Description:Comcast proposes to overlash 4,045' of 144ct fiber and push small section in occupied conduit. Restoration per City of
Renton standards.
CONDITIONS OF OVERHEAD APPROVAL:1.Any existing height violations within the Project Reach must be resolved
at the time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15’ 6”.
2. Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking
place. 3. A traffic control plan must be separately submitted to the City, and no construction may take place until the
City has approved a traffic control plan. 4. The new aerial fiber lines within the Project Reach must be converted to
underground facilities in the future, at Comcast’s cost, when any one of the following events occurs: (1) any other
utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the
Project Reach, in which case Comcast shall participate in the joint use trench installation for the purpose of
undergrounding its aerial lines, or (3) a conduit is made available within the Project Reach that will accommodate the
aerial lines. The new aerial lines must be undergrounded within one year, or approved otherwise by the City of Renton
Community and Economic Development Administrator or designee, from the first event triggering the requirement to
underground the aerial lines.
Contacts
Name Address PhoneTypeBilling
Comcast Cable Communication
Management & Comcast Cable Holding
B: (215) 665-1700Applicant
Tom Donnelly
Comcast Business Communications
1701 Jfk Blvd, 32nd Floor
Philadelphia, PA 19103
B: (215) 286-7347
C: (215) 286-7557
Contact
Scott Nall
SEFNCO Communications Inc
2904 4th Ave NE
Puyallup, WA 98372
B: (877) 385-2903
C: (253) 444-9057
Contractor
Business License Number: 41108Construction Contractor: SEFNCCI850QD
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at
425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the
transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with
the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Page 1 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP19001595
(Date)(Signature)
Page 2 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Comcast Cable Communications Management, LLC
310850
Cody Shackett
253 235-7406
owen_shackett@comcast.com
3304 NE 6th Street RN31A NEW NODE RN63
Comcast proposes to overlash 4,045' of 144ct fiber and push small
section in occupied conduit.
200
SEFNCO Communications, Inc.253 299-8587
SEFNCC1850QD BLO-29666
3-11-2019
4
MFP19001595
Scott Warlick 3/28/2019
Justin Johnson 4-19-2019
MFP19001595Justin Johnson4-19-2019Monday through Friday
POLE-27POLE-26
POLE-25
POLE-24
POLE-23
POLE-22
POLE-21
POLE-20
POLE-19
POLE-18POLE-17POLE-16POLE-15POLE-14POLE-13POLE-12POLE-11POLE-10POLE-9POLE-8POLE-7POLE-6POLE-5POLE-4POLE-3POLE-2POLE-1
SCOPE OF WORK:
SHEET INDEX:
1 - COVER SHEET
2 - NOTES & LEGEND SHEET
3-12 - DESIGN
BILL OF MATERIALS*:
CONTACTS:
RN31A NEW NODE RN63
THIS IS PROPRITORY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED SEFNCO COMMUNICATIONS
PROJECT MAP:
COVER
4045 FT
578 FT
FT
PROJECT DESCRIPTION*
3304 NE 6TH ST KENT, WA
SEFNCO:BRANDON MORRIS 253-299-4973
COMCAST:JERRY STEELE
*ALL FOOTAGES AND MATERIALS ARE ESTIMATED
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC3304 NE 6TH STRENTON, WA310850PERMIT1 123/20/2019PERMITMDB***COMCAST
COMCAST
JT#: 310850
TOTAL FOOTAGE 4623FT
=
=
=
=
NEW 144CT FIBER
OVERLASH 144CT FIBER
PROOF/PULL 144CT FIBER
WORK AREA
OVERLASH 4,045' 144CT FIBER. AND PUSH 578' THRU OCCUPIED
CONDUIT.
MFP19001595
NOTES & LEGEND
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC3304 NE 6TH STRENTON, WA310850PERMIT2 123/20/2019PERMITMDBCOMCAST
FIBER PLACEMENT NOTES:
GENERAL NOTES:
DISCLAIMER:
1.IT IS THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR TO VERIFY ALL RIGHT OF WAY
BEFORE CONSTRUCTION IS TO BEGIN. NO UNDERGROUND INSTALLATION REPRESENTED WITHIN
THESE PLAN SHEETS IS PROPOSED OUTSIDE OF THE RIGHT OF WAY.
2.THE UNDERGROUND ROUTE DEPICTED IS PRELIMINARY AND WILL/MAY VARY ONCE UTILITIES HAVE
BEEN FIELD LOCATED.
3.ANCHORING FOR THE AERIAL CONSTRUCTION IS TYPICALLY DETERMINED DURING CONSTRUCTION
AND IS COLLECTED IN THE AS-BUILT PHASE.
1.CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 48 HOURS PRIOR TO CONSTRUCTION ACTIVITY
SEE LOCAL DIRECTORY FOR CONTACT TELEPHONE NUMBER OF LOCAL CALL BEFORE YOU DIG AGENCY.
2.CONTRACTOR SHALL RECORD SEQUENCE # OF FIBER CABLE AT EVERY WORK POLE, MANHOLE, FIBER STORAGE LOOP
AND TAIL LOCATION. CONTRACTOR TO PROVIDE PROJECT MANAGER WITH SEQUENCE NUMBERS AT PROJECT
COMPLETION.
3.SLACK LOOP AND SNOWSHOE STORAGE LOCATIONS SHALL BE DETERMINED ON CONSTRUCTION DRAWINGS, HOWEVER,
REEL LENGTHS OF FIVE HUNDRED FEET (500') OR LESS ON LARGE COUNT FIBER OR THREE HUNDRED FEET (300') OR LESS
ON SMALL COUNT FIBER ARE DIFFICULT TO USE AND SHOULD BE PLACED AS FSL'S, NOT CUT AND RETURNED.
4.FIBER OPTIC IDENTIFICATION TAGS SHALL BE PLACED AT EVERY WORK POLE, MANHOLE, FIBER, STORAGE LOOPS, SPLICE
CASES AND WHERE INDICATED BY PROJECT MANAGER. TAGS NEED TO BE PLACED SO AS TO BE READ FROM THE GROUND.
5.CABLE LUBRICATION SHALL BE USED TO REDUCE PULLING TENSION. LUBRICANTS MUST NOT CONTAIN ANY PETROLEUM
PRODUCTS.
6.A 100 FOOT FIBER COIL MUST REMAIN IN ALL VAULTS UNLESS OTHERWISE NOTED.
7.ALL BURIED INFRASTRUCTURE MUST BE ACCOMPANIED WITH WARNING TAPE AND A TRACER WIRE, AT RISER POLES THE
LOCATE WIRE SHALL BE ACCESSIBLE AT THE BASE OF THE RISER.
8.ALL RISERS WILL BE CAPPED AT ALL TIMES.
9.ALL FIBER SHALL BE MARKED AS TO DIRECTION IN EACH VAULT. RED-NORTH, GREEN-SOUTH,YELLOW-EAST, AND
BLUE-WEST. DO NOT TAPE FIBER CABLES TOGETHER IN RISER.
1. ALL VAULTS / HANDHOLES TO BE EQUIPPED WITH SECURITY LIDS WITH LOCKING BOLTS.
2. GROUND RESTORATION/RIGHT-OF-WAY SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION.
3. ALL 90 DEGREE BENDS IN CONDUIT CONSTRUCTION WILL BE A MINIMUM OF 36" RADIUS UNLESS
SPECIFIED OTHERWISE.
4. BURIED FIBER OPTIC WARNING SIGNS SHALL BE PLACED AT EACH SIDE OF ALL ROAD CROSSINGS,
AT CULVERTS, DITCHES AND IN A STRAIGHT LINE OF SIGHT SPACING OF APPROXIMATELY 500 FEET.
5. DEVIATIONS FROM THE ENGINEERED ROUTE REQUIRES A PROJECT MANAGER AND RIGHT-OF-WAY
OWNER OR CARETAKER APPROVAL PRIOR TO CONSTRUCTION.
6. WHERE PERMITS FROM STATE, COUNTY, CITY, RAILROAD OR GOVERNMENT AGENCIES ARE
REQUIRED, ALL WORK PERFORMED WILL COMPLY WITH THESE AGENCIES STANDARD
SPECIFICATIONS.
7. THE PROJECT MANAGER WILL NOTIFY BUILDING MANAGEMENT WHEN WORK WILL BEGIN ON
BUILDING. CONTRACTOR TO COORDINATE ROOM ACCESS AND WORK START AND STOP TIMES
WITH BUILDING MANAGEMENT.
8. THE PROJECT MANAGER IS TO BE NOTIFIED BY THE CONTRACTOR 24 HOURS PRIOR TO
CONSTRUCTION. SEE COMPANY CONTACT LIST FOR CONTACT NAME(s) AND TELEPHONE NUMBER(s).
9. THE PROJECT MANAGER WILL RESERVE THE RIGHT TO INSPECT AT ANY TIME THE WORK BEING
PERFORMED BY THE CONTRACTOR. IF PROJECT MANAGER DETERMINES THAT THE WORK IS NOT
BEING PERFORMED TO MINIMUM QUALITY STANDARDS, THEN THE CONTRACTOR SHALL PROVIDE
REWORK AT HIS OWN COST.
10. ANY CHANGE IN PROJECT SCOPE, INCLUDING BUT NOT LIMITED TO, CONDUIT LENGTH, CONDUIT
PATH, AERIAL PATH ETC., MUST BE APPROVED BY THE PROJECT MANAGER.
11. ALL CORING/CONSTRUCTION THAT WILL CAUSE NOISE AND/OR VIBRATION SHALL BE DONE WITHIN
ALLOWED (9AM-3PM) BUSINESS HOURS.
12. ANY AND ALL UNDERGROUND UTILITIES ENCOUNTERED ARE THE RESPONSIBILITY OF THE
CONTRACTOR TO LOCATE, PROTECT, AND REPAIR, IF DAMAGED.
13. ALL FOOTAGES ARE BASED ON FIELD GATHERED MEASUREMENTS, AS SUCH SOME VARIANCE
SHOULD BE ANTICIPATED. ADJUST AS NEEDED.
14. ALL BURIED CONDUIT/CABLE WILL BE PLACED AT 36" MINIMUM COVER. SITE HAS POTENTIAL FOR
ROCK THAT WOULD PREVENT THE ABILITY TO PROVIDE THE MINIMUM COVER. IN CASES WHERE THE
MINIMUM COVER CAN NOT BE ACHIEVED, THE CONDUIT SHALL BE PLACED IN A SCH 40 EMT SLEEVE
OR APPROVED EQUIVALENT.
15. WATER, SEWER, STORM SEWER AND EASEMENT LOCATIONS ARE BASED OFF OF CITY MAPS,
NOT FIELD VERIFIED.
16. BORING OF AC PAVING IS REQUIRED AT ALL LOCATIONS AS INDICATED ON PLANS.
17. AT NO TIME SHALL CURBS, GUTTERS OR HANDICAP BE DISTURBED.
18.DOOR HANGERS ARE TO BE PLACED A MINIMUM OF 72 HOURS PRIOR TO START OF CONSTRUCTION.
19. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL PLACE MESSAGE BOARDS STATING LANE
CLOSURES, AND DELAYS A WEEK IN ADVANCE. LOCATION OF THE MASSAGE BOARD SHALL BE
COORDINATED WITH THE CITY INSPECTOR AT THE PRE-CONSTRUCTION MEETING.
20. LANE CLOSURES CANNOT EXCEED MORE THAN 300 FT. AT A TIME. FOR SAFETY PURPOSES THERE
SHALL BE ONLY ONE CLOSURE AT A TIME ALONG INTERNATIONAL BLVD. MORE FLAGGERS WILL BE
NECESSARY TO HELP VEHICLES AND PEDESTRIANS IN THE WORK ZONES DURING THE LANE
CLOSURES.
STORM DRAIN
MANHOLE
COMMUNICATIONS
WATER
SEWER
POWER
GAS
6
ROW
PROPOSED VAULT
PROPOSED BORE PIT
STREET/SIGNAL/TRAFFIC LIGHT
CONSTRUCTION NOTE
CATCH BASIN
FIRE HYDRANT
EXISTING POLE W/ NEW RISER
BUILDING OUTLINE
TRAFFIC FLOW
POTHOLE LOCATION
CHANNELIZATION
(xxx') OPEN TRENCH
EXISTING PULL THRU
PROPOSED BORE
PROPOSED OPEN TRENCH
(xxx') EXISTING PULL THRU
(xxx') BORERIGHT-OF-WAY
CENTERLINE
TRAFFIC LANE
FENCE
D
CB
S C
GAURD RAIL
AERIAL STRAND
LEGEND:
U U U U U U
S S
W W
P P
C C
G G
D D
EOP EDGE OF PAVEMENT
POLE
MFP19001595
EOPEOP EOP
NE 6TH ST
NE 6TH ST
POLE-3
POLE-2POLE-1
EOPEOPEOPEOPEOP165'152'MONROE AVE NEMONROE AVE NEMONROE AVE NENEWPORT AVE NEDRIVEWAYDRIVEWAYDRIVEWAYDRIVEWAYEOPEOPEOPEOPEOPDRIVEWAYSIDEWALKSIDEWALKSIDEWALKSIDEWALKSIDEWALKDRIVEWAY"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC3304 NE 6TH STRENTON, WA310850PERMIT3 123/20/2019PERMITMDBCOMCAST
MID-SHEATH HERE AND TIE
IN USING SLACK LOOP.
OVERLASH 144CT FIBER TO
EXISTING STRAND.OVERLASH 144CT FIBER TO
EXISTING STRAND.
MFP19001595
EOP EOPNE 6TH ST
POLE-6POLE-5POLE-4155'112'153'101'OLYMPIA AVE NEOLYMPIA AVE NEDRIVEWAYDRIVEWAYDRIVEWAYDRIVEWAYDRIVEWAYDRIVEWAYDRIVEWAYEOP EOP EOP
EOPEOPEOPEOPEOPEOP"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC3304 NE 6TH STRENTON, WA310850PERMIT4 123/20/2019PERMITMDBCOMCAST
OVERLASH 144CT FIBER TO
EXISTING STRAND.OVERLASH 144CT FIBER TO
EXISTING STRAND.
MFP19001595
NE 6TH STNE 6TH ST
POLE-10
POLE-9POLE-8POLE-7 149'161'111'DRIVEWAYDRIVEWAYDRIVEWAYDRIVEWAYDRIVEWAYDRIVEWAYDRIVEWAYEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPSIDEWALK SIDEWALKDRIVEWAY
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC3304 NE 6TH STRENTON, WA310850PERMIT5 123/20/2019PERMITMDBCOMCAST
OVERLASH 144CT FIBER TO
EXISTING STRAND.OVERLASH 144CT FIBER TO
EXISTING STRAND.
MFP19001595
NE 6TH STNE 6TH STNE 6TH ST
POLE-12POLE-11POLE-10 176'167'202'QUEEN ANNE AVE NEQUEEN ANNE AVE NEQUEEN ANNE AVE NEQUEEN ANNE AVE NEDRIVEWAYDRIVEWAYDRIVEWAYDRIVEWAYDRIVEWAYEOPEOP EOP EOP EOP EOP
EOPEOPEOPEOPEOPSIDEWALKSIDEWALKSIDEWALKSIDEWALKSIDEWALK
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC3304 NE 6TH STRENTON, WA310850PERMIT6 123/20/2019PERMITMDBCOMCAST
OVERLASH 144CT FIBER TO
EXISTING STRAND.OVERLASH 144CT FIBER TO
EXISTING STRAND.
MFP19001595
FLFL
NE 6TH STNE 6TH ST
NE 6TH ST
POLE-15POLE-14POLE-13 149'127'109'SHELTON PL NESHELTON AVE NEDRIVEWAYDRIVEWAYDRIVEWAYEOP EOP EOP
EOP
FL FL FL FL FL FL FLEOPEOPEOPEOPEOPEOP
SIDEWALKSIDEWALKSIDEWALK
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC3304 NE 6TH STRENTON, WA310850PERMIT7 123/20/2019PERMITMDBCOMCAST
OVERLASH 144CT FIBER TO
EXISTING STRAND.OVERLASH 144CT FIBER TO
EXISTING STRAND.
MFP19001595
NE 6TH ST
NE 6TH STNE 6TH ST
POLE-19
POLE-18
CROSS OVERPOLE-17
POLE-16 122'152'122'69'144'TACOMA AVE NETACOMA AVE NEUNION AVE NEUNION AVE NEDRIVEWAYDRIVEWAYDRIVEWAYEOP EOP EOP EOP EOP
EOPEOPEOPEOPEOPEOPDRIVEWAY
FL FL FL FL FL FL FL FL FL FL FL FL
EOP EOP EOPEOPEOPEOPEOPEOPSIDEWALKSIDEWALKSIDEWALKSIDEWALK"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC3304 NE 6TH STRENTON, WA310850PERMIT8 123/20/2019PERMITMDBCOMCAST
OVERLASH 144CT FIBER TO
EXISTING STRAND.OVERLASH 144CT FIBER TO
EXISTING STRAND.
MFP19001595
POLE-21
POLE-20
210'110'UNION AVE NEUNION AVE NEDRIVEWAY
NE 5TH CT NE 5TH CT NE 5TH CT
NE 5TH ST NE 5TH STEOPEOPEOP
NE 5TH PL
EOP
EOPEOPEOPEOPEOP EOP
EOP EOP
SIDEWALK SIDEWALK
SIDEWALKSIDEWALKSIDEWALKSIDEWALKSIDEWALKSIDEWALK
SIDEWALKSIDEWALK"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC3304 NE 6TH STRENTON, WA310850PERMIT9 123/20/2019PERMITMDBCOMCAST
OVERLASH 144CT FIBER TO
EXISTING STRAND.
OVERLASH 144CT FIBER TO
EXISTING STRAND.
MFP19001595
POLE-23
POLE-22
173'57'44'UNION AVE NEUNION AVE NEUNION AVE NEUNION AVE NEDRIVEWAY
D
R
I
V
E
W
A
Y
DRIVEWAY
DRIVEWAY
DRIVEWAY
DRIVEWAY
DRIVEWAY
PRIVATE DRIVE
EOPEOPEOPEOPSIDEWALKSIDEWALKSIDEWALKSIDEWALKSIDEWALKSIDEWALKSIDEWALKSIDEWALKSIDEWALKEOP"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC3304 NE 6TH STRENTON, WA310850PERMIT10 123/20/2019PERMITMDBCOMCAST
OVERLASH 144CT FIBER TO
EXISTING STRAND.
OVERLASH 144CT FIBER TO
EXISTING STRAND.
MFP19001595
POLE-25
POLE-24
76'138'176'UNION AVE NEUNION AVE NEUNION AVE NEDRIVEWAYDRIVEWAY
NE 4TH PLNE 4TH PL
EOPEOPEOPEOPEOPSIDEWALKSIDEWALKSIDEWALKSIDEWALKSIDEWALKSIDEWALKSIDEWALKSIDEWALKSIDEWALKEOP EOPEOP
EOP"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC3304 NE 6TH STRENTON, WA310850PERMIT11 123/20/2019PERMITMDBCOMCAST
OVERLASH 144CT FIBER TO
EXISTING STRAND.
OVERLASH 144CT FIBER TO
EXISTING STRAND.
MFP19001595
POLE-27
POLE-26
53'UNION AVE NEDRIVEWAY
DRIVEWAY
DRIVEWAY
DRIVEWAY
NE 4TH PL NE 4TH PLNE 4TH PLNE 4TH PL
EOPEOPEOPEOPEOPEOPEOPEOPDRIVEWAYDRIVEWAYDRIVEWAYSIDEWALKSIDEWALKSIDEWALK SIDEWALK SIDEWALK
SIDEWALKSIDEWALK
SIDEWALK SIDEWALK SIDEWALKSIDEWALKEOPEOPEOP37
8
'UNION AVE NE"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC3304 NE 6TH STRENTON, WA310850PERMIT12 123/20/2019PERMITMDBCOMCAST
OVERLASH 144CT FIBER TO
EXISTING STRAND.
END OF ROW DESIGN
RISER DN
ADD 200' SLACK
PROOF/PULL THRU EXISTING
CONDUIT.
EXISTING VAULT
MFP19001595
MFP19001595
MFP19001595
MFP19001595
April 23, 2019
Cody Shackett
Comcast Cable Communications, LLC
410 Valley Ave NW
Puyallup, WA 98371
Via Email: owen_shackett@comcast.com
SUBJECT: Request for Undergrounding Exemption (JT#310850, MFP19001595, 3304 NE 6th Street)
Dear Mr. Shackett:
The City of Renton has reviewed your request to grant Comcast an exemption from Renton Municipal
Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be required
to be installed underground, pursuant to the standards of the section of RMC.
Comcast proposes to have SEFNCO Communications overlash approximately 4,045 lineal feet of new 144-
count aerial fiber to existing Puget Sound Energy (PSE) poles beginning at the northwest corner of Monroe
Avenue NE and NE 6th Street intersection. The new fiber line will extend east along the north side of NE
6th Street, then south along the west side of Union Avenue NE to a location approximately 110 lineal feet
north of NE 4th Street, and end at an existing pole located on the east side of Union Avenue NE
approximately 85 lineal feet north of NE 4th Street.
ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090(D)(1)(h) ii. Ordinance
5720 grants Comcast, the right to install fiber optic cable and related appurtenances under, along, over,
below, through and across the streets, avenues and alleys of City of Renton within the right-of-way of
Renton. Section 3.4 of the franchise ordinance states that if all of the distribution lines all the wireline
service providers, such as telecommunications service providers, as defined in RCW 35.99.010, a utility
service provider or a Cable Operator (collectively “Service Providers”) in any portion of the Franchise Area
are underground, Grantee shall place its Cable System’s distribution cables underground within that area;
provided that such underground locations are actually capable of accommodating Grantee’s cable and
other equipment without technical degradation of the Cable Systems’ signal quality.
The proposal would utilize existing poles with other attached franchisee communication facilities and
overlash to the existing Comcast aerial path. As minimum vertical height clearance of 15’-6” would need
to be provided for, any existing obsolete cable will need to be removed; staff recommends these as
conditions of approval. Therefore, the City is granting an exemption with conditions, per the Comcast
franchise agreement which allows new overhead facilities to be placed overhead provided at there are
other similar providers overhead as well.
Comcast Job JT#310850
Page 2 of 2
April 23, 2019
DECISION: The requested exemption from underground utility installation requirements (RMC4-6-090 (C)
as requested by the applicant is approved with conditions subject to the conditions below as the request
complies with exemption criteria of RMC 4-6-090(D)(1)(h) ii, and the Comcast Franchise Agreement.
Conditions of Approval:
1. Any existing height violations within the Project Reach must be resolved at the time of
construction. New aerial lines within the Project Reach must have a minimum vertical
clearance of 15’-6”.
2. Any abandoned or unused lines within the Project Reach must be removed at the time that
construction is taking place.
3. A traffic control plan must be separately submitted to the City, and no construction may take
place until the City has approved a traffic control plan.
4. The new aerial fiber lines within the Project Reach must be converted to underground
facilities in the future, at Comcast’s cost, when any one of the following events occurs: (1) any
other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed
by a franchisee within the Project Reach, in which case Comcast shall participate in the joint
use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is
made available within the Project Reach that will accommodate the aerial lines. The new
aerial lines must be undergrounded within one year, or approved otherwise by the City of
Renton Community and Economic Development Administrator or designee, from the first
event triggering the requirement to underground the aerial lines.
This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period
from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed
with the City Clerk, along with the required appeal fee, by 5:00 pm, May 7, 2019.
Sincerely,
Brianne Bannwarth, PE
Development Engineering Manager
cc: C.E. “Chip” Vincent, CED Administrator
Gregg Zimmerman, PW Administrator
Jennifer Henning, Planning Director
Justin Johnson, Civil Engineer III
Scott Warlick, Engineering Specialist II
Holly Powers, Permit Technician
Pat Miller, Construction Inspection Supervisor
Franchise Permits
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Conditions for Permit MFP19001595
Engineering
1 Engineering General Conditions
A traffic control plan must be separately submitted to the City, and no construction may take place until the City
has approved a traffic control plan.
2 Engineering General Conditions
The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at
Comcast’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the
Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case
Comcast shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or
(3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial
lines must be undergrounded within one year, or approved otherwise by the City of Renton Community and
Economic Development Administrator or designee, from the first event triggering the requirement to underground
the aerial lines.
3 Engineering General Conditions
Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking
place.
4 Engineering General Conditions
Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial
lines within the Project Reach must have a minimum vertical clearance of 15’-6”.
Page 1 of 1