Loading...
HomeMy WebLinkAboutRS-GEOT-2018-11-12-ESNWEarthSolutionsNWLLC EarthSolutions NW LLC Geotechnical Engineering Construction Observation/Testing Environmental Services 1805 -136th Place N.E.,Suite 201 Bellevue,WA 98005 (425)449-4704 Fax (425)449-4711 www.earthsolutionsnw.com GEOTECHNICAL ENGINEERING STUDY SUMPTER PROPERTY 14204 -156 AVENUE SOUTHEAST RENTON,WASHINGTON ES-3220.03 TH Drwn. Checked Date Date Proj.No. Plate Earth Solutions NWLLC Geotechnical Engineering,Construction EarthSolutionsNWLLC EarthSolutions NW LLC Observation/Testing and Environmental Services Vicinity Map Sumpter Property Renton,Washington MRS 10/25/2018 3220.03 TJD Oct.2018 1 NOTE:This plate may contain areas of color.ESNW cannot be responsible for any subsequent misinterpretation of the information resulting from black &white reproductions of this plate. Reference: King County,Washington Map 657 By The Thomas Guide Rand McNally 32nd Edition NORTH SITE Plate Proj.No. Date Checked By Drwn.ByEarthSolutionsNWLLCGeotechnicalEngineering,ConstructionObservation/TestingandEnvironmentalServicesEarthSolutionsNWLLCEarthSolutionsNWLLCTestPitLocationPlanSumpterPropertyRenton,WashingtonMRS TJD 10/25/2018 3220.03 2 NORTH 0 5 0 1 0 0 2 0 0 Sc ale in Feet1"=1 0 0 ' NOTE:This plate may contain areas of color.ESNW cannot be responsible for any subsequent misinterpretation of the information resulting from black &white reproductions of this plate. NOTE:The graphics shown on this plate are not intended for design purposes or precise scale measurements,but only to illustrate the approximate test locations relative to the approximate locations of existing and /or proposed site features.The information illustrated is largely based on data provided by the client at the time of our study.ESNW cannot be responsible for subsequent design changes or interpretation of the data by others. LEGEND Approximate Location of ESNW Test Pit,Proj.No. ES-3220.03,Sept.2018 Subject Site Existing Building Proposed Lot Number TP-1 TP-2 TP-3 TP-4 TP-5 TP-6 TP-1 1 2 3 4 5 6 7 8 Tract A S.E. 7TH PLACE S.E. 143RD STREET156TH AVENUE S.E.WAPATO PLACE S.E.158TH AVENUE S.E.Drainage Facility Gravel Driveway 5 Drwn.CAM Checked TJD Date Nov.2018 Date 11/12/2018 Proj.No.3220.03 Plate 3 Earth Solutions NWLLCEarthSolutionsNWLLC EarthSolutions NW LLC Geotechnical Engineering,Construction Obser vation/Testing and Environmental Services Retaining Wall Drainage Detail Sumpter Property Renton,Washington NOTES: Free-draining Backfill should consist of soil having less than 5 percent fines. Percent passing No.4 sieve should be 25 to 75 percent. Sheet Drain may be feasible in lieu of Free-draining Backfill,per ESNW recommendations. Drain Pipe should consist of perforated, rigid PVC Pipe surrounded with 1-inch Drain Rock. LEGEND: Free-draining Structural Backfill 1-inch Drain Rock 18"Min. Structural Fill Perforated Rigid Drain Pipe (Surround in Drain Rock) SCHEMATIC ONLY -NOT TO SCALE NOT A CONSTRUCTION DRAWING Drwn.CAM Checked TJD Date Nov.2018 Date 11/12/2018 Proj.No.3220.03 Plate 4 Earth Solutions NWLLCEarthSolutionsNWLLC EarthSolutions NW LLC Geotechnical Engineering,Construction Observation/Testing and Environmental Services Footing Drain Detail Sumpter Property Renton,Washington Slope Perforated Rigid Drain Pipe (Surround in Drain Rock) 18"Min. NOTES: Do NOT tie roof downspouts to Footing Drain. Surface Seal to consist of 12"of less permeable,suitable soil.Slope away from building. LEGEND: Surface Seal:native soil or other low-permeability material. 1-inch Drain Rock SCHEMATIC ONLY -NOT TO SCALE NOT A CONSTRUCTION DRAW ING