Loading...
HomeMy WebLinkAboutCM_Construction_Mitigation_190503_v1303 NICKERSON STREET SEATTLE, WA I 98109 phone 206.632.1818 www RYANRHODESDESIGNS.COM Construction Mitigation PRE17000417 • Proposed construction dates (begin and end dates); (permitting dependent) – Start fall 2019 / End fall 2020 • Hours and days of operation; (deadline dependent) Standard construction hours ~7am – 5pm • Proposed hauling/transportation routes; TBD – Likely N to S 2nd St to Bronson Way N to 405 • Measures to be implemented to minimize dust, traffic and transportation impacts, erosion, mud, noise, and other noxious characteristics; -Project size and scope eliminates mud, erosion, bulk of noxious characteristics. -Bulk of project is interior work, dust will be largely contained. Exterior masonry cutting will include wetting and encapsulation to control dust. -Noise should be controlled due to bulk of work being interior. • Any special hours proposed for construction or hauling (i.e. weekends, late nights); -Not at this time • Preliminary traffic control plan -Not at this time