HomeMy WebLinkAboutS-382405I
N
Y■
M
:i
ITT
Q
U
LU
ITT
I O
CL o rr,
z
LU
2
LU
J
I
LU
J
J
IIIIIIIIIIIIs■
z
0
z
LU
h
co �I
IZ �I
4 3
CEDAR AVE S I I
------_------------'--� I—I—I
T T T—T—I—T —� r 7 -r- L`7
CEDAR A VE S
5 ASEE GENERAL NOTE 4.
�' re
�� — T _ T -7-
LU
LU 1 I RENTON AVE S
—jL REN TON AVE S
r— -----T—T—T.-----rr----
1.
/ I � 12 I =I=h 6h�
/ ) o I I W W�
co
--TTT—I-- r� —rT-------T—��
% GR4NTAVE S
V I I cl) �a
I 13
I I L
I 16 17
--- -- r—T—T—.T—I—T—
I I I HIGHAVE S
14
I
I 19 20
—I--L—
�� JONES AVE S
GENERAL SEQUENCING AND REQUIREMENTS
T SUGGESTED SEQUENCING OF UTILITY INSTALLATION /5 SHOWN FOR EACH BLOCK ON THIS SHEET THIS
SEQUENCE TAKES INTO ACCOUNT EXISTING UTILITIES THAT NEED TO BE ABANDONED PRIOR TO
INSTALLING NEW UTILITIES. PROJECT SECTIONS 1 THROUGH 5 SHALL BE DONE IN THE ORDER
SHOWN. SECTIONS 6 THROUGH 21 ARE NOT LISTED IN THE TABLE BY ORDER OF COMPLETION.
WORK IN THESE AREAS SHALL BE SEQUENCED AT THE CONTRACTORS DISCRETION. HOWEVER, THE
CONTRACTOR SHALL MINIMIZE IMPACT TO THE NEIGHBORHOOD BY LIMITING WORK TO A SINGLE
STREET AS FEASIBLE.
2. CONTRACTOR MAY PROPOSE AN ALTERNATIVE SEQUENCE FOR THE CITY'S APPROVAL IN
ACCORDANCE WITH THE CONTRACT DOCUMENTS AND ACCESS REQUIREMENTS ON THIS SHEET.
3. NO CONSTRUCTION WORK SHALL TAKE PLACE ON RENTON AVE S AND CEDAR AVE S
SIMULTANEOUSLY RENTON AVE S AND CEDAR AVE S ARE THE ONLY STREETS THAN CAN BE USED
BY THE COMMUNITY FOR INGRESS AND EGRESS.
4, VEHICULAR ACCESS SHALL BE MAINTAINED AT THE INTERSECTION OF S 7TH ST AND RENTON AVE S.
5. TO PROTECT EXISTING SEATTLE WATER PIPELINES, NO HEAVY CONSTRUCTION VEHICLES OR
EQUIPMENT SHALL BE ALLOWED TO DRIVE ON BEACON WAY S AT ANY TIME DURING CONSTRUCTION.
6. PRIOR TO EVERY WEEKEND, THE CONTRACTOR SHALL PATCH THE CONSTRUCTION SITE WITH HMA
AND LEAVE THE SITE IN A CLEAN AND ORDERLY CONDITION. ANY TRAFFIC DETOURS SHALL BE
MAINTAINED IN ACCORDANCE WITH THE APPROVED TRAFFIC CONTROL PLAN.
• HOWN
ONE -CALL RSTING UTILITIES EE ER NCE ONLY. ACONTRACTOROR
SHALL FIELD LOCATE ALL ENISTING
® 1-800-424-5555 1 UTILITIES A MINIMUM OF 722 HOURS
Know what's below. PRIOR TO CONSTRUCTION.
Call before you dig. J
N
—L I
� —
M
WER
C
15
GRANTAVE S
CONTRACTOR SHALL NOT CLOSE BOTH RENTON
AVE S AND CEDAR AVE S SIMULTANEOUSLY
TO MAINTAIN NEIGHBORHOOD ACCESS, EITHER
STREET MUST BE OPEN DURING CONSTRUCTION.
CONTRACTOR MUST PROVIDE ADEQUATE
DETOUR SIGNAGE FOR TRAFFIC BOTH ENTERING
AND EXITING THE NEIGHBORHOOD.
RENTON AVE S I I
-,--rTT4-1
—ITT—T-7 --7 J
21
T CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN FOR EACH WORK ZONE, SHOWING DETOUR
ROUTES DUE TO ROAD CLOSURES.
2 CONTRACTOR SHALL PLACE BARRICADES MARKED 'LOCAL ACCESS ONLY AT THE END OF EACH
BLOCK WHERE WORK IS BEING PERFORMED AND PROVIDE FLAGGERS TO COORDINATE LOCAL ACCESS
TRAFFIC. CONTRACTOR SHALL NOTIFY RESIDENTS OF LIMITED ACCESS A MINIMUM OF 72 HOURS IN
ADVANCE OF THE WORK.
3. PRIOR TO BEGINNING ANY WORK THE CONTRACTOR SHALL PROVIDE THE CITY WITH A MAP SHOWING
THE PROPOSED HAUL ROUTE BETWEEN THE STAGING AREA AND THE PROJECT SITE.
BRH ORMAL O IZONTAL HAD NN
oESICNEo-
AW, JH, JF
oaawN:
F, AW
cHEcrcEo- DATUM
AW, AG Ai FN
IF NOT ONE
INCH
NC
NO. REVISION BY DATE APPR iaaaoveo SIT
ucoaowcw
AG
CITY OF
RENTON
Planning/Building/Publlc Works Dept.
RENTON HILL UTILITY REPLACEMENT PROJECT I xx/xx/xx
CONSTRUCTION SEQUENCING DIRWIINGNo:
AND G-6
GENERAL REQUIREMENTS HE� 7 °f
W 03000
Section
Street
From
To
Suggested Sequence
Notes
(S=Sewer, W=Water, D=Stormj
1
S 4th Street
Cedar AveS
W
Pothole vault at Cedar & S 4th St before installing water main along 4th St. See sheet W-3.
2
Cedar AveS
S5th Street
S4th Street
S,D,W
Due to proxi mity, may need joint trench for storm and sewer
Construction order of sewer or storm may be done at the contractor's discretion. Install water mai n
3
Cedar AveS
S5th Street
Stith Street
S,D,W
after existing sewer is demolished. See sheets S -2,S -3,W-1, and W-2.
4
Cedar Ave S
S 6th Street
S 7th Street
S
5
S 7th Street
Cedar Ave S
Renton Ave S
S,D,W
w
6
S 7th Street
Renton Ave S
Grant Ave S
D
See General Note 4.
F
z7
S7th Street
Grant AveS
High AveS
S,W,D
Instal l storm drain at intersection of S. 7th St. &High Ave S. after new water is operational.
J
8
S7th Street
High AveS
Jones AveS
S,W,D
Instal l storm drain at intersection of S. 7th St. &High Ave S. after new water is operational.
w
z
w
9
Renton Ave S
S 7th Street
S 9th Street
S,W
w
10
Renton Ave S
S 9th Street
S 10th Street
W,D
N
11
IS 10th Street
Renton AveS
Grant AveS
S,W
Ed
12
S 9th Street
Renton Ave S
Grant Ave S
D
13
S 9 Street
Grant AveS
High AveS
S,D,W
Pothole existing side sewers before installing storm and water. See sheet S-10.
z
14
S9th Street
High AveS
Jones AveS
S,W,D
Install side sewer before installing storm and water. Install storm after new water is operational.
U
M
15
Grant AveS
S7th Street
Beacon Way
S,W
0
O
16
High Ave S
End
S 9th Street
D,S,W
Due to proximity, may need joint trench for storm and sewer
w
w
17
High AveS
59th Street
57th Street
S,W,D
Install storm drain after new water main is operational.
z
Q
18
High Ave S
S 7th Street
Beacon Way S
W
w
U
z
19
Jones Ave S
End
S 9th Street
W
W
n
0
20
Jones Ave S
S 9th Street
S 7th Street
W
W
rn
21
Renton AveS
Beacon Way
I
D,W
BRH ORMAL O IZONTAL HAD NN
oESICNEo-
AW, JH, JF
oaawN:
F, AW
cHEcrcEo- DATUM
AW, AG Ai FN
IF NOT ONE
INCH
NC
NO. REVISION BY DATE APPR iaaaoveo SIT
ucoaowcw
AG
CITY OF
RENTON
Planning/Building/Publlc Works Dept.
RENTON HILL UTILITY REPLACEMENT PROJECT I xx/xx/xx
CONSTRUCTION SEQUENCING DIRWIINGNo:
AND G-6
GENERAL REQUIREMENTS HE� 7 °f
W 03000