Loading...
HomeMy WebLinkAboutD-382418v N co (h N N d W In m I > >: PARCEL: • 723150-0470 PARCEL s 723150-0470 I , ' _ Ar Av._ i3 PARCEc 723150-0490 PARCEL: 723150-0485 PARCEL. 723150-3495 CI \; ROW J _ 'T v' PARCEL: 722140-0190 NEW WATER LINE SEE DWG W-1 — PLAN STORM SYSTEM IMPROVEMENTS SCALE: 1"=20' R ;,, PARCEL. 722140—ons 15- 50 A^ A', S PARCEL. 722140-0767 NEW SEWER LINE SEE DWG S-2 ," O `I I Is �*�\�. w , c+ 0 0 0 0 0 0 EOUNIP NAIL IN CORA DOWN- IT., 0.30IN MOINUMEIVT IN CASE CB ,up[ I - A - N17PHv248b7 PIM=1994 nnsfm4-tmaT )II"CMP' N) IT=197 S (P'CONC EJ If=194-62(12'CONC W) ROT=194..3 _.�,E S i P PARCEL PARCEL 723150-0505 723750-0500 TIL- 15- 50 A^ A', S PARCEL. 722140-0767 NEW SEWER LINE SEE DWG S-2 ," O `I I Is �*�\�. w , c+ 0 0 0 0 0 0 o � A r 4 Louis Berger w /05/ 17 520 Pike St, Ste 1005, Seattle, WA 98101 .206.453.1043 GENERAL NOTES 1. SEE GENERAL STORMWATER NOTES ON DWG G2. 2. SEE DWG DETAIL 2 ON SW15 FOR TYPICAL TRENCH CROSS SECTION. 3. CONTRACTOR IS RESPONSIBLE FOR LOCATING AND POTHOLING ALL UTILITIES NOT PREVIOUSLY POTHOLED WITHIN EXCAVATION LIMITS, WHICH SHALL BE INCIDENTAL TO PIPE BID ITEMS. WHERE ADDITIONAL SITE SPECIFIC POTHOLING IS REQUIRED BY THE PLANS OR REQURESTED BY ENGINEER, IT SHALL BE PAID FOR BY "SITE SPECIFIC POTHOLING". 5. SEE DWG SW17 AND SW18 FOR STORM STRUCTURE DATA. 6. SEE DWG G7 FOR UTILITY POTHOLE DATA. CONSTRUCTION NOTES 01 DEPTH OF EXISTING UTILITY UNKNOWN. CONTRACTOR TO POTHOLE PRIOR TO START OF WORK AND PROTECT AND PROVIDE SUPPORT DURING CONSTRUCTION AS NECESSARY. 02 PROTECT AND SUPPORT EXISTING UTILITY CROSSING. (3)CONNECT NEW 12" SD TO EXISTING TYPE 1 CB. CORE DRILL NEW KNOCKOUT. FILL EXISTING VACATED KNOCKOUT WITH NON—SHRINKING GROUT. ® REMOVE AND REPLACE APPROXIMATELY 19 LF OF 8" SO WITH 12" SD. (5)CONNECT NEW CB TO EXISTING 8" CONCRETE PIPE FROM EAST. (6)UTILITIES (GAS AND POWER) TO BE RELOCATED AROUND SDCB34 BY OTHERS. 07 REMOVE AND REPLACE CEMENT CONCRETE CURB AND GUTTER AS NEEDED PER COR STD PLAN 10.1 FOR CB INSTALLATION. REPLACE TO NEAREST JOINT. (S)SPECIAL TYPE 1L CB WITH CIRCULAR RING AND SOLID COVER. SEE DETAIL 5 ON DWG SW15. (9)RESTORE EXISTING SURFACE TRENCH DRAIN IF DISTURBED DURING CONSTRUCTION. 10 PROTECT AND SUPPORT EXISTING GAS LINE DURING CONSTRUCTION. KEY PLAN _* 5 2.5 0 5 10 1"=5' Scale Feet 20 10 0 20 40 1"=20' Scale Feet PROFILE RECOMMENDED FOR APPROVAL BY CEDAR AVE. S STA 12+6.21 TO STA 16+12.43 HORZ SCALE: 1"=20' VERT SCALE: 1"=5' SURVEYED DESIGNED TE wwN. JTE BID SET MSG 05/05/2017 MSG HES oMew N0. REVISION BY DATE APPR p"RCEED MSG ELLEVERTI988 AS NOTED °R`°NTE N�9°983/1991 1 RL CIT OF ML RENTON aN°i oTNE � DATUM SIT N T ONE INCH H Planning/13w1ding/Public Works Dept. JOSEPH FARAH SURFACE WATER UTILITYENGINEER � l�1 DATE RENTON HILL UTILITY REPLACEMENT PROJECT 05/05/2017 STORM SYSTEM IMPROVEMENTS E'"°BOOK DRCYSNG NO PLAN AND PROFILE, CEDAR AVE S, SHEET 1 OF 2 SW 1 2 SHEET: OF 45 89 S W P 3 8 2 4 • IT., I A - IT ITT ITT P z,,r,- o TIL- v " < I o � A r 4 Louis Berger w /05/ 17 520 Pike St, Ste 1005, Seattle, WA 98101 .206.453.1043 GENERAL NOTES 1. SEE GENERAL STORMWATER NOTES ON DWG G2. 2. SEE DWG DETAIL 2 ON SW15 FOR TYPICAL TRENCH CROSS SECTION. 3. CONTRACTOR IS RESPONSIBLE FOR LOCATING AND POTHOLING ALL UTILITIES NOT PREVIOUSLY POTHOLED WITHIN EXCAVATION LIMITS, WHICH SHALL BE INCIDENTAL TO PIPE BID ITEMS. WHERE ADDITIONAL SITE SPECIFIC POTHOLING IS REQUIRED BY THE PLANS OR REQURESTED BY ENGINEER, IT SHALL BE PAID FOR BY "SITE SPECIFIC POTHOLING". 5. SEE DWG SW17 AND SW18 FOR STORM STRUCTURE DATA. 6. SEE DWG G7 FOR UTILITY POTHOLE DATA. CONSTRUCTION NOTES 01 DEPTH OF EXISTING UTILITY UNKNOWN. CONTRACTOR TO POTHOLE PRIOR TO START OF WORK AND PROTECT AND PROVIDE SUPPORT DURING CONSTRUCTION AS NECESSARY. 02 PROTECT AND SUPPORT EXISTING UTILITY CROSSING. (3)CONNECT NEW 12" SD TO EXISTING TYPE 1 CB. CORE DRILL NEW KNOCKOUT. FILL EXISTING VACATED KNOCKOUT WITH NON—SHRINKING GROUT. ® REMOVE AND REPLACE APPROXIMATELY 19 LF OF 8" SO WITH 12" SD. (5)CONNECT NEW CB TO EXISTING 8" CONCRETE PIPE FROM EAST. (6)UTILITIES (GAS AND POWER) TO BE RELOCATED AROUND SDCB34 BY OTHERS. 07 REMOVE AND REPLACE CEMENT CONCRETE CURB AND GUTTER AS NEEDED PER COR STD PLAN 10.1 FOR CB INSTALLATION. REPLACE TO NEAREST JOINT. (S)SPECIAL TYPE 1L CB WITH CIRCULAR RING AND SOLID COVER. SEE DETAIL 5 ON DWG SW15. (9)RESTORE EXISTING SURFACE TRENCH DRAIN IF DISTURBED DURING CONSTRUCTION. 10 PROTECT AND SUPPORT EXISTING GAS LINE DURING CONSTRUCTION. KEY PLAN _* 5 2.5 0 5 10 1"=5' Scale Feet 20 10 0 20 40 1"=20' Scale Feet PROFILE RECOMMENDED FOR APPROVAL BY CEDAR AVE. S STA 12+6.21 TO STA 16+12.43 HORZ SCALE: 1"=20' VERT SCALE: 1"=5' SURVEYED DESIGNED TE wwN. JTE BID SET MSG 05/05/2017 MSG HES oMew N0. REVISION BY DATE APPR p"RCEED MSG ELLEVERTI988 AS NOTED °R`°NTE N�9°983/1991 1 RL CIT OF ML RENTON aN°i oTNE � DATUM SIT N T ONE INCH H Planning/13w1ding/Public Works Dept. JOSEPH FARAH SURFACE WATER UTILITYENGINEER � l�1 DATE RENTON HILL UTILITY REPLACEMENT PROJECT 05/05/2017 STORM SYSTEM IMPROVEMENTS E'"°BOOK DRCYSNG NO PLAN AND PROFILE, CEDAR AVE S, SHEET 1 OF 2 SW 1 2 SHEET: OF 45 89 S W P 3 8 2 4