Loading...
HomeMy WebLinkAboutD-382413H Lu N 0 m CR nPE I - RIM IM 6 3.3 o- ,5701(8 CONC E) 11 156.83(78 CONC W) NOT i56 83 NO MONUMENT FOUND CALCULATED POSITION N: 174686.4381 E:1302920.2117 CB TYPE I cud 562.99 IF -361,29(6 ' VC SW) IE=36129(6'CONC NE) I1,=361.19(8"ADS SE) IE=359.59(12'COIVC W) 559.59(12"CONC N) E31 NCIIMMI ',.1" 101' C N IER E301 1 OF FIRE IiYDNANT AT ON➢9 AST END OF HIGH AVE 5 1 I EVA11oN 367.30' EDGE OF PAVEMENT (TYP) W_ PARCEL 39470-0400 NEW WATER LINE SEE DWG W-10 +50 927 6 .. 9 i — x1M=364.&8 � CC FYPE E l COC 35LE,3 RIM-JFFJ 56 (h fl C ONC N s OF IE C P, TYPE 1 (A CONC E 4 OF IL-,3E0.2E(1L RIM362 60 11 3 61(6"CONE W) 11=360.50(1 CONC N) 130T=3h1 96 Lor ,so,o - NEW SEWER LINE 14 SEE DWG S-10,7— 3 +50 927 6 .. 9 i V CC FYPE E l RIM-JFFJ 56 CU TYPE I IE 560 i6(1 C ONC IV) RIM =364.56 IL-,3E0.2E(1L CONC OF ACE S PARCEL: 329470-0392 IiC PLAN STORM SYSTEM IMPROVEMENTS SCALE: 1 "=20' '2' �470 028E S CR TYPE I RIM -7C4,19 11 363.19(E CONC E) If 36'3.09(5 COIVC S) 11 , ih2.H 1(E "CONC W) (PIPE f I CICCFD N) RCT S62A9 3 , c CR E. S PARCEL: 329470-0391 co co 0 7 .x,.. _.I__. i■ w 1 w cn Lu ' z .I U ' H CH RIM IF - IE -j E "O'i I KEY PLAN GENERAL NOTES 1. SEE GENERAL STORMWATER NOTES ON DWG G2. 2. SEE DETAIL 2 ON DWG SW15 FOR TYPICAL TRENCH CROSS SECTION. 3. CONTRACTOR IS RESPONSIBLE FOR LOCATING AND POTHOLING ALL UTILITIES NOT PREVIOUSLY POTHOLED WITHIN EXCAVATION LIMITS, WHICH SHALL BE INCIDENTAL TO PIPE BID ITEMS. WHERE ADDITIONAL SITE SPECIFIC POTHOLING IS REQUIRED BY THE PLANS OR REQUESTED BY ENGINEER, IT SHALL BE PAID FOR BY "SITE SPECIFIC POTHOLING". 4. EXISTING STORM DRAIN ON EAST SIDE OF HIGH AVE S, WHERE MULTIPLE LATERALS CURRENTLY CONNECT, IS NOT SHOWN IN BASEMAP. NOTE THAT THE NEW STORM SYSTEM MAY REQUIRE THE REMOVAL OF EXTENSIVE PORTIONS OF THIS PIPE AND THE RECONNECTION OF THE LATERALS AS REQUIRED ON THIS SHEET. 5. SEE DWG SW17 AND SW18 FOR STORM STRUCTURE DATA. 6. SEE DWG G7 FOR UTILITY POTHOLE DATA. CONSTRUCTION NOTES O REMOVE AND REPLACE EXISTING CATCH BASIN. PLUG EXISTING PIPE TO NORTH. O2 REMOVE AND REPLACE CATCH BASIN. CONNECT TO EXISTING 6" SO TO EAST AND EXTEND 6" SO TO NEW SDMH. REGRADE AND PAVE DRIVEWAY ENTRANCE TO SLOPE TOWARD NEW HIGH AVE S GUTTER LINE. O EXTEND 6" OR 8" LATERAL TO CONNECT TO NEW 12" STORM WITH 12"x8" OR 12"x6" PPP TEE. INSTALL CLEANOUT PER DETAIL 4 ON DWG SW15. REMOVE EXISTING STORM LATERAL AS NEEDED. ® GAS LINE TO BE RELOCATED BY PSE. (5)EXISTING CENTURYLINK CONDUIT RUNS PARALLEL TO NEW STORM FROM APPROX STA 0+80 TO STA 3+00. CONTRACTOR TO FIELD VERIFY AND LOCATE. ANY CONFLICTS SHALL BE RESOLVED WITH CENTURYLINK. CONTACT TOM BROWN, (206) 799-2989. O SENTRY BOX WITH UNDERGROUND CENTURYLINK LINE IN VICINITY. PROTECT AND MAINTAIN SERVICE DURING CONSTRUCTION. CONTRACTOR TO FIELD VERIFY LOCATIONS CU TYPE I RIM =364.56 11 3 61(6"CONE W) 130T=3h1 96 ROW 3 rnl PARCEL 329470-0390 PLAN STORM SYSTEM IMPROVEMENTS SCALE: 1 "=20' '2' �470 028E S CR TYPE I RIM -7C4,19 11 363.19(E CONC E) If 36'3.09(5 COIVC S) 11 , ih2.H 1(E "CONC W) (PIPE f I CICCFD N) RCT S62A9 3 , c CR E. S PARCEL: 329470-0391 co co 0 7 .x,.. _.I__. i■ w 1 w cn Lu ' z .I U ' H CH RIM IF - IE -j E "O'i I KEY PLAN GENERAL NOTES 1. SEE GENERAL STORMWATER NOTES ON DWG G2. 2. SEE DETAIL 2 ON DWG SW15 FOR TYPICAL TRENCH CROSS SECTION. 3. CONTRACTOR IS RESPONSIBLE FOR LOCATING AND POTHOLING ALL UTILITIES NOT PREVIOUSLY POTHOLED WITHIN EXCAVATION LIMITS, WHICH SHALL BE INCIDENTAL TO PIPE BID ITEMS. WHERE ADDITIONAL SITE SPECIFIC POTHOLING IS REQUIRED BY THE PLANS OR REQUESTED BY ENGINEER, IT SHALL BE PAID FOR BY "SITE SPECIFIC POTHOLING". 4. EXISTING STORM DRAIN ON EAST SIDE OF HIGH AVE S, WHERE MULTIPLE LATERALS CURRENTLY CONNECT, IS NOT SHOWN IN BASEMAP. NOTE THAT THE NEW STORM SYSTEM MAY REQUIRE THE REMOVAL OF EXTENSIVE PORTIONS OF THIS PIPE AND THE RECONNECTION OF THE LATERALS AS REQUIRED ON THIS SHEET. 5. SEE DWG SW17 AND SW18 FOR STORM STRUCTURE DATA. 6. SEE DWG G7 FOR UTILITY POTHOLE DATA. CONSTRUCTION NOTES O REMOVE AND REPLACE EXISTING CATCH BASIN. PLUG EXISTING PIPE TO NORTH. O2 REMOVE AND REPLACE CATCH BASIN. CONNECT TO EXISTING 6" SO TO EAST AND EXTEND 6" SO TO NEW SDMH. REGRADE AND PAVE DRIVEWAY ENTRANCE TO SLOPE TOWARD NEW HIGH AVE S GUTTER LINE. O EXTEND 6" OR 8" LATERAL TO CONNECT TO NEW 12" STORM WITH 12"x8" OR 12"x6" PPP TEE. INSTALL CLEANOUT PER DETAIL 4 ON DWG SW15. REMOVE EXISTING STORM LATERAL AS NEEDED. ® GAS LINE TO BE RELOCATED BY PSE. (5)EXISTING CENTURYLINK CONDUIT RUNS PARALLEL TO NEW STORM FROM APPROX STA 0+80 TO STA 3+00. CONTRACTOR TO FIELD VERIFY AND LOCATE. ANY CONFLICTS SHALL BE RESOLVED WITH CENTURYLINK. CONTACT TOM BROWN, (206) 799-2989. O SENTRY BOX WITH UNDERGROUND CENTURYLINK LINE IN VICINITY. PROTECT AND MAINTAIN SERVICE DURING CONSTRUCTION. CONTRACTOR TO FIELD VERIFY LOCATIONS