Loading...
HomeMy WebLinkAboutHEX_Notice_Willowcrest_PUD_20190402 OF PUBLIC HEARING CITY OF RENTON HEARING EXAMINER A Public Hearing will be held by the Renton Hearing Examiner on May 14, 2019 at 11:00 , in the Council Chambers on the seventh floor of Renton City Hall, 1055 South Grady Way, Renton, Washington, to consider the following petitions: DATE OF NOTICE OF HEARING: May 3, 2019 /  PROJECT NAME/NUMBER: PR19-000126 Willowcrest PUD / LUA19-0000061   PROJECT LOCATION: 1132 Edmonds Ave NE (APN 0923059080)   APPLICANT/PROJECT CONTACT PERSON: Suzanne Davis / Third Place Design Cooperative / 177 Western Ave W, Suite 266 Seattle, WA 98119   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2WHQtzw  PROJECT DESCRIPTION: The applicant is requesting combined preliminary and final Planned Urban Development approval, Binding Site Plan approval, and concurrence with the Sunset Area Planned Action EIS for a 12 unit townhome project located at 1132 Edmonds Ave NE. The subject property is 74,052 square feet (1.7 acres) and located in Commercial Mixed Use land use designation and Center Village zoning classification. The subject property is located within the Sunset Terrace Redevelopment Master Site Plan (LUA14001474) and has been allocated 68 multifamily units as part of the approved master plan. The 12 townhomes would be located on the eastern portion of the property and encompass 31,187 square feet (0.72 acres) of the site resulting in approximately 21 units per net acre. The townhome portion of the site would be subdivided into 12 lots, a common open space tract, and a utility/access tract. Lot sizes would range from 1,500 to 1,800 square feet. Access to the townhome site would be via an existing driveway located at the Glennwood Townhome project at 1141 Glennwood Ave NE. The applicant proposes to retain four (4) of the 26 significant trees on the townhome portion (eastern) of the site. The applicant proposes to construct a detention vault and install a filtration system to capture and treat storm drainage prior to discharge into the City’s stormwater system. The western portion of the site would be comprised of approximately 40,927 square feet (0.94 acres) and is proposed to be developed with multifamily housing in a future phase that would be reviewed under separate permit. No general vehicle access from Edmonds Ave NE would be provided with this initial phase of development. The City’s mapping system indicates slopes greater than 40% and High Landslide Area along the western portion of the property. The applicant has submitted reports and memoranda for impacts related to transportation, stormwater, geotechnical, and tree removal/retention. The project site is within the Sunset Planned Action Area and the City’s Environmental Review Committee will determine whether the proposal qualifies as a Planned Action.  DATE OF APPLICATION: March 29, 2019  NOTICE OF COMPLETE APPLICATION: April 3, 2019  PERMITS/REVIEW REQUESTED: Binding Site Plan Review (BSP), Preliminary and Final Planned Urban Development (PUD)  PUBLIC HEARING: A public hearing is tentatively scheduled for May 14, 2019 at 11:00 AM before the Renton Hearing Examiner in Renton Council Chambers on the 7th floor of Renton City Hall, located at 1055 South Grady Way.   If you are interested in attending the hearing, please contact the Planning Division to ensure that the hearing has not been rescheduled at (425) 430-6583. If you have questions about this proposal, or wish to be made a party of record and receive additional information by mail, please contact the project manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project.  CONTACT PERSON: Matt Herrera, Senior Planner; Tel: (425) 430-6593; Email: mherrera@rentonwa.gov