Loading...
HomeMy WebLinkAboutMH 3-MH 4Drain -Pro 2901 72nd Street E Tacoma, WA 98411 Phone: 253-539-4498 Fax: 253-539-4497 Customer Project City Street Bowen Construction 156 Sewer Renton 13010 156th Ave SE Start MH End MH Crew Truck Pipe Size Pi e T e MH 3 MH 4 Laiton 8 PVC MH Depth Se ment ID Backup Tae Tape Counter Date Time D ed Sheet 1 4/1/2019 10:55 AM Yes Length Precipitation Ground Surface Weather None Dry Unpaved Cloud Ftg. Condition Category Comments 10.0 Downstream Manhole Structure 12.0 Ponding 3/8" Pipe r-8.9 Service Connection Right Structure I� r — 88.4 Service Connect Top Structure 110.3 Ponding 1/4" Pipe 118.8 Service Connection Left Structure — 168.2 Service Connection Right Structure 197.9 Service Connection Left Structure — 1333.5 Service Connection Right Structure 361.4 Service Connection Left Structure 498.7 Service Connection Right Structure — 1511.9 Upstream Manhole Structure Page 1 of 6 Generated on 4/1/2019 at 11:23 AM by the PipeTech° TV inspection system. Drain -Pro 2901 72nd Street E Tacoma, WA 98411 Phone: 253-539-4498 Fax: 253-539-4497 Customer Project City Street Bowen Construction 156 Sewer I F -Renton 11 13010 156th Ave SE Start MH End MH Crew Truck Pipe Size Pipe T e MH 3 MH 4 Laiton I I 11 8 11 PVC MH Depth Segment ID Backup Tape Tape Counter Date Time D ed Sheet 1 1 11 11 4/1/2019 10:55 AM Yes Len th Precipitation Ground Surface Weather None Dry Unpaved Cloud DNMH - Downstream Manhole @ 0.0 ft. P38 - Ponding 3/8" @ 2.0 ft. SCR - Service Connection Right @ 8.9 ft. SCT - Service Connect Top @ 88.4 ft. Page 2 of 6 Generated on 4/1/2019 at 11:23 AM by the PipeTech° TV inspection system. Drain -Pro 2901 72nd Street E Tacoma, WA 98411 Phone: 253-539-4498 Fax: 253-539-4497 Customer Project City Street Bowen Construction 156 Sewer I F -Renton 11 13010 156th Ave SE Start MH End MH Crew Truck Pipe Size Pipe T e MH 3 MH 4 Laiton I I 11 8 11 PVC MH Depth Segment ID Backup Tape Tape Counter Date Time D ed Sheet 1 1 11 11 4/1/2019 10:55 AM Yes Len th Precipitation Ground Surface Weather None Dry Unpaved Cloud P14 - Ponding 1/4" @ 110.3 ft. SCL - Service Connection Left @ 118.8 ft. SCR - Service Connection Right @ 168.2 ft. SCL - Service Connection Left @ 197.9 ft. Page 3 of 6 Generated on 4/1/2019 at 11:23 AM by the PipeTech° TV inspection system. Drain -Pro 2901 72nd Street E Tacoma, WA 98411 Phone: 253-539-4498 Fax: 253-539-4497 Customer Project City Street Bowen Construction 156 Sewer I F -Renton 11 13010 156th Ave SE Start MH End MH Crew Truck Pipe Size Pipe T e MH 3 MH 4 Laiton I I 11 8 11 PVC MH Depth Segment ID Backup Tape Tape Counter Date Time D ed Sheet 1 1 11 11 4/1/2019 11 10:55 AM Yes Len th Precipitation Ground Surface Weather None Dry Unpaved Cloud SCR - Service Connection Right @ 333.5 ft. SCL - Service Connection Left @ 361.4 ft. SCR - Service Connection Right @ 498.7 ft. UPMH - Upstream Manhole @ 511.9 ft. Page 4 of 6 Generated on 4/1/2019 at 11:23 AM by the PipeTech° TV inspection system. Drain -Pro 2901 72nd Street E Tacoma, WA 98411 Phone: 253-539-4498 Fax: 253-539-4497 Customer Project City Street Bowen Construction 156 Sewer I F -Renton 11 13010 156th Ave SE Start MH End MH Crew Truck Pipe Size Pipe T e MH 3 MH 4 Laiton I I 11 8 11 PVC MH Depth Segment ID Backup Tape Tape Counter Date Time D ed Service Connection Left Sheet 1 1 11 11 4/1/2019 10:55 AM Yes Len th Precipitation Ground Surface Weather None Dry Unpaved Cloud Ftg. 0.0 2.0 8.9 88.4 110.3 118.8 168.2 197.9 333.5 361.4 498.7 511.9 Conditio Category Comments Downstream Manhole Structure Ponding 3/8" Pipe Service Connection Riqht Structure Service Connect Top Structure Pondinq 1/4" Pipe Service Connection Left Structure Service Connection Riqht Structure Service Connection Left Structure Service Connection Riqht Structure Service Connection Left Structure Service Connection Riqht Structure Upstream Manhole Structure Page 5 of 6 Generated on 4/1/2019 at 11:23 AM by the PipeTech° TV inspection system. Drain -Pro 2901 72nd Street E Tacoma, WA 98411 Phone: 253-539-4498 Fax: 253-539-4497 Customer Project City Street Bowen Construction 156 Sewer Renton 13010 156th Ave SE Start MH End MH Crew Truck Pipe Size Pi e T e MH 3 MH 4 Laiton 8 PVC MH Depth Segment ID Backup Tae Tape Counter Date Time D ed Sheet 1 4/1/2019 10:55 AM Yes Length Precipitation Ground Surface Weather None Dry Unpaved Cloud —0' Downstream Manhole Structure Ponding 3/8" Pipe 9' Service Connection Right Structure .4' Service Connect Top Structure 110.3' Ponding 1/4" Pipe 18.8' Service Connection Left Structure 168.2' Service Connection Right Structure •197.9' Service Connection Left Structure 333.5' Service Connection Right Structur 361.4' Service Connection Left Structur 498.7' Service Connection Right Structure 511,.9' Upstream Manhole Structu p i, p i Page 6 of 6 Generated on 4/1/2019 at 11:23 AM by the PipeTech° TV inspection system.