HomeMy WebLinkAboutCommittee of the Whole - 20 May 2019 - Agenda - PdfCITY OF RENTON
AGENDA Committee of the Whole Meeting
5:30 PM - Monday, May 20, 2019
Conferencing Center, 7th Floor, City Hall — 1055 S. Grady Way
1. Airport Building Lease Proposals Discussion
a) Memo
2. Community Services Dept Bond -funded Projects Update (cont'd)
a) Presentation
3. Boeing Apron R Update
4. Recreation & Neighborhoods Division Updates
a) Presentation
5. Parks & Trails Division Updates
a) Presentation
AGEN,
PUBLIC WORKS DEPARTMENT
M E M O R A N D U M
DATE: May 17, 2019
#1. a)
TO: Don Persson, Council President
Members of the Renton City Council
CC: Denis Law, Mayor
Robert Harrison, Chief Administrative Officer
FROM: Gregg Zimmerman, Public Works Administrator, ext. 7311
SUBJECT: Airport 300 Rainier Avenue North (Old Chamber ofD
Commerce Site) Lease Proposals Information
During the May 13 Committee of the Whole meeting, two proposals for leases on the
300 Rainier Avenue North (Old Chamber of Commerce site) were presented to the City
Council — the Aviator Proposal and the Yene Boona Cafe Proposal. We are providing you
some information on key airport leasing policies and also FAA regulations that may
impact or supersede those policies for landside leases for non -aeronautical uses and
also next steps.
These proposals require an explanation of the differences in airport leasing agreements.
The facilities can be distinguished by airside versus landside, while the revenue
distinction is between aeronautical versus non -aeronautical.
Airside versus Landside Leasing:
The airside of the airport is any building or pavement surface inside of the perimeter
fence of the airport, which has direct access to the runway and taxiway system. The
landside of the airport includes facilities and pavement outside of the perimeter fence
where there is no direct access to the runway or taxiway system. Both proposals for the
300 Rainier Avenue North parcel are considered proposals for landside.
Aeronautical versus Non -Aeronautical Agreements and Revenues:
Aeronautical agreements and the revenues that result are associated activities directly
associated with the operation of aircraft, for example, aircraft servicing, maintenance or
flight training. Non -aeronautical agreements and revenues are those agreements
and/or revenues generated from activities that support airport functions, but that are
not directly tied to the operation of an aircraft. Examples of these activities would be
rental car facilities, concessions, landside vehicle parking, advertising, etc. In modern
day airport administration, non -aeronautical agreements are where a bulk of the
revenue is generated to sustain the airport.
Commercial activities on the Renton Airport are principally governed by two
documents —the Airport Minimum Standards, which are required under Federal
Aviation Administration rules, and the Airport Leasing Policies, which the city has
Renton City Council
Page 2 of 3
May 17, 2019
AGENDA ITEM #1. a)
promulgated. Currently, the Airport Minimum Standards do not address commercial
activities associated with concessions or retail operations. Therefore, the airport
recommends that the City Council adopt policies to the Airport Minimum Standards to
remain consistent with benchmarking the commercial operations on the airport. The
airport will prepare draft policies for the City Council's consideration. Below, the airport
provides language from the current leasing policies adopted by the Council. However,
these policies are based on presumption of aeronautical uses and do not fully address
non -aeronautical agreements.
Airport Leasing Policies:
Leasing Policy
Provision #
5.2.2.1
6.3.1
6.5.3
Airport Lease Policy Statement
The applicant must obtain a score from
a consultant acceptable to the City on
an analysis of the lessee's financial
capacity.
The base lease term for land leases shall
be no longer than 25 years. Longer
lease terms may be granted based on
proven need for additional years to
amortize investment.
The City may set different rates for
different tenants based on rational
factors.
6.7.1 Reversion Policy — at the end of the
base term of the lease, the lessee shall
quit and surrender the premises to the
Comments
See Attachment B. An application
with a score of 25-32 is eligible for
a lease over 5 years.
The FAA guidance recommends 20
years, however allows leases up to
50 years for non -aeronautical uses.
Lifetime/99-year leases are highly
discouraged.
The FAA does not require ground
lease rates for non -aeronautical
uses to be the same as lease rates
for aeronautical uses. In fact,
landside non -aeronautical leases
must not be executed below Fair
Market Value per FAA regulation.
Typical non -aeronautical leases
usually include a base square
footage lease plus a minimum
annual guarantee/percentage of
gross sales.
The FAA also requires the lessee to
surrender the premises to the City
at the end of the lease.
c:\users\lmoschetti\desktop\council airport chamber proposal memo 051719.docx
Renton City Council
Page 3 of 3
May 17, 2019
AGENDA ITEM #1. a)
All revenues generated on landside and non -aeronautical leases must still be used only
for the operation of the airport -under federal regulation. Revenues need not be
devoted to aviation system improvements, although the airport can choose to do so.
Usually these types of revenues generated on an airport are used for customer services,
advertising/marketing, property acquisition, flood or noise mitigation, on -airport art
programs, etc. The airport may choose to use these revenues to support employee
salaries or to make up shortfalls in capital programs.
Next Steps:
The next steps, and minimum timelines for those steps, are included in the
Lease/Operating Permit Application Process Flow Chart (Attachment A). With respect to
the subject lease proposals, we have advised the Council of the complete applications,
but the applicants have not yet performed the analysis of lessee's financial capacity as
established in provision 5.2.2.1. That will add some additional time in the process flow.
The airport will also need to establish airport minimum standards for non -aeronautical
uses, which will also require some additional time.
cc: Leslie Clark, Senior Assistant City Attorney
Jim Seitz, Transportation Systems Division Director
Jason Seth, City Clerk
Megan Gregor, Deputy City Clerk
Harry Barrett, Jr., Airport Manager
Jason Anderson, Assistant Airport Manager
Casey Boatman, Airport Business Coordinator
April Alexander, Executive Assistant
Julia Medzegian, Council Liaison
c:\users\lmoschetti\desktop\council airport chamber proposal memo 051719.docx
Airport
Manager
determines if
Application Application is
Submitted complete
Attachment A
Lease/Operating Permit Application Process Flow Chart
Airport
Manager drafts
Administration
Lease or
advises
Operating
Council of
Permit if
Complete
Application was
Application
complete
At least 3 weeks
For applications deemed
incomplete or infeasible
Administration Referred to Council Council
Legal Review Authorization Committee Decision
4
At least 1 week At least 4 weeks
"�g
At least 2 weeks
Page 18 of 20
-9
At least 2
weeks
n,
Z
v
n
m
AttnrhmPnt R
--------------- —
Criteria
Rating Scale
Score
Years in airport -related business
No experience
0
Less than 1-2.9 years
1
3 — 6.9 years
2
7 — 12 years
3
more than 12 years
4
Airport -related management experience of
No experience
0
principal owner/manager
Less than 3 years
1
3 — 6.9 years
2
7 — 12 years
3
more than 12 years
4
Dunn & Bradstreet Pay history/credit report
No credit history
0
Pay History — high risk
I
Pay History — medium risk
2
Pay History — low risk
3
Pay History — low risk and clear credit report no bankruptcies, judgments, liens, etc.)
4
Viability of operations
Cannot demonstrate profitability
0
Losses (net) in all 3 years
I
Profitable (net) in I of last 3 years
2
Profitable (net) in 2 of last 3 years
3
Profitable (net) in past 3 years
4
Earnings net of cost of operations, taxes,
Net Earnings less than annual lease payment
I
depreciation/amortization, other debt/lease
Net Earnings equal to or less than 1.25x annual lease payment
2
obligations (if new enterprise, use projected
Net Earnings 1.25-2.0 times over annual lease payment
3
income and obligations)
Net Earnings more than 2.0 times over annual lease payment
4
Current ratio
Current ratio is less than I.Ox
I
Current ratio is 1.Ox —1.5x
2
Current ratio is 1.6x — 2.Ox
3
Current ratio is above 2.Ox
4
Debt Service Coverage (DSC)
DSC is less than 1.Ox
I
DSC is 1.Ox — 1.5x
2
DSC is 1.6x — 2.Ox
3
DSC is above 2.Ox
4
Net worth
Negative net worth
0
Net worth is positive, but less than annual lease payment
I
Net worth is equal to annual lease payment but less than 2x annual lease payment
2
Net worth is 2x — 5x annual lease payment
3
Net worth is more than 5x annual lease payment
4
Page 19 of 20
Park Avenue N Extension — General Area
=,EN F,
PRE--IMIMARY SECO R-ACV-.,
"A�
" 4-/t-
OX
44 Iqj
At
Z
tEWFE T
Extend Park Avenue N from the
existing intersection with Logan
Avenue N to connect to the
Southport site.
y LE
Design and Permitting: $813,000
Construction: $3,679,000
Right-of-way acquisition: $ 2,9571599
Total = $7,449,599
m
Z
Park Avenue N Extension — Water Main
�- ' ` _ `.•r'' ., '� �� � � ' "ram
�� �_ i 1 �. � .� 4�• ��� tel:' �'
4-
M,FBI e •�
V' y u
- 44
PE RTE ET �o.ce.xu�u ezw eir %:, 11 �F �Ury vRRK AVE E NIExTENSiDN
PRELIMINARY + �vRT��{. T
I-�..i+. n- uoc las T IOR CONailluGlloM: �^ `s�r..wgq wen. wn wA
rrntlnnc,M
The extension of approximately 250 Design and Construction Cost: $226,435
feet of 12-inch water main with 75
feet of 24" steel casing under BNSF
railroad right-of-way.
m
v
n
m
N
BNSF Trestle -Area
• ..,� • • i e 2 -
V..
'
JA
pERTEET ry
�v�...�. .�,._. � �•.`.GITYOF^... -uEry
r s..mwcac»..exe PRELIMIWARY � K�I Pnrik n�EExrErvsiov
TR
Trestle Bridge Replacement Design and Construction Cost: $275,000
h
I
BNSF Trestle — Sanitary Sewer
14
SANI IAPY SE'MEI2 LASING -
.44
o
PERTEET %�, y� - _ A c-ii Mn P.� �i.rofAEw.o« m
f' PRELIMINARY KArvErvuCry ExiErvSrtp+
H F:N7'V
u - IS
Installation of a 36-inch Steel
Casing crossing of BNSF railroad
right-of-way for a future Sanitary
Sewer System
Design and Construction Cost: $58,000
Highlands to Landing Pedestrian Lighting
x
-k�j N Southport Drive and NE Sunset Blvd Z
from Garden Ave to NB 1-405 Ramps n
• Design and Construction y
• 22 Pedestrian Luminaire Poles
• Foundations, Conduit, Service
• Estimate $300,000 ^'
Park Bond — Projects Update
Projects noted in slides are from the original `43 Project List — 6 year CIP'
Forwarded from the Community Advisory Committee and Council Approved
Following are:
• Completed bond projects
Cedar River Trail Park
Playground Replacement
j Al
'
ter. f..
Completed Projects
• Teasdale Park —Playground Replacement
OLD
NEW m
N
P
Completed Projects
• Philip Arnold - Bathroom Demolition
Demo 0OLD
Restroom Cleared Site n
Completed Projects
• Coulon Park —Structural and other repairs
• Boat launch
Coulon —Completed Projects
• Trestle Bridge — structural repair
• Sailing Float — decking and new floats
• Wave Breaks - repair and removal
• Stairs and Pilings down to Ivar's
M
Coulon — Completed Projects
• Ivar's - South Walk and Finger Piers repair
Coulon —Completed Projects
• Ivar's- North Walk repairs
Upcoming Prioritized Bond Projects
1. Complete identified Coulon projects
• Coulon parking lot improvements
• Water walk and picnic floats (DNR Lease)
• Repair Rosewall bulkhead (DNR Lease)
• Address shoreline erosion
• Repair the swim beach promenade
• Replace irrigation system
Examples at Coulon
k
2. Kiwanis Park - Improvements
• Ballfield renovation
• Multi -Use field renovation
• Parking lot full replacement
• Playground equipment replacement
• Sports Court renovation
m
z
• New ADA access from Union Ave. n
m
N
P
*„!Asil
:r
5
Y
3. Philip Arnold Park -Improvements
• Improvements to basketball court
• New ADA walkways to activity building, ballfield and lower
parking lot
• Relocate and replace playground equipment
• Install a picnic plaza
• Renovation of upper parking lot
•
a
9 �
h
Current Funding Status
Approved Park Bond - $14.5 million
Monies spent to date on completed projects — $3.4 million
Estimated funding for noted prioritized projects - $19.8 million
Includes 10% contingency and project management
QUESTIONS ?
Recreation & Neighborhoods Division
Our mission:
Creating an active, vibrant and connected community
through grants, recreational programming, and events
that are in response to growing service demands
through partnerships, innovation, and outcome
management.
eK S4
14' IPA KS
n
m
v
�.
Lines of Service
• Recreation
Programmi��
• Rec Events
• City Events
• Marketing
kn
• Boards
• Permits
• Rentals
• Contracts 8
Leases
• 3 Full servic
counters
• Personnel
• Volunteers
• Vehicles
• Buildings
• Financial
• Legal & H R
• Softwa re
Workshops
Grants
Events
Meetings
Vista
7R
m
z
v
n
.0'.
L)minj
$1,509,375
2018 Revenue
$681953
2018 Sponsorships
$110,797
2018 King County Grants
• $171430
2018 Gift of Play
ti r-
�,T Y
�FNTOI
_ E AOL �-
ir
lag
Erg
-Al
�j'T Y p�
+
ND107!A�d
T
�F
1
PILVW
IM04 P UP Le- I ..
F A sound source such as a The amplifier sends a current to a
microphone feeds sound wire loop that surrounds the room.
into an amplifier.
O,f T
Hearing Loop
The current generates a magnetic
field, which emanates from the loop.
Tiny wire t-coils built into
most hearing aids pick up the
magnetic signal.
The hearing aid converts the signal into sound customized
for the listener's individual pattern of hearing loss.
Fj ! I VA ki LVA m D-
0
PI.0. 0
4D
J
0'T
Y Ok.
�FNT0
We're listening
&EENPLAYL41C,
771e feeding Egge 1?? Parks, Aecrea�ion
An46sa Spare Corrauiting
sh.d0
Clam Lights 2018
Interaction report
Let's Go MAY-AUG 2019
Renton ! RECREATION
■ FOR ALL AGES
YOUTH ADULTS SENIORS
Day Camps Sports Leagues Technology, Dance,
PAGen PAGED Day Trips and More!
PAGE 35
F
E
ILS Im
Leading with Heart
■ lRentan Schools o
rito May 12013 - Q)
Renton High School senior ❑uIce Ventura has been named a 2018 Gates
Scholar_ DuIce is one of only 300 high school students nationwide — out of
nearly 3D_000 applicants — to win the prestigious award. She received the
award based on her academic achievement, community service and
leadership abilities. As part of the award, she will be granted a full -ride
college scholarship funded by the BIII and Melinda Gates Foundation to
pursue a biology degree: with a minor in Latin American studies, at
Swarthmore College in Pennsylvania. Read mare about DuIce and this
great he nor at https:#goo.gllrMGSbi
n,
z
v
n
'' 249 20 Comments 14 Shares
�.
Partners & Sponsors
+echbridge girls"
AIPM Excite, Educate and Equip Girls through STEM
ENVIRONMENTAL
it
y�w SCIENCE CENTER
AIN CITE'
CATEFD,ING
Seafood Bar
awks
THE LEADER IN YOUTH
SPORTS SINCE 1979.
Du Great Tasting Lunchmeat
N+W
L9 King County
'5e.S+ '5+kNr+S kco,r
HYATT
KIDS REGENCY
.000�
onntt
SCHOOL DISTRICT G
STONEWAY SERVICE � EXCELLENCE � EQUITY
CONCRETE n
Questions
r
�.
COMMUNITY SERVICES DEPARTMENT
PARKS and TRAILS
Division
Parks Maintenance
Farmers Market Program
Volunteer Proaram
4,p
y
/.
y 9 i
V-
Total Park Acreage
Developed Parks (32)
Maintained by Division
ROW Irrigation
Trails
1,246 acres
284 acres
809 acres
25 sites
10 miles
Picnic l
P�
Trail (Hard Surface) - Cleo
Grass - Mow by Ride
Playground Inspection
Storm Cleanup
Park Lock Up
Picnic Tables - Annual Maintenan
Daily Safety Inspe
Lear t-ieanup
Tasks
Support for all City -
sponsored events
Trash cleanup
Mowing
Ballfield preparations
Playground inspections
Cityworks —
Work Management Software
Garbage Baseline information this year
Reporting and graphics
Integrates with Public Works
Certified Playground Safety Inspectors
Tri-annual re -certification
Final inspections with Project Manager
In-house trainings
Design input at Sunset Neighborhood Park
Encampment Management
Community Services - lead on
City -owned properties
CED Code Enforcement - lead on
privately -owned properties
Post sites with Police
City Policy 1000-01 provides
requirements
Cleanups contracted out Z
v
n
m
Center ,
BURIEN
NORMANDY
PARK
Puget
Sound
\ Lake
SEA] ftshinglon
0
J— TUKWILA
r
GCS
MOINES
s4ww
Seg. Sag. E . .
Seg. D.
f �
h
KENT
Lake to Sound Trail
Segment A —1.2 miles
HAWK signal across
Monster Road
Bridge over Black River
King County will maintain
Construction to start today!
n
n,
v
m
PASFFjAIL
Branding launch
Eastrail Partnership
WSDOT mitigation
May Creek trailhead
New interim entrance
being designed for
Coulon Park
ATTENDANCE: 50,161 for 17 Market days;
highest single -day attendance 4,952 at end of
June
59 VENDORS: 13 new; 12 Renton residents; 23
farmers
SALES: Over $414,000 reported by vendors
• 31% increase from 2017, 2 fewer vendors
• 54% of total sales ($227,320) were from 23
farmers
• 10 farmer vendors cultivated 30 acres in King
County and reported a 65% increase in sales
from 2017 ($51,492)
, 0_�
peh
g0^
Ju f
he �11
4s
n
G)
l y
FAMRS
MArRKET
FV0
Food Trucks
VENDOR MAP
Market Footprint is expanding!
Logan Ave S closed on Tuesdays
Safer crossings
31 32 [
More vendors
30
29 Education, entertainment
28
27 Unlimited Fresh Bucks
51
complement Supplemental
Nutrition Assistance Program
(SNAP) benefits
1 f_
In 2018, Renton Volunteers gave:
• 5,985 volunteers
• Over 50,000 hours = $1,588,506
CERVIS software tracks:
• Police assistance
• Coach sports
• Renton Farmers Market
• Public Works Recycle events
• Parks Trail Rangers
• Park beautification projects
• Advisory boards and commissions
2019 Goals
• 15% increase of meals served to 31,516
• 9 United Way staff members
• 11 sites with recreation activities
• King County Library System will host
three special events
• 4 sites will stay open additional week
P.11 MjZ-",
!`} " 4
Arun at
AthLetes
ArimaLes Attetas
TRACK Trail — Kids in Parks
00- Nature's
Hide 4, Seef<,,
Self -guided nature hike
4 educational brochures
First in WA State
Website registration
• Prizes from each hike
The Need for
e e s
Software Implementations
Cityworks for Parks Maintenance
CERVIS for Volunteers
Update Park Kiosks
Cedar River Dog Park
North Highlands
Community Garden
New Dog Park Location
Discussions for a %2-acre dog park
Park and Trails Division would
maintain site
Agreements for Park Use
Sailing Center at Coulon Park
Softball league at Tiffany Park
n
Washington Conservation Corp
Urban Agriculture o
n
m
y�
VI
iWilt'`.
�r
�Vf
p7r• • e