Loading...
HomeMy WebLinkAboutC-Cover letter April 29, 2019 ELECTRONIC DELIVERY Jill Ding, Senior Planner City of Renton Community and Economic Development Department 1055 South Grady Way Renton, WA 98057 RE: Application for Preliminary Short Plat Sumpter Property King County Parcel No. 142305-9013 City File No. PRE18-000234 Our Job No. 20291 Dear Jill, On behalf of Don Sumpter, we are submitting the formal application for a Preliminary Short Plat of the property referenced above. The project is proposed as a preliminary short plat of eight (8) residential lots that will be developed with eight (8) single-family homes and tracts for drainage and access. Existing utilities serve the site, including water, sewer, power, natural gas, telephone, and cable. Stormwater will be routed to a new underground vault system that will discharge to the existing conveyance system in 156th Avenue S.E. west of the site. This submittal is provided as a complete application for the permit reviews noted above with all items listed in the submittal checklists, as applicable. As listed in the Submittal Requirements Checklists for Preliminary Short Plat, the following items are enclosed on compact disc as required: 1. Preliminary Short Plat Submittal Checklist 2. City of Renton Pre-Application Meeting Summary dated April 12, 2018 3. Submittal Requirements Waiver Form 4. Land Use Permit Master Application Form 5. Check for fees 6. Project Narrative prepared by Barghausen Consulting Engineers, Inc. dated April 29, 2019, including: a. Modification Justification for:  Shared Driveway serving six lots and longer than 200 feet  Modification of Frontage Improvements proposing meandering sidewalk in right-of-way  Modification of Right-of-Way Dedication to match existing  Modification for Landscape Buffer to include rockery  Modification for Tree Protection Easement in lieu of Tract 7. City of Renton Density Worksheet 8. Construction Mitigation Description prepared by Barghausen Consulting Engineers, Inc. Jill Ding, Senior Planner City of Renton Community and Economic Development Department - 2 - April 29, 2019 9. Title Report issued by Ticor Title with attachments 10. Neighborhood Detail Map 11. Affidavit of Public Information Sign Posting, including a. Photos b. Map 12. Water Availability Certificate issued by Water District 90 dated October 19, 2018 13. Preliminary Short Plat Plan set prepared by Barghausen Consulting Engineers, Inc. dated April 29, 2019, including: a. Cover Sheet b. Horizontal Control Plan c. Preliminary Utility Plan d. Preliminary Grading and Drainage Plan e. Preliminary Cross Sections Plan f. Preliminary Tree Retention Plan g. Preliminary Landscape Plan 14. Preliminary Landscape Plan prepared by Barghausen Consulting Engineers, Inc. dated April 29, 2019 15. Boundary, Topographic, and Tree Surveys prepared by Barghausen Consulting Engineers, Inc. dated October 16, 2018 16. Preliminary Tree Retention/Land Clearing Plan prepared by Barghausen Consulting Engineers, Inc. dated April 29, 2019 17. Tree Retention Worksheet 18. Arborist Report prepared by Washington Forestry Consultants, Inc. dated September 25, 2018 19. Geotechnical Report prepared by prepared by Earth Solutions NW , LLC dated November 11, 2018 20. Geotechnical Report prepared by prepared by Earth Solutions NW , LLC dated March 27, 2019 21. Preliminary Utilities Plan prepared by Barghausen Consulting Engineers, Inc. dated April 29, 2019 22. Preliminary Grading and Drainage Plan prepared by Barghausen Consulting Engineers, Inc. dated April 29, 2019 23. Preliminary Drainage Report prepared by Barghausen Consulting Engineers, Inc. dated April 4, 2019 24. Preliminary Street Profiles and Cross Sections Plan prepared by Barghausen Consulting Engineers, Inc. dated April 29, 2019 25. Preliminary Grading and Drainage Plan prepared by Barghausen Consulting Engineers, Inc. dated April 29, 2019 Jill Ding, Senior Planner City of Renton Community and Economic Development Department - 3 - April 29, 2019 26. Reduced (8.5- by 11-inch) Preliminary Plat Plan Set 27. One (1) copy of the Colored Maps, including: a. Neighborhood Detail Map b. Site Plan c. Tree Retention Plan 28. Prescreen Comment emails from City of Renton 29. Applicant's Response to Prescreen Comments dated April 4, 2019 30. Variance Request to Renton Fire dated April 4, 2019 The enclosed materials comprise a complete application for Preliminary Short Plat review. Please route and review the enclosed materials at your earliest convenience. The applicant looks forward to working with the City on this project. Please contact me at this office with any plan review comments or questions. Thank you. Respectfully, Ivana Halvorsen Senior Planner IH/lb 20291c.003.docx enc: As Noted cc: Don Sumpter (w/enc via We Transfer)