Loading...
HomeMy WebLinkAboutP_Arch_Elevations _190521_v1.pdf' env GUY WIRE -CONNECT UA 1011 SW Klickitat Way, Suite 208 Seattle, WA 98134 TO ROOF STRUCTURE. P: 206.631.8442 www.oaips.com EXHAUST DISCHARGE DUCT. SEE MECHANICAL DRAWINGS. �r 7' � I DEMO WATER HEATER VENT i 1 ROOF BEYOND A4.0 � I � I � I METAL SIDING 6273 REGISTERED ARCHITECT JER D.OSBORN STATE OF WASHINGTON DEMO HM DOOR AND FRAME. 11 (N) 3'-0" X 7'-0" HM DOOR AND FRAP INFILL OPENING WITH METAL A5.0 SEE DETAILS 3 & 7 ON SHEET A5.0 STUDS AND CEMENT BOARD. CONCRETE BASE I � _ _ _ _ _ _ J CONT. CONC. FOOTING ♦♦W^^ 16 momiV z A5.0 W 0 W Jo 1 EXISTING PARTIAL SOUTH ELEVATION - DEMO 2 NEW PARTIAL SOUTH ELEVATION > 0 Q Scale. 1/4"-1'-0" Scale: 1/4"=1'-0" W J CO z� a 0 P m J cf) Q EDLU 0 = rn Q J 13= w Qom � ~ MLU Z z 0 W0 0 � — LU co GUY WIRE - CONNECT TO ROOF STRUCTURE. EXHAUST DISCHARGE DUCT. SEE MECHANICAL DRAWINGS. �r -� DEMO WATERi 2 ROOF BEYOND HEATER VENT ; A4.0 OVERFLOW SCUPPER � I � I � I L (E) MASONRY 2'-6" X 2'-6" ALUM. WINDOW W/ 1" INSUL. GLAZING. SEE DTLS 4, 8, 1 un I DEMO MASONRY WALL & 12 ON SHEET A5.0 AND HM DOOR AND FRAME MASONRY METAL SIDING X CO CONCRETE BASE CONT. CONC. FOOTING — — — — — Sheet No Title: 16A3mO A5.0 EXISTING PARTIAL EAST ELEVATION 1' - DEMO NEW PARTIAL EAST ELEVATION EXTERIOR 3 Scale: l/4"=-0" Scale: l/4"=1'-0" ELEVATIONS Project #: 2019-116A(1-1) ©copyright 2019 a vi •� o 0 L *k C, U