Loading...
HomeMy WebLinkAboutStamp Approved P_Civil_Construction_Plans_C19000922.pdfIFC SUBMITTALFEBRUARY 8, 2019 BOEING COMMERCIAL AIRPLANES APRON C PARCEL 820 PROJECT PROJECT LOCATION VICINITY MAP PROJECT SITE LEGAL DESCRIPTIONLEGAL DESCRIPTION GENERAL NOTES CODE SUMMARY PROJECT SUMMARY APRON C - PROJECT LOCATION SEE SHEETS C80 FOR LAND PARCELS &BUILDING LOCATIONS. HORIZONTAL & VERTICAL DATUM GALVANIZATION NOTE CITY OF RENTON PERMIT NUMBERS SITE 05-YD COVER SHEET G0 G0 R-405602TED-40-4056C1900922DEVELOPMENT ENGINEERING rnair 04/26/2019 WATER UTILITY agafour 04/26/2019 CURRENT PLANNING amorganroth 04/26/2019 REGIONAL FIRE AUTHORITY cthomas 04/29/2019 APPROVED C19000922 R-405601 IFC SUBMITTALFEBRUARY 8, 2019 SITE 05-YD KEY SHEET G1 G1 R-405602TED-40-4056DEVELOPMENT ENGINEERING rnair 04/26/2019 C19000922 R-405602  GENERAL DRAWING INDEX DRAWINGNUMBER SHEET SEQ.NO REV DRAWING TITLE GENERAL    CIVIL                GENERAL DRAWING INDEX DRAWING NUMBER SHEET SEQ.NO.REV DRAWING TITLE                                GENERAL DRAWING INDEX DRAWING NUMBERSHEET SEQ.NO.REV DRAWING TITLE LANDSCAPE STRUCTURAL MECHANICAL        ELECTRICAL     IFC SUBMITTALFEBRUARY 8, 2019 SITE 05-YD DRAWING INDEX SHEET G2 G2 R-405602TED-40-4056DEVELOPMENT ENGINEERING rnair 04/26/2019 C19000922 R-405603 IFC SUBMITTALFEBRUARY 8, 2019 SITE 05-YD CIVIL NOTES C2 C1 “” R-405602TED-40-4056DEVELOPMENT ENGINEERING rnair 04/26/2019 C19000922 R-405604 IFC SUBMITTALFEBRUARY 8, 2019 SITE 05-YD CIVIL NOTES C3 C2 “” R-405602TED-40-4056DEVELOPMENT ENGINEERING rnair 04/26/2019 C19000922 R-405605 1 1 CONTROL POINT TABLE SITE 05-YD OVERALL SITE PLAN C80 C3 IFC SUBMITTALFEBRUARY 8, 2019 R-405602TED-40-4056DEVELOPMENT ENGINEERING rnair 04/26/2019 C19000922 R-405606 SITE 05-YD CIVIL SITE PLAN C82 C4 IFC SUBMITTALMARCH 22, 2019 3/22/19 ALL MATERIALS AND RESTORE FINAL SURFACE PAVING. THE CONTRACTOR SHALL PROVIDE R-405602TED-40-4056W-405601 DEVELOPMENT ENGINEERING rnair 04/26/2019 C19000922 R-405607 SITE 05-YD TESC PLAN C223R C5 IFC SUBMITTALFEBRUARY 8, 2019 REMOVAL R-405602TED-40-4056C1900922 R-405608 DEVELOPMENT ENGINEERING rnair 04/26/2019 IFC SUBMITTALFEBRUARY 8, 2019 SITE 05-YD TESC DETAILS C224R C6 10' MAX. (TYP) R-405602TED-40-4056DEVELOPMENT ENGINEERING rnair 04/26/2019 C19000922 R-405609 IFC SUBMITTALFEBRUARY 8, 2019 SITE 05-YD PAVING REMOVAL PLAN C221R C7 REMOVAL R-405602TED-40-4056DEVELOPMENT ENGINEERING rnair 04/26/2019 C19000922 R-405610 2 C502 1C5023 C502 1C5022C502 IFC SUBMITTALFEBRUARY 8, 2019 SITE 05-YD PAVING PLAN C221 C8 R-405602TED-40-4056DEVELOPMENT ENGINEERING rnair 04/26/2019 C19000922 R-405611 IFC SUBMITTALFEBRUARY 8, 2019 SITE 05-YD PAVEMENT MARKING PLAN C225 C9 R-405602TED-40-4056C19000922DEVELOPMENT ENGINEERING rnair 04/26/2019 R-405612 IFC SUBMITTALFEBRUARY 8, 2019 SITE 05-YD STORM DRAIN REMOVAL PLAN C292R C10 REMOVAL R-405602TED-40-4056DEVELOPMENT ENGINEERING rnair 04/26/2019 C19000922 IFC SUBMITTALFEBRUARY 8, 2019 SITE 05-YD FENCING REMOVAL PLAN C471R C11 REMOVAL R-405602TED-40-4056C19000922DEVELOPMENT ENGINEERING rnair 04/26/2019 IFC SUBMITTALFEBRUARY 8, 2019 SITE 05-YD FENCING PLAN C471 C12 R-405602TED-40-4056C19000922DEVELOPMENT ENGINEERING rnair 04/26/2019 IFC SUBMITTALFEBRUARY 8, 2019IFC SUBMITTALFEBRUARY 8, 2019 SITE 05-YD TYPICAL SECTION DETAILS C502 C13 R-405602TED-40-4056 VAULT No. 504-BL COVER SAFE DRAIN SECTION AA A PLAN VIEW A END VIEW IFC SUBMITTALFEBRUARY 8, 2019 SITE 05-YD STORM DRAINAGE DETAILS C511 C14 R-405602TED-40-4056 IFC SUBMITTALFEBRUARY 8, 2019 SITE 05-YD FENCING DETAILS C514 C15 R-405602TED-40-4056 GRASS M GRASS S. S.PAVEDGRASS GRASS GRASS CONC DENSE BRUSH GRASSS. DENSE BRUSH S. RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA SITE 05 - YD - APRON C COMPRESSED AIR PIPING PLAN M113R M1 REMOVAL ISSUE FOR CONSTRUCTION FEBRUARY 8, 2019 R-405602TED-40-4056 MS.PAVEDSITE 05-YD - APRON CCOMPRESSED AIR PIPING PLANM111RM2REMOVALISSUE FOR CONSTRUCTIONFEBRUARY 8, 2019R-405602TED-40-4056 IFC SUBMITTALMARCH 22, 2019 SITE 05-YD FIRE PROTECTION AND WATER REMOVAL PLAN M261R M3 REMOVAL 3/22/19 THE CONTRACTOR SHALL PROVIDE ALL MATERIALS AND RESTORE FINAL SURFACE PAVING. R-405602TED-40-4056W-405601 WATER UTILITY agafour 04/26/2019 DEVELOPMENT ENGINEERING rnair 04/26/2019 C19000922 w-405602 GRASS M GRASS S.PAVEDGRASS GRASS GRASS CONC DENSE BRUSH GRASSS. DENSE BRUSH S. RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA SITE 05 - YD - APRON C SAFETY SHOWER TEPID WATER PIPING PLAN M264R M4 REMOVAL ISSUE FOR CONSTRUCTION FEBRUARY 8, 2019 R-405602TED-40-4056 SITE 05-YD - APRON C SAFETY SHOWER TEPID WATER PIPING PLAN M263R M5 REMOVAL ISSUE FOR CONSTRUCTION FEBRUARY 8, 2019 M S.PAVEDR-405602TED-40-4056 R-405602TED-40-4056 R-405602TED-40-4056 R-405602TED-40-4056 R-405602TED-40-4056 R-405602TED-40-4056 R-405602TED-40-4056 R-405602TED-40-4056 R-405602TED-40-4056 R-405602TED-40-4056 R-405602TED-40-4056 R-405602TED-40-4056 R-405602TED-40-4056 R-405602TED-40-4056 R-405602TED-40-4056 R-405602TED-40-4056 R-405602TED-40-4056 R-405602TED-40-4056 R-405602TED-40-4056 R-405602TED-40-4056 R-405602TED-40-4056 R-405602TED-40-4056 R-405602TED-40-4056 R-405602TED-40-4056 R-405602TED-40-4056