Franchise Permit: MFP19002271
IVR Number: 19002271
Permit Informaon
Permit Name:Comcast Cable Franchise Permit
Address/Locaon :04/26/2019Application Date:2823059010Parcel Number:17148 116TH AVE SE
Permit Type:05/24/2019Issue Date:Franchise
Permit Work Class:05/23/2020Expiration Date:Minor Utility
Job Number:279166 (strapFranchise Type:Cable
Description:Comcast Tie in Case SP.WAKV.0041/KVO5S.1A.1B; proof from existing riser to existing vault to find continuity;
overlash 96 ct fiber on 20 poles. Tie in at Case SP.WAKV.0477. Restoration per City of Renton standards. Work
associated with permit MFP18006110.
CONDITIONS OF OVERHEAD APPROVAL
1. Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial lines
within the Project Reach must have a minimum vertical clearance of 15’ 6”. 2. Any abandoned or unused lines within
the Project Reach must be removed at the time that construction is taking place. 3. A traffic control plan must be
separately submitted to the City, and no construction may take place until the City has approved a traffic control plan.
4. The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at
Comcast’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the
Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case Comcast shall
participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made
available within the Project Reach that will accommodate the aerial lines. The new aerial lines must be undergrounded
within one year, or approved otherwise by the City of Renton Community and Economic Development Administrator or
designee, from the first event triggering the requirement to underground the aerial lines.
Contacts
Name Address PhoneTypeBilling
Comcast Cable Communication
Management & Comcast Cable Holding
B: (215) 665-1700Applicant
Tom Donnelly
Comcast Business Communications
1701 Jfk Blvd, 32nd Floor
Philadelphia, PA 19103
B: (215) 286-7347
C: (215) 286-7557
Contact
Scott Nall
SEFNCO Communications Inc
2904 4th Ave NE
Puyallup, WA 98372
B: (877) 385-2903
C: (253) 444-9057
Contractor
Business License Number: 41108Construction Contractor: SEFNCCI850QD
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at
425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the
transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with
the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Page 1 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Comcast Cable Communications Management, LLC
279166 (strap)
Cody Shackett
253 235-7406
owen_shackett@comcast.com
17148 116th Ave SE SE52XC173 - Fiber Strap
Tie in Case SP.WAKV.0041/KVO5S.1A.1B; proof from existing
riser to existing vault to find continuity; overlash 96 ct fiber on 20 poles. Tie
in at Case SP.WAKV.0477
SEFNCO Communications, Inc.
SEFNCC1850QD BLO29666
4-26-2019
MFP19002271
Scott Warlick 5/1/2019
Justin Johnson 5/24/2019
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
SE52XC173 - JT#279166(strap)
SEFNCO Communications, Inc.
Stefania Spencer 253 299-8587
4610 Tacoma Ave, Sumner, WA 98390
sspencer@sefnco.com
17148 116th Ave SE
9:00 am to 3:00 pm
TBD
Reset FormPrint Form
Stefania Spencer, Permit Coordinator 4-26-2019
MFP19002271
Justin Johnson
5/24/2019Monday - Friday
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
266'223'116TH AVE SESE 168TH ST
ROADWORKAHEAD
BEPREPARED
TO STOP
BEPREPAREDTO STOP
ROADWORKAHEAD
POLICE
OFFICER
BEPREPAREDTO STOP
ROADWORKAHEAD
RIGHTSHOULDER
CLOSED
ROADWORKAHEAD
UTILITYWORKAHEADBEPREPAREDTO STOPROADWORKAHEADCOMCAST
SCALE: N.T.S.
ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURESWILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROLDEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO
ADOPTED SEPCIALIZED GUIDLINES FOR TRAFFIC CONTROL
WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF AND
ANY SPECIAL CONDITIONS EXIST
52''&25 30 35 45 50 55
155 200 250 360 425 495 570
.10)+67&+0#.$7(('452#%'$
.'0)6*
40
305
60 65 70
780 840 10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
.#0'
9+&6*25 30 35 40 45 50 55 60 65 70
/+0+/7/6#2'4.'0)6*+0(''6.
2156'&52''&.+/+6
/2*
LIMIT
SPEED
25
5+6'52'%+(+%64#((+%%10641.2.#0
14')10.0=241215'&914-70&'4)4170&?
%10641.6;2'
':#/2.'Ä2'&'564+#09+6*52166'45
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC17148 116TH AVE SERENTON, WA279166TCP1 45/24/2018TCP PERMITMNGC5+6'016'5
MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
SIDE WALK TO REMAIN OPEN AND WILL BE MONITORED BY A SPOTTER TO INSURE FLOW AND
SAFETY DURING WORK UNLESS OTHERWISE NOTED.
3.CROSSING WILL BE HANDLED WITH 2 SEPARATE SINGLE LANE CLOSURES.
4.SAME TCP REPEATS THROUGH OUT THE PASS
NOTE:
PEDESTRIAN TRAFFIC WILL BE MONITORED BY
A SPOTTER TO INSURE FLOW AND SAFETY
DURING CONSTRUCTION.
MFP19002271
160'
125
'60'198'SE 168TH ST108TH AVE SESE 168TH ST
ROADWORKAHEAD
BEPREPARED
TO STOP
BE
PREPARED
TO STOP
ROAD
WORKAHEAD
POLICE
OFFICER
BE
PREPARED
TO STOP
ROADWORKAHEAD
WORKVEHICLEPATH OF AERIAL OVERLASH
COMCAST
SCALE: N.T.S.
ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURESWILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROLDEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO
ADOPTED SEPCIALIZED GUIDLINES FOR TRAFFIC CONTROL
WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF AND
ANY SPECIAL CONDITIONS EXIST
52''&25 30 35 45 50 55
155 200 250 360 425 495 570
.10)+67&+0#.$7(('452#%'$
.'0)6*
40
305
60 65 70
780 840 10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
.#0'
9+&6*25 30 35 40 45 50 55 60 65 70
/+0+/7/6#2'4.'0)6*+0(''6.
2156'&52''&.+/+6
/2*
LIMIT
SPEED
25
5+6'52'%+(+%64#((+%%10641.2.#0
14')10.0=241215'&914-70&'4)4170&?
%10641.6;2'
':#/2.'Ä2'&'564+#09+6*52166'45
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC17148 116TH AVE SERENTON, WA279166TCP2 45/24/2018TCP PERMITMNGC5+6'016'5
MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
SIDE WALK TO REMAIN OPEN AND WILL BE MONITORED BY A SPOTTER TO INSURE FLOW AND
SAFETY DURING WORK UNLESS OTHERWISE NOTED.
3.CROSSING WILL BE HANDLED WITH 2 SEPARATE SINGLE LANE CLOSURES.
4.SAME TCP REPEATS THROUGH OUT THE PASS
NOTE:
PEDESTRIAN TRAFFIC WILL BE MONITORED BY
A SPOTTER TO INSURE FLOW AND SAFETY
DURING CONSTRUCTION.
MFP19002271
116'WORKVEHICLEPATH OF AERIAL OVERLASH108TH AVE SERIGHT
SHOULDER
CLOSED
ROAD
WORKAHEAD
UTILITY
WORK
AHEAD
ROAD
WORK
AHEAD
COMCAST
SCALE: N.T.S.
ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURESWILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROLDEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO
ADOPTED SEPCIALIZED GUIDLINES FOR TRAFFIC CONTROL
WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF AND
ANY SPECIAL CONDITIONS EXIST
52''&25 30 35 45 50 55
155 200 250 360 425 495 570
.10)+67&+0#.$7(('452#%'$
.'0)6*
40
305
60 65 70
780 840 10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
.#0'
9+&6*25 30 35 40 45 50 55 60 65 70
/+0+/7/6#2'4.'0)6*+0(''6.
2156'&52''&.+/+6
/2*
LIMIT
SPEED
25
5+6'52'%+(+%64#((+%%10641.2.#0
14')10.0=241215'&914-70&'4)4170&?
%10641.6;2'
':#/2.'Ä2'&'564+#09+6*52166'45
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC17148 116TH AVE SERENTON, WA279166TCP3 45/24/2018TCP PERMITMNGC5+6'016'5
MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
SIDE WALK TO REMAIN OPEN AND WILL BE MONITORED BY A SPOTTER TO INSURE FLOW AND
SAFETY DURING WORK UNLESS OTHERWISE NOTED.
3.CROSSING WILL BE HANDLED WITH 2 SEPARATE SINGLE LANE CLOSURES.
4.SAME TCP REPEATS THROUGH OUT THE PASS
NOTE:
PEDESTRIAN TRAFFIC WILL BE MONITORED BY
A SPOTTER TO INSURE FLOW AND SAFETY
DURING CONSTRUCTION.
MFP19002271
83'140'146'108TH AVE SESE 170TH ST
108TH AVE SEROADWORKAHEAD
BEPREPARED
TO STOP
ROAD
WORKAHEADBEPREPAREDTO STOPROADWORKAHEADBEPREPAREDTO STOPROADWORKAHEADBEPREPAREDTO STOPROADWORKAHEADCOMCAST
SCALE: N.T.S.
ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURESWILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROLDEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO
ADOPTED SEPCIALIZED GUIDLINES FOR TRAFFIC CONTROL
WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF AND
ANY SPECIAL CONDITIONS EXIST
52''&25 30 35 45 50 55
155 200 250 360 425 495 570
.10)+67&+0#.$7(('452#%'$
.'0)6*
40
305
60 65 70
780 840 10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
.#0'
9+&6*25 30 35 40 45 50 55 60 65 70
/+0+/7/6#2'4.'0)6*+0(''6.
2156'&52''&.+/+6
/2*
LIMIT
SPEED
25
5+6'52'%+(+%64#((+%%10641.2.#0
14')10.0=241215'&914-70&'4)4170&?
%10641.6;2'
':#/2.'Ä2'&'564+#09+6*52166'45
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR:BYQCDATEREVISIONBYQC17148 116TH AVE SERENTON, WA279166TCP4 45/24/2018TCP PERMITMNGC5+6'016'5
MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
SIDE WALK TO REMAIN OPEN AND WILL BE MONITORED BY A SPOTTER TO INSURE FLOW AND
SAFETY DURING WORK UNLESS OTHERWISE NOTED.
3.CROSSING WILL BE HANDLED WITH 2 SEPARATE SINGLE LANE CLOSURES.
4.SAME TCP REPEATS THROUGH OUT THE PASS
NOTE:
PEDESTRIAN TRAFFIC WILL BE MONITORED BY
A SPOTTER TO INSURE FLOW AND SAFETY
DURING CONSTRUCTION.
MFP19002271
46'116TH AVE SE46'
116TH AV
E
S
E
BEPREPAREDTO STOPROADWORKAHEAD
BEPREPAREDTO STOPROADWORKAHEAD
139'
UC
228'
228'
10'
266'
SE 170
T
H
P
L
119TH A
V
E
S
E
118TH LN SE
119TH AVE SE
223'216'262'200'260'298'186'210'212'250'160'
125'60'198'
116'144'83'140'146'116TH A
VE
S
E
SE 168TH ST113TH A
VE
S
E
SE 168TH ST
111TH
A
V
E
SE
SE 168TH ST
109TH
A
VE
SE
SE 168TH ST
108TH
AV
E
S
E
SE 168TH ST
108TH
AV
E
S
E
SE 170TH ST
108TH
A
VE
SE
SCOPE OF WORK:
SHEET INDEX:
1 - COVER SHEET
2 - NOTES & LEGEND SHEET
3-12 - DESIGN
CONTACTS:
THIS IS PROPRITORY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED SEFNCO COMMUNICATIONS
PROJECT MAP:
SEFNCO: MATTHEW POWELL
*ALL FOOTAGES AND MATERIALS ARE ESTIMATED
COMCAST
TOTAL FOOTAGE = 3,698'
- TIE IN CASE: SP.WAKV.0041 / KV05S.1A.1B
- PROOF FROM EXISTING RISER TO EXISTING VAULT TO FIND
CONTINUITY
- OVERLASH 96CT FIBER ON 20 POLES
- TIE IN AT CASE: SP.WAKV.0477
=266'
PROJECT DESCRIPTION*
EXISTING U/G
AERIAL OVERLASH =3,423'
SE52XC173
17148 116TH AVE SE. RENTON, WA
JT#279166 - FIBER STRAP
U/G LOCATION
COVER
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR: BYQCDATEREVISION BYQC17148 116TH AVE SERENTON, WA279166PERMIT1 95/24/2018PERMITMN GC
COMCAST
OVERLASH LOCATION
MFP19002271
NOTES & LEGEND
6
R
PROPOSED VAULT
PROPOSED BORE PIT
STREET/SIGNAL/TRAFFIC LIGHT
CONSTRUCTION NOTE
CATCH BASIN
FIRE HYDRANT
EXISTING POLE W/ NEW RISER
BUILDING OUTLINE
TRAFFIC FLOW
LANDSCAPING/TREE
POTHOLE LOCATION
CHANNELIZATION
5+39 STATIONING
(xxx') OPEN TRENCH
PROPOSED DIRECTIONAL DRILL
EXISTING PULL THRU
PROPOSED BORE
PROPOSED OPEN TRENCH
(xxx') EXISTING PULL THRU
(xxx') BORE
(xxx') DIRECTIONAL DRILLRIGHT-OF-WAY
CENTERLINE
TRAFFIC LANE
FENCE
STORM DRAIN
MANHOLE
COMMUNICATIONS
WATER
SEWER
POWER
GAS
GAURD RAIL AERIAL STRAND
FIBER PLACEMENT NOTES:
GENERAL NOTES:
DISCLAIMER:
1. IT IS THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR TO VERIFY ALL RIGHT OF WAY
BEFORE CONSTRUCTION IS TO BEGIN. NO UNDERGROUND INSTALLATION REPRESENTED WITHIN
THESE PLAN SHEETS IS PROPOSED OUTSIDE OF THE RIGHT OF WAY.
2.THE UNDERGROUND ROUTE DEPICTED IS PRELIMINARY AND WILL/MAY VARY ONCE UTILITIES HAVE
BEEN FIELD LOCATED.
3. ANCHORING FOR THE AERIAL CONSTRUCTION IS TYPICALLY DETERMINED DURING CONSTRUCTION
AND IS COLLECTED IN THE AS-BUILT PHASE.
1.CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 48 HOURS PRIOR TO CONSTRUCTION ACTIVITY
SEE LOCAL DIRECTORY FOR CONTACT TELEPHONE NUMBER OF LOCAL CALL BEFORE YOU DIG AGENCY.
2. CONTRACTOR SHALL RECORD SEQUENCE # OF FIBER CABLE AT EVERY WORK POLE, MANHOLE, FIBER STORAGE LOOP
AND TAIL LOCATION. CONTRACTOR TO PROVIDE PROJECT MANAGER WITH SEQUENCE NUMBERS AT PROJECT
COMPLETION.
3. SLACK LOOP AND SNOWSHOE STORAGE LOCATIONS SHALL BE DETERMINED ON CONSTRUCTION DRAWINGS, HOWEVER,
REEL LENGTHS OF FIVE HUNDRED FEET (500') OR LESS ON LARGE COUNT FIBER OR THREE HUNDRED FEET (300') OR LESS
ON SMALL COUNT FIBER ARE DIFFICULT TO USE AND SHOULD BE PLACED AS FSL'S, NOT CUT AND RETURNED.
4. FIBER OPTIC IDENTIFICATION TAGS SHALL BE PLACED AT EVERY WORK POLE, MANHOLE, FIBER, STORAGE LOOPS, SPLICE
CASES AND WHERE INDICATED BY PROJECT MANAGER. TAGS NEED TO BE PLACED SO AS TO BE READ FROM THE GROUND.
5. CABLE LUBRICATION SHALL BE USED TO REDUCE PULLING TENSION. LUBRICANTS MUST NOT CONTAIN ANY PETROLEUM
PRODUCTS.
6. A 100 FOOT FIBER COIL MUST REMAIN IN ALL VAULTS UNLESS OTHERWISE NOTED.
7. ALL BURIED INFRASTRUCTURE MUST BE ACCOMPANIED WITH WARNING TAPE AND A TRACER WIRE, AT RISER POLES THE
LOCATE WIRE SHALL BE ACCESSIBLE AT THE BASE OF THE RISER.
8. ALL RISERS WILL BE CAPPED AT ALL TIMES.
9. ALL FIBER SHALL BE MARKED AS TO DIRECTION IN EACH VAULT. RED-NORTH, GREEN-SOUTH,YELLOW-EAST, AND
BLUE-WEST. DO NOT TAPE FIBER CABLES TOGETHER IN RISER.
1. ALL VAULTS / HANDHOLES TO BE EQUIPPED WITH SECURITY LIDS WITH LOCKING BOLTS.
2. GROUND RESTORATION/RIGHT-OF-WAY SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION.
3. ALL 90 DEGREE BENDS IN CONDUIT CONSTRUCTION WILL BE A MINIMUM OF 36" RADIUS UNLESS
SPECIFIED OTHERWISE.
4. BURIED FIBER OPTIC WARNING SIGNS SHALL BE PLACED AT EACH SIDE OF ALL ROAD CROSSINGS,
AT CULVERTS, DITCHES AND IN A STRAIGHT LINE OF SIGHT SPACING OF APPROXIMATELY 500 FEET.
5. DEVIATIONS FROM THE ENGINEERED ROUTE REQUIRES A PROJECT MANAGER AND RIGHT-OF-WAY
OWNER OR CARETAKER APPROVAL PRIOR TO CONSTRUCTION.
6. WHERE PERMITS FROM STATE, COUNTY, CITY, RAILROAD OR GOVERNMENT AGENCIES ARE
REQUIRED, ALL WORK PERFORMED WILL COMPLY WITH THESE AGENCIES STANDARD
SPECIFICATIONS.
7. THE PROJECT MANAGER WILL NOTIFY BUILDING MANAGEMENT WHEN WORK WILL BEGIN ON
BUILDING. CONTRACTOR TO COORDINATE ROOM ACCESS AND WORK START AND STOP TIMES
WITH BUILDING MANAGEMENT.
8. THE PROJECT MANAGER IS TO BE NOTIFIED BY THE CONTRACTOR 24 HOURS PRIOR TO
CONSTRUCTION. SEE COMPANY CONTACT LIST FOR CONTACT NAME(s) AND TELEPHONE NUMBER(s).
9. THE PROJECT MANAGER WILL RESERVE THE RIGHT TO INSPECT AT ANY TIME THE WORK BEING
PERFORMED BY THE CONTRACTOR. IF PROJECT MANAGER DETERMINES THAT THE WORK IS NOT
BEING PERFORMED TO MINIMUM QUALITY STANDARDS, THEN THE CONTRACTOR SHALL PROVIDE
REWORK AT HIS OWN COST.
10. ANY CHANGE IN PROJECT SCOPE, INCLUDING BUT NOT LIMITED TO, CONDUIT LENGTH, CONDUIT
PATH, AERIAL PATH ETC., MUST BE APPROVED BY THE PROJECT MANAGER.
11. ALL CORING/CONSTRUCTION THAT WILL CAUSE NOISE AND/OR VIBRATION SHALL BE DONE WITHIN
ALLOWED (9AM-3PM) BUSINESS HOURS.
12. ANY AND ALL UNDERGROUND UTILITIES ENCOUNTERED ARE THE RESPONSIBILITY OF THE
CONTRACTOR TO LOCATE, PROTECT, AND REPAIR, IF DAMAGED.
13. ALL FOOTAGES ARE BASED ON FIELD GATHERED MEASUREMENTS, AS SUCH SOME VARIANCE
SHOULD BE ANTICIPATED. ADJUST AS NEEDED.
14. ALL BURIED CONDUIT/CABLE WILL BE PLACED AT 36" MINIMUM COVER. SITE HAS POTENTIAL FOR
ROCK THAT WOULD PREVENT THE ABILITY TO PROVIDE THE MINIMUM COVER. IN CASES WHERE THE
MINIMUM COVER CAN NOT BE ACHIEVED, THE CONDUIT SHALL BE PLACED IN A SCH 40 EMT SLEEVE
OR APPROVED EQUIVALENT.
15. WATER, SEWER, STORM SEWER AND EASEMENT LOCATIONS ARE BASED OFF OF CITY MAPS,
NOT FIELD VERIFIED.
16. BORING OF AC PAVING IS REQUIRED AT ALL LOCATIONS AS INDICATED ON PLANS.
17. AT NO TIME SHALL CURBS, GUTTERS OR HANDICAP BE DISTURBED.
18.DOOR HANGERS ARE TO BE PLACED A MINIMUM OF 72 HOURS PRIOR TO START OF CONSTRUCTION.
19. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL PLACE MESSAGE BOARDS STATING LANE
CLOSURES, AND DELAYS A WEEK IN ADVANCE. LOCATION OF THE MASSAGE BOARD SHALL BE
COORDINATED WITH THE CITY INSPECTOR AT THE PRE-CONSTRUCTION MEETING.
20. LANE CLOSURES CANNOT EXCEED MORE THAN 300 FT. AT A TIME. FOR SAFETY PURPOSES THERE
SHALL BE ONLY ONE CLOSURE AT A TIME ALONG INTERNATIONAL BLVD. MORE FLAGGERS WILL BE
NECESSARY TO HELP VEHICLES AND PEDESTRIANS IN THE WORK ZONES DURING THE LANE
CLOSURES.
LEGEND:
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEISSUE FOR: BYQCDATEREVISION BYQC17148 116TH AVE SERENTON, WA279166PERMIT2 95/24/2018PERMITMN GC
COMCAST
MFP19002271
266'223'116TH AVE SESE 168TH ST
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONSDATEISSUE FOR: BYQCDATEREVISION BYQC17148 116TH AVE SERENTON, WA279166PERMIT3 OF 95/24/2018PERMITMN GC
COMCAST
FIBER TIE IN FOR STRAP
RECOMEND PROOFING. PATH
DOES NOT APPEAR TO CONNECT.
OVERLASH 96 CT FIBER
MFP19002271
262'200'113TH AVE SESE 168TH ST
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONSDATEISSUE FOR: BYQCDATEREVISION BYQC17148 116TH AVE SERENTON, WA279166PERMIT4 OF 95/24/2018PERMITMN GC
COMCAST
OVERLASH 96 CT FIBER
MFP19002271
298'186'111TH AVE SE"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONSDATEISSUE FOR: BYQCDATEREVISION BYQC17148 116TH AVE SERENTON, WA279166PERMIT5 OF 95/24/2018PERMITMN GC
COMCAST
OVERLASH 96 CT FIBER
MFP19002271
210'212'
SE 168TH ST
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONSDATEISSUE FOR: BYQCDATEREVISION BYQC17148 116TH AVE SERENTON, WA279166PERMIT6 OF 95/24/2018PERMITMN GC
COMCAST
OVERLASH 96 CT FIBER
MFP19002271
250'160'
125'60'198'116'SE 168TH ST
SE 168TH ST
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONSDATEISSUE FOR: BYQCDATEREVISION BYQC17148 116TH AVE SERENTON, WA279166PERMIT7 OF 95/24/2018PERMITMN GC
COMCAST
OVERLASH 96 CT FIBER
MFP19002271
144'83'140'108TH AVE SESE 170TH ST
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONSDATEISSUE FOR: BYQCDATEREVISION BYQC17148 116TH AVE SERENTON, WA279166PERMIT8 OF 95/24/2018PERMITMN GC
COMCAST
OVERLASH 96 CT FIBER
MFP19002271
146'108TH AVE SE"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONSDATEISSUE FOR: BYQCDATEREVISION BYQC17148 116TH AVE SERENTON, WA279166PERMIT9 OF 95/24/2018PERMITMN GC
COMCAST
OVERLASH 96 CT FIBER
END OF DESIGN
MFP19002271
SEFNCO COMMUNICATIONS
4610 TACOMA AVE
SUMNER WA, 98390
April 26, 2019
City of Renton
1055 South Grady Way
Renton, WA 98057
RE: Aerial Variance Request for JT#279166
To whom it may concern,
SEFNCO Communications has been contracted to design and engineer this project on behalf of Comcast
Cablevision. Comcast is applying for a variance request in order to upgrade their existing facilities.
Comcast proposes to overlash 96 ct fiber on 20 poles ~3423’ and proof and pull ~266’ through existing
riser to existing vault along SE 168th St and ending at 108th Ave SE and SE 170th St.
Comcast is requesting that the City of Renton approve this variance request based on the fact that the
requirements for undergrounding this proposed over-lash will not cause substantial adverse impacts to
other person or entities in the immediate area and will cause undue hardship.
1. Installation of undergrounding facilities will increase the total cost of construction roughly
15-25 times the amount of an aerial over-lash on the existing Comcast strand.
2. Potential damage to underground facilities will be increased.
3. Over-lash will not cause substantial adverse impact to other persons or entities in the
immediate area. Over-lashing the cable will be accomplished in a few days, and the
residents will not notice any impact. Comcast will clean up the over-lashed spans as
necessary and identify and remove any existing dead cables along this route.
4. The variance is necessary to prevent and undue hardship due to the increased construction
costs if forced to install the proposed extension underground.
5. The granting of the variance will not be materially detrimental to the public welfare because
Comcast does agree to underground the cable system, but they are waiving the obligation
into the future when all other utilities are underground to prevent an undue hardship
against Comcast currently.
Upon the granting of the Variance, Comcast will coordinate construction and traffic control as per your
requirements. Comcast and their contractors want to cooperate at the highest level and agree to
adhere to all provisions and requirements set forth by the City of Renton to insure safe installation and
maintenance of the proposed facilities.
MFP19002271
If you have any further questions regarding this project please contact Matthew Powell at 253 299-4973.
Thank you for your consideration in this matter.
Stefania Spencer
Permit Coordinator
SEFNCO Communications, Inc.
o 253 299-8587 | e sspencer@sefnco.com
Attachments:
1. Application for ROW permit
2. 11” x 17” Site plan
3. 11” x 17” Design plan
4. Traffic Control Plan
May 24, 2019
Cody Shackett
Comcast Cable Communications, LLC
410 Valley Ave NW
Puyallup, WA 98371
Via Email: owen_shackett@comcast.com
SUBJECT: Request for Undergrounding Exemption (JT#279166, MFP19002271, 17148 116th Ave SE)
Dear Mr. Shackett:
The City of Renton has reviewed your request to grant Comcast an exemption from Renton Municipal
Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be required
to be installed underground, pursuant to the standards of the section of RMC.
Comcast proposes to have SEFNCO Communications overlash approximately 2,763 lineal feet of new 96-
count aerial fiber to existing Puget Sound Energy (PSE) poles beginning at the existing pole on the
southeast corner of SE 168th Street and 116th Avenue SE, then extend west to the west side of 108th Avenue
SE, south along the west side of 108th Avenue SE, and will end at the north property line of 17023 108th
Avenue SE.
ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090(D)(1)(i) ii. Ordinance
5720 grants Comcast, the right to install fiber optic cable and related appurtenances under, along, over,
below, through and across the streets, avenues and alleys of City of Renton within the right-of-way of
Renton. Section 3.4 of the franchise ordinance states that if all of the distribution lines all the wireline
service providers, such as telecommunications service providers, as defined in RCW 35.99.010, a utility
service provider or a Cable Operator (collectively “Service Providers”) in any portion of the Franchise Area
are underground, Grantee shall place its Cable System’s distribution cables underground within that area;
provided that such underground locations are actually capable of accommodating Grantee’s cable and
other equipment without technical degradation of the Cable Systems’ signal quality.
The proposal would utilize existing poles with other attached franchisee communication facilities and
overlash to the existing Comcast aerial path. As minimum vertical height clearance of 15’-6” would need
to be provided for, any existing obsolete cable will need to be removed; staff recommends these as
conditions of approval. Therefore, the City is granting an exemption with conditions, per the Comcast
franchise agreement which allows new overhead facilities to be placed overhead provided at there are
other similar providers overhead as well.
Comcast Job JT#279166
Page 2 of 2
May 24, 2019
DECISION: The requested exemption from underground utility installation requirements (RMC4-6-090 (C)
as requested by the applicant is approved with conditions subject to the conditions below as the request
complies with exemption criteria of RMC 4-6-090(D)(1)(i) ii, and the Comcast Franchise Agreement.
Conditions of Approval:
1. Any existing height violations within the Project Reach must be resolved at the time of
construction. New aerial lines within the Project Reach must have a minimum vertical
clearance of 15’-6”.
2. Any abandoned or unused lines within the Project Reach must be removed at the time that
construction is taking place.
3. A traffic control plan must be separately submitted to the City, and no construction may take
place until the City has approved a traffic control plan.
4. The new aerial fiber lines within the Project Reach must be converted to underground
facilities in the future, at Comcast’s cost, when any one of the following events occurs: (1) any
other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed
by a franchisee within the Project Reach, in which case Comcast shall participate in the joint
use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is
made available within the Project Reach that will accommodate the aerial lines. The new
aerial lines must be undergrounded within one year, or approved otherwise by the City of
Renton Community and Economic Development Administrator or designee, from the first
event triggering the requirement to underground the aerial lines.
This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period
from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed
with the City Clerk, along with the required appeal fee, by 5:00 pm, June 7, 2019.
Sincerely,
Brianne Bannwarth, PE
Development Engineering Manager
cc: C.E. “Chip” Vincent, CED Administrator
Gregg Zimmerman, PW Administrator
Jennifer Henning, Planning Director
Justin Johnson, Civil Engineer III
Scott Warlick, Engineering Specialist II
Holly Powers, Permit Technician
Pat Miller, Construction Inspection Supervisor
Franchise Permits
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Conditions for Permit MFP19002271
Engineering
1 Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial
lines within the Project Reach must have a minimum vertical clearance of 15’-6”.
2 A traffic control plan must be separately submitted to the City, and no construction may take place until the City
has approved a traffic control plan.
3 The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at
Comcast’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the
Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case
Comcast shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or
(3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial
lines must be undergrounded within one year, or approved otherwise by the City of Renton Community and
Economic Development Administrator or designee, from the first event triggering the requirement to underground
the aerial lines.
4 Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking
place.
Page 1 of 1
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP19002271
(Date)(Signature)
Page 2 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES