HomeMy WebLinkAboutCM_SNP2-ConstructionMitigationDescription.pdfSunset Neighborhood Park, Phase 2 - Construction Mitigation Description May 20, 2019 Proposed Construction Dates: Ph. II: July 2019 – May 2020 Hours/Days of Operation: 7:00 a.m. – 4:00 p.m., Monday – Friday Proposed Hauling/Transportation Routes: The primary site access will be from Sunset Boulevard NE to Harrington Ave NE to the park, with site vehicle access directly across Sunset Lane NE from Harrington Ave NE. Vehicles will likely come from either I-405 from the west or Sunset Boulevard NE from the east. Measures to Minimize Dust, Traffic, and Transportation Impacts: WSDOT standard plans and specifications will be followed for all TESC onsite and surrounding streets, including but not limited to construction entrance material, temporary sediment trap, silt fence and inlet protection, weekly inspection of TESC measures, and daily street cleaning as needed. Major deliveries shall be scheduled to not interfere with neighborhood school transit times. Construction Special Hours: No special hours are planned. City of Renton construction hours will be followed. Preliminary Traffic Control Plan: Provided as required at later date.