Loading...
HomeMy WebLinkAboutLANDSCAPE COST ESTIMATE WORKSHEET Senza 4-19-2019b.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT 1 H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\LANDSCAPE COST ESTIMATE WORKSHEET.docx 07/2015 LANDSCAPE QUANTITY WORKSHEET Planning Division 1055 South Grady Way-Renton, WA 98057 Phone: 425-430-7200 Fax: 425-430-7231 www.rentonwa.gov PROJECT NAME: ADDRESS: PREPARED BY: PHONE: UNIT PRICE* UNIT TYPE QUANTITY PRICE SOD LAWN AREAS $500.00 MSF (1000 SQ FT) HYDROSEEDING $50.00 MSF (1000 SQ FT) SOIL PREPARATION A. TOPSOIL (6 INCHES DEEP) $23.00 SY (SQUARE YARD) B. MULCH (2 INCHES DEEP) $4.00 SY (SQUARE YARD) C. PEAT MOSS (TWO INCHES DEEP) $2.30 SY (SQUARE YARD) D. COMPOST 13 INCHES DEEP & TILLING $26.00 CY (CUBIC YARD) E. FERTILIZER $6.67 CY (CUBIC YARD) PLANT MATERIALS A. DECIDUOUS TREES 2.00” MINIMUM CALIPER $250.00 COST & LABOR B. EVERGREEN TREES MINIMUM SIX (6) FEET OR ABOVE $225.00 COST & LABOR C. SHRUBS $35.00 COST & LABOR D. GROUND COVER $4.00 EACH COST & LABOR SUB TOTAL BOND AMOUNT BOND AMOUNT SUB TOTAL $ *OR ESTIMATE BY LANDSCAPE CONTRACTOR, WHICHEVER IS GREATER. 2 H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\LANDSCAPE COST ESTIMATE WORKSHEET.docx 07/2015 UNIT PRICE* UNIT TYPE QUANTITY PRICE MISCELLANEOUS TREE STAKES $2.65 EACH PER STAKE & LABOR FENCING $28.50 LINEAR FOOT INCLUDE LABOR BERMING $17.50 LINEAR FOOT INCLUDES LABOR IRRIGATION $0.80 SQUARE FOOT RELOCATING TREES ON SITE 36” BALL $260.00 EACH 60” BALL $920.00 EACH RELOCATING SHRUBS ON SITE 12” BALL $26.00 EACH 24” BALL $33.00 EACH ADDITIONAL ITEMS SUB TOTAL BOND AMOUNT BOND SUB TOTAL: Page 1 $ Page 2 $ TOTAL BOND PRICE TOTAL BOND PRICE: $ *OR ESTIMATE BY LANDSCAPE CONTRACTOR, WHICHEVER IS GREATER.