Project Name: Maple Valley Asphalt Facility
t
Applicant: Lakeside Industries
ATTN: Karen Deal
PO. Box7016
Issaquah, WA 98027
Date Application Filed: November 6, 2018_1�
Date Determined Complete: December 4, 2018
Date mailed: December 28, 2018
i
Combi eel Notice of
Ap 1i11ations
!t�
EnvironmeIntal Review
Process
File No.: COMM1
DPER Project Mar�ag
Phone No.: 206-477-
E-mail:
Project Location: 18825 SE Renton -Maple Valley Road
Maple Valley, WA 98058
14 & SHOR18-0032
Fereshteh Dehkordi
Project Description: Construction of a hot -mix asphalt plant togeth r with associated parking,
'driveway, and drainage facilities. This permit will include removal of stockpiles, excavation of
petroleum contaminated soils, and backfill with clean soils under he Grading permit GRDE17-
0069*. Construction of an acceleration lane within SR-169 Right of Way, and construction of a new
driveway within the Shoreline jurisdiction
Permit requested in this application: Building Permit and Shorelin s4stantial Development Permit.
Environmental review is required and relevant environmental doLuments are available on-line at
www.kincicounty.aov/permits, or at the above address.
Consistency with applicable County plans and regulations: This (proposal will be reviewed for
compliance with all applicable King County codes including Roads Standards, i Surface Water Design
u Manal, Zoning, Grading, Shoreline and Critical Areas Codes.
Other permits not included in this application: *GRDE17-0069 c
King County Code requires notification of property owners within at least
above, so they can obtain additional information about the proposal and 1
The Department of Permitting and Environmental Review (DPER) will iss
Determination pursuant to the State Environmental Policy Act (SEPA) pu
application following a 33-day public comment period which ends Jan
SEPA decision may be made to the King County Superior Court.
The Department o rental RPerpAittiRg eview (DPER) will iss
applicati owing the public comment period. rl en
DPE at:. jt30 SE Douglas St. #210, Snoqual►nie, WA 98065-9266.
these plications prior to the DPER decision on each permit. The Sho
Shoreline s Board, who would conduct an appeal hear' or to
Details of the appeal proce Ice of decision for
nsolidated into this permit
00 feet of the project proposed
)mm4nt if they wish (KCC 20.20).
an nvironmental Threshold
;uant to WAC 197-11-355 on this
ary 30, 2019. The Appeal to the
a decision on the shoreline permit
application must be submitted to
)ubliI hearing is not required for
ie d cision may be appealed to the
akin�q a decision on the appeal.
e shoreline permit.
This may be the only opportunity to comment on the environmental iTpaots of the proposal. Written
comments on this application must be submitted to DPER at the address ove� by the end of the comment
period. I b
Any person wishing additional information on this proposed project shouldlcontect the DPER Project Manager
at the telephone number or e-mail listed above. You may also review the application and any environmental
documents or studies in our Snoqualmie'office or at www.kinacountv.nnv/r)prmij�-i
NOTE: To request this information in alternative formats for people with djsabilities please call 206-296-6600
or TTY Relay: 711. II
If you wish to receive a copy of DPER's decisions, complete and return the ortiot� below to the Department of
Permitting and Environmental Review at the address listed above.
Please send me notification of any official notices concerning this applicatio . (PI lase print)
File No.: COMM18-0014 and SHOR18-0032 I
Name: Phone NO. & Email:
Address:
Note: DPER notifications will be sent via US Mail