Construction Mitigation Description
The anticipation for construction date will be starting in June 2020 and end
November 2020.
All the work will be done from Monday to Friday roughly from 8:00am to
7:00pm and Saturday from 9:00am to 7:00pm.
The project doesn’t require any dirt hauling from job site.
Dust and noise will be very minimal during construction. Silt fence will be
installed around the project site perimeter and a temporary construction
entrance to prevent any debris or dirt from travel to adjacent property and
public right of way.
The project site is located adjacent to SE 173rd ST. SE 173rd ST is a dead
end street and traffic is very low. Traffic control plan for shoulder work will be
provide at the construction civil permit phase. The work along the shoulder of
SE 173rd ST can be done without temporary closing the road.