Loading...
HomeMy WebLinkAboutCitizen Comment 05-13-2019 - Robert Steelea King County Department of Permitting and Environmental Review 35030 SE Douglas Street, Suite 210 Snoqualmle, WA 98065-9266 206-296-6600 TTY Relay: 711 www.klnqcotjnty.gov Project Name: Maple Valley Asphalt Facility t Applicant: Lakeside Industries ATTN: Karen Deal PO. Box7016 Issaquah, WA 98027 Date Application Filed: November 6, 2018_1� Date Determined Complete: December 4, 2018 Date mailed: December 28, 2018 i Combi eel Notice of Ap 1i11ations !t� EnvironmeIntal Review Process File No.: COMM1 DPER Project Mar�ag Phone No.: 206-477- E-mail: Project Location: 18825 SE Renton -Maple Valley Road Maple Valley, WA 98058 14 & SHOR18-0032 Fereshteh Dehkordi Project Description: Construction of a hot -mix asphalt plant togeth r with associated parking, 'driveway, and drainage facilities. This permit will include removal of stockpiles, excavation of petroleum contaminated soils, and backfill with clean soils under he Grading permit GRDE17- 0069*. Construction of an acceleration lane within SR-169 Right of Way, and construction of a new driveway within the Shoreline jurisdiction Permit requested in this application: Building Permit and Shorelin s4stantial Development Permit. Environmental review is required and relevant environmental doLuments are available on-line at www.kincicounty.aov/permits, or at the above address. Consistency with applicable County plans and regulations: This (proposal will be reviewed for compliance with all applicable King County codes including Roads Standards, i Surface Water Design u Manal, Zoning, Grading, Shoreline and Critical Areas Codes. Other permits not included in this application: *GRDE17-0069 c King County Code requires notification of property owners within at least above, so they can obtain additional information about the proposal and 1 The Department of Permitting and Environmental Review (DPER) will iss Determination pursuant to the State Environmental Policy Act (SEPA) pu application following a 33-day public comment period which ends Jan SEPA decision may be made to the King County Superior Court. The Department o rental RPerpAittiRg eview (DPER) will iss applicati owing the public comment period. rl en DPE at:. jt30 SE Douglas St. #210, Snoqual►nie, WA 98065-9266. these plications prior to the DPER decision on each permit. The Sho Shoreline s Board, who would conduct an appeal hear' or to Details of the appeal proce Ice of decision for nsolidated into this permit 00 feet of the project proposed )mm4nt if they wish (KCC 20.20). an nvironmental Threshold ;uant to WAC 197-11-355 on this ary 30, 2019. The Appeal to the a decision on the shoreline permit application must be submitted to )ubliI hearing is not required for ie d cision may be appealed to the akin�q a decision on the appeal. e shoreline permit. This may be the only opportunity to comment on the environmental iTpaots of the proposal. Written comments on this application must be submitted to DPER at the address ove� by the end of the comment period. I b Any person wishing additional information on this proposed project shouldlcontect the DPER Project Manager at the telephone number or e-mail listed above. You may also review the application and any environmental documents or studies in our Snoqualmie'office or at www.kinacountv.nnv/r)prmij�-i NOTE: To request this information in alternative formats for people with djsabilities please call 206-296-6600 or TTY Relay: 711. II If you wish to receive a copy of DPER's decisions, complete and return the ortiot� below to the Department of Permitting and Environmental Review at the address listed above. Please send me notification of any official notices concerning this applicatio . (PI lase print) File No.: COMM18-0014 and SHOR18-0032 I Name: Phone NO. & Email: Address: Note: DPER notifications will be sent via US Mail