Loading...
HomeMy WebLinkAboutD-382405I N Y■ M :i ITT Q U LU ITT I O CL o rr, z LU 2 LU J I LU J J IIIIIIIIIIIIs■ z 0 z LU h co �I IZ �I 4 3 CEDAR AVE S I I ------_------------'--� I—I—I T T T—T—I—T —� r 7 -r- L`7 CEDAR A VE S 5 ASEE GENERAL NOTE 4. �' re �� — T _ T -7- LU LU 1 I RENTON AVE S —jL REN TON AVE S r— -----T—T—T.-----rr---- 1. / I � 12 I =I=h 6h� / ) o I I W W� co --TTT—I-- r� —rT-------T—�� % GR4NTAVE S V I I cl) �a I 13 I I L I 16 17 --- -- r—T—T—.T—I—T— I I I HIGHAVE S 14 I I 19 20 —I--L— �� JONES AVE S GENERAL SEQUENCING AND REQUIREMENTS T SUGGESTED SEQUENCING OF UTILITY INSTALLATION /5 SHOWN FOR EACH BLOCK ON THIS SHEET THIS SEQUENCE TAKES INTO ACCOUNT EXISTING UTILITIES THAT NEED TO BE ABANDONED PRIOR TO INSTALLING NEW UTILITIES. PROJECT SECTIONS 1 THROUGH 5 SHALL BE DONE IN THE ORDER SHOWN. SECTIONS 6 THROUGH 21 ARE NOT LISTED IN THE TABLE BY ORDER OF COMPLETION. WORK IN THESE AREAS SHALL BE SEQUENCED AT THE CONTRACTORS DISCRETION. HOWEVER, THE CONTRACTOR SHALL MINIMIZE IMPACT TO THE NEIGHBORHOOD BY LIMITING WORK TO A SINGLE STREET AS FEASIBLE. 2. CONTRACTOR MAY PROPOSE AN ALTERNATIVE SEQUENCE FOR THE CITY'S APPROVAL IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND ACCESS REQUIREMENTS ON THIS SHEET. 3. NO CONSTRUCTION WORK SHALL TAKE PLACE ON RENTON AVE S AND CEDAR AVE S SIMULTANEOUSLY RENTON AVE S AND CEDAR AVE S ARE THE ONLY STREETS THAN CAN BE USED BY THE COMMUNITY FOR INGRESS AND EGRESS. 4, VEHICULAR ACCESS SHALL BE MAINTAINED AT THE INTERSECTION OF S 7TH ST AND RENTON AVE S. 5. TO PROTECT EXISTING SEATTLE WATER PIPELINES, NO HEAVY CONSTRUCTION VEHICLES OR EQUIPMENT SHALL BE ALLOWED TO DRIVE ON BEACON WAY S AT ANY TIME DURING CONSTRUCTION. 6. PRIOR TO EVERY WEEKEND, THE CONTRACTOR SHALL PATCH THE CONSTRUCTION SITE WITH HMA AND LEAVE THE SITE IN A CLEAN AND ORDERLY CONDITION. ANY TRAFFIC DETOURS SHALL BE MAINTAINED IN ACCORDANCE WITH THE APPROVED TRAFFIC CONTROL PLAN. • HOWN ONE -CALL RSTING UTILITIES EE ER NCE ONLY. ACONTRACTOROR SHALL FIELD LOCATE ALL ENISTING ® 1-800-424-5555 1 UTILITIES A MINIMUM OF 722 HOURS Know what's below. PRIOR TO CONSTRUCTION. Call before you dig. J N —L I � — M WER C 15 GRANTAVE S CONTRACTOR SHALL NOT CLOSE BOTH RENTON AVE S AND CEDAR AVE S SIMULTANEOUSLY TO MAINTAIN NEIGHBORHOOD ACCESS, EITHER STREET MUST BE OPEN DURING CONSTRUCTION. CONTRACTOR MUST PROVIDE ADEQUATE DETOUR SIGNAGE FOR TRAFFIC BOTH ENTERING AND EXITING THE NEIGHBORHOOD. RENTON AVE S I I -,--rTT4-1 —ITT—T-7 --7 J 21 T CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN FOR EACH WORK ZONE, SHOWING DETOUR ROUTES DUE TO ROAD CLOSURES. 2 CONTRACTOR SHALL PLACE BARRICADES MARKED 'LOCAL ACCESS ONLY AT THE END OF EACH BLOCK WHERE WORK IS BEING PERFORMED AND PROVIDE FLAGGERS TO COORDINATE LOCAL ACCESS TRAFFIC. CONTRACTOR SHALL NOTIFY RESIDENTS OF LIMITED ACCESS A MINIMUM OF 72 HOURS IN ADVANCE OF THE WORK. 3. PRIOR TO BEGINNING ANY WORK THE CONTRACTOR SHALL PROVIDE THE CITY WITH A MAP SHOWING THE PROPOSED HAUL ROUTE BETWEEN THE STAGING AREA AND THE PROJECT SITE. BRH ORMAL O IZONTAL HAD NN oESICNEo- AW, JH, JF oaawN: F, AW cHEcrcEo- DATUM AW, AG Ai FN IF NOT ONE INCH NC NO. REVISION BY DATE APPR iaaaoveo SIT ucoaowcw AG CITY OF RENTON Planning/Building/Publlc Works Dept. RENTON HILL UTILITY REPLACEMENT PROJECT I xx/xx/xx CONSTRUCTION SEQUENCING DIRWIINGNo: AND G-6 GENERAL REQUIREMENTS HE� 7 °f W 03000 Section Street From To Suggested Sequence Notes (S=Sewer, W=Water, D=Stormj 1 S 4th Street Cedar AveS W Pothole vault at Cedar & S 4th St before installing water main along 4th St. See sheet W-3. 2 Cedar AveS S5th Street S4th Street S,D,W Due to proxi mity, may need joint trench for storm and sewer Construction order of sewer or storm may be done at the contractor's discretion. Install water mai n 3 Cedar AveS S5th Street Stith Street S,D,W after existing sewer is demolished. See sheets S -2,S -3,W-1, and W-2. 4 Cedar Ave S S 6th Street S 7th Street S 5 S 7th Street Cedar Ave S Renton Ave S S,D,W w 6 S 7th Street Renton Ave S Grant Ave S D See General Note 4. F z7 S7th Street Grant AveS High AveS S,W,D Instal l storm drain at intersection of S. 7th St. &High Ave S. after new water is operational. J 8 S7th Street High AveS Jones AveS S,W,D Instal l storm drain at intersection of S. 7th St. &High Ave S. after new water is operational. w z w 9 Renton Ave S S 7th Street S 9th Street S,W w 10 Renton Ave S S 9th Street S 10th Street W,D N 11 IS 10th Street Renton AveS Grant AveS S,W Ed 12 S 9th Street Renton Ave S Grant Ave S D 13 S 9 Street Grant AveS High AveS S,D,W Pothole existing side sewers before installing storm and water. See sheet S-10. z 14 S9th Street High AveS Jones AveS S,W,D Install side sewer before installing storm and water. Install storm after new water is operational. U M 15 Grant AveS S7th Street Beacon Way S,W 0 O 16 High Ave S End S 9th Street D,S,W Due to proximity, may need joint trench for storm and sewer w w 17 High AveS 59th Street 57th Street S,W,D Install storm drain after new water main is operational. z Q 18 High Ave S S 7th Street Beacon Way S W w U z 19 Jones Ave S End S 9th Street W W n 0 20 Jones Ave S S 9th Street S 7th Street W W rn 21 Renton AveS Beacon Way I D,W BRH ORMAL O IZONTAL HAD NN oESICNEo- AW, JH, JF oaawN: F, AW cHEcrcEo- DATUM AW, AG Ai FN IF NOT ONE INCH NC NO. REVISION BY DATE APPR iaaaoveo SIT ucoaowcw AG CITY OF RENTON Planning/Building/Publlc Works Dept. RENTON HILL UTILITY REPLACEMENT PROJECT I xx/xx/xx CONSTRUCTION SEQUENCING DIRWIINGNo: AND G-6 GENERAL REQUIREMENTS HE� 7 °f W 03000