WASHINGTON
BOULEVARD IMPROVEMENTS
Legal Description
LAKE WASHINGTON BOULEVARD. SEE BOUNDARY & TOPOGRAPHIC SURVEY
C3-003 AND C3-004
CONDITIONS OF APPROVAL FOR LAND USE
H. DECISION:
THE PROPOSED SITE PLAN MINOR MODIFICATION, FILE NO. LUA00-156, MOD IS
APPROVED. THE PROPOSAL IS SUBJECT TO THE FOLLOWING CONDITIONS:
1. THE APPLICANT SHALL COMPLY WITH ALL MITIGATION MEASURES ISSUED AS
PART OF THE SFEIS, DATED SEPTEMBER 17, 1999 (EXHIBIT 17).
2. THE APPLICANT SHALL DEMONSTRATE COMPLIANCE WITH ALL CONDITIONS OF
APPROVAL ISSUED AS PART OF THE SOUTHPORT OFFICE LEVEL I SITE PLAN,
DATED FEBRUARY 5, 2001 (EXHIBIT 9).
3. THE APPLICANT SHALL BE REQUIRED TO PROVIDE A CONTINUAL PEDESTRIAN
CONNECTION, ALONG THE SOUTHERN FAQADE OF THE PARKING GARAGE.
ADDITIONALLY, ALL DESIGNATED PEDESTRIAN AREA SHALL BE
DIFFERENTIATED, IN MATERIAL, FROM DRIVE AISLES. A REVISED SITE PLAN
SHALL BE SUBMITTED TO, AND APPROVED BY, THE CURRENT PLANNING
PROJECT MANAGER PRIOR TO CONSTRUCTION PERMIT APPROVAL.
4. THE APPLICANT SHALL RECORD A PUBLIC RECREATION EASEMENT PRIOR TO
ISSUANCE OF THE BUILDING PERMIT APPROVAL. SUCH EASEMENT SHALL
CONNECT TO THE EXISTING PEDESTRIAN EASEMENTS (IDENTIFIED ABOVE)
FOR A FUTURE CONTINUOUS TRAIL CONNECTION FROM GENE COULON PARK
TO THE CEDAR RIVER TRAIL. SUCH EASEMENT SHALL BE SUBJECT TO
SEVERAL CONDITIONS PRECEDENT SUCH THAT THE EASEMENT RIGHTS
GRANTED THEREIN SHALL ONLY BECOME EFFECTIVE IF AND WHEN THE CITY
COMPLETES (DEFINED AS HAVING SECURED ALL NECESSARY PROPERTY
TIGHTS, PERMITS, AND FINANCING TO COMPLETE CONSTRUCTION) THE TRAIL
CONNECTION ON THE PROPERTY TO THE WEST (CURRENTLY OWNED BY
BOEING AND DNR AS SHOWN IN EXHIBIT 21). FURTHER, THE CITY WILL MAKE
CONTINUOUS, DILIGENT EFFORTS TO OBTAIN A SUBSTITUTE OVERLAND
EASEMENT FROM THE ADJOINING PROPERTY TO THE WEST (CURRENTLY
OWNED BY BOEING), AND THE EASEMENT REQUIRED IN THIS CONDITION
SHALL EXPIRE AS SOON AS THE CITY IS ABLE TO OBTAIN A SUBSTITUTE
OVERLAND EASEMENT OVER THE ADJOINING PROPERTY TO THE WEST. THE
FINAL TERMS OF THE SUBJECT EASEMENT SHALL BE SUBJECT TO REVIEW
AND APPROVAL BY THE CITY ATTORNEY.
5. THE APPLICANT SHALL SUBMIT A REVISED AND DETAILED LANDSCAPE PLAN
COMPLYING WITH THE FOLLOWING: A MIXTURE OF TREES, SHRUBS, AND
GROUNDCOVER TO SATISFACTION OF THE CURRENT PLANNING PROJECT
MANAGER. THE DETAILED LANDSCAPE PLAN, SHALL BE SUBMITTED TO, AND
APPROVED BY, THE CURRENT PLANNING PROJECT MANAGER PRIOR TO
CONSTRUCTION PERMIT ISSUANCE.
6. THE APPLICANT SHALL PROVIDE A MATERIAL/COLORS BOARD TO THE
CURRENT PLANNING PROJECT MANAGER PRIOR TO THE PRIMARY BUILDING
PERMIT APPROVAL. THE MATERIALS BOARD SHALL DEMONSTRATE
COMPATIBILITY WITH THE BRISTOL APARTMENTS AND HOTEL.
7. THE APPLICANT SHALL BE REQUIRED TO CONSTRUCT IMPROVEMENTS WHICH
INCLUDE THE WIDENING OF LAKE WASHINGTON BLVD NE, SOUTH OF HOUSER
(TO PROVIDE A 4-LANE SECTION), AND WIDEN THE EXISTING ON -SITE BRIDGE
OVER JOHN'S CREEK TO PROVIDE A NEW 4-LANE BRIDGE. THE APPLICANT
SHALL CONSTRUCT THE IMPROVEMENTS PRIOR TO TEMPORARY OCCUPANCY
FOR THE THIRD AND FINAL OFFICE BUILDING.
CONSTRUCTION RECORD DRAWING
This construction record drawing is a copy of a cad file prepared by
COUGHLIN PORTER LUNDEEN and has been edited to reflect field
verified invert and rim elevations of the storm, sanitary sewer and water
main systems. Field verified invert and rim elevations were obtained by
KLB IN AUGUST 2019
The on -site private storm drainage facilities and public/private water and
sewer systems were installed in accordance with the approved plans and
the documented field revisions and function as intended.
COUGHLIN
PORTER
LUNDEEN
1083 LAKE WASHINGTON BLVD N
RENTON, WASHINGTON
PHASE III FOR SOUTHPORT DEVELOPMENT
RECORD DRAWINGS - 09/03/2019
Horizontal Datum
NAD 83/91
Vertical Datum
NAVD 88 - CITY OF RENTON DATUM
Basic of Bearings
CITY OF RENTON DATUM LOT LINE ADJUSTMENT NO. LUA-98-176-LLA
Benchmark
CITY OF RENTON BENCHMARK NO. 2118 - 3-1/2" BRASS DISC
STAMPED'CITY OF RENTON BM" IN THE SOUTHEAST CORNER OF CONCRETE
BASE OF SOUTHERLY LEG OF POWER TOWER.
ELEV=16.75 FT
Utilitv Providers:
SANITARY SEWERS, STORM DRAINAGE, WATER CITY OF RENTON
DEVELOPMENT SERVICES
1055 SOUTH GRADY WAY
RENTON, WA 98055
(425) 430-7200
POWER AND NATURAL GAS PUGET SOUND ENERGY
MUNICIPAL LAND PLANNING
815 MERCER STREET
SEATTLE, WA 98109
1-800-CALLPSE
(206)224-2120
TELEPHONE U.S. WEST
LDA GROUP
PO BOX 625001
LITTLETON, CO 80162
Site Information
TOTAL SITE AREA = N/A
TOTAL WORK AREA = 0.53 AC
TOTAL NET NEW IMPERVIOUS AREA ADDED BY THE PROJECT=7,800
SQFT (0.18 ACRES).
PROFESSIONAL SEAL ONLY APPLIES TO
TECHNICAL CONTENT ON SHEETS C3-000.
REFER TO REMAINING PLAN SHEETS IN SET
FOR INDIVIDUAL TECHNICAL SEALS AND
SIGNATURES BY RESPECTIVE DISCIPLINES
Call before you
Djg.8-1-1
or1-800-424-5555
UNDERGROUND
SERVICE (USA)
Vicinity Map
NOT TO SCALE a ■ L �\ r
LMF ASH/NGlO1V
Owner
SECO DEVELOPMENT
1083 LAKE WASHINGTON BLVD N, SUITE 50
RENTON, WA 98056
(425) 282-5833 CONTACT: DEREK JANKE
Civil Engineer
COUGHLIN PORTER LUNDEEN
801 SECOND AVENUE, SUITE 900
SEATTLE, WA 98104
(206) 343-0460 CONTACT: TIM BROCKWAY, PE
Structural Engineer
SHEARER DESIGN
3613 PHINNEY AVE N #B
SEATTLE, WA 98103
(206) 781-7830 CONTACT: BRIEN LINDSTROM, PE
Transportation Engineer
TENW
11400 SE 8TH ST, SUITE 200
BELLEVUE, WA 98004
(425) 250-5002 CONTACT: CHRIS BICKET, PE
GeoTechnical Engineer
GEO ENGINEERS
1101 FAWCETT AVE, SUITE 200
TACOMA, WA 98402
(253) 722-2414 CONTACT: DAVID CONLIN
S u rvevo r
BUSH, ROED AND HITCHINGS, INC
2009 MINOR AVENUE E
SEATTLE, WA 98102
(206) 323-4144 CONTACT: TAYLOR R. SHULTE, PLS
Sheet Index
R-400501
03-000
CIVIL COVER SHEET
SHEET 1 OF 29
R-400502
C3-001
GENERAL NOTES
SHEET 2 OF 29
R-400503
03-002
OVERALL HORIZONTAL CONTROL PLAN
SHEET 3 OF 29
R-400504
C3-003
BOUNDARY & TOPOGRAPHIC SURVEY
SHEET 4 OF 29
R-400505
C3-004
BOUNDARY & TOPOGRAPHIC SURVEY
SHEET 5 OF 29
R-400506
C3-101
DEMOLITION & T.E.S.C. PLAN
SHEET 6 OF 29
R-400507
C3-110
T.E.S.C. DETAILS
SHEET 7 OF 29
R-400508
C3-201
ROADWAY PLAN & PROFILE
SHEET 8 OF 29
R-400509
C3-210
GRADING DETAIL PLAN
SHEET 9 OF 29
R-400510
C3-211
PAVING AND STORM DRAINAGE DETAILS
SHEET 10 OF 29
R-400511
C3-212
PAVING AND STORM DRAINAGE DETAILS
SHEET 11 OF 29
R-400512
C3-220
ROADWAY SECTIONS
SHEET 12 OF 29
R-400513
L1101
TREE RETENTION PLAN
SHEET 13 OF 29
R-400514
L1102
LANDSCAPE PLAN
SHEET 14 OF 29
R-400515
S201
CHANNEL LAYOUT
SHEET 15 OF 29
R-400516
S202
LWB WALL DETAILS
SHEET 16 OF 29
R-400517
S203
LWB WALL LAYOUT
SHEET 17 OF 29
R-400518
S204
BRIDGE RAILING TYPE BP I
SHEET 18 OF 29
R-400519
S205
BRIDGE RAILING TYPE BP II
SHEET 19 OF 29
R-400520
PM-01
PAVEMENT MARKING PLANS
SHEET 20 OF 29
R-400521
PM-02
PAVEMENT MARKING PLANS
SHEET 21 OF 29
R-400522
PM-03
PAVEMENT MARKING DETAILS
SHEET 22 OF 29
R-400523
PM-04
PAVEMENT MARKING DETAILS
SHEET 23 OF 29
R-400524
TS-01
TRAFFIC SIGNAL PLAN
SHEET 24 OF 29
R-400525
TS-02
TRAFFIC SIGNAL PLAN
SHEET 25 OF 29
R-400526
TS-03
TRAFFIC SIGNAL WIRE DIAGRAM
SHEET 26 OF 29
R-400527
TS-04
TRAFFIC SIGNAL POLE SCHEDULE
SHEET 27 OF 29
R-400528
TS-05
TRAFFIC SIGNAL DETAILS
SHEET 28 OF 29
R-400529
TS-06
TRAFFIC SIGNAL DETAILS
SHEET 29 OF 29
R-400501
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
RECORD DRAWINGS
/03/201
SURVEYED:
SCALE:
VERTICAL: NAVD 83/1
HORIZONTAL: NAD 1983/1991
DATU M
` CITY OF
0 RENTON
Planning/Building/Public Works Dept.
LAKE WA BLVD IMPROVEMENTS
PHASE III FOR SOUTHPORT DEVELOPMENT
CIVIL COVER SHEET
UAIt:
09-03-2019
DESIGNEDALC
FIELDBOOK:
PAGE:
DRAWN:
LBJ
ONE INCH
DRAWING NO:
C3-000
CHECKED;
TBB
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
N 0.
REVISION
BY
DATE
AP P R
APPROVED:
SHEET: 1 OF: 29
00
C3)
C'7
O
O
T
Al
LJ
N
00
O
O
O
T
Z
LLJ
2
0-
0
LLJ
>
LLJ
O
0-
0
0
Ir
O
LL
LLJ
U)
Q
Z
LLJ
2
Lu
>
O
rr
Q
>
Lu
J
D
O
m
Z
O
Z
(n
Q
W
J