Loading...
HomeMy WebLinkAboutAdmin Report   EXECUTIVE DEPARTMENT    M   E   M   O   R   A   N   D   U   M       DATE: May 20, 2019    TO: Don Persson, Council President  Members of Renton City Council     FROM: Denis Law, Mayor  Robert Harrison, Chief Administrative Officer     SUBJECT: Administrative Report        The Solid Waste Utility wants to remind you that shredded paper is no longer  accepted in curbside organics or recycling bins due to contamination issues. Please  only shred paper when necessary and recycle shredded paper at local shredding  events.     SAVE THE DATE – Reuse it! Renton Stop & Swap, Saturday, June 1. The Solid Waste  Utility will hold its annual Reuse it! Renton Stop & Swap one‐day reuse event from  10 a.m. to 2p.m. in the Renton Memorial Stadium main parking lot, located at 405  Logan Avenue North. For more information, including a list of acceptable and  unacceptable items, please visit our website at www.rentonwa.gov/stopandswap, or  contact the Solid Waste Utility at 425‐430‐7396. Keep usable items out of the  landfill! Your trash may be someone’s treasure.       Information about preventative street maintenance, traffic impact projects, and  road closures happening this week can be found at http://rentonwa.gov/traffic.   Preventative street maintenance, traffic impact projects, and road closures will be at  the following locations:   Monday, May 20 through Tuesday, May 21, 7:00 a.m. to 4:00 p.m.  Expect  intermittent lane closures for preventative utility maintenance work at the  intersection of NE 7th Street and Sunset Blvd NE. Flaggers will be on hand to  provide traffic control.       Monday, May 20 through Friday, May 24, 7:00 a.m. to 4:00 p.m.  Street  maintenance crews will be closing the northbound curb lane of Garden Avenue  North between North 5th Street and North 8th Street.     Monday, May 20 through Friday, May 24, 8:00 a.m. to 4:00 p.m.  Expect lane  reductions along Talbot Road South in the vicinity of Valley Medical Center to  allow crews to conduct preventative maintenance on utility lines.      Don Persson, Council President  Members of Renton City Council  Page 2 of 3  May 20, 2019       Monday, May 20 through Friday, May 24, 9:00 a.m. to 3:00 p.m.  Single lane  closure on 156th Avenue SE between SE 130th Street and SE 132nd Street due to  utility construction.  Questions may be directed to Brad Stocco at 206‐282‐2373.     Monday, May 20 through Friday, May 24.  Road closure on South 14th Street  between Smithers Avenue South and Davis Avenue South for utility construction.  Questions may be directed to Patrick DeCaro at 425‐207‐6013.     Monday, May 20 through Friday, May 24, 9:00 a.m. to 3:00 p.m.  Single lane  closure in the westbound lane of Puget Drive SE at the 1500 block due to utility  construction.  Questions may be directed to Tom Main at 206‐999‐1833.     Monday, May 20 through Friday, May 24, 9:00 a.m. to 5:00 p.m.  Intermittent  lane closures on Renton Avenue South between South 132nd Street and South  130th Street for utility construction. Questions may be directed to Justin Johnson  at 425‐430‐7291.     Monday, May 20 through Friday, May 24, 9:00 a.m. to 3:00 p.m.  Northbound  single lane closure at the 1200 block and 3400 block of Lake Washington Blvd  due to roadway construction.  Questions may be directed to Brad Stocco at 206‐ 282‐2373.     Monday, May 20 through Friday, May 24, 7:00 a.m. to 3:30 p.m.  Single lane  closure on Talbot Road South in the vicinity of Valley Medical Hospital related to  the construction of the new Medical Office Building. Questions may be directed  to Tom Main at 206‐999‐1833.     Monday, May 20 through Friday, May 24, 9:00 a.m. to 3:00 p.m.  Single lane  closure on South 7th Street between Cedar Avenue South and Renton Avenue SE  due to roadway construction. Questions may be directed to Todd Freih at 206‐ 999‐1832.     Monday, May 20 through Friday, May 24, 9:00 a.m. to 3:00 p.m.  The roadways  within the neighborhood bordered by 116th Avenue SE, 125th Avenue SE, SE  164th Street, and SE 168th Street have been ground down and are rough due to  paving activities for the water main replacement work performed by Soos Creek  Water and Sewer District. Questions may be directed to Patrick DeCaro at 425‐ 207‐6013.     Monday, May 20 through May 31.  Pavement restoration related to the Renton  Hill Utility Replacement Project has begun.  The project is scheduled to be  completed in May, but pavement restoration is dependent on weather  conditions.  For a proposed schedule and updates on the restoration project,  Don Persson, Council President  Members of Renton City Council  Page 3 of 3  May 20, 2019      please visit the project webpage at  https://rentonwa.gov/cms/one.aspx?portalId=7922741&pageId=11366266.      Monday, May 20 through Wednesday, January 1, 2020.  Intermittent single and  double lane closures along Logan Avenue North between North 6th Street and  near Garden Avenue North in support of the King County Eastside Sewer  Interceptor Rehabilitation project. Questions may be directed to Brad Stocco at  425‐282‐2373 or Rohini Nair at 425‐430‐7298.     Monday, May 20 through Wednesday, January 1, 2020.  Full road closure on  Burnett Avenue North at North 6th Street in support of the King County Eastside  Sewer Interceptor Rehabilitation project. Both the City of Renton and King  County’s Wastewater Division have reached out to property owners along the  approved detour route and to affected parties providing advanced notification of  the proposed road closure and detour route. In addition, notification was  provided in the Renton Reporter and signage will be provided in the field prior to  roadway closure. Resolution 4378 has been approved by City Council for the  roadway closure of Burnett Avenue North. Questions may be directed to Brad  Stocco at 425‐282‐2373 or Rohini Nair at 425‐430‐7298.