Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutMFP19000307.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP19000307
IVR Number: 19000307
Permit Informaon
Permit Name:Puget Sound Energy - Electric
Address/Locaon :01/15/2019Application Date:2423049097Parcel Number:1200 MONSTER RD SW
Permit Type:04/24/2019Issue Date:Franchise
Permit Work Class:04/23/2020Expiration Date:Minor Utility
Job Number:588010970Franchise Type:Electric
Description:Relocate AMI network device. The device will be installed on existing pole grid #317386 165201 and connect power
from pole grid #317360 165204. Restoration per City of Renton standards.
CONDITIONS OF OVERHEAD APPROVAL: 1. Any existing height violations within the Project Reach must be resolved
at the time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15’ 6”.
2. Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking
place. 3. A traffic control plan must be separately submitted to the City, and no construction may take place until the
City has approved a traffic control plan. 4. The new aerial fiber lines within the Project Reach must be converted to
underground facilities in the future, at PSE’s cost, when any one of the following events occurs: (1) any other utilities
are undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the Project
Reach, in which case PSE shall participate in the joint use trench installation for the purpose of undergrounding its
aerial lines, or (3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new
aerial lines must be undergrounded within one year, or approved otherwise by the City, from the first event triggering
the requirement to underground the aerial lines.
Contacts
Name Address PhoneTypeBilling
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Applicant
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at
425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the
transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with
the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy - Electric
588010970
Anish Kumar
253-208-2183
anish.kumar@pse.com
1200 Monster Rd SW 98057 588010970
Crew to relocate AMI network device. The device will be installed on existing
pole grid # 317386-165201 and connect power from pole grid # 317360-165204. Work on site
will be completed within 2 hours. No pavement cuts. Restoration per City of Renton standards.
Potelco Inc.253-208-2183
BL005109 Poteli*227PL
11/20/2018
MFP19000307
Scott Warlick 4/24/2019
Justin Johnson 4/24/2019
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
588010970
PSE/Potelco Inc.
Patima Dejarath 425-647-7110
6905 S 228th St, Kent, WA 98032
patima.dejarath@pse.com
1200 Monster Rd SW
TBD
TBD
Anish Kumar 11/20/2018
MFP19000307
Monday - Friday
8:00AM - 3:30PM Scott Warlick
4/24/2019
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
121213131111
12
12
MONSTER RD SWJ
A
C
K
S
O
N
P
L
S
WJACKSON PL SWP01
STOP
FLAGGER
STOP
FLAGGER
W
2
0
-
7
A
10
0
'
W
2
0
-
4 ONE LANEROADAHEADROADWORKAHEADW
2
0
-
1
10
0
'
10
0
'W20-7A1
0
0
'W20-4ONE LANEROAD
AHEADROAD
WORKAHEAD W20-11
0
0
'
1
0
0
'
BEPREPARED
TO
STOP W3-4ROAD
WORK
AHEAD W20-1W20-7A100'100'100'BIKESMERGE
WITH
TRAFFI
C W4-1BBIKELANE
ENDSW9-1BCHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
N PSE PUGETSOUNDENERGY
JOB#92009011
1200 Monster Rd SW, Renton, WA
October 2nd, 2018
patrick.byrne@pse.com
425-424-6618
Sheet 1 of 2
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 008997
Card Exp. 08/13/2019
gregory.harwood@pse.com
(425)424-6425
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise
indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
STOP
POLE
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
ROW ROW
MFP19000307
P02 13131111
12
12
MONSTER RD SWJ
A
C
K
S
O
N
P
L
S
W
STOP
FLAGGER
STOP
FLAGGER
W20-7A100'W20-4ONE
L
A
N
E
ROA
D
AHE
A
D
ROA
D
WO
R
K
AHE
A
D W20-1100'100'BEPREP
ARE
D
TO
STOP W3-4ROADWORK
AHEA
D W20-1W20-7A1
0
0
'X'1
0
0
'
USE MAXIMUM AVAILABLE
SPACE FOR SIGNSBEPREPAREDTOSTOPW3-4ROADWORKAHEADW20-1100'
1
0
0
'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
N PSE PUGETSOUNDENERGY
JOB#92009011
1200 Monster Rd SW, Renton, WA
October 2nd, 2018
patrick.byrne@pse.com
425-424-6618
Sheet 2 of 2
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 008997
Card Exp. 08/13/2019
gregory.harwood@pse.com
(425)424-6425
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
STOP
POLE
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
ROW ROW
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise
indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
MFP19000307
Map data © OpenStreetMap contributors, CC-BY-SA
The information on the attached map is subject to changewithout notice.Puget Sound Energy makes no representation orwarranty of suitability of this information for any purpose.This map is not to be used fordetermining the actual location of any PSE facilities.Copyright ©2012. All rights reserved
Property of Puget Sound EnergyMaps, Records and Technology355 110th AVE NE, BELLEVUE, WA, 98004NAD_1983_StatePlane_Washington_North_FIPS_4601_Ft
Date: 7/11/2018 Reference Scale: 1:0±0 0.01 0.020.005 MilesPSE Web Map
INSTALL AMI NETWORK DEVICE AT
POLE GRID # 317386-165201
Connect power from POLE GRID #
317360-165204
MFP19000307
TO: City of Renton
RE: PSE Job Number 588010971
TYPE OF WORK: Installing Advance Meter Infrastructure (AMI) network device at the
existing pole grid# 317386-165201 and connect power to the device.
BACKGROUND: PSE current electric and natural gas meters are outdated and in
need of replacement. PSE is implementing to upgrade its meter reading technology
and will be updating its metering equipment from the old Automated Meter Reading (AMR)
system, installed in the late 1990s and early 2000s, to a new Advanced Meter Infrastructure,
more commonly referred to as AMI.
LOCATION OF WORK: 1200 Monster Rd SW, Renton
SCOPE OF WORK: PSE is requesting exemption (cited Exemption 1.i under RMC 4-6-090) to
install AMI network device on existing pole grid# 317386-165201 and connect power to
energize the device by install secondary OH wire from existing pole grid# 317368-165207
to pole grid# 317386-165201.
[Exemption 1.i. Installations where the Administrator determines:
i. There is a technological difficulty associated with the particular facility, or the particular
real property involved; or
ii. The cost of undergrounding such a facility outweighs the general welfare consideration
implicit in underground installation]
JUSTIFICATION:
i) Installing AMI network device completely underground is not an option due to radio
frequency technology of the device would not be possible.
ii) AMI network device is required power to energize the device and designed to be
located within 1000 feet radius of network design point in order to maintain meter
readings for the existing electric and gas meters in this area. The existing PSE
electric facility in this area is already overhead; therefore, utilizing the existing PSE
facility to attach AMI network device would outweigh converting electric facility to
underground to provide underground power feed to the device.
Sincerely,
Patima Dejarath, PMP
Network Deployment Lead
Meter Upgrade Project
(425) 456-2654 – desk | (425) 647-7110 – mobile
patima.dejarath@pse.com
MFP19000307
April 24, 2019
Marita Bond
Puget Sound Energy - Electric
P.O. Box 97034
Bellevue, WA 98009-9734
Via Email: marita.bond@pse.com
SUBJECT: Request for Undergrounding Exemption
(PSE#58801970, MFP19000307, 1200 Monster Road SW)
Dear Ms. Bond:
The City of Renton has reviewed your request to grant Puget Sound Energy (PSE) an exemption from
Renton Municipal Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities
shall be required to be installed underground, pursuant to the standards of the section of RMC.
PSE proposes to have Potelco Inc. install approximately 185 lineal feet of new overhead wire and
Advanced Meter Infrastructure (AMI) network device on existing poles. The work will begin on the pole
at the north most end of 1400 Monster Rd SW and terminate at the pole approximately 185 linear feet
northeast of the first pole.
ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090(D)(1)(i) i. Ordinance
5834 grants Puget Sound Energy, the right to construct, operate, set, erect, support, attach, connect,
maintain, repair, replace, enlarge and use facilities for purposes of transmission, distribution and sale of
electrical energy and gas, in, upon, over, under, along, across and through the franchise area.
The proposal would utilize existing poles and attach to the existing aerial path. A minimum vertical height
clearance of 15’-6” would need to be provided for; therefore, staff recommends this as a condition of
approval. Therefore, the City is granting an exemption with conditions, per RMC 4-6-090(D)(1)(i) i which
allows for extensions of existing overhead communication facilities when there are There is a
technological difficulty associated with the particular facility, or the particular real property involved.
DECISION: The requested exemption from underground utility installation requirements (RMC4-6-090 (C)
as requested by the applicant is approved with conditions subject to the conditions below as the request
complies with exemption criteria of RMC 4-6-090(D)(1)(i) i.
PSE Electric #58801970
Page 2 of 2
April 24, 2019
Conditions of Approval:
1. Any existing height violations within the Project Reach must be resolved at the time of
construction. New aerial lines within the Project Reach must have a minimum vertical
clearance of 15’-6”.
2. Any abandoned or unused lines within the Project Reach must be removed at the time that
construction is taking place.
3. A traffic control plan must be separately submitted to the City, and no construction may take
place until the City has approved a traffic control plan.
4. The new aerial fiber lines within the Project Reach must be converted to underground
facilities in the future, at PSE’s cost, when any one of the following events occurs: (1) any
other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed
by a franchisee within the Project Reach, in which case PSE shall participate in the joint use
trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made
available within the Project Reach that will accommodate the aerial lines. The new aerial lines
must be undergrounded within one year, or approved otherwise by the City, from the first
event triggering the requirement to underground the aerial lines.
This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period
from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed
with the City Clerk, along with the required appeal fee, by 5:00 pm, May 8, 2019.
Sincerely,
Brianne Bannwarth, PE
Development Engineering Manager
cc: C.E. “Chip” Vincent, CED Administrator
Gregg Zimmerman, PW Administrator
Jennifer Henning, Planning Director
Justin Johnson, Civil Engineer III
Scott Warlick, Engineering Specialist II
Holly Powers, Permit Technician
Pat Miller, Construction Inspection Supervisor
Patima Dejarath, PSE, patima.dejarath@pse.com
Sandy Leek, PSE, sandy.leek@pse.com
Franchise Permits