1. APPROVAL OF THIS EROSION AND SEDIMENTATION CONTROL 0 (ESC) PLAN DOES NOT
CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (E.G.,
SIZE
AND LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, RETENTION FACILITIES,
UTILITIES, ETC.). _._-__: _.�_.......:_.._..,_.-. .:..._._�_«�__..».-----•-_ _.._-_._._.___....--------- _................__.,.__:...------..__..--
'
2•THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE
REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF
THE CONTRACTORS ESC SUPERVISOR UNTIL ALL CONSTRUCTION IS APPROVED.
s
3.ALL REQUIRED SEDIMENTATION AND EROSION CONTROL FACILITIES MUST BE
CONSTRUCTED AND
IN OPERATION PRIOR TO LAND CLEARING AND/OR OTHER
CONSTRUCTION
AND DEMOLITION ACTIVITIES9 TO PROPERTIES OR THE _ NATURAL
DRAINAGE WAYS. ALL EROSION AND SEDIMENT FACILITIES SHALL BE MAINTAINED INA � •
j
SATISFACTORY CONDITION UNTIL SUCH TIME THAT% CLEARING AND OR CONSTRUCTION
z
AND DEMOLITION IS COMPLETED AND POTENTIAL FOR ONSITE EROSION HAS PASSED. s g
THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO
EROSION /SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR.
4.THE SEDIMENTATION AND EROSION CONTROL FACILITIES DEPICTED ON THIS DRAWING
ARE INTENDED TO BE MINIMUM RQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS.
4
AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS
:
DICTATE THE CONTRACTOR SHALL ANTICIPATE THAT MORE EROSION AND
SEDIMENTATION CONTROL FACILITIES WILL BE NECESSARY TO INSURE COMPLETE
SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION,
IT SHALL BE THE OBLIGATION
AND RESPONSIBILITY OF THE CONTRACTOR TO ADDRESS
ANY NEW CONDITIONS THAT MAY BE CREATED BY HIS ACTIVITIES AND TO PROVIDE
PROT
ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE
NEEDED
TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING
�s
DRAINAGE SYSTEM. THE IMPLEMENTATION, MAINTENANCE REPLACEMENT AND / ^
i t
ADDITIONS TO THESE CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR.
Uj ` ROCK RETAINING WALL EX. CONCRET`,E
5.ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT _
TO BE REMOVED, TYP. TO BE REMOVED, TYP.
BE DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1 THROUGH �W
' ' EX. PROPERTY
MARCH 30TH) OR SEVEN DAYS DURING THE DRY SEASON (APRIL 1ST THROUGH CONTRACTOR
..,
-=y LINE
C COVER - LAYDOWN AREA
SEPTEMBER 30 SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ES r :�:
.afi+Y ?K. - _ s ^Y �• _ _fi • :_7•{c:5 fes:.^._ � / ,
»
— '� g
-tea _. »»_��...._. ..... .__. . ....... .... . _. _- ,::..... » ...::._...... ........-.._" .__ -"• .. rr�4:r''1�%"". v�::::f=,-,:.:---.::...
/ - .a,�. wd! - y�-"' --r- -r <s:,-.'�`Y..�d-. ._..- .. s,�
-�-•• .��� _.,�� t. � ._ �...-:�.�::�..�. , ,.�.,�.._�..�._ r" __. ��- w WOODEN SHED
COVERING, ETC.. _..._. `_�
MULCHING PLASTIC CO .�.._ -.
METHODSEEDING ) _ ._.... _.�.__ »
(E.G.,( � // `AA. �—�'-:,. ---» .-µ^',`Vi•-�^,"`..;
,-- /-.�... -� ��.���,-=-= TO BE REMOVED
w
_. ,
:
{
APPLY TO __. __ _� __ .
REQUIREMENTS A --T._ : - _ - _ _».._...._.,�.: _. _ : »..__.... °�. 8 27 __ t
ON TR OL - - __ �........ �._ �.� _ __ _ _ _ - _ ....._.�__... _
T SEASON SEASONAL EROSION AND SEDIMENT C Q _ _ _
-- -
z
-
6 '. -
MARCH 30 INCLUSIVE `�
ALL CONSTRUCTION SITES CLEARING BETWEEN OCTOBER 1 AND � '
i CHAIN—LINK FENCE -_�ti ` _ _.� r
GH AN ADJUSTMENT PROCESS. ~"
APPROVED BY THE CITY THROUGH �..% Y�
LESS OTHERWISE _.__._ -
UN % �. % „ ,= ---.w:, � l�> �..' '` � �`-�` WOOD ��FE�I�E
i » » „- ; - TFC••'_ -BE REMOVED, TYP. �� F �- ,^ &•Typo
: i / =: _ TO 'B•E- REMOVED ,
NDIX D OF THE KING ------.......
APPLIED IN CONFORMANCE WITH APPE i / -
7. COVER MEASURES WILL BE / -"��� ._. -.
µ GATE `� .:� e
COUNTY SURFACEWATER DESIGN MANUAL, CURRENT EDITION. i ;. ,t - ! _ �:'�: ..::- ,:.a •�,' .. -:� ,_
'-,-
i
i >
r
AREA NEEDING ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE 3, ;
8. AN Y , ; ,^ i k - EX. TREE a
..1 11
{
r ..sy.4 � s' •'v •,
X i -ti d
i` TO BE
REMO �3 - _
�, Y.E .�
S. , •.
AY
SEVEN ,
SE _
SED
WITHIN _
RES •, '-�
D t. ,
AD /
_ i'
!,.
f l
r•,
I A,l r t
s' •as:/
i h i. ire�•'.!'v'v'''�
E ESC FACILITIES
INACTIVE VE S TE
S
SHALL
E
INSPECTED AND MAINTAINED f f __ ._. «..__-_ °
-_... ........�.( �.,.... .._,�_--MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT. ....... ...... ._ ..j
,
'.
...s. �
.,... t ' '\
.{ •> .y ". i> i ,4 Ari _
T OF SEDIMENT BE ALLOWED TO ; ✓ __ .._._- -- ._------______- ...__..__ ._.»_-•_---____-- _
10. AT NO TIME SHALL MORE THAN ONE(1)FOO
THE CLEANING OPERATION SHALL NOT FLUSH _ _......._._
ACCUMULATE WITHIN A CATCH BASIN. ; CARiQRTS `
j /� '._ TO B� --REMOVED \
WATER INTO THE DOWNSTREAM SYSTEM. �t- , _ 4 i!
SEDIMENT LADEN -'--
FI LD VERIFIED BY CO
NTRACTOR �; ,� ��;� ,n o Ln ,��� `; -%
11. ALL INLET PROTECTION LOCATIONS ARE TO BE E